S.No Project Name Mode Programme NH No Total Length (KM) Approved TPC Rs (CR) LOA Date Promoter of Concessionaire State RO PIU

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 2

Total Length Approved Promoter of

S.No Project Name Mode Programme NH No LOA Date State RO PIU


(Km) TPC Rs(Cr) Concessionaire

1 Delhi-Vadodara Greenfield alignment (NH- EPC Bharatmala- 148N 32 780.88 28/05/2019 Centrodorstroy India Pvt. Haryana RO- Sohna
148N) (Pkg-03) (Ch. 47+000 to Ch. Expressways Ltd Chandigarh
78+800) [starting near Khanpur Ghati and
ending at HR-RJ Border
2 Kamliya village to Kandarwasa village EPC Bharatmala- 148N 30.2 0 28/05/2019 GR Infraprojects Ltd. Madhya RO-Bhopal Ratlam
Expressways Pradesh
3 Delhi-Vadodara Greenfield Alignment Item Rate Bharatmala- 148N 31.26 946 28/05/2019 Gawar Construction Ltd. Rajasthan RO-Jaipur Dausa
(NH-148N) (Pkg-07) (Ch 183.00 to Ch Expressways
214.260) [Junction with NH-11 - Start of
RoB near junction with NH-11A]
4 Balance work of Tindivanam Krishnagiri Item Rate Balance Road 77 182.18 519.38 29/05/2019 S.P.K. and Co. Tamil Nadu RO-Chennai Viluppuram
works under
NHDP
5 Balance work of Dindigul – Theni and Item Rate Balance Road 45,220 43.12 347.94 29/05/2019 EKK Infrastructure Limited Tamil Nadu RO-Chennai Dindigul
Theni - Kumili works under
NHDP
6 Akola City -Shivar-PKV Square-Nehru EPC NH(O) 6 13 131 30/05/2019 BP Sangle Constructions Maharashtra RO-Mumbai Amravati
Park Square - Dakshata Nagar Square- (MH)
Nimwadi Chowk -Washim Bypass -
Ridhora Bypass road
7 Improvement of NH-53 passing through EPC Balance Road 53 7 61.85 30/05/2019 Jandu Construction Maharashtra RO-Mumbai Jalgaon
Jalgaon City tp four lane along with works under Company
construction of VUPs & PUP NHDP

8 Deogarh (near Dhandhaniya)- EPC Balance Road 754K 27 348.26 03/06/2019 VRC Construction (India) Rajasthan RO-Jaipur Jodhpur
Rajasthan/Gujarat Border (Phase-I) works under Pvt. Ltd. - Varindera
(AJ/DRGB-Package-2) NHDP Construction Ltd. - S&P
Infrastructure Developers
Pvt Ltd (JV)

9 Deogarh (near Dhandhaniya)- EPC Balance Road 754K 24 454.62 03/06/2019 NKC Projects Private Ltd. Rajasthan RO-Jaipur Jodhpur
Rajasthan/Gujarat Border (Phase-I) works under
(AJ/DRGB-Package-3) NHDP
10 Sangariya (near Chautala)-Rasisar (near EPC Bharatmala- 754K 24.3 575 03/06/2019 Krishna Constructions Rajasthan RO-Jaipur Hanumangar
Bikaner) (Phase-I) (AJ/SR-Package-2) Economic h
Corridor
11 Deogarh (near Dhandhaniya)- EPC Balance Road 754K 22.14 710.49 11/06/2019 VRC Constructions (India) Rajasthan RO-Jaipur Jodhpur
Rajasthan/Gujarat Border (Phase-I) works under Pvt. Ltd.
(AJ/DRGB-Package-1) NHDP
12 Remaining works of Trichy - Karaikudi Item Rate Bharatmala- 83 12.77 166.9 20/06/2019 SD Infra Tamil Nadu RO-Chennai Karaikudi
Inter-corridor &
Feeder Roads

13 Meerut to Haryana Border via Baghpat EPC Bharatmala- 334B 43.78 0 20/06/2019 M/s Raj Shyama Uttar Ro-Lucknow Baghpat
section of NH-334B Inter-corridor & Constructions Pvt. Ltd. Pradesh
Feeder Roads
14 Dwarka Expressway Pkg-II (RoB near EPC Bharatmala- 248 BB 4 0 26/07/2019 Delhi RO-Delhi Dwarka
Dwarka Sector 21-DL / HR Border) National
Corridor
Efficiency
Improvements
15 Warora - Wani EPC NH(O) 930 18.31 0 06/08/2019 Maharashtra RO-Nagpur Chandrapur

You might also like