0.90
COLUMN/PEDESTAL 0.90
Depth of footing from NGL = 1.5
Length (l, dim. || Z axis ) = 600 mm
Breadth (b, dim. || X axis) = 300 mm global
X
Depth of filling = 1
Height of pedestal = 2.1 m Breadth 2.1 m
global
FOOTING global
Z
Z
Foot length (L, dim. || Z axis) = 2.4 m
Foot Breadth (B, dim. || X axis) = 2.1 m
Thickness of footing (t) = 400 mm global
Clear cover to Reinforcement = 50 mm X
Main bar dia of footing = 12 mm
Effective depth of footing = 344 mm Length 2.4 m
Selfweight of the footing = 5.04 T Footing Dimensions
Area of Footing(A) = 5.04 m2
Sect mod of foot about Z axis (Zz) = 1.76 m3
Sec mod of foot about X axis (Zx) = 2.02 m3
MATERIALS OF CONSTRUCTION
Grade of concrete fck = 20 N/mm2
Grade of steel fy = 415 N/mm2
CALCULATION OF PRESSURES
Joint 1
5 45.39 0.581 0.803 1 9.75 8.26 0.70
6 40.39 0.630 4.241 1.25 10.73 5.30 0.61
7 41.39 9.581 0.698 1.25 13.36 3.06 0.76
8 50.39 0.531 5.846 1.25 13.58 6.42 0.78
9 49.39 10.742 0.907 1.25 15.64 3.96 0.89
Joint 6
5 49.39 0.614 1.509 1 10.96 8.64 0.78
6 53.39 0.599 6.284 1.25 14.45 6.73 0.83
7 44.39 13.413 1.613 1.25 16.38 1.24 0.94
8 46.39 0.630 3.267 1.25 11.37 7.04 0.65
9 55.39 14.641 1.404 1.25 19.05 2.93 1.09
OK 0.89
Al
ar
as
12 mm dia bar @ 150 mm c/c ne
1 1
Sec 1-1
944 300
644
L1 X1 X
a a
Z Z
N1 N1
a a
L2 L2
556 X1 X
L1 Breadth 2100 mm
600
Footing Length 2400 mm 556
PLAN
tc = 0.34 N/mm2
tv < tc Hence O.K.
[ √ ]
wt. of pedestal/column is using above max imum
not to be considered. not considered in Pu. effective soil pressure 0 . 5 f ck 4. 6 M u side. side.
Footing Dimensions A st = 1− 1− bd
fy f ck bd
2
Column/Pedestal Footing size Footing Properties Materials of Const CHECK FOR GROSS BEARING PRESSURE FACTORED DESIGN FORCES EFFECTIVE SOIL PRESSURE CALCULATION FOR BOTTOM STEEL CHECK FOR ONE WAY SHEAR CHECK FOR TWO WAY SHEAR (Ref. cl 34.2.4 and cl.31.6.3 of IS 456 : 2000)
Length (l, Breadth Height of Weight Foot Foot Thickness Clear Main Effective Self Area of Sect mod Sec mod Grade of Grade of Safe NET Safe gross Unfactored Axial Moment Moment Depth Unit wt Weight P = (P1+ Maximum Minimum Check if Factored Axial Moment Moment Maximum Minimum Mu about X1 Mulimit Check type Ast Min Ast = Spacing pt Bar Dia Mu about N1 Check type Ast Min Ast Spacing pt Bar Dia Distance Shear Shear tc Check for Distance of Shear force Shear stress tc Check for k s = If k s >1 tc = Allowable Shear Length of Area of the Hence Check for two way
dim. || Z (b, dim. || Pedestal of length Breadth of footing cover bar dia depth of weight of Footing of foot of foot concrete steel fy bearing bearing pr. load case load about Z about X of top of soil of soil soil + bearing bearing footing is load load: about Z about X effective soil effective soil X1 = ( pe max of section (0.12 % (considering provided /Spacing of N1 = ( pe of section = (0.12 (considering provided /Spacing of of critical force Vs stress one way critical sec. Vs =pe max tv = Vs/bd one way ( 0.5 + 0.25 shear stres force critical critical shear shear
