DAILY UPDATE ACTIVITY NORTH TOWER

Date PT.JANGHO PT.TSK PT.KIA PT.KONE PT.ARKM-ATMC

Activity Floor Activity Floor Activity Floor Activity Floor Activity Floor

INS/DIS SCAFF&INST BRC GONDOLA 19 WELDING GASKET 4 INST.BEGISTING KOLOM 36&37 PINDAH OFFICE B3-7 CASTING 34
VERTICALITY PH
Senin 14 Okt 19

INS/DIS SCAFF&INST BRC GONDOLA 20 REPAIR GASKET 1 INST.BEGISTING SLAB IN 21 26

INST/DISMAN SCAFFOLD 20M INST.SCAFFOLD 5 INST.BEGISTING TANGGA 20-22

INST/DISMAN SCAFFOLD 1to6 LIFT.INST KOLOM 5&9 BONGK BEGISTING LANTAI 20M

WELDING BRACKET 20 UP 21

WELDING BRACKET 1.2.3


UNLOADING MATERIAL 37 TO 28

INSTAL HARDING GONDOLA 24

INST GONDOLA 26 UP 27

Activity Floor Activity Floor Activity Floor Activity Floor Activity Floor

INST/DISMAN SCAFFOLD 19 WELDING GASKET 5 INST.BEGISTING KOLOM 36&37 PINDAH OFFICE B3-7 CASTING 34
Selasa 15 Okt 19

INST/DISMAN SCAFFOLD 20 REPAIR GASKET 1 INST.BEGISTING SLAB IN 21 VERTICALITY PH 26


INST/DISMAN SCAFFOLD 20M INST.SCAFFOLD 7 INST.BEGISTING TANGGA 20-22

INST/DISMAN SCAFFOLD 1to6 LIFT.INST KOLOM 5&9 BONGK BEGISTING LANTAI 20M

WELDING BRACKET 20 UP 21

WELDING BRACKET 1.2.3


UNLOADING MATERIAL 37 TO 28

INSTAL HARDING GONDOLA 24

INST GONDOLA 26 UP 27

Activity Floor Activity Floor Activity Floor Activity Floor Activity Floor

INST/DISMAN SCAFFOLD 19 WELDING GASKET 6 INST.BEGISTING KOLOM 36&37 PINDAH OFFICE B3-7 CASTING 34
Rabu 16 Okt 19

INST/DISMAN SCAFFOLD 20 REPAIR GASKET 3 INST.BEGISTING SLAB IN 21 VERTICALITY PH 26


INST/DISMAN SCAFFOLD 20M INST.SCAFFOLD 8 INST.BEGISTING TANGGA 20-22
INST/DISMAN SCAFFOLD 1to6 LIFT.INST KOLOM 6&9 BONGK BEGISTING LANTAI 20M
WELDING BRACKET 20 UP 21

WELDING BRACKET 1.2.3


UNLOADING MATERIAL 37 TO 28
Rab

Date PT.JANGHO PT.TSK PT.KIA PT.KONE PT.ARKM-ATMC

Activity Floor Activity Floor Activity Floor Activity Floor Activity Floor

INST/DISMAN SCAFFOLD 19 WELDING GASKET 7 INST.BEGISTING KOLOM 36&37 PINDAH OFFICE B3-7 CASTING 34
Kamis 17 Okt 19

INST/DISMAN SCAFFOLD 1to6 REPAIR GASKET 3 INST.BEGISTING SLAB IN 21


WELDING BRACKET 20 UP 21 INST.SCAFFOLD 9 INST.BEGISTING TANGGA 20-22
WELDING BRACKET 1.2.3 LIFT.INST KOLOM 6&9 BONGK BEGISTING LANTAI 20M
UNLOADING MATERIAL 37 TO 28

INST GONDOLA 26 UP 27

Activity Floor Activity Floor Activity Floor Activity Floor Activity Floor

INST/DISMAN SCAFFOLD 1to6 WELDING GASKET 8 INST.BEGISTING KOLOM 36&37 PINDAH OFFICE B3-7 CASTING 34
Jumat 18 Okt 19

WELDING BRACKET 20 UP 21 REPAIR GASKET 4 INST.BEGISTING SLAB IN 21


WELDING BRACKET 1.2.3 LIFT.INST KOLOM 7 INST.BEGISTING TANGGA 20-22
UNLOADING MATERIAL 37 TO 28 BONGK BEGISTING LANTAI 20M
INST GONDOLA 26 UP 27

