OPERATION
SUKIT RIVER
PRE-OP SITE PREPARATION
SUKIT RIVER
PRE-OP SITE PREPARATION
PHASE 1
• Manpower
• Purchasing of Materials
• Site Construction
• Studies
• Land and Marine Base Mobilization
PHASE 2
• Construction of Platform
• Dredging of Approach Channel
• Backfilling of Temporary River Mouth
• Opening of the New River Mouth
• Construction of Access Road
• Construction of Holding Area
PURCHASING OF MATERIALS
Eco-link: Oscar:
• Gabion Box • Boulders, head size
• Roll Geotextile • Base coarse
• Bamboo /Aggregates(access road,
• Timber cause way, pathway)
• Plywood (signage)
• Rolls of tire wire
SITE CONSTRUCTION
SUKIT FENCING
SAND FENCING
Materials to be use for constructing
Sukit River fence.
• 50 Bamboo (Foundation)
• Bamboo (Buho)
• 6 Roll of Nylon
• 1 kg Nail
SAND FENCING
Length: 100 m
CANTEEN FLOOR PLAN
COMFORT ROOM FLOOR PLAN
INSTALLATION OF MARKERS
MARINE
o Cutter Dredger
-Simultaneously done while
backfilling the existing river mouth
-6 m depth
-100 m wide opening
-Reinforce sides with Gabion
Boxes
3 layers
OPENING OF NEW RIVER MOUTH
Land Based Extraction
Volume to be Extracted:
Vol. = 100 x 50 x 2
Vol. = 10, 000 cubic meters
Vol. = 15, 500 Mt
No. of Days to extract
Working Hours:10 hrs
Extraction Rate of backhoe: 202. 50 MT/hr
15,500 𝑀𝑇 1 𝑑𝑎𝑦
No. of Days= 𝑀𝑇 x
202.50 10 ℎ𝑟
ℎ𝑟
No. of Days= 7.65 days
Note:
• Maintenance, repair and Downtime are not considered in
the working hours.
Marine Based Extraction
Use cutter dredger to extract the remaining 4 meters depth.
Volume to be Extracted:
Vol. = 50 x 50 x 4
Vol. = 10, 000 cubic meters
Vol. = 15, 500 Mt
No. of Days to extract
Working Hours:10 hrs
Extraction rate of cutter: 500 MT/hr
15,500 𝑀𝑇 1 𝑑𝑎𝑦
No. of Days= 𝑀𝑇 x
500 10 ℎ𝑟
ℎ𝑟
No. of Days= 3.1 days
Note:
Maintenance, repair and Downtime are not considered in the
working hours.
ENTRY TO NEW RIVER MOUTH
Dimensions:
100 m x 100 m x 6 m
Volume: 93,000 MT
Dredged
material will
be stockpiled
here
Northward
1 Southward
200 x 100
200 x 100
3
2
Dimensions:
100 m x 100 m x 6 m
Volume: 93,000 MT
Volume to be dredged:
Vol.= 100 x 100 x 6
Vol. =60, 000 cubic meters
Vol. =93, 000 Metric Tons
Stockpile from
the cutter
dredger
Volume of River Mouth that needs to be
backfilled:
Vol1 = Area x Depth
Vol1 = 9,637 x 2
Vol1 = 19, 274 cubic meters m2
Vol1 = 29, 874.7 Metric Tons
Gabion Boxes:
3 layers
30 pcs total
Isometric drawing
Excavation of the area
Laying of Geotextile
Laying of Gabion Boxes
Overall view of the laid Geotextile & Gabion Boxes
End result of the Platform Area
Volume inside the gabion box and sheet pile that need to be
backfilled:
Vol2 = 10 x 20 x 3
Vol2 = 600 cubic meters
Vol2 = 930 Metric Tons
Holding Area for RS
Note: once the river mouth is passable the pay loader will
immediately go to the new river mouth.
Steps:
• While the backhoe is opening the new river mouth, the pay
loader will scrape the designated holding area for RS to
remove the vegetation.
• Flatten the area.
HOLDING AREA FOR CS
Area to be
backfilled
HA CS
Computation:
Volume to be backfilled:
Area: 4, 503 m2
% of Compaction: 15%
Volume= 4, 503 x 2.5 x (1+0.15)
Volume= 12, 946.13m3
Volume=20, 066. 49 MT
FULL LOADING
PARTIAL LOADING
SHARE LOADING
OPERATOR: ________________________________________
________________________
Signature
________________________ ________________________
SURVEYOR ECOLINK REPRESENTATIVE
____________________________ ________________________
OSCAR'S TEAM ALEX' TEAM
FINAL LOADING
________________________ ________________________
SURVEYOR ECOLINK REPRESENTATIVE
____________________________ ________________________
OSCAR'S TEAM ALEX' TEAM
SHARE LOADING
______________________________ ________________________
Signature Signature
THE END