then Ks =1
axis ) X axis) pedestal (L, dim. (B, dim. || (t) to of footing footing (A) about Z about X f ck pressure (net pr. + number from axis (Mz) axis (Mx) of foot. retained Pedestal pressure pressure safe comb. no. (Pu) axis (Muz) axis (Mux) pressure p e max = ( pressure pe min = x length 2/2) singly / for slab, max of two Reinf. max x singly / % for max of two Reinf. Parallel sec. L1- =pe max tv = shear at L2- L2 from x dist of L2- shear at bc) (fck) 0.5 tv allowable = ks x Vs section section stress tv
|| Z axis) X axis) Reinf footing axis (Zz) axis (Zx) depth of foot output from above + foot against Pu/Area+ Muz/Zz ( Pu/Area - doubly cl calculated Parallel to length 2/2) doubly slab, cl calculated to breadth of L1 from x dist of Vs/bd Critical edge of L2 x 1m Critical else Ks=Ks
= tc (length of
* soil unit wt) (P1) ground footing self wt) M M max gross + Mux/Zx) Muz/Zz - reinforced. 26.5.2.1) values of length of reinforced. 26.5.2.1) values of footing (|| to edge of L1-L1 x section L1- footing width of section L2- critical sec
P
± y± x bearing pr Mux/Zx) Ast) foot. (|| to Z) Ast) X) footing 1m width L1 footing L2 x eff. d )
A Zy Zx of footing
446521818.xls
NUCLEAR POWER CORPORATION OF INDIA LTD.
1 1
446521818.xls
NUCLEAR POWER CORPORATION OF INDIA LTD.
Sec 1-1
1167 600
1267
L1 X1 X
a a
Z Z
N1 N1
a a
L2 L2
2458 X1 X
L1 Breadth 6500 mm
500
Footing Length 6750 mm 2283
PLAN
446521818.xls
NUCLEAR POWER CORPORATION OF INDIA LTD.
COLUMN
Length (l, dim. || Z axis ) = 700 mm
Breadth (b, dim. || X axis) = 600 mm global
X Input pedestal height = 0 if
Height of pedestal = 1 m Breadth 3 m wt. of pedestal/column is
Weight of pedestal/column = 10.50 KN not to be considered.
FOOTING
global
Foot length (L, dim. || Z axis) = 5 m global
Z
Foot Breadth (B, dim. || X axis) = 3 m Z Z and X axis are assumed
Thickness of footing (t) = 750 mm as two horizontal Global
global
Clear cover to Reinforcement = 75 mm X axis of building.
Main bar dia of footing = 16 mm
Hence, input the
Effective depth of footing = 667 mm Length 5 m dimensions of footing easily
Selfweight of the footing = 281.25 KN by inputing footing length
Footing Dimensions parallel to global Z and
Area of Footing(A) = 15.00 m2
footing breadth parallel to
Sect mod of foot about Z axis (Zz) = 7.50 m3 global X.
Sec mod of foot about X axis (Zx) = 12.50 m3
MATERIALS OF CONSTRUCTION
Grade of concrete fck = 20 N/mm2
Grade of steel fy = 415 N/mm2
446521818.xls
NUCLEAR POWER CORPORATION OF INDIA LTD. If min pressure is nega
then to recalculate pres
use solver of sheet2.
446521818.xls
NUCLEAR POWER CORPORATION OF INDIA LTD.
1 1
Sec 1-1
1367 600
1267
L1 X1 X
a a
Z Z
N1 N1
a a
L2 L2
1483 X1 X
L1 Breadth 3000 mm
700
Footing Length 5000 mm 533
PLAN
446521818.xls
NUCLEAR POWER CORPORATION OF INDIA LTD.
446521818.xls
uniaxial
-32.5209652
4.218141515
Page 14
biaxial
1.00E+30
-32.5209652
4.218141515
Page 15
UNI
-233.931624
2.604476613
Page 16
B
1.00E+30
-32.5209652
4.218141515
Page 17
B1
1.00E+30
-233.931624
2.604476613
Page 18
DOC: 3 VIN BBL A4 11 C -404
ALIF ENGINEERS &
PLANNERS DESIGN OF FOOTING - F1
REV : R0
MATERIALS OF CONSTRUCTION
Grade of concrete fck = 20 N/mm2
Grade of steel fy = 415 N/mm2
`
Safe NET bearing pressure = 14 T/m2
Safe gross bearing pr. = 16.55 T/m2 (net pr. + depth of foot * soil unit wt)
Allowable Bearing pressure 20.69 T/m2
Factor of overstressing 1
Unit wt of soil = 1.7 T/m3
Weight of soil retained above foot = 17.46 T
CALCULATION OF PRESSURES
OK 0.72
1 1
Sec 1-1
844 300
644
L1 X1 X
a a
Z Z
N1 N1
a a
L2 L2
606 X1 X
L1 Breadth 2100 mm
Instead of calculatin
500 accurate pressure
Footing Length 2400 mm 556 ordinate at L1-L1 we
have used "pemax"
PLAN
conservative side.
tc = 0.34 N/mm2
tv < tc Hence O.K.
0.95
COLUMN/PEDESTAL
Depth of footing from NGL = 1.5 Input pedestal height = 0 if
Length (l, dim. || Z axis ) = 600 mm wt. of pedestal/column is
global not to be considered.
Breadth (b, dim. || X axis) = 300 mm
X
Depth of filling = 1
Height of pedestal = 2.05 m Breadth 2.2 m
global
FOOTING global Z and X axis are assumed
Z
Z as two horizontal Global
Foot length (L, dim. || Z axis) = 2.5 m axis of building.
Foot Breadth (B, dim. || X axis) = 2.2 m
Thickness of footing (t) = 450 mm global Hence, input the
X dimensions of footing easily
Clear cover to Reinforcement = 50 mm by inputing footing length
Main bar dia of footing = 12 mm parallel to global Z and
Effective depth of footing = 394 mm Length 2.5 m footing breadth parallel to
global X.
Selfweight of the footing = 6.19 T Footing Dimensions
Area of Footing(A) = 5.50 m2
Sect mod of foot about Z axis (Zz) = 2.02 m3
Sec mod of foot about X axis (Zx) = 2.29 m3
MATERIALS OF CONSTRUCTION
Grade of concrete fck = 20 N/mm2
Grade of steel fy = 415 N/mm2
CALCULATION OF PRESSURES
Joint 3
5 56.73 7.293 0.358 1 13.67 6.95 0.83
6 52.73 7.272 6.340 1.25 15.90 3.27 0.77
7 55.73 -1.115 0.484 1.25 10.86 9.41 0.52
8 61.73 7.314 -5.624 1.25 17.20 5.24 0.83
9 57.73 15.701 0.231 1.25 17.46 3.53 0.84
Joint 4
5 53.73 7.039 -0.327 1 13.00 6.54 0.79
6 57.73 6.954 5.694 1.25 16.35 4.64 0.79
7 52.73 -2.942 -0.200 1.25 10.97 8.20 0.53
8 49.73 7.124 -6.347 1.25 15.30 2.79 0.74
9 54.73 17.019 -0.454 1.25 17.60 2.30 0.85
Joint 7
5 58.73 -0.112 -2.835 1 12.13 9.22 0.73
6 56.73 -0.096 10.932 1.25 15.78 4.85 0.76
7 59.73 -4.038 -2.875 1.25 14.05 7.67 0.68
8 59.73 -0.128 -16.602 1.25 19.15 2.57 0.93
9 56.73 3.814 -2.794 1.25 13.36 7.26 0.65
Joint 8
5 59.73 -0.142 3.442 1 12.63 9.09 0.76
6 61.73 -0.145 18.173 1.25 20.30 2.15 0.98
7 61.73 -5.644 3.546 1.25 15.44 7.00 0.75
8 58.73 -0.139 -11.290 1.25 16.34 5.02 0.79
9 57.73 5.360 3.338 1.25 14.49 6.50 0.70
OK
A st =
fy [ √
0. 5 f ck
1− 1−
4.6 Mu
f ck bd
2]bd The section is singly reinforced This design is done as
singly reinforced section.
