33 KV Romai Line: (Line Plan of The Proposed Work) Drawing Not To Scale
33 KV Romai Line: (Line Plan of The Proposed Work) Drawing Not To Scale
33 KV Romai Line: (Line Plan of The Proposed Work) Drawing Not To Scale
TO
Drawing not to scale
MO
HA
NB
Ch
A
. 60
RI
7.4
0 Km
UA
W AB
OV
Utility Corridor (2 metre)
RO CH
ER
33KV Line TO
HE
Pole
ROW
AD
W
RO
CR
ROW ROW ROW ROW
OS
UA
HAB
SING
TO C
W
TO BOKEL Mohanbari-Chabua By Pass RO
W
RO
Ch
ROW
.6
ROW ROW ROW ROW W
RO
07
.90
Km
W
RO
Ch. 599.50 Km
UN
DE
W
RG
RO
RO
Formation Width
UN
D
W
ROW ROW ROW ROW RO
CR
OSS
UNDERGROUND CROSSING
IN
G
Existing NH-37