Projet Name Water Supply Pipe Line
Projet Name Water Supply Pipe Line
INFLOW SUMP TANK CAPACITY 0.35 MLD 350,000.00 Lts per Day
Discharge Calcuation
Consider Max Pumpring time 18 Hours
Pump Capacity IN Cum/hr 19444.45 Ltr/hr
Pump Capacity in Cum/min 324.08 Ltr/min
Pump Capacity Cum/sec 5.41 Ltr/Sec
V = 0.85 CH R S
0.63 0.54
d= Dia of Pipe
R = d/4 S = Friction dueto Slope
S = HL/L V = Velocity of Liquid
DATA :
DIA "d" = 0.1 mm
Velocity "V" = 1 m/s
Coefficient "CH" = 140 for DI pipe
R= D/4 = 0.025
S = 0.54Ö(V/(0.85XR0.63)
S = 0.010604
HL = SxL
Capacity Check = 5 hp
CASE-2
1ST PEAK POINT TO SUMP TANK
HL = L x S
Head Loss in 1st Raise = 1160 x 0.0107 12.31 m
Head loss at Valve connection = 0.3 m
Head loss at 90 0 bend = 0.5 m
Head Loss Due to Bends = 3x0.30 1m
Total Head Loss = 14.11 m
Head gain due to level difference = 15.07 m
Net Head Available for flow = 0.96 m