Activity Floor Activity Floor Activity Floor Activity Floor Activity Floor

INST/DISMAN SCAFFOLD 1to6 WELDING GASKET 9&10 INST.BEGISTING KOLOM 36&37 PINDAH OFFICE B3-7 CASTING 34
abtu 19 Okt 19

WELDING BRACKET 20 UP 21 REPAIR GASKET 4 INST.BEGISTING SLAB IN 21


WELDING BRACKET 1.2.3 INST.SCAFFOLD 10 INST.BEGISTING TANGGA 20-22
UNLOADING MATERIAL 37 TO 28 LIFT.INST KOLOM 7 BONGK BEGISTING LANTAI 20M
INST GONDOLA 26 UP 27
Sabtu 19

Activity Floor Activity Floor Activity Floor Activity Floor Activity Floor
Minggu 20 Okt 19

INST/DISMAN SCAFFOLD 1to6 PINDAH OFFICE B3-7


WELDING BRACKET 20 UP 21

WELDING BRACKET 1.2.3


INST GONDOLA 26 UP 27
DAILY UPDATE ACTIVITY NORTH TOWER
Date PT.STEEL STRUCTURE PT.INTERDESIGN PT.ALFASTEELINDO PT.AWT PT.BAROKAH 74 Date

Activity Floor Activity Floor Activity Floor Activity Floor Activity Floor

COMPOUND AMPLAS 8 WELDING&INSTAL EMBED 49 INSTAL BEGISTING 51


Senin 14 Okt 19

Senin 14 Okt 19
INST FRAME GIPSUM 11 WELDING SLAB 30-32
INST GIPSUM LEVEL FRAME 12

INST GIPSUM COMPOUND 13

INST ACSOUSTIC&GIPSUM 15

INST FRAME ACUSTIC 16

Activity Floor Activity Floor Activity Floor Activity Floor Activity Floor

COMPOUND AMPLAS 8 WELDING&INSTAL EMBED 49 INSTAL BEGISTING 51


Selasa 15 Okt 19

Selasa 15 Okt 19
INST FRAME GIPSUM 11 WELDING SLAB 30-32
INST GIPSUM LEVEL FRAME 12

INST GIPSUM COMPOUND 13

INST ACSOUSTIC&GIPSUM 15

INST FRAME ACUSTIC 16

Activity Floor Activity Floor Activity Floor Activity Floor Activity Floor

COMPOUND AMPLAS 8 WELDING&INSTAL EMBED 49 INSTAL BEGISTING 51


Rabu 16 Okt 19

Rabu 16 Okt 19
INST FRAME GIPSUM 11 WELDING SLAB 30-32 BONGKAR BEGISTING 51
INST GIPSUM LEVEL FRAME 12

INST GIPSUM COMPOUND 13

INST ACSOUSTIC&GIPSUM 15

INST FRAME ACUSTIC 16


Rab

Rab
Date PT.STEEL STRUCTURE PT.INTERDESIGN PT.ALFASTEELINDO PT.AWT PT.BAROKAH 74 Date

Activity Floor Activity Floor Activity Floor Activity Floor Activity Floor

COMPOUND AMPLAS 8 WELDING&INSTAL EMBED 49 BONGKAR BEGISTING 51


Kamis 17 Okt 19

INST FRAME GIPSUM 11 WELDING SLAB 30-32

Kamis 17 Okt 19
INST GIPSUM LEVEL FRAME 12

INST GIPSUM COMPOUND 13

INST ACSOUSTIC&GIPSUM 15

INST FRAME ACUSTIC 16

Activity Floor Activity Floor Activity Floor Activity Floor Activity Floor

COMPOUND AMPLAS 8 WELDING&INSTAL EMBED 49 BONGKAR BEGISTING 51


Jumat 18 Okt 19

Jumat 18 Okt 19
INST FRAME GIPSUM 11 WELDING SLAB 30-32 JACK UP RAIL 51
INST GIPSUM LEVEL FRAME 12

INST GIPSUM COMPOUND 13

INST ACSOUSTIC&GIPSUM 15

INST FRAME ACUSTIC 16

Activity Floor Activity Floor Activity Floor Activity Floor Activity Floor

COMPOUND AMPLAS 8 WELDING&INSTAL EMBED 49 UP ACS PLATFORM 51


abtu 19 Okt 19

abtu 19 Okt 19
INST FRAME GIPSUM 11 WELDING SLAB 30-32 HOUSEKEEPING 51
INST GIPSUM LEVEL FRAME 12

INST GIPSUM COMPOUND 13

INST ACSOUSTIC&GIPSUM 15

INST FRAME ACUSTIC 16


Sabtu 19

Sabtu 19
Activity Floor Activity Floor Activity Floor Activity Floor Activity Floor