1 1
Sec 1-1
994 300
694
L1 X1 X
a a
Z Z
N1 N1
a a
L2 L2 Instead of calculating
accurate pressure
ordinate at L1-L1 we
556 X1 X have used "pemax" on
L1 Breadth 2200 mm conservative side.
600
Footing Length 2500 mm 556
PLAN
tc = 0.32 N/mm2
tv < tc Hence O.K.
MATERIALS OF CONSTRUCTION
Grade of concrete fck = 20 N/mm2
Grade of steel fy = 415 N/mm2
Joint 14
5 69.24 0.057 1.132 1 11.57 10.62 0.70
6 73.24 0.055 12.278 1.25 16.68 6.80 0.81
7 69.24 -4.364 1.163 1.25 13.18 9.02 0.64
8 64.24 0.059 -10.014 1.25 14.33 6.26 0.69
9 68.24 4.477 1.101 1.25 13.03 8.84 0.63
Joint 18
5 66.24 -0.832 -1.154 1 11.39 9.85 0.69
6 59.24 -0.802 8.914 1.25 13.36 5.63 0.65
7 67.24 -5.636 -1.170 1.25 13.33 8.22 0.64
8 74.24 -0.862 -11.221 1.25 16.71 7.08 0.81
9 66.24 3.972 -1.138 1.25 12.54 8.69 0.61
Joint 19
5 93.24 -1.245 -1.228 1 15.90 13.99 0.960
6 97.24 -1.235 10.117 1.25 20.09 11.07 0.97
7 94.24 -7.074 -1.246 1.25 18.22 11.99 0.88
8 90.24 -1.255 -12.573 1.25 19.96 8.96 0.96
9 93.24 4.585 -1.211 1.25 17.12 12.76 0.83
Joint 20
5 72.24 -0.014 1.577 1 12.21 10.94 0.74
6 76.24 -0.024 11.071 1.25 16.66 7.77 0.81
7 71.24 -4.667 1.564 1.25 13.77 9.06 0.67
8 68.24 -0.003 -7.917 1.25 14.11 7.76 0.68
9 74.24 4.640 1.591 1.25 14.25 9.54 0.69
Joint 22
5 72.24 0.063 0.057 1 11.62 11.53 0.70
6 73.24 0.083 4.739 1.25 13.67 9.81 0.66
7 68.24 -7.293 0.069 1.25 13.66 8.21 0.66
8 71.24 0.043 -4.626 1.25 13.29 9.55 0.64
9 75.24 7.419 0.044 1.25 14.82 9.30 0.72
Joint 25
5 67.24 -1.417 0.005 1 11.30 10.25 0.68
6 68.24 -1.398 5.014 1.25 13.46 8.41 0.65
7 73.24 -8.704 -0.128 1.25 15.01 8.47 0.73
8 66.24 -1.437 -5.003 1.25 13.15 8.08 0.64
9 60.24 5.870 0.138 1.25 11.88 7.43 0.57
Joint 28
5 75.24 -3.734 -0.657 1 13.70 10.41 0.83
6 76.24 -3.715 4.264 1.25 15.30 9.14 0.74
7 80.24 -14.159 -0.788 1.25 18.41 7.31 0.89
8 74.24 -3.752 -5.578 1.25 15.52 8.28 0.75
9 69.24 6.692 -0.526 1.25 13.78 8.41 0.67
OK
0.97
Maximum bearing pressure = 20.09 T/m2 P My Mx
Minimum bearing pressure = 5.63 T/m2
± ±
A Zy Zx
Hence footing is safe against max gross bearing pr.
