Reasoned document for Amendment to Indian Railway Standard Specification for Fusion Welding of Rails by Alumino-

Thermic Process (IRST-19-2012)

A. Annexure-3: Specification of 3- Pieces Pre-Fabricated Mould Manufactured by A.T. Portion Manufacturers for use
during A.T. Welding of Rails as per IRST-19-2012

S.No. Para/ Existing para Discussion during Revised para Reason of change
Clause no. meeting
1. Title Annexure-3: Specification of 3- Annexure-3: Specification of 3- Pieces Pre- The year of
Pieces Pre-Fabricated Mould Fabricated Mould Manufactured by A.T. specification has
Manufactured by A.T. Portion Portion Manufacturers for use during A.T. been corrected.
Manufacturers for use during Welding of Rails as per IRST-19-2012
A.T. Welding of Rails as per
IRST-19-1994
2. Para 4.1 4.1 High Silica Sand: It was mentioned by 4.1 High Silica Sand: The provision has
vendors that they decide been modified in
4.1.1 The sand shall be of Gr. the grain fineness 4.1.1 The silica sand shall be of appropriate accordance with
A to IS:1987-2002 in respect of depending upon the grade in respect of chemical decision taken during
chemical composition. chemistry of portion and it composition & grain fineness as per IS: the meeting so as not
4.1.2 The grain fineness of the will not be proper to 1987-2002. The grade used as per to have any adverse
sand shall be of Grade 425/212 define this parameter requirement of firm shall be indicated in effect on quality of
(See Appendix-I). uniformly. Accordingly, it QAP of firm. The grain shape shall be main product i.e. AT
4.1.3 The grain shape shall be was agreed that the mostly of sub angular to rounded welding.
mostly of sub angular to rounded vendors shall fix the shape.
shape. suitable grade of grain The Para has been
4.1.4 The manufacturer shall fineness as per IS 1919- 4.1.2 The manufacturer shall keep record/ reworded and
keep record/inspection certificate 1966 on their own as per inspection certificate of high silica sand, renumbered for
as per IS-1987-2002 with proper the chemistry of portion. being used in the production as per IS- better clarity.
traceability of high silica sand, The same shall be 1987-2002 with proper traceability. The
being used in the production. mentioned in QAP and manufacturer should also carry out its
4.1.5 The manufacturer must suitable records be made own inspection check on the Silica sand
also have its own inspection as per provisions of this and proper record shall be maintained
check on the Silica sand as per specification. with traceability.
Appendix-I and proper record
shall be maintained with
traceability.
3. Para 4.2 4.2 Sodium Silicate: It was mentioned by 4.2 Sodium Silicate: The provision has
vendors that they decide been modified in
4.2.1 Sodium silicate used as a the properties of sodium 4.2.1 Sodium silicate used as a binding accordance with
binding agent for pre- silicate depending upon agent for pre-fabricated mould shall decision taken during
fabricated mould shall be the chemistry of portion be of appropriate grade as per the meeting so as not
of Gr.2 to IS:6773-1978 and it will not be proper to IS:6773-1978 (Reaffirmed 2003). to have any adverse
(Reaffirmed 2003). define this parameter The grade used as per requirement effect on quality of
4.2.2 The manufacturer shall uniformly. Accordingly, it of firm shall be indicated in QAP of main product i.e. AT
keep record/inspection was agreed that the firm. welding.
certificate as per Gr.2 to vendors shall fix the
IS:6773-1978 suitable grade of sodium 4.2.2 The manufacturer shall keep The Para has been
(Reaffirmed-2003) with silicate as per IS 6773- record/inspection certificate of reworded and
proper traceability of 1978 on their own as per sodium silicate, being used in the renumbered for
sodium silicate, being the chemistry of portion. production as per IS:6773-1978 better clarity.
used in the production. The same shall be (Reaffirmed-2003) with proper The appendix
mentioned in QAP and traceability. The manufacturer should number III has been
4.2.3 The manufacturer must suitable records be made also have its own inspection check changed to I
also have its own as per provisions of this on sodium silicate batch wise as per subsequent to
inspection check on specification. Appendix-I and proper record shall deletion of earlier
sodium silicate batch be maintained with traceability. Appendix-I.
wise as per Appendix-III
and proper record shall
be maintained with
traceability.