Minggu 20 Okt 19
COMPOUND AMPLAS 8 WELDING&INSTAL EMBED 49
Minggu 20 Okt 19

INST FRAME GIPSUM 11 WELDING SLAB 30-32


INST GIPSUM LEVEL FRAME 12

INST GIPSUM COMPOUND 13

INST ACSOUSTIC&GIPSUM 15

INST FRAME ACUSTIC 16


DAILY UPDATE ACTIVITY NORTH TOWER

PT.GTECH PT.CAT PT.ABA & ABL PT.FHS PT.BERKAH ABADI Date

Activity Floor Activity Floor Activity Floor Activity Floor Activity Floor

THREADING BESI 1 INST.REBAR COREWAL 49-50

Senin 14 Okt 19
INST.REBAR SLAB 37&20m

INSTAL REBAR COLUMN 37

FABRICATION REBAR B1

Activity Floor Activity Floor Activity Floor Activity Floor Activity Floor

THREADING BESI 1 INST.REBAR COREWAL 49-50

Selasa 15 Okt 19
INST.REBAR SLAB 37&20m

INSTAL REBAR COLUMN 37

FABRICATION REBAR B1

Activity Floor Activity Floor Activity Floor Activity Floor Activity Floor

THREADING BESI 1 INST.REBAR COREWAL 49-50

Rabu 16 Okt 19
INST.REBAR SLAB 37&20m

INSTAL REBAR COLUMN 37

FABRICATION REBAR B1
Rab
PT.GTECH PT.CAT PT.ABA & ABL PT.FHS PT.BERKAH ABADI Date

Activity Floor Activity Floor Activity Floor Activity Floor Activity Floor

THREADING BESI 1 INST.REBAR COREWAL 49-50

Kamis 17 Okt 19
INST.REBAR SLAB 37&20m

INSTAL REBAR COLUMN 37

FABRICATION REBAR B1

Activity Floor Activity Floor Activity Floor Activity Floor Activity Floor

THREADING BESI 1 INST.REBAR COREWAL 49-50

Jumat 18 Okt 19
INSTAL REBAR COLUMN 37

FABRICATION REBAR B1

Activity Floor Activity Floor Activity Floor Activity Floor Activity Floor

THREADING BESI 1

abtu 19 Okt 19
Sabtu 19
Activity Floor Activity Floor Activity Floor Activity Floor Activity Floor

Minggu 20 Okt 19
THREADING BESI 1
DAILY UPDATE ACTIVITY NORTH TOWER

PT.HONNEYWEL (BINKEI) PT.PGI (BINKEI) PT.AIRSINDO (BINKEI) PT.EFFRESINDO (BINKEI) PT.TTI (BINKEI)

