Download as pdf or txt
Download as pdf or txt
You are on page 1of 2

Deepak Dubasi

Phone: +91-9109876868
Email: deepak4dubasi@gmail.com
Skype: dubasi.deepak
LinkedIn Id: linkedin.com/in/deepak-dubasi-48672919

Career Objective-
Competent electrical engineer with MS degree and 4 years’ experience in relevant field, looking for a position in a
challenging and growing environment.

Professional Experience-
Earthwork Security Private Limited – Nagpur, Maharashtra, India Jul 2017 - May 2018
Junior Technical Engineer
 Provide technical support to the engineering team in executive projects
 Designed schematic of electrical equipment and wiring diagrams of the equipment in AutoCAD.
 Drafted and prepared layout drawings of the given structure components and devices in AutoCAD.
 Testing metal detectors in various security equipment
 Worked on access control systems like biometric access control system and real time viewing system.
 Coordinate with technicians in developing engineering designs
 Worked on search and detection equipment like fixed door metal detector and under vehicle surveillance system
 Demonstration of the products to clients and explaining the benefits and usage of the equipment.

Wacker Polysilicon- Wacker Chemie AG- Charleston, TN, USA Oct 2016 – May 2017
EIC support engineer- Silanes
 Involved in the planning and construction of processing plants taking into account environmental compatibility,
operational reliability and cost-effectiveness.
 Worked on COMOS tool as platform for maintaining the plant infrastructure, processes, and information
 Analyzed and provided suitable solutions to problems the team faced by detecting the problem and doing the needful.
 Coordinated with project team to maintain project status knowledge and resolved issues.
 Managed client communications and resolved all the problems for client deliverables.
 Worked on SAP at user end as platform for inventory and warehouse management.
 Maintaining stock level of the required electrical equipment and checking on the delivery of the equipment in well- timed
manner.
 Active in troubleshooting and coordinated with relevant team to resolve all technical issues.
 Estimating labor costs, material and project timescale and giving presentation to managers and clients on the same.
 Consulting with marketing representatives and negotiate for getting new parts at lower cost and checking if it is getting
delivered on time or get it repaired as per the requirement.

The University Of Tennessee at Chattanooga- Chattanooga, TN, USA Jan 2015 - May 2016
Graduate Teaching Assistant
 Help professors to develop course plans.
 Assisted faculty members with classroom instruction, exams, record keeping, and other miscellaneous projects.
 Assisted faculty members with their research work going on in the university towards my assistantship.
 Assisted faculty in lesson delivery in electrical circuit laboratory and power electronics laboratory.
 Demonstrate use of laboratory equipment and enforce laboratory rules to undergraduate students.

Nanda Engineering and Foundry Works- Bhilai, India Aug 2013 - May 2014
Graduate apprentice
 Assisted in the design and building of test equipment and prototypes for departmental research, including carrying out
tests, monitoring and recording results.
 Ordering of appropriate consumables to maintain adequate stock levels and ensuring stocks are well organized.
 Inspecting and calibrating of electronic and electrical equipment in-line with a Planned Maintenance Program.
 Making sure projects meet electrical and construction safety regulations.
Education:
The University of Tennessee at Chattanooga Gpa- 3.4/4.0
Master of Science in Electrical Engineering (EE) Aug 2014 - May 2016
Chhattisgarh Swami Vivekananda Technical University Gpa-3.3/4.0
Bachelors in Electrical and Electronics Engineering (EEE) Aug 2009 - May 2013

Projects:
Multilayer networks to perform the classifications Nov 2014
 Designed a multilayer network using MATLAB to recognize pattern.

New Wind Farm Design Project Apr 2015


 Designed a model of new wind farm and inspected over simulation on power world. Every bus was inspected by power-
flow analysis and each was well within range of maximum operating conditions.

Fuzzy Logic controller Design Project Nov 2015


 Designed real time system of DC motor speed and current control using Simulink to replace dual loop PI controls and
implemented on d-Space system.

Project on Voltage Stability Using Q-V Modal Analysis Apr 2016


 Analyzed Voltage Stability Using Q-V Model Analysis and with Mat-lab. Q-V curves are used to confirm the obtained
results and to predict the stability margin or distance to voltage collapse based on the reactive power load demand

Implementation of Cockcroft Walton Voltage Multiplier Circuit Apr 2013


 In this project, output voltage of 33KV is being generated with the help of capacitors and diodes with a supply of 1KV.

Wireless AC Motor Speed Control Using Triac and Microcontroller Apr 2012
 In this project, simple method is used for controlling a motor using a triac and a flash microcontroller. In this system,
speed is controlled with the help of switches connected to RF transmitter section.

Research Papers:
Research paper on transmission line protection and distribution line protection Dec 2015
 This research paper about transmission line gives a brief idea about how the transmission line and distribution line are
made and what all are the faults possible in these types of line and how can we reduce them by using various methods.

Research paper on protection and coordination of fuses in smart distribution Apr 2016
 This paper presents the coordination between the fuse and recloser by using data of heating and cooling of the fuse in
load side and source side. This paper includes artificial intelligence or manual coordination in the power system when
coordinating protection devices in a system all factor must be included for each possible setting.

Training:
National Thermal Power Corporation- Korba, India May 2012 - Jun 2012
 Trained in Coal handling plant, Electrical Maintenance, Boiler & Turbine.
 Performed duties in quality testing.

Godrej & Boyce Mfg. Co. Ltd May 2011- Jun 2011
 Industrial automation training on Programmable Logic Controller
 The PLC receives information from connected sensors or input devices, processes the data, and triggers outputs based on
pre-programmed parameters.

Micro-Pro, The Computer Professional Jun 2011- Jul 2011


 Vocational training and project on Labview
 This is a graphical programming approach that helps you visualize every aspect of your application, including hardware
configuration, measurement data, and debugging.

Skills and Languages:


 MAT-LAB, AutoCAD, P-spice, Power World, E-Tap, MS Office, MS Access, PCB design.
 SQL, SAP (user), COMOS, C, communication skills, calm under pressure, troubleshooting.

You might also like