If this moment is very h
FOR DESIGN OF FOOTINGS try to reduce moment by
changing footing size.
Maximum effective soil pressure pe max Higher moment will requ
( Pu/Area+ Muz/Zz + Mux/Zx) = 20.09 T/m2 higher steel and section
may be doubly reinforce
Design of footing is done using above maximum effective soil pressure This design is done as
singly reinforced section
may be doubly reinforce
This design is done as
singly reinforced section
CALCULATION FOR BOTTOM STEEL
Mu about X1 X1 = ( pe max x length 2/2)= 11.08 T-m per meter
Mulimit = 42.88 T-m per meter
A st =
fy [ √
0. 5 f ck
1− 1−
4.6 Mu
]
f ck bd 2
bd The section is singly reinforced
1 1
Sec 1-1
894 300
694
L1 X1 X
a a
Z Z
N1 N1
a a
L2 L2
tc = 0.35 N/mm2
tv < tc Hence O.K.
COLUMN/PEDESTAL 1
Depth of footing from NGL = 1.5 1.05
Length (l, dim. || Z axis ) = 600 mm
Breadth (b, dim. || X axis) = 300 mm global Input pedestal height = 0 if
X wt. of pedestal/column is
Depth of filling = 1 not to be considered.
Height of pedestal = 2.05 m Breadth 2.4 m
global
FOOTING global Z and X axis are assumed
Z
Z as two horizontal Global
Foot length (L, dim. || Z axis) = 2.6 m axis of building.
Foot Breadth (B, dim. || X axis) = 2.4 m
Thickness of footing (t) = 450 mm global Hence, input the
Clear cover to Reinforcement = 50 mm X dimensions of footing easily
by inputing footing length
Main bar dia of footing = 12 mm parallel to global Z and
Effective depth of footing = 394 mm Length 2.6 m footing breadth parallel to
global X.
Selfweight of the footing = 7.02 T Footing Dimensions
Area of Footing(A) = 6.24 m2
Sect mod of foot about Z axis (Zz) = 2.50 m3
Sec mod of foot about X axis (Zx) = 2.70 m3
MATERIALS OF CONSTRUCTION
Grade of concrete fck = 20 N/mm2
Grade of steel fy = 415 N/mm2
CALCULATION OF PRESSURES
Joint 11
5 70.14 -2.805 1.090 1 12.71 9.77 0.77
6 75.14 -3.034 5.881 1.25 15.52 8.56 0.75
7 59.14 -14.674 1.126 1.25 15.36 3.60 0.74
8 65.14 -2.577 -3.700 1.25 12.87 8.00 0.62
9 80.14 9.063 1.054 1.25 16.62 9.07 0.80
Joint 12
5 70.14 -1.646 -0.987 1 12.24 10.24 0.74
6 63.14 -1.596 5.185 1.25 12.79 7.45 0.62
7 67.14 -15.261 -0.967 1.25 16.79 4.73 0.81
8 78.14 -1.696 -7.159 1.25 16.02 9.03 0.77
9 74.14 11.969 -1.007 1.25 16.71 7.05 0.81
OK
0.81
Maximum bearing pressure = 16.79 T/m2 P M y Mx
± ±
Minimum bearing pressure = 3.60 T/m2 A Zy Zx
Footing is not safe against max bearing pressure.
[ √ ]
0. 5 f ck 4.6 Mu This design is done as
The section is singly reinforced singly reinforced section.