Activity Floor Activity Floor Activity Floor Activity Floor Activity Floor

INST.BAS&SECSYSTEM INST. TRAY&LADDER 4 GROUPING PIPA B1 INST.FA SYSTEM 24-27 INST.PIPA AIR HUJAN .1-25

INST. TRAY&LADDER 22-26 INST.DUCTING 24-27 INST.FA SYSTEM 28-31 INST.PIPA AIR BERSIH .1-25

INST. TRAY&LADDER 17-19 INST.DUCTING 16-23 INST.PIPA AIR KOTOR .1-25

WIREING CABLE 13-19 INST.SUPPORT PIPA .2-5 INST.PIPA RISER AIR BERSIH .1-25

WIREING CABLE 22-25 INST. SUPPORT PIPA MEP 1 INST.PIPA FF .16-20

DISM SCAFFOLDING 1 INST.SUPPORTFF 17

INST.SCAFF 1 FABRIKASI SENAI 24

INST PIPA FF 24

INST.PIPEING 23-25

INST.PIPEING 13-19

Activity Floor Activity Floor Activity Floor Activity Floor Activity Floor

INST. TRAY&LADDER 4 GROUPING PIPA B1 INST.FA SYSTEM 24-27 INST.PIPA AIR HUJAN .1-25

INST. TRAY&LADDER 22-26 INST.DUCTING 24-27 INST.FA SYSTEM 28-31 INST.PIPA AIR BERSIH .1-25

INST. TRAY&LADDER 17-19 INST.DUCTING 16-23 INST.PIPA AIR KOTOR .1-25

WIREING CABLE 13-19 INST.SUPPORT PIPA .2-5 INST.PIPA RISER AIR BERSIH .1-25

WIREING CABLE 22-25 INST. SUPPORT PIPA MEP 1 INST.PIPA FF .16-20

DISM SCAFFOLDING 1 INST.SUPPORTFF 17

INST.SCAFF 1 FABRIKASI SENAI 24

INST PIPA FF 24

INST.PIPEING 23-25

INST.PIPEING 13-19

Activity Floor Activity Floor Activity Floor Activity Floor Activity Floor

INST. TRAY&LADDER 4 GROUPING PIPA B1 INST.FA SYSTEM 24-27 INST.PIPA AIR HUJAN .1-25

INST. TRAY&LADDER 22-26 INST.DUCTING 24-27 INST.FA SYSTEM 28-31 INST.PIPA AIR BERSIH .1-25

INST. TRAY&LADDER 17-19 INST.DUCTING 16-23 INST.PIPA AIR KOTOR .1-25

WIREING CABLE 13-19 INST.SUPPORT PIPA .2-5 INST.PIPA RISER AIR BERSIH .1-25

WIREING CABLE 22-25 INST. SUPPORT PIPA MEP 1 INST.PIPA FF .16-20

DISM SCAFFOLDING 1 INST.SUPPORTFF 17

INST.SCAFF 1

INST PIPA FF 24
INST.PIPEING 23-25

INST.PIPEING 13-19 FABRIKASI SENAI 24

PT.HONNEYWEL (BINKEI) PT.PGI (BINKEI) PT.AIRSINDO (BINKEI) PT.EFFRESINDO (BINKEI) PT.TTI (BINKEI)

Activity Floor Activity Floor Activity Floor Activity Floor Activity Floor

INST. TRAY&LADDER 4 GROUPING PIPA B1 INST.FA SYSTEM 24-27 INST.PIPA AIR HUJAN .1-25

INST. TRAY&LADDER 22-26 INST.DUCTING 24-27 INST.FA SYSTEM 28-31 INST.PIPA AIR BERSIH .1-25

INST. TRAY&LADDER 17-19 INST.DUCTING 16-23 INST.PIPA AIR KOTOR .1-25

WIREING CABLE 13-19 INST.SUPPORT PIPA .2-5 INST.PIPA RISER AIR BERSIH .1-25

WIREING CABLE 22-25 INST. SUPPORT PIPA MEP 1 INST.PIPA FF .16-20

DISM SCAFFOLDING 1 INST.SUPPORTFF 17

INST.SCAFF 1

INST PIPA FF 24 FABRIKASI SENAI 24

INST.PIPEING 23-25

INST.PIPEING 13-19

Activity Floor Activity Floor Activity Floor Activity Floor Activity Floor

INST. TRAY&LADDER 4 GROUPING PIPA B1 INST.FA SYSTEM 24-27 INST.PIPA AIR HUJAN .1-25

INST. TRAY&LADDER 22-26 INST.DUCTING 24-27 INST.FA SYSTEM 28-31 INST.PIPA AIR BERSIH .1-25

INST. TRAY&LADDER 17-19 INST.DUCTING 16-23 INST.PIPA AIR KOTOR .1-25

WIREING CABLE 13-19 INST.SUPPORT PIPA .2-5 INST.PIPA RISER AIR BERSIH .1-25

WIREING CABLE 22-25 INST. SUPPORT PIPA MEP 1 INST.PIPA FF .16-20

DISM SCAFFOLDING 1 INST.SUPPORTFF 17

INST.SCAFF 1

INST PIPA FF 24

INST.PIPEING 23-25

INST.PIPEING 13-19 FABRIKASI SENAI 24

Activity Floor Activity Floor Activity Floor Activity Floor Activity Floor

INST. TRAY&LADDER 4 GROUPING PIPA B1 INST.FA SYSTEM 24-27 INST.PIPA AIR HUJAN .1-25

INST. TRAY&LADDER 22-26 INST.DUCTING 24-27 INST.FA SYSTEM 28-31 INST.PIPA AIR BERSIH .1-25

INST. TRAY&LADDER 17-19 INST.DUCTING 16-23 INST.PIPA AIR KOTOR .1-25

WIREING CABLE 13-19 INST.SUPPORT PIPA .2-5 INST.PIPA RISER AIR BERSIH .1-25

WIREING CABLE 22-25 INST. SUPPORT PIPA MEP 1 INST.PIPA FF .16-20

DISM SCAFFOLDING 1 INST.SUPPORTFF 17


INST.SCAFF 1

INST PIPA FF 24

INST.PIPEING 23-25

INST.PIPEING 13-19 FABRIKASI SENAI 24

Activity Floor Activity Floor Activity Floor Activity Floor Activity Floor

INST. TRAY&LADDER 4 GROUPING PIPA B1 INST.FA SYSTEM 24-27 INST.PIPA AIR HUJAN .1-25

INST. TRAY&LADDER 22-26 INST.DUCTING 24-27 INST.FA SYSTEM 28-31 INST.PIPA AIR BERSIH .1-25

INST. TRAY&LADDER 17-19 INST.DUCTING 16-23 INST.PIPA AIR KOTOR .1-25

WIREING CABLE 13-19 INST.SUPPORT PIPA .2-5 INST.PIPA RISER AIR BERSIH .1-25

WIREING CABLE 22-25 INST. SUPPORT PIPA MEP 1 INST.PIPA FF .16-20

DISM SCAFFOLDING 1

INST.SCAFF 1

INST PIPA FF 24

INST.PIPEING 23-25 INST.SUPPORTFF 17

INST.PIPEING 13-19 FABRIKASI SENAI 24