Checklist: Documentary Requirements For Bidding - R.A. 9184 Description Remarks
Checklist: Documentary Requirements For Bidding - R.A. 9184 Description Remarks
: NRP -BAA-03-16
PORT MANAGEMENT OFFICE - BATAAN/AURORA Name of the Contract: Various
Admin. Bldg., Port of Lamao, Limay, Bataan Repairs Damaged by Typhoon
Lando at Port of Casiguran,
Aurora Province
Location:Port of Casiguran
Amount:Php 2,681,851.72
CHECKLIST
Name of Contractor: _______________________________________________________
3 Valid PCAB License & Registration for the type & cost of the Contract to be
bid (Sec. 23.1.a.iv)
License No. ______ ______ Principal Category:_"_____"_ Expiration Date: _________
Inter-Agency Class. __________ Reg. No. _________ Expiration Date:_____________
c. FINANCIAL DOCUMENTS
1 Audited Financial Statements, Stamped, received by the BIR or its duly
authorized/accredited institutions, for the immediately preceeding calendar
year showing among others the total assets and liabilities.
2 Bidder's computation of its NFCC or a commitment from a licensed bank to
extend to it a Credit Line if awarded the Contract in an amount not lower than
the set in the bid documents w/c shall be at least 10% of the ABC = P 268,185.17
2 BID SECURITY (ABC = Php 2,681,851.72)
a. Cash, Cashier's Check, Manager's Check, Bank Draft/Guarantee or irrevocable
Letter of Credit issued by a Universal or Commercial Bank (2% of the ABC =
(P53,637.03)
b. Surety Bond - callable on demand:validity = 120 CD issued by a surety or
insurance company duly certified by the Insurance Commision
(5% of ABC = P 134,092.59)
c. Combination of the above proportionate to share of form with respect to total
amount of surety
d. Bid Securing Declaration in the prescribed form (Notarized)
3 PROJECT REQUIREMENTS
a. Organizational Chart for the Contract to be Bid
b. List of Contractor's Personnel to be assigned to the contract to be bid.
with their complete Qualification & Experience Data:
Name PRC ID/Expiry Date
1. Project Manager: __________________________ ________________________
2. Project Engineer: __________________________ ________________________
3. Const.Safety Health Officer: __________________ _______________________
4. Materials Engineer: _______________________ ________________________
5. Foreman: _________________________ _______________________
c. List of Contractor's Equipment units, which are owned, leased and/or under
Purchased Agreements supported by Certification of Availability of Equipment
from the lessor/vendor for the duration of the project.
1. One (1) unit Backhoe with concrete breaker - __________
2. One (1) unit Dump Truck - __________
3. One (1) unit Concrete Cutter) - __________
4. One (1) unit Plate Compactor - __________
5. One (1) unit Concrete Mixer - __________
6. One (1) unit Concrete Vibrator - __________
7. One (1) unit Bar Cutter - __________
8. One (1) unit Bar Bender - __________
9. Three (3) sets Scaffolding - __________
10. One (1) unit Electric Drill - __________
CHECKLIST
d. Construction Methods
e. Construction Safety & Health Programs
1. Any missing documents in the above-mentioned checklist is a ground for outright rejection of the bid.
LEGEND:
C - Chairman P - Passed
VC - Vice-Chairman F - Failed
RM - Regular Member
PM - Provisional Member REMARKS:
O - Observer
Eligible
Ineligible
___________________ _____________________
PICE Representative NGO Member
REMEDIOS M. FRAC
BAC Chairperson