4. Para 4.4 4.4 Carbon Di-Oxide Gas: Vendors informed that it 4.4 Carbon Di-Oxide Gas: As per feedback
will be difficult to get the during meeting that
4.4.1 Carbon-di-oxide gas manufacturer test 4.4.1 Carbon-di-oxide gas shall be of Inspection Certificate
shall be of commercial certificate for carbon commercial grade to IS:307-66 for CO2gas is not
grade to IS:307-66 dioxide, as this is being (Reaffirmed 2006). The available with the
(Reaffirmed 2006). manufactured by small manufacturer shall keep record of traders from where
units. The provision can Carbon-di-oxide gas, being used in the CO2 gas is
4.4.2 The manufacturer shall be dispensed with since the production as per IS-307-66 procured.
keep record/inspection the mould will be (Reaffirmed 2006) with proper , the requirement of
certificate as per IS-307- subjected to non- traceability. Inspection certificate
66 (Reaffirmed 2006) destructive tests and has been deleted.
with proper traceability of destructive test as per The Para has been
Carbon-di-oxide gas, para 7.3 of Annexure –III reworded and
being used in the of IRST-19. renumbered for
production. better clarity.
5. Para 4.5 4.5 Mould Wash: AT welding vendors 4.5 Mould Wash: No Change in
informed that it will be Stipulations of Para.
4.5.1 To achieve good finish of difficult to get the 4.5.1 To achieve good finish of the weld
the weld surface, mould manufacturer test surface, mould wash shall be The Para has been
wash shall be used. certificate for Zircon wash. used. It shall be alcohol base Zircon reworded and
It shall be alcohol base It was clarified that this wash Gr. ZA to IS: 10033-92 renumbered for
Zircon wash Gr.ZA to IS: provision is important for (Reaffirmed 2003) (See Appendix- II). better clarity.
10033-92 (Reaffirmed maintaining quality of .
2003) (See Appendix- II). mould, hence, the vendors 4.5.2 The manufacturer shall keep
shall arrange record/inspection certificate of mould
4.5.2 The manufacturer shall manufacturer test wash being used in the production as
keep record/inspection certificate. Alternatively per IS-10033-92 (Reaffirmed 2003)
certificate as per IS- tests may have to be done with proper traceability. The
10033-92 (Reaffirmed in-house for which manufacturer shall also have its own
2003) with proper requisite facilities will have inspection check of mould wash batch
traceability of mould to be developed. The wise as per Appendix -II and proper
wash, being used in the vendors agreed that they record shall be maintained with
production. will impress upon traceability.
manufacturer to provide
4.5.3 The manufacturer must requisite test certificate.
also have its own
inspection check of mould
wash batch wise as per
Appendix -II and proper
record shall be
maintained with
traceability.

6. Para 5.1 The Mould shall be Vendors mentioned that The Mould shall be manufactured by no- No change in Para.
manufactured by no-bake, erroneously “no – bake” bake, sodium silicate process using
sodium silicate process using has been mentioned detachable pattern and shall be suitable for
detachable pattern and shall be which should be “bake”. welding the required rail section.
suitable for welding the It has been clarified by
required rail section. M&C Dte. that CO2mould
preparation is
theoretically known as
“Inorganic no-bake
method’. Some people do
a low temperature
heating only to drive out
moisture. Therefore, no
change is needed
7. Para 6 The insignia containing firm's It was mentioned by The insignia containing firm's code allotted As decided during
code allotted (ITC=T, HTI=H, vendors that in this para (ITC=T, HTI=H, OTPL=O, SIRIL=S, meeting, ‘Month’ has
OTPL=O, SIRIL=S, RMPL=R, month has been added to RMPL=R, IFA=F as per AT welding Manual) deleted from the para
IFA=F as per AT welding be embossed in the and year of manufacture shall be embossed so as to make
Manual) month and year of mould during in the mould during manufacture for provisions in
manufacture shall be manufacture, which is in identification. conformity to the
embossed in the mould during contradiction to para 20 provisions at Para 20
manufacture for identification. at page 28 & 29 of on Main
specification, which Specification.
stipulate only year to be
embossed. It will be
difficult to emboss the
month. It was agreed to
modify the para 6.0 as
per stipulation of para 20
of main specification.
8. Para 7.2.5 7.2.5 Record of important It was mentioned by 7.2.5 Record of important parameters like Batch size, which
parameters like moisture vendors that the batch for moisture content, permeability, was not defined
content, permeability, PF Moulds has not been hardness and compressive strength earlier, has been
hardness and defined in specifications. (As per IS: 11099-1984- Reaffirmed- specified as Muller/
compressive strength M&C Dte. has commented 2005) of test block of 50x50 mm for Mixer batch, as
(As per IS: 11099-1984- that batch for PF moulds every batch i.e. Muller/ Mixer batch decided during the
Reaffirmed-2005) of test shall be as per Mulling/ of production shall be maintained. meeting.
block of 50x50 mm for Mixer batch. The firm has
every batch of to keep the record of
production shall be parameters i.e. non-
maintained. destructive tests observed
9. New Para -------- on each Muller/ Mixing 7.3.1 For Inspection of finished mould, the New para 7.3.1
batch. For inspection of Batch size shall be production of each day added in
the finished mould, batch subject to maximum of batch size of AT specification defining
for PF Moulds shall be welding portion of firm+5%, which shall be Batch size for
each day’s production included in QAP of firm. inspection of finished
subject to maximum of mould. Existing Para
batch size for AT portion + 7.3.1 renumbered as
upto 5% (5% taken Para 7.3.2.
considering the normal
wastage). This will be
suitably incorporated in
the specification.
10. Para 7.3.1 7.3.1 The mould should be It was mentioned by 7.3.2 The mould should be sound and it Weld metal
sound and it should not break vendors that provision of should not break during transit under dimensions checking
during transit under normal both para 7.3.1(a) & (e) normal condition. The name of the required execution of
condition. The name of the test are identical and can be test and their frequency, to be large no. of sample
and their frequency, to be carried merged as a single test. carried out on finished mould by the welds as compared
out on finished mould by the This was agreed. manufacturer at their own and by to inspection of
manufacturer at their own and by Regarding 7.3.1 (f), the purchaser or nominated agency shall portion itself, which is
purchaser or nominated agency vendors indicated that be as under: the main product.
shall be as under: for AT Portion batch size S.N. Test Sample Rema Since, Dimensional
a)Visual Examination - 1% of 600, 6 welds shall be size rks check is also
b)Dimensional check - 1% executed only to check 1. Visual 1% of As per required to be
c)Ringing Test - 1% the weld metal Examina Batch size para undertaken on
d)Hardness Test - 1% dimensions from moulds, tion rounded off 7.3.3 moulds, execution of
e)Internal surface of - 1% whereas for portion to next large no. of sample
mould for proper mould wash inspection, only one higher welds is not
f)Weld metal dimensions- 1% weld is to be executed. number considered
This being destructive 2. Dimensi 2% of As per necessary.
The tests shall be carried test, has cost onal Batch size para Accordingly, sample
out at manufacturer's implications. Instead, the check rounded off 7.3.4 size of Weld metal
premises. If any test is non-destructive test of to next dimensions test has
conducted by outside dimension check of higher been made similar to
approved agency, the cost mould can be kept more. number AT welding portion
of the test is to be borne by It was agreed that 3. Ringing 1% of As per inspection and
the manufacturer. provision will be suitably Test Batch size para frequency of non
reviewed. rounded off 7.3.5 destructive
to next Dimensional check
higher has been doubled.
number
4. Hardnes 1% of As per Para no. has been
s Test Batch size para renumbered and
rounded off 7.3.6 descriptive note
to next about procedure of
higher test has been added
number as remarks for better
5. Internal 1% of As per clarity.
surface Batch size para
of mould rounded off 7.3.7
for to next
proper higher
mould number
wash
6. Weld 1 per As per
metal Batch, to para
dimensi be checked 7.3.8
ons along with
AT welding
Portion
inspection.

The tests shall be carried out at


manufacturer's premises. If any test is
conducted by outside approved agency,
the cost of the test is to be borne by the
manufacturer.

11. Annexure- 7.3.1.1 Visual Examination: 1% 7.3.3 Visual Examination: The Para no. has been
III, Para of The prefabricated mould shall prefabricated mould shall be checked changed. Sample
7.3.1.1 be checked visually for any visually for any visible imperfection, such as size already defined
visible imperfection, such as surface condition etc. in para 7.3.2, hence
surface condition etc. deleted in this para.

12. Annexure- 7.3.1.2 Dimensional check: It was mentioned by 7.3.4 Dimensional check: Dimensional Para no. has been
III, Para Dimensional check shall be vendors that weld check shall be carried out on the moulds for changed. The details
7.3.1.2 carried out on 1% of the moulds dimension test as per their conformity to the respective drawing, of standardized
for their conformity to the para 7.3.1.6 shall be done fitment with rail end and in mould shoe. dimension to be
respective drawing, fitment with at the time of portion The weld profile dimension achieved in AT incorporated in QAP
rail end and in mould shoe. inspection only. weld using developed 3 pieces PF mould has been included for
The weld profile dimension Accordingly, the should confirm to the approved weld profile information of
achieved in AT weld using dimension check shall be dimension. Dimension of 3 pieces PF mould inspecting official.
developed 3 pieces PF mould doubled to 2% from as width and depth at respective web, foot Sample size already
should confirm to the approved existing 1%. It was and bottom which affect the weld profile included in para 7.3.2
weld profile dimension. agreed that provision will dimension of AT weld will be indicated in has been deleted
Dimension of 3 pieces PF mould be suitably reviewed. QAP of firm and the same shall be from here. Revised
as width and depth at respective standardized during approval. The location Appendix no. has
web, foot and bottom which of weld profile dimension shall be as per been indicated.
affect the weld profile dimension Appendix-III.
of AT weld will be standardized
during approval. The location of
weld profile dimension shall be
as per Appendix-IV.

13. Annexure- 7.3.1.3 Ringing Test: Ringing 7.3.5 Ringing Test: Ringing Test shall be Para no. has been
III, Para Test shall be carried out by using carried out by using a small and light changed.
7.3.1.3 a small and light hammer made hammer made of 10 mm steel rod for
of 10 mm steel rod for checking checking soundness and degree of ramming
soundness and degree of during manufacture. The mould shall have
ramming during manufacture. characteristic ringing sound and shall not
The mould shall have break.
characteristic ringing sound and
shall not break.

14. Para 7.3.1.4 Hardness Test: 7.3.6 Hardness Test: Hardness Test shall Para no. has been
7.3.1.4 Hardness Test shall be carried be carried out on the plane surface of the changed. Sample
out on the plane surface of the mould using a duly calibrated core hardness size already defined
mould using a duly calibrated tester (scratch type). The min. hardness in para 7.3.2, hence
core hardness tester (scratch value for a silicate carbon-di-oxide hardened deleted from this
type). The min. hardness value mould shall be 70. The hardness test shall para to avoid
for a silicate carbon-di-oxide be carried out as per Cl.26 of IS: 1918-66 duplication.
hardened mould shall be 70. (Reaffirmed 2003).
The hardness test shall be
carried out on 1% mould as per
Cl.26 of IS: 1918-66
(Reaffirmed 2003).

15. Para 7.3.1.5 Internal surface of 7.3.7 Internal surface of mould for proper Para no. has been
7.3.1.5 mould for proper mould mould wash: Surface finish shall be changed. Sample
wash: Surface finish shall be checked on the moulds for uniform and size already defined
checked on 1% of the moulds sufficient coatings as per Cl.7.3 of in para 7.3.2, hence
for uniform and sufficient APPENDIX-II. deleted from this
coatings as per Cl.7.3 of para to avoid
APPENDIX-II. duplication.

16. Para 7.3.1.6 Weld dimensions: It was mentioned by 7.3.8 Weld dimensions: Para no. has been
7.3.1.6 Dimensional check shall be vendors that 1% weld Dimensional check shall be carried out on changed. Sample
carried out on the finished rail dimension check at the the finished rail joints using mould pairs for size already defined
joints using 1% of the mould time of manufacturing & conformity of the approved weld profile in para 7.3.2, hence
pairs for conformity of the inspection of mould dimension of respective AT portion deleted from this
approved weld profile dimension result in execution of manufacturer. para to avoid
of respective AT portion substantial quality of duplication.
manufacturer. weld. Accordingly, it was
discussed that weld
dimension test done at
present at the time of
inspection of portion
only. This will be suitably
reviewed.

17. Annexure- 7.3.2 Testing facilities to 7.3.9 All requisite Testing facilities to Both paras have
III, Para Inspectors shall be provided by Inspecting officials shall be provided by the been combined and
7.3.2 the manufacturer at their own manufacturer at their own cost. The reworded for better
cost. Inspecting officials shall have free access at clarity. Para no. has
18. Para 7.3.3 7.3.3 Inspecting officials shall be manufacturer’s works in working hours to been changed.
free to visit manufacturer’s works assess the quality of manufacturing process.
in working hours to assess the
quality of manufacturing process.
19. Annexure- 7.3.4 The manufacturer shall 7.3.10 The manufacturer shall provide test Para no. has been
III, Para provide test results of raw results of raw materials and the batches changed.
7.3.4 materials and the batches offered for inspection to the Inspecting
offered for inspection to the officials.
Inspecting officials.

20. Para 9.2 9.2 A pair of such packed Vendors mentioned that 9.2 A pair of such packed moulds shall AT portion
moulds shall again be packed in proper nylon strip bailing again be packed in carton paper boxes manufacturers
carton paper boxes confirming to can damage the mould. confirming to IS:2771(Second Revision). advised that Nylon
IS:2771 (Second Revision). Instead of this, the Proper sealing shall be done on each carton. strip bailing may
Proper Nylon strip bailing shall cartoon paper boxes can damage the mould.
be done on each carton. be sealed by proper Accordingly, Nylon
BOPP tape. It was strip bailing is being
discussed and decided substituted with
that provision will be proper sealing.
reviewed and para shall
be suitably modified.
B. Indian Railway Standard Specification for Fusion Welding of Rails by Alumino-Thermic Process : Main
Specification

S.No. Para/ Existing para Discussion during Revised para Reason of change
Clause no. meeting
1. Para 4 4. ACCEPTANCE TEST: It was mentioned that para 4. ACCEPTANCE TEST:
does not provide for auto Provision for
Two portion shall be thimble, which is required Two portion shall be randomly checking of tapping
randomly selected per batch and as the same is under selected per batch and weight of each time range for AT
weight of each portion shall be development. It was portion shall be within + 0.25% of the welding techniques
within + 0.25% of the approved agreed that this para shall approved weight of the portion which shall be with Auto-tapping
weight of the portion which shall be suitably modified. recorded by the inspector. thimble / One shot
be recorded by the inspector. crucible has been
One portion shall be utilized for made in para to
One portion shall be execution of test weld as per approved cover these welding
utilized for execution of test weld parameters for AT Welding technique. While techniques.
as per approved parameters for executing the test joint, characteristics of the
AT Welding technique. While aluminothermic reaction, i.e. whether it is
executing the test joint, quiet, normal or boiling shall be observed
characteristics of the alumino- and if the reaction is found to be boiling, the
thermic reaction, i.e. whether it is batch shall be rejected. The reaction and
quiet, normal or boiling shall be tapping shall be within 20+ 3 seconds for
observed and if the reaction is manual tapping.
found to be boiling, the batch In case of A.T. welding technique
shall be rejected. The reaction with Auto tapping thimble/ One shot crucible,
and tapping shall be within 20+ 3 the reaction and tapping time shall conform
seconds for manual tapping. to the tapping time range approved for the
Following tests shall be particular AT welding technique, as indicated
conducted for assessing the in approval certificate and QAP of Firm.
quality of portion : Following tests shall be conducted
for assessing the quality of portion :
a) Ultrasonic test on test
weld as per Annexure-1. a) Ultrasonic test on test weld as
b) Checking of weld metal per Annexure-1.
dimensions of test weld b) Checking of weld metal
with approved weld metal dimensions of test weld with
dimensions of that approved weld metal dimensions
particular AT Welding of that particular AT Welding
technique.
technique. c) Mechanical and metallurgical
c) Mechanical and test as per Para 4.2.
metallurgical test as per d) Weld metal chemistry test as per
Para 4.2. Para 4.1.”
d) Weld metal chemistry test
as per Para 4.1.”

2. Para 12.5.1 “12.5.1 (ii) Twelve tests weld “12.5.1 (ii) Twelve tests weld joints shall be The para has been
joints shall be made as per made as per clause 4.2.2. modified so as to
While executing the test joints, make stipulations in
clause 4.2.2. The joints shall characteristics of the aluminothermic line with Para 4 and
be subjected to following reaction, i.e. whether it is quiet, normal or to cover new welding
tests:” boiling shall be observed and if the reaction techniques of auto
is found to be boiling, the technique shall be thimble.
rejected. The reaction and tapping shall be
within 20+ 3 seconds for manual tapping.

The reaction and Tapping time for A.T.


welding technique with Auto tapping thimble/
One shot crucible, shall conform to the
tapping time range indicated in respective
QAP..
The joints shall be subjected to following
tests:”

3. Para 6.2 The manufacturer shall dispatch It was mentioned that in The manufacturer shall dispatch the The provision has
the accepted portions to the view of the latest accepted portions immediately to the been modified in line
consignee preferably within 60 instruction about validity of consignee so as to reach consignee within of ISO guidelines of
days from the date of IC for one month, this para 30 days from the date of issue of Inspection RDSO for validity of
acceptance. shall be deleted. It was Certificate . IC as 30 days.
agreed that this para will
be modified suitably.