Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 6

Engineer Panca Sembiring

ID FMS-13062016-134

Date Customer Name Industry Contact Person Customer Type

PT. Picco Prima Artha Contractor Mr. Surjasa Kamal OEM

PT. Anugrah Langkat Makmur Palm Oil Mill Mr. Rizki AU

13-Sep-16

Mr. Petrus
J.W Marriott Hotel AU
Mr. Ady Rusman

CV. Viozel Abadi Contractor Mr Rian OEM

Syrup Kurnia F&B Mr. Jonathan AU

PT. Amal Tani Palm Oil Mill Mr. Firman AU


14-Sep-16

PT. Agri Andalas Palm Oil Mill Mr. Hemat AU

PT. Unilever Oleochemical - Sei Mangke Oleochemical Mr. Jonardo AU

15-Sep-16
PT. Bintang Tenera Refinery Mr. Rudi AU
15-Sep-16

PT. Paya Pinang Palm Oil Mill Mr. Eko AU

PT. Pasific Medan Industri Refinery Mr. Eka Budiono AU

PT. Indah Pontjan Feed Mill Ms. Merry / Ms Rina AU

16-Sep-16 PT. First Mujur Feed Mill Mr. Hamdani AU

PT. Soci Mas Oleochemical Oleochemical Ms. Merry AU

17-Sep-16 PT. Prima Tatadaya Mr. Sumito Meeting with Mr. Sumito and Mr Ru
Call Type Call Summary Follow-up Action

Introducing FM, Follow up


Visit Office Quotation Flowirl 8700 - 4" in the Follow intensive
process to their user.

Introducing Forbes Marshall and


make appointment to visit the Make a proposals for
Visit Office
plan, so if wan to visit the plan visit
must be make a proposal

Scoping loundry area to take a


data for calculation of
Visit Make a reports
Condensate Resovery and Flash
Steam

Make a Quotation Safety Valve


Email Follow by call
DN25 x DN50 ANSI600

Introducing product Forbes Do appoinment for


Visit Marshall, Make appoinment for scoping plant to make
visit to plan a proposal

Introducing Product Forbes


Marshall, make appoinment for Call again Mr Firman
Visit Office
visit to plan must be permit to as soon.
managemnet

Introducing Forbes Marshall,


They have problem for heating Must be change the
Visit Office the Kernel silo, so they used steam trap from TD to
steam trap is TD. It's that Float Trap
incorrect Steam trap

They wait for the offer


To take the data of condensate
Email and design
recovery in Plan Soap and Dove,
condensate recovery
Introducing Forbes Marshall, for Make a proposal for
Visit Office do scoping should be make scoping plan to his
proposal to Director. Direcor

Introducing Forbes Marshall and Make a proposal for


Visit Office for visit to plan make scoping plan to his
appoinment to Engineering Engineering

Introducing Product Forbes waiting the


Marshall, Disccuss for information from
Visit Flowmeter, because they need manager Palm Oil
flowmeter steam for Press. 10 Mill, make quote 2
bar and flowrate 1200 kg/hr pcs Flowmeter

Introducing Forbes Marshall and Make a proposal for


Visit for visit to plan make scoping plan to his
appoinment to Engineering Engineering

Introducing Forbes Marshall and Make a proposal for


Visit Office for visit to plan make scoping plan to his
appoinment to Engineering Engineering

Introducing Forbes Marshall,


They wait for the offer
Discuss for System
and design
Visit Contamination Condensate,
Contamination of
because they need install the
Condensate System
system and take the data

ng with Mr. Sumito and Mr Rusdi


Engineer Panca Sembiring
ID FMS-13062016-134

Date Customer Name Industry Contact Person Custome

19-Sep-06 Visit to Kalimantan with Mr Hardy CV. Pelita Abadi Teknik

20-Sep-06 PT. Manis Mata Mill - Cargill Group Palm Oil Mill AU

21-Sep-06 PT. Paku Juang Mill - Cargill Group Palm Oil Mill AU

22-Sep-06 PT. Polly Plant - Cargill Group Palm Oil Mill AU

22-Sep-06 PT. Indosawit Kekal - Cargill Group Palm Oil Mill AU


Call Type Action Plan Accompanied by

Visit Introduction Product FM, Scoping

Visit Introduction Product FM, Scoping

Visit Introduction Product FM, Scoping

Visit Introduction Product FM, Scoping

You might also like