Roberto A. Raña: Eng'G. & Gen. Services

You might also like

Download as doc, pdf, or txt
Download as doc, pdf, or txt
You are on page 1of 2

ROBERTO A.

RAÑA
ENG'G. & GEN. LOW COST ELEVATOR
SERVICES
ADDRESS: 101 Brgy. Sta. Lucia, Magarao, Camarines Sur CONTACT NUMBER: 09058382444 / 09167873838 SPAN: (054) 4784713
BRANCH: South Super Highway, Parañaque, Metro Manila EMAIL ADDRESS: roberto_raa@yahoo.com
SUPPLIER & FABRICATOR: Fire Sprinkler Aluminum Cladding S/S Kitchen Equipment All kind of Blower & Duct
System AC Centralized
Construction Glass & A luminum Mechanical Consultant Elevator Dump Waiter

DATE: October 22, 2019

TO: Joseph Cabral


Bodega Home Plus

Request for full payment of the following:

1. Fire Pump & Jockey Pump


Balance - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - P 30,000.00

2. Labor & Design for Bodega Sprinkler


System (Bodega Home Plus)
Balance - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - P 50,000.00

PREPARED BY:

ENGR. ROBERTO A. RAÑA


ROBERTO A. RAÑA
ENG'G. & GEN. LOW COST ELEVATOR
SERVICES
ADDRESS: 101 Brgy. Sta. Lucia, Magarao, Camarines Sur CONTACT NUMBER: 09058382444 / 09167873838 SPAN: (054) 4784713
BRANCH: South Super Highway, Parañaque, Metro Manila EMAIL ADDRESS: roberto_raa@yahoo.com
SUPPLIER & FABRICATOR: Fire Sprinkler Aluminum Cladding S/S Kitchen Equipment All kind of Blower & Duct
System AC Centralized
Construction Glass & A luminum Mechanical Consultant Elevator Dump Waiter

DATE: October 22, 2019

TO: Joseph Cabral


Star Master Plaza
Calabanga Camarines Sur

PROPOSED: RE-DESIGN & LABOR OF AUTOMATIC FIRE SPRINKLER SYSTEM


FOR STAR MASTER PLAZA.

A. SCOPE OF WORK AND COST:

1. Re-design of main pipe & layout system ground floor


To 3rd floor with total of assorted sprinkler heads of 255
Pcs. 100mm main pipe to 25mm distribution of sprinkler
Heads 3.0 both ways ground to 3rd floor area.

Amount re-design & labor - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - P 540,000.00

B. COMPLETION OF WORKS: 60 WORKING DAYS

C. TERM’S OF PAYMENT: 25% D.P Others for progress billing

D. WARRANTY: 6 months

PREPARED:

ENGR. ROBERTO A. RAÑA

You might also like