METHOD STATEMENT

NO OPERATION QTY METHOD DIAGRAM MENPOW PLANT/MA OUTPUT DURATI MATERIALS


. ER CHINERIE ON/DAY
S S

PLUMBER
1. Supply and fix 8 Clear all the debris away from 8hrs/day@ 2 days  Siphonic
A) the following the closet flange and put in the  2 General 4pcs/days Model No.
approved mounting bolts to hold the toilet Worker 8/4pcs C704l/SW784
sanitary fittings in place. (TOTO "Siphonic" =2 days JP Ceramic
including Model No. C704l/SW784JP Toilet Bowl.
sorting, washdown WC with S-trap
assembling, complete including all
bedding, necessary accessories and
plugging, connecting to services.
screwing,
priming,
jointing.
7K-L, Second & Third Floor,
Jalan Ban Hock,
93100, Kuching, Sarawak.
cs@buildilitycons.com.my
Tel: +6082 7877 123
Fax: +6082 7877 234
METHOD STATEMENT

NO OPERATION QTY METHOD DIAGRAM MENPOW PLANT/MA OUTPUT DURATI MATERIALS


. ER CHINERIE ON/DAY
S S
1. TOTO Model 10  Get the toilet bowl and turn it 8hrs/day@ 2 days  CW660J/SW
B) No. upside down and Install the  2 General 5pcs/days 660J
CW660J/SW66 wax ring on the bottom of the Worker 10/5pcs Washdown
0J washdown bowl and then turn the bowl =2 days WC
WC with S-strap right side up.
complete with  Once your toilet is in the
TX212CW5 position press it down to create
tank trim a seal between the flange and
without stop the wax ring.
valve complete  Turn the tank around and make
including all sure that all the nuts and
accessories and gaskets are in their proper
connecting to place, especially check the tank
services. to bowl gasket. Install the tank
to bowl nuts and bolts.
 Hook up the water supply (can
be a braided hose, plastic closet
supply, or a chrome closet
supply) place the tank lid.
7K-L, Second & Third Floor,
Jalan Ban Hock,
93100, Kuching, Sarawak.
cs@buildilitycons.com.my
Tel: +6082 7877 123
Fax: +6082 7877 234
METHOD STATEMENT
1. INAX Model 10  Outline an area on the floor 8hrs/day@ 2 days  C336 ceramic
C) No. C336 where squat toilet will be  2 General 5pcs/days squatting pan
squatting pan installed, using the current toilet Worker 10/5pcs
with H3S S- drainpipe as a focal point. =2 days
trap, T620 Determine the perimeter of the
cistern and hole that will cut in the floor to
cover install the parts of the toilet that
including all sit below the floor.
necessary  Remove bathroom floor to
accessories accommodate the parts of the
and connecting toilet that will sit below floor
to services. level. Use the sledgehammer and
chisel to remove tile or wood
boards. Use utility knife to cut
through linoleum floor
coverings.
 Move the squat toilet into the
hole that has been prepared.
Make sure to line up the drain on
the toilet with the drainpipe in
the bathroom floor. Ensure that
any rim on your toilet sits on,
rather than in, the floor.
 Apply solvent or sealant
approved for use with plumbing
pipes at the juncture of drainpipe
and toilet drain (watertight).
7K-L, Second & Third Floor,
Jalan Ban Hock,
93100, Kuching, Sarawak.
cs@buildilitycons.com.my
Tel: +6082 7877 123
Fax: +6082 7877 234
METHOD STATEMENT

 Apply a floor sealant of


waterproof caulk where the floor
meets the toilet, to protect your
home from water leaks.
7K-L, Second & Third Floor,
Jalan Ban Hock,
93100, Kuching, Sarawak.
cs@buildilitycons.com.my
Tel: +6082 7877 123
Fax: +6082 7877 234
METHOD STATEMENT

NO OPERATION QT METHOD DIAGRAM MENPO PLANT/MAC OUTPUT DURATI MATERIALS


. Y WER HINERIES ON/DAY
S
1. TOTO Model 30  Use the sink manufacturer’s 8hrs/days@ 5 days  TOTO Model
D) No. L521V3 template to draw the cut-out line  2 General 6pcs/day No. L521V3
round counter on the countertop. If no template Worker 30/6pcs round counter
top basin only is provided, set the bowl upside =5 days top basin only
1 tap hole down on the countertop and trace 1 tap hole
overall size the outline, then draw a second
540 mm x 490 line about 3/4 inch inside that
mm complete line to serve as your cut line.
including all  Carefully drill a 3/8-inch starter
necessary hole inside the cut line. Using a
accessories power jig saw (saber saw), begin
and connecting cutting along the line. Before
to services. finishing the cut, screw a scrap
board longer than the span of the
cut-out to the center of the cut-
out to prevent it from falling
when you finish cutting.
Remove the support after you
finish the cut.
Place a bead of plumber’s
putty around the bottom edge of
the drain -assembly housing’s
lip, then press the housing into
7K-L, Second & Third Floor,
Jalan Ban Hock,
93100, Kuching, Sarawak.
cs@buildilitycons.com.my
Tel: +6082 7877 123
Fax: +6082 7877 234
METHOD STATEMENT

the drain hole. Attach the gasket


and washer, then tighten the
locknut. Remove any excess
plumber’s putty. Attach the
tailpiece to the housing with the
slip nut and washer.
 Turn the sink over and carefully
align it with the countertop’s
front edge. Press firmly around
the lip to form a tight seal. After
the adhesive has set, apply a
bead of latex caulk around the
edge, then smooth it with a wet
finger.
 Install the pop-up assembly
set the sink in place, firmly
pressing down all edges to assure
a secure seal.
7K-L, Second & Third Floor,
Jalan Ban Hock,
93100, Kuching, Sarawak.
cs@buildilitycons.com.my
Tel: +6082 7877 123
Fax: +6082 7877 234
METHOD STATEMENT

NO OPERATION QT METHOD DIAGRAM MENPO PLANT/MAC OUTPUT DURATI MATERIALS


. Y WER HINERIES ON/DAY
S
1. TOTO Model 10  If your sink includes a mounting  2 General 8hrs/days@ 2 days  TOTO Model
E) No. plate, you can use that for a Worker 5pcs/day No.
LW103JT1 template to drill your pilot holes. 10/5pcs LW103JT1
wall hung Otherwise, you'll use the sink =2 days wall hung
lavatory for itself to identify and mark where lavatory
disabled basin to drill.
overall size  Drill your pilot holes for the lag
580 mm x 550 screws which should be included
mm including with your wall-mount sink. Be
all necessary sure to use a masonry bit if
accessories you're drilling through tile.
and connecting  Prepare the faucet, drain and
to services pop-up assemblies on the sink.
 Insert the faucet to the sink and
attach with locknuts.
 Wrap a thin line of plumber's
putty under the edge of your
drain assembly's housing, then
insert into the drain hole and
press to seal. On the underside
install the gasket and the washer.
Position opening on the drain to
the back of the sink; that's where
7K-L, Second & Third Floor,
Jalan Ban Hock,
93100, Kuching, Sarawak.
cs@buildilitycons.com.my
Tel: +6082 7877 123
Fax: +6082 7877 234
METHOD STATEMENT

you'll install your pop-up


assembly. Tighten the locknut].
You may have to hold the
housing so it doesn't turn with
the drain and remove any extra
plumber's putty from around the
housing.
 Push your sink stopper into place
through the housing. Put your
pivot rod into the opening on the
drain piece and thread the rod
through the end of the sink
stopper. The pivot rod will
include a plastic ball that fits into
the opening and acts as a washer.
Install a nut over the top to keep
it in place. Your pivot rod should
still be able to move up and
down.
 Turn the handle on your shutoff
valves counter-clockwise, then
open the faucet to flush out the
lines. Make sure there are no
leaks anywhere in the assembly.
7K-L, Second & Third Floor,
Jalan Ban Hock,
93100, Kuching, Sarawak.
cs@buildilitycons.com.my
Tel: +6082 7877 123
Fax: +6082 7877 234
METHOD STATEMENT

NO OPERATION QT METHOD DIAGRAM MENPO PLANT/MAC OUTPUT DURATI MATERIALS


. Y WER HINERIES ON/DAY
PLUMBER

1. Supply and fix 20  Switch off the water supply  2 General  Drill 8hrs/day@ 4 days  TOTO Model
A) the following valve on the wall. Then, flush Worker  Screw 5pcs/day No.
approved the toilet a couple of times to  Pipe Wrench 20/5pcs TX4033SCR
sanitary empty the tank.  Teflon tape =4 days hand bidet
fittings  Adjustable Span
including  Disconnect the flex pipe or Wrench
sorting, water line. Remove the
assembling, connection from the cistern.
bedding, Unscrew it by hand / use a
plugging, wrench if the connection is
screwing,
too tight. Ready a towel or
priming,
bucket below it to catch
jointing and
making good excess water left in the tank.
disturbed area  Wrap Teflon tape onto the
all in strict
threaded valve at the end of
accordance to
the the cistern, the part where
Manufacturer's you disconnected the water
details and line from. Then, connect your
instructions. T-adapter onto the water
7K-L, Second & Third Floor,
Jalan Ban Hock,
93100, Kuching, Sarawak.
cs@buildilitycons.com.my
Tel: +6082 7877 123
Fax: +6082 7877 234
METHOD STATEMENT

tank. Also, remember not to


over-tighten connections
from here on.

 Before screwing the T-


adapter on, place the washer
or O-ring that comes with
your set onto the opening that
joins with your water tank
valve. Attach firmly to avoid
leaks.

 Pick up the disconnected


water line and reconnect it to
the cistern. Instead of
connecting it directly to the
water tank, join it to the other
end of the T-adapter.

 Next, fetch the bidet hose to


complete the setup. One end
of the hose goes to the
remaining opening of the T-
adapter, which is right across
the T-adapter’s on and off
valve. The other end of the
7K-L, Second & Third Floor,
Jalan Ban Hock,
93100, Kuching, Sarawak.
cs@buildilitycons.com.my
Tel: +6082 7877 123
Fax: +6082 7877 234
METHOD STATEMENT

bidet hose connects with the


sprayer and trigger.

 Before screwing the T-


adapter on, place the washer
or O-ring that comes with
your set onto the opening that
joins with your water tank
valve. Attach firmly to avoid
leaks.

 Pick up the disconnected


water line and reconnect it to
the cistern. Instead of
connecting it directly to the
water tank, join it to the other
end of the T-adapter.

 Next, fetch the bidet hose to


complete the setup. One end
of the hose goes to the
remaining opening of the T-
adapter, which is right across
the T-adapter’s on and off
valve. The other end of the
bidet hose connects with the
7K-L, Second & Third Floor,
Jalan Ban Hock,
93100, Kuching, Sarawak.
cs@buildilitycons.com.my
Tel: +6082 7877 123
Fax: +6082 7877 234
METHOD STATEMENT

sprayer and trigger.

 After you have secured all


connections, turn on the
water supply valve at the wall
as well as the T-adapter to
check for leaks. Press the
trigger or button of the bidet
sprayer to see if you’ve got
the setup done right.

 Lastly, decide on where you


want to hang your bidet
sprayer. Depending on the
kind of holder you’ve got
with your set or your
preference, you can hook the
holster onto the rim of the
water tank for easy
installation or screw it onto
your bathroom wall which
may prove to be a more
convenient location.
7K-L, Second & Third Floor,
Jalan Ban Hock,
93100, Kuching, Sarawak.
cs@buildilitycons.com.my
Tel: +6082 7877 123
Fax: +6082 7877 234
METHOD STATEMENT

NO OPERATION QT METHOD DIAGRAM MENPO PLANT/MAC OUTPUT DURATI MATERIALS


. Y WER HINERIES ON/DAY
S
1. TOTO Model 20  Measure the height for the door 2 General 8hrs/day@ 2 days  Stainless Steel
B) No. handle. You can measure the Workers 10pcs/day
T30ARQ13N height of the handles on the 20/10pcs
"STANDARD other doors in the house and use =2 days
" series lever that. Alternatively, you can read
handle sink tap
the instructions that come with
with swivel
the door handle kit.
spout sink tap,
including all  Mark where the door handle will
necessary go and drill pilot holes in the
accessories
door.
and fixing to
wall.  Drill a hole for the spindle, for
the barrel and mark around the
face plate.

 Attach the latch to the door then


install the striker plate.

 Attach the striker plate, the


handles and lastly Attach the
face plates.
7K-L, Second & Third Floor,
Jalan Ban Hock,
93100, Kuching, Sarawak.
cs@buildilitycons.com.my
Tel: +6082 7877 123
Fax: +6082 7877 234
METHOD STATEMENT

NO OPERATION QT METHOD DIAGRAM MENPO PLANT/MAC OUTPUT DURATI MATERIALS


. Y WER HINERIES ON/DAY
S
1. Model No. 20  Locate and measure the steel  2 General  Stainless steel 8hrs/day@ 2 days  600mm
C) SSE2 stainless bar to find centre to centre or Workers grab bar 10pcs/day Stainless Steel
steel grab bar the distance of mounting holes  Drill tool 20/10pcs
overall size should be spaced.  Screwdriver =2 days
600 mm  Screw
including all
necessary  Drill a hole through the wall, at
accessories each mark. Use a screwdriver
and fixing to to back the bolt until the end of
wall. its finish with the nut at the
opposite end.

 Install the fasteners into the


holes in the wall while they’re
attached to the grab bar.
7K-L, Second & Third Floor,
Jalan Ban Hock,
93100, Kuching, Sarawak.
cs@buildilitycons.com.my
Tel: +6082 7877 123
Fax: +6082 7877 234
METHOD STATEMENT

NO OPERATION QT METHOD DIAGRAM MENPO PLANT/MAC OUTPUT DURATI MATERIALS


. Y WER HINERIES ON/DAY
S
1. Model No. 20  Locate and measure the steel  2 General  Stainless steel 8hrs/day@ 2 days  700mm
D) SSE9 stainless bar to find centre to centre or Workers grab bar 10pcs/day Stainless Steel
steel grab bar the distance of mounting holes  Drill tool 20/10pcs
overall size should be spaced.  Screwdriver =2 days
700 mm x 700  Screw
mm, including
all necessary  Drill a hole through the wall,
accessories at each mark. Use a
and fixing to screwdriver to back the bolt
wall until the end of its finish with
the nut at the opposite end.

 Install the fasteners into the


holes in the wall while they’re
attached to the grab bar.
7K-L, Second & Third Floor,
Jalan Ban Hock,
93100, Kuching, Sarawak.
cs@buildilitycons.com.my
Tel: +6082 7877 123
Fax: +6082 7877 234
METHOD STATEMENT

NO OPERATION QT METHOD DIAGRAM MENPO PLANT/MAC OUTPUT DURATI MATERIALS


. Y WER HINERIES ON/DAY
S
1. Model No. 20  Locate and measure the steel  2 General 8hrs/day@ 2 days  700mm x
E) SSE14 L- bar to find centre to centre or Workers 10pcs/day 700mm
shaped the distance of mounting holes 20/10pcs Stainless Steel
stainless-steel should be spaced. =2 days Grab
grab bar
overall size
700 mm x 700  Drill a hole through the wall, at
mm, including each mark. Using a screwdriver
all necessary to back the bolt until the end of
accessories its finish with the nut at the
and fixing to opposite end.
wall.

 Install the fasteners into the


holes in the wall while they’re
attached to the grab bar.
7K-L, Second & Third Floor,
Jalan Ban Hock,
93100, Kuching, Sarawak.
cs@buildilitycons.com.my
Tel: +6082 7877 123
Fax: +6082 7877 234
METHOD STATEMENT

NO OPERATION QT METHOD DIAGRAM MENPO PLANT/MAC OUTPUT DURATI MATERIALS


. Y WER HINERIES ON/DAY
S
1. PECO Model 20  Snip a length of adhesive tape  2 General 8hrs/day@ 2 days  P913 Stainless
F) No. P913 from the tape roll and stick it on Workers 10pcs/day Steel Soap
stainless steel the extender. 20/10pcs Dispenser
soap dispenser =2 days
with key wall
mounting.  Apply adequate force a minute,
gradually release the grip and
leave it for 24 to 48 hours.
7K-L, Second & Third Floor,
Jalan Ban Hock,
93100, Kuching, Sarawak.
cs@buildilitycons.com.my
Tel: +6082 7877 123
Fax: +6082 7877 234
METHOD STATEMENT

NO OPERATION QT METHOD DIAGRAM MENPO PLANT/MAC OUTPUT DURATI MATERIALS


. Y WER HINERIES ON/DAY
S
1. Approved 20  Choose the location and point it  2 General 8hrs/day@ 2 days  150mm X
G) 150mm x 150 so that the worker easy to Workers 10pcs/day 150mm
mm stainless measure the size at the floor. 20/10pcs Stainless Steel
steel floor trap =2 days
with integral  The minimum height for the
hinged cover installation is 64mm-71mm.
and standard However, cut the reducer to
perforated appropriate height. Make sure
cleanout. the slope must in 1-2 degrees in
piping system.

 Always keep clean hoop for


hydro insulation.

 Then, apply the waterproof


coating for the first layer and dry
it for 5hr. Then apply the hydro
isolation and tightening it with
thin flange.
7K-L, Second & Third Floor,
Jalan Ban Hock,
93100, Kuching, Sarawak.
cs@buildilitycons.com.my
Tel: +6082 7877 123
Fax: +6082 7877 234
METHOD STATEMENT

 Apply second layer of


waterproof coat and dry it in
24hr minimum.

 After apply the waterproof


coat, apply glue for the tiles
smoothly.

 To connect between drain and


the tiles, apply the waterproof
silicon.

 Lastly, put the cover of the


floor trap smoothly.
7K-L, Second & Third Floor,
Jalan Ban Hock,
93100, Kuching, Sarawak.
cs@buildilitycons.com.my
Tel: +6082 7877 123
Fax: +6082 7877 234
METHOD STATEMENT

NO OPERATION QT METHOD DIAGRAM MENPO PLANT/MAC OUTPUT DURATI MATERIALS


. Y WER HINERIES ON/DAY
S
1. Model No. 20  Choose the point of installation.  2 General 8hrs/day@ 2 days  4 Roll tissue
H) JRD100 The toilet paper must be easy to Workers 10pcs/day  Roll holder
JUMBO roll reach. 20/10pcs  Spring
toilet tissue  Measure the location of the =2 days loaded paper
dispenser
holder with the template
overall size
included and measure the 4
58.8 x 37.9 x
30.9 cm screws of the holders and point it
including all to the locations before moving it.
necessary  Mark the screws location with
accessories the felt - trio marker on the wall.
and fixing to  Drill the screw on the wall and
wall. insert wall anchors for added
stability.
 Screw the bracket onto the wall.
After that hang each of the roller
holders on the attached brackets.

 Lastly, add toilet paper and the


spring-loaded paper holder.
7K-L, Second & Third Floor,
Jalan Ban Hock,
93100, Kuching, Sarawak.
cs@buildilitycons.com.my
Tel: +6082 7877 123
Fax: +6082 7877 234
METHOD STATEMENT