A st = 1− 1− 2
bd
fy f ck bd
Hence, Ast = 610.06 mm2
Min Ast = 472.80 mm2 (0.12 % for slab, cl 26.5.2.1)
Spacing = 185.39 mm (considering max of above two calculated values of Ast)
Provide spacing = 125 mm
pt provided = 0.23 %
Hence provide 12 mm dia bar @ 125 mm c/c parallel to length of footing ( || to Z)
1 1
Sec 1-1
994 300
694
L1 X1 X
a a
Z Z
N1 N1
a a
L2 L2
606 X1 X
L1 Breadth 2400 mm Instead of calculating
accurate pressure
600 ordinate at L1-L1 we
Footing Length 2600 mm 656 have used "pemax" on
PLAN conservative side.
tc = 0.35 N/mm2
tv < tc Hence O.K.
tc = 0.35 N/mm2
tv < tc Hence O.K.
Instead of calculating
accurate pressure
ordinate at L1-L1 we
have used "pemax" on
conservative side.
COLUMN/PEDESTAL 1.2
Depth of footing from NGL = 1.5 1.2
Input pedestal height = 0 if
Length (l, dim. || Z axis ) = 600 mm wt. of pedestal/column is
Breadth (b, dim. || X axis) = 400 mm global not to be considered.
X
Depth of filling = 1
Height of pedestal = 1.95 m Breadth 2.8 m
Z and X axis are assumed
as two horizontal Global
global axis of building.
FOOTING global
Z
Z
Foot length (L, dim. || Z axis) = 3 m Hence, input the
Foot Breadth (B, dim. || X axis) = 2.8 m dimensions of footing easily
by inputing footing length
Thickness of footing (t) = 550 mm global
parallel to global Z and
Clear cover to Reinforcement = 50 mm X footing breadth parallel to
Main bar dia of footing = 12 mm global X.
Effective depth of footing = 494 mm Length 3 m
Selfweight of the footing = 11.55 T Footing Dimensions
Area of Footing(A) = 8.40 m2
Sect mod of foot about Z axis (Zz) = 3.92 m3
Sec mod of foot about X axis (Zx) = 4.20 m3
Bharat Bijlee Ltd.
DOC: 3 VIN BBL A4 11 C -404
ALIF ENGINEERS &
PLANNERS DESIGN OF FOOTING - F4
REV : R0
MATERIALS OF CONSTRUCTION
Grade of concrete fck = 20 N/mm2
Grade of steel fy = 415 N/mm2
CALCULATION OF PRESSURES
Joint 2
5 83.60 9.890 -0.012 1 12.31 7.59 0.74
6 85.60 10.473 11.384 1.25 15.59 4.79 0.75
7 82.60 -0.610 0.219 1.25 10.03 9.63 0.49
8 82.60 9.307 -11.407 1.25 14.96 4.71 0.72
9 85.60 20.390 -0.243 1.25 15.11 5.27 0.73
Joint 5
5 91.60 11.216 -0.991 1 13.83 7.98 0.84
6 92.60 10.828 10.213 1.25 16.21 5.84 0.78
7 89.60 -5.089 -0.757 1.25 12.07 9.26 0.58
8 90.60 11.604 -12.195 1.25 16.66 4.91 0.81
9 93.60 27.521 -1.225 1.25 18.01 4.28 0.87
Joint 10
5 100.60 -3.954 0.547 1 13.06 10.90 0.79
6 102.60 -4.134 11.552 1.25 16.15 8.28 0.78
7 89.60 -18.801 0.633 1.25 15.30 6.03 0.74
8 98.60 -3.774 -10.459 1.25 15.30 8.17 0.74
9 111.60 10.894 0.460 1.25 16.00 10.57 0.77
Joint 13
5 117.60 -4.113 -1.558 1 15.38 12.62 0.93
6 119.60 -4.082 12.101 1.25 18.30 10.18 0.88
7 113.60 -25.513 -1.519 1.25 19.99 7.06 0.97
8 115.60 -4.145 -15.218 1.25 18.63 8.89 0.90
9 121.60 17.286 -1.598 1.25 19.00 9.95 0.92
OK
0.97
Maximum bearing pressure = 19.99 T/m 2
P My Mx
Minimum bearing pressure = 4.28 T/m2
± ±
A Zy Zx
Hence footing is safe against max gross bearing pr.
[ √ ]
singly reinforced section.
0. 5 f ck 4.6 Mu The section is singly reinforced
A st = 1− 1− 2
bd
fy f ck bd
Hence, Ast = 836.59 mm2
Min Ast = 592.80 mm2 (0.12 % for slab, cl 26.5.2.1)
Spacing = 135.19 mm (considering max of above two calculated values of Ast)
Provide spacing = 125 mm
pt provided = 0.18 %
Hence provide 12 mm dia bar @ 125 mm c/c parallel to length of footing ( || to Z)
1 1
Sec 1-1
1094 400
894
L1 X1 X
a a
Z Z
N1 N1
a a
L2 L2
706 X1 X
L1 Breadth 2800 mm
600
Footing Length 3000 mm 706
Instead of calculating
PLAN accurate pressure
ordinate at L1-L1 we
CHECK FOR ONE WAY SHEAR : have used "pemax" on
conservative side.
One way shear at critical section L1- L1
Distance of critical sec. from edge of footing = 0.706 m
Shear force Vs =pe max x 0.706 x 1m width of footing = 14.110 T
Shear stress tv = Vs/bd = 0.286 N/mm2
tc = 0.31 N/mm2
tv < tc Hence O.K.
Joint 26
5 32 -1.399 0.3162
6 27 -1.294 5.3698
7 37 -9.057 0.1901
8 36 -1.503 -4.7373
9 26 6.26 0.4423
Joint 27
5 31 -2.88 -0.2907
6 35 -2.811 4.7775
7 34 -11.5 -0.4213
8 26 -2.949 -5.3589
9 28 5.7389 -0.1601
COLUMN/PEDESTAL 1
Depth of footing from NGL = 1.5 0.95 Input pedestal height = 0
Length (l, dim. || Z axis ) = 500 mm wt. of pedestal/column is
Breadth (b, dim. || X axis) = 300 mm global not to be considered.
X
Depth of filling = 1
Height of pedestal = 2.05 m Breadth 2.2 m
Z and X axis are assumed
as two horizontal Global
axis of building.
MATERIALS OF CONSTRUCTION
Grade of concrete fck = 20 N/mm2
Grade of steel fy = 415 N/mm2
CALCULATION OF PRESSURES
Joint 9
5 54.83 -0.260 -0.394 1 10.28 9.66 0.62
6 48.83 -0.245 8.686 1.25 13.29 4.46 0.64
7 52.83 -3.543 -0.320 1.25 11.31 7.90 0.55
8 60.83 -0.275 -9.474 1.25 15.88 6.24 0.77
9 56.83 3.023 -0.468 1.25 11.88 8.78 0.57
Joint 16
5 56.83 -2.581 0.152 1 11.53 9.13 0.70
6 57.83 -2.672 4.680 1.25 14.00 7.03 0.68
7 66.83 -10.307 0.140 1.25 16.72 7.58 0.81
8 56.83 -2.491 -4.377 1.25 13.59 7.08 0.66
9 47.83 5.144 0.163 1.25 11.02 6.37 0.53
Joint 21
5 54.83 0.090 -0.818 1 10.41 9.52 0.63
6 50.83 0.107 8.046 1.25 13.28 5.21 0.64
7 54.83 -3.345 -0.793 1.25 11.82 8.12 0.57
8 58.83 0.072 -9.683 1.25 15.53 5.86 0.75
9 54.83 3.524 -0.844 1.25 11.93 8.01 0.58
Joint 26
5 56.83 -1.399 0.316 1 11.10 9.57 0.67
6 51.83 -1.294 5.370 1.25 12.65 6.20 0.61
7 61.83 -9.057 0.190 1.25 15.29 7.20 0.74
8 60.83 -1.503 -4.737 1.25 14.07 8.06 0.68
9 50.83 6.260 0.442 1.25 12.19 6.29 0.59
Joint 27
5 55.83 -2.880 -0.291 1 11.55 8.75 0.70
6 59.83 -2.811 4.778 1.25 14.47 7.28 0.70
7 58.83 -11.499 -0.421 1.25 15.92 5.47 0.77
8 50.83 -2.949 -5.359 1.25 13.19 5.30 0.64
9 52.83 5.739 -0.160 1.25 12.19 7.02 0.59
OK
0.81
Maximum bearing pressure = 16.72 T/m2 P M y Mx
± ±
Minimum bearing pressure = 4.46 T/m2 A Zy Zx
Hence footing is safe against max gross bearing pr.
1 1
Footing Length 2500 mm Breadth 2200 mm
Sec 1-1
894 300
694
L1 X1 X
a a
Z Z
N1 N1
a a
L2 L2
606 X1 X
L1 Breadth 2200 mm
500
Footing Length 2500 mm 556
PLAN Instead of calculating
accurate pressure
ordinate at L1-L1 we
CHECK FOR ONE WAY SHEAR : have used "pemax" on
One way shear at critical section L1- L1 conservative side.
Distance of critical sec. from edge of footing = 0.606 m
Shear force Vs =pe max x 0.606 x 1m width of footing = 10.131 T
Shear stress v t = Vs/bd = 0.257 N/mm 2
tc = 0.32 N/mm2
tv < tc Hence O.K.
REV : R0
-0.0117
11.3841
0.2192
-11.4074
-0.2426
0.3578
6.3399
0.4842
-5.6243
0.2314
-0.3266
5.6936
-0.1996
-6.3467
-0.4536
-0.9909
10.2129
-0.7567
-12.195
-1.225
1.5085
6.2836
1.6133
-3.2667
1.4037
-2.8347
10.9322
-2.875
-16.602
-2.7944
3.4418
18.1733
3.5456
-11.2896
3.338
-0.3941
8.6856
-0.3199
-9.4737
-0.4683
0.5466
11.5524
0.6328
-10.459
0.4604
1.0901
5.8805
1.1262
-3.7002
1.0541
-0.9869
5.1853
-0.9668
-7.159
-1.0069
-1.5584
12.1014
-1.5193
-15.218
-1.5975
1.1322
12.2784
1.1633
-10.014
1.101
-0.5796
7.9806
-0.6021
-9.1397
-0.557
0.1515
4.6803
0.1402
-4.3772
0.1629
0.9204
4.6971
0.9205
-2.8563
0.9203
-1.1538
8.9136
-1.1698
-11.2212
-1.1378
-1.2281
10.1167
-1.2455
-12.573
-1.2107
1.5771
11.0707
1.5637
-7.9165
1.5905
-0.8184
8.046
-0.7933
-9.6828
-0.8436
0.0567
4.7392
0.069
-4.6258
0.0444
0.8294
4.7489
0.8381
-3.09
0.8208
-0.7849
3.5664
-0.9039
-5.1362
-0.6659
0.0051
5.0136
-0.1276
-5.0034
0.1378
0.3162
5.3698
0.1901
-4.7373
0.4423
-0.2907
4.7775
-0.4213
-5.3589
-0.1601
-0.6569
4.264
-0.7881
-5.5778
-0.5258
1.506
5.6833
1.3998
-2.6714
1.6121
-0.0697
1.7236
-0.3084
-1.8629
0.1691
-0.0713
1.7221
-0.3099
-1.8647
0.1674