2400

BTS
1400

ROOM + 3m
Ext Ant 3G VMS 43m
New Ant 4G VMS 43m

8000 New RRU VMS 41m


+ 40m

REMARK:

Room dimension (W*D*H): 2.4x1.4x3.0m

Height of tower: 3m

The height of existing 2G antenna: NA

The height of existing 3G antenna: 43m


BTS
The height of proposed 4G antenna: 43m
ROOM
Total length of new cable ladder: 2.5m + 0m

REMARK:
SIGNAL CABLE POWER CABLE GRD CABLE
OLD EQUIP NEW EQUIP EXISTING