Professional Documents
Culture Documents
Landscape Standard Drawings: March 2019
Landscape Standard Drawings: March 2019
March 2019
REVISION HISTORY
DRAWING NO OF
CATEGORY NUMBER DESCRIPTION SHEETS
PLANTING
LSD-PLA-01 TREE PIT WITH TREE GUARD (IN TURF VERGE) 1
SECTION A SECTION B
D2 Scale 1:50 (typical long section) D3 Scale: 1:50 (typical cross section)
City Council
1 1 LSD-PLA-03 7
PLAN
D1 Typical plan 1:75
SECTION A
D2 Typical section 1:50
SECTION B
D3 Typical section 1:50
City Council
1 1 LSD-PLA-04 5
Tree in Parks & Reserves - Mass Planting (45L+)
D1 Typical section 1:50
City Council
1 1 LSD-PLA-05 3
PLAN
D1 Typical layout 1:50
SECTION B
SECTION A D3 Typical section 1:50
D2 Typical Long section 1:50
City Council
1 1 LSD-PLA-07 2
Section A
ze D2 Typical cross section 1:25
si
py
no
ca
e
t ur
Ma
City Council
1 1 LSD-PLA-08 2
Multiple trees in linked pit Single tree in pit
D1 D2 plan view 1:200
plan view 1:200
City Council
1 1 LSD-PLA-09 2
Central planting trench with structural cells
D1 Typical layout 1:100
City Council
1 2 LSD-PLA-10 2
Section A - Long section
D2 Scale 1:50
Cross Section C
Cross Section B D4
D3 Scale 1:50
Scale 1:50
City Council
2 2 LSD-PLA-10 2
Mass Planting
D1 Typical section 1:20
City Council
1 1 LSD-PLA-21 2
Typical Turf Planting
D1 Scale 1:10
City Council
1 2 LSD-PLA-22 2
Typical Isolation Joint
2 Section A scale 1:20
City Council
1 1 LSD-PAV-01 2
ISOLATION JOINT
1 Section A Scale 1:20
CONTROL JOINT
2 Section B Scale 1:20
City Council
1 1 LSD-PAV-02 2
EXPANSION JOINT
2 Section A Scale 1:20
CONTROL JOINT
3 Section B Scale 1:20
City Council
1 1 LSD-PAV-03 2
Utility Lid in pavement
D1 (town centres) typical layout scale 1:20
City Council
1 1 LSD-PAV-04 2
PLAN
City Council
1 1 LSD-BIN-01 2
BICYCLE PARKING LAYOUT ON A FOOTPATH
2 1:100
City Council
1 1 LSD-BKR-01 2
Typical Wheel Stops layout Section
D1 Typical plan scale 1:50
D2 scale 1:20
City Council
1 1 LSD-CPR-01 2
Straight Timber Edging Joint
D2 Typical plan scale 1:10
City Council
1 1 LSD-EDG-01 2
NOTES: FOR INFORMATION ONLY
NOT FOR CONSTRUCTION
· All timber to be supplied DAR and seasoned.
· For all other timber, use timber with natural durability class 2-4 treated to H3 in Posts to be plumb.
accordance with AS1604.1
· Ensure all saw cuts are preservative paint treated to maintain required hazard
(H4/H3) classification. fix rails to post with 2 tamper
resistant gal. screws on each end
· Paint finish with exterior grade paint. Undercoat and two surface coats. Paint colour per rail, finish neat, countersunk.
in accordance with approved plans.
150
40
40
nom. 1500 (above ground)
to ground slope.
rail, paint finish as noted. CL
40 40
Nom. 100mm sq. (Dressed all round)
seasoned hardwood timber upright.
Rail 300mm above recess posts to
1200
300
pavement at centre line. accommodate rails
Centre tree in
tree guard
Inground
Nom. 600
Compact ground under
posts to avoid slumping.
Standard Drawings -
3 2015-12 Amended format, review 2015 A4
2 2015-11 Amended timber post notes (removed seasoned) A4
Tree Guard ( typical )
1 2013-05 Final for DCP. A4
City Council
1 1 LSD-GUA-01 3