Transfer Pump: Transfer Pump 1 Basement 1 Fuji Electric DRIVE MOTOR (Specification Plate)
Transfer Pump: Transfer Pump 1 Basement 1 Fuji Electric DRIVE MOTOR (Specification Plate)
Date Particulars
Annual Preventive Maintenanc
» Replaced one (1) of fuel filter Conducted by Power
system Inc.
» Replaced two (2) of lube filter
August 25,'18
(Accredited HB
» Changed oil of lubricating oil contractor)
» Replaced cooling system water.
General Cleaning
» Replaced three (3) pieces of BAN
with size 13 mm x 1370 mm. Conducted by in house
February 4, '19
» Drained water down to prevent in technician.
» Replaced cooling system water.
»
» Dust off dirts
Replaced two wiped external
(2) pieces of sur
Conducted by in house
October 10,'19
batteries
» Dust charger
off dirts found
wiped defective)
external technician.
Conducted by in house
(Battery
October 29,'19
surfaces using
» Installation diesel
of newly fuel
purchased technician.
Conducted by in house
November 6,'19
battery charger technician.