Professional Documents
Culture Documents
Equipment/machinery Checklist School Name:: - Manual
Equipment/machinery Checklist School Name:: - Manual
Date Regular servicing as per maintenance checklist/major or minor repairs Maintenance performed by Time Cost Tag-out (if Tag removed
company/business/individual taken required) and checked by
Equipment/machinery checklist School name:
Equipment: hydraulic press – manual Make/model and edquip no: _______________________________________________
The below checks are recommended for equipment prior to or during a unit of work where the equipment will undergo moderate to heavy use.
Check the press frame for damage and that all nuts and bolts are tight and secure.
Ensure pressure gauge and release valve (where fitted) is functioning correctly.
Check support pins and height location holes are in good condition – free from
damage.
Other:
Other:
Other:
Other:
Other:
Equipment/machinery checklist School name:
Equipment: hydraulic press – manual Make/model and edquip no: _______________________________________________
Date / /
End of semester Date / / / / Follow-up actions Annual check
Signature
Signature
checks Tick or Tick or E.g. blade and pulley alignment Tick or comment
comment comment adjusted 02/18
John Smith Check condition of 50mm line markings defining
Sem 1 Sem 2 operator zones and access walkways.
Lubricate all points in accordance with the manufacturer's
Review safety operating procedure and update if
specification.
necessary.
Protect all bare metal surfaces before term shutdown
(CRC, WD40, RP7 of similar). Other:
Check the press frame for damage and that all nuts and Other:
bolts are tight and secure.
Other:
Ensure V blocks and any other accessories are in good
condition.
Other:
Other:
Other:
Other: