PLUMBING PUMPS CHECKLIST

Project: One ICC & Two ICC Project – Island City Centre

Building : Floor Level Date :

SR NO ACTIVITIES TO BE CHECKED L&T Hill/BR Remarks

R0 R1 R2 R0 R1 R2

Transfer / Hydropneumatic Pumps/Submerisble

1.0 Check the pump is installed as per the approved shop drawings
Check the pump installation whether it is as per the manufacturer
2.0
instructions
3.0 Check the firmness & tightness of foundation bolts

4.0 Check the base frame level is installed correct

5.0 Check the Y Strainer installed at the Suction is Properly Installed.


Check the Piping manifold of the Pump Set. Suction & discharge piping are
6.0
properly connected to water tank and building network respectively.
7.0 Check the Valves and Strainers are fitted and functioning properly
Check the Installation and Physical Functionality of Pressure Guage and
8.0
Instruments
9.0 Ensure the Pump Piping System is Pressure Leak test.

Check the Pumps Cabling and Termination upto the Panel Cables, terminal
10.0 connections, trunking lines or conduits, cable trays are as per
approved materials and installation.

11.0 Ensure that the Pump Motor is earthed or bonded to earthing system.

12.0 Ensure all Pressure switch are installed and Wired Properly

13.0 Check the Identification and Labling

14.0 Ensure the Pump Control Panel is properly commissioned by the Supplier

15.0 Check the Electrical Testing is completed

16.0 Check operation of all panel indication lamps by simulating alarms

17.0 Check the Float valve/Level sensor in the tank for the operation properly

18.0 Ensure that the BMS Connection are done

19.0 Ensure all the Identification of the Pipe work is complete


Wiring Diagram of the Pump Control Panel shall be displayed inside or
20.0
outside of the Control Panel

Verify that each pump is free to rotate by hand. If pump is bound or drags,
21.0
do not operate until cause of trouble is determined and corrected.

Ensure that complete installation and start up checks is according to


22.0
manufacturer’s written instruction
23.0 Set and record pressure switch settings.

24.0 Check operation of auto change over of duty pump on alarm.

25.0 Set and record overload settings

26.0 Set and record settings of minimum run timers.

27.0 Check cyclic change over of duty pump.

28.0 Check operation of low water cut out

29.0 Check operation of remote indication to BMS.

30.0 Physical Check for Noise and Vibration.

31.0 Pump performance curve test


COMMENTS

L&T Hill International Bombay Realty


Signature

Name

Date