Download as pdf or txt
Download as pdf or txt
You are on page 1of 6

83V - A330

JOB CARD PACKAGE TITLE: Tail Number - MSN -


carpet FSN
ALL

Reference Title DocType


Removal of the cockpit Textile Floor Covering
25-13-45-000-801-A AMM
(Carpet)

JCP Title: carpet CERTIFICATE OF TASK / INSPECTION COMPLETION: Page 1 of 1


PRINT DATE: Nov 10/2019
CERTIFIES THAT THE TASK / INSPECTION HAS BEEN
COMPLETED TO THE REQUIRED STANDARD AND SUPPORTS
THE FINAL MAINTENANCE RELEASE / CERTIFICATE OF
RELEASE TO SERVICE
JOB CARD REV DATE: Oct 01/2019

AMM - 83V - A330 TASK:


25-13-45-000-801-A
Tail Number - MSN - TITLE: 25-13-45-04 CONF 00
FSN: 25-13-45-000-801-A - Removal of the cockpit Textile Floor
ALL Covering (Carpet)

MECH. INSP.
See IPC
** ON A/C FSN ALL
TASK 25-13-45-000-801-A
Removal of the cockpit Textile Floor Covering (Carpet)
1. Reason for the Job
Self explanatory

2. Job Set-up Information

A. Work Zones and Access Panels

ZONE/ACCESS ZONE DESCRIPTION


210 CKPT FWD PRESSURE BHD TO CKPT PARTITION

B. Referenced Information

REFERENCE DESIGNATION
Ref. 24-42-00-861-801-A Energize the Ground Service Network
Ref. 25-11-41-000-801-A Removal of the Third Occupant Seat
Ref. 25-11-42-000-801-A Removal of the Fourth Occupant Seat
Ref. 25-11-51-000-801-A Removal of the Captain/First Officer Seat
Ref. Fig. Textile Floor Covering (Carpet)
Ref. Fig. Furnishing

3. Job Set-up
SUBTASK 25-13-45-860-050-A
A. Energize the ground service network
Ref. AMM TASK 24-42-00-861-801

CAUTION: DO NOT CAUSE DAMAGE TO THE SURFACES. THE COMPONENTS ARE MADE OF
CARBON FIBER REINFORCED PLASTIC.
4. Procedure
Ref. Fig. Textile Floor Covering (Carpet)
Ref. Fig. Furnishing
SUBTASK 25-13-45-020-050-A

JCP Title: carpet CERTIFICATE OF TASK / INSPECTION COMPLETION: Page 1 of 5


PRINT DATE: Nov 10/2019
CERTIFIES THAT THE TASK / INSPECTION HAS BEEN
COMPLETED TO THE REQUIRED STANDARD AND SUPPORTS
THE FINAL MAINTENANCE RELEASE / CERTIFICATE OF
RELEASE TO SERVICE
JOB CARD REV DATE: Oct 01/2019

AMM - 83V - A330 TASK:


25-13-45-000-801-A
Tail Number - MSN - TITLE: 25-13-45-04 CONF 00
FSN: 25-13-45-000-801-A - Removal of the cockpit Textile Floor
ALL Covering (Carpet)

MECH. INSP.

A. Removal of the Seats


(1) Remove the Fourth Occupant seat (folding seat), 5001MS Ref. AMM TASK
25-11-42-000-801.
(2) Remove the Third Occupant seat, 5000MS Ref. AMM TASK 25-11-41-000-801.
(3) Remove the Captain seat and the First Officer seat, 3MS, 4MS Ref. AMM TASK
25-11-51-000-801.
SUBTASK 25-13-45-020-051-A
B. Removal of the cross beam cover
(1) Remove the four screws (31) and the four washers (30).
(2) Remove the cross beam cover (29).
SUBTASK 25-13-45-020-052-A
C. Removal of the Cover Strip
(1) Remove the three screws (23) and the washers (24).
(2) Remove the cover strip (25).
SUBTASK 25-13-45-020-053-A
D. Removal of the dado panels
(1) Removal of the dado panel (44):

(a) Remove the screw (45), the washer (46) and the nut (42).
(b) Remove the screw (43), the dado panel (44) and the washer (41).
(2) Removal of the dado panel (40):

(a) Remove the screw (39) and the washer (38).


(b) Remove the dado panel (40).
(3) Removal of the dado panel (37):

(a) Remove the four screws (34) and the four washers (35).
(b) Remove the dado panel (37).
(4) Removal of the dado panel (36):

(a) Remove the three screws (32) and the three washers (33).
(b) Remove the dado panel (36).
(5) Removal of the dado panel (26):

(a) Remove the six screws (28) and the six washers (27).
(b) Remove the dado panel (26).

JCP Title: carpet CERTIFICATE OF TASK / INSPECTION COMPLETION: Page 2 of 5


PRINT DATE: Nov 10/2019
CERTIFIES THAT THE TASK / INSPECTION HAS BEEN
COMPLETED TO THE REQUIRED STANDARD AND SUPPORTS
THE FINAL MAINTENANCE RELEASE / CERTIFICATE OF
RELEASE TO SERVICE
JOB CARD REV DATE: Oct 01/2019

AMM - 83V - A330 TASK:


25-13-45-000-801-A
Tail Number - MSN - TITLE: 25-13-45-04 CONF 00
FSN: 25-13-45-000-801-A - Removal of the cockpit Textile Floor
ALL Covering (Carpet)

MECH. INSP.

(6) Removal of the dado panels (19) and (22):

(a) Remove the screws (21) and the six washers (20).
(b) Remove the dado panels (19) and (22).
SUBTASK 25-13-45-020-054-A
E. Removal of the Avionics Compartment Access Panel and Hinge
(1) Open the access panel (13).
(2) Remove the six bolts (15) and the nine screws (8).
(3) Remove the hinge (9).
SUBTASK 25-13-45-020-055-A
F. Removal of the Textile Covering of the Access Panel
(1) Removal of the cover strip (5):

(a) Remove the five screws (6) and the five washers (7).
(b) Remove the cover strip (5).
(2) Removal of the cover strip (2):

(a) Remove the six screws (4) and the six washers (3).
(b) Remove the cover strip (2).
(3) Removal of the cover strip (12):

(a) Remove the five screws (10) and the five washers (11).
(b) Remove the cover strip (12).
(4) Remove the carpet (1):

(a) Use a non-metallic scraper to release the carpet from the floor.
(b) Remove the remaining double sided adhesive tape (16) with non-metallic
scraper.
SUBTASK 25-13-45-020-056-A
G. Removal of the Textile Floor Covering
(1) Remove the floor covering (14):

(a) Use a non-metallic scraper to release the carpet from the floor.
(b) Remove the remaining double sided adhesive tape (17) with a non-metallic
scraper.

JCP Title: carpet CERTIFICATE OF TASK / INSPECTION COMPLETION: Page 3 of 5


PRINT DATE: Nov 10/2019
CERTIFIES THAT THE TASK / INSPECTION HAS BEEN
COMPLETED TO THE REQUIRED STANDARD AND SUPPORTS
THE FINAL MAINTENANCE RELEASE / CERTIFICATE OF
RELEASE TO SERVICE
JOB CARD REV DATE: Oct 01/2019

AMM - 83V - A330 TASK:


25-13-45-000-801-A
Tail Number - MSN - TITLE: 25-13-45-04 CONF 00
FSN: 25-13-45-000-801-A - Removal of the cockpit Textile Floor
ALL Covering (Carpet)

MECH. INSP.
6
A 8
7
- 5

9
4
A
3

Figure 25-13-45-991-00300-00-A (SHEET 1) - Textile Floor Covering (Carpet)


** ON A/C FSN ALL

JCP Title: carpet CERTIFICATE OF TASK / INSPECTION COMPLETION: Page 4 of 5


PRINT DATE: Nov 10/2019
CERTIFIES THAT THE TASK / INSPECTION HAS BEEN
COMPLETED TO THE REQUIRED STANDARD AND SUPPORTS
THE FINAL MAINTENANCE RELEASE / CERTIFICATE OF
RELEASE TO SERVICE
JOB CARD REV DATE: Oct 01/2019

AMM - 83V - A330 TASK:


25-13-45-000-801-A
Tail Number - MSN - TITLE: 25-13-45-04 CONF 00
FSN: 25-13-45-000-801-A - Removal of the cockpit Textile Floor
ALL Covering (Carpet)

MECH. INSP.

Figure 25-13-45-991-00400-00-A (SHEET 1) - Furnishing


** ON A/C FSN ALL
© *** END OF CARD ***

JCP Title: carpet CERTIFICATE OF TASK / INSPECTION COMPLETION: Page 5 of 5


PRINT DATE: Nov 10/2019
CERTIFIES THAT THE TASK / INSPECTION HAS BEEN
COMPLETED TO THE REQUIRED STANDARD AND SUPPORTS
THE FINAL MAINTENANCE RELEASE / CERTIFICATE OF
RELEASE TO SERVICE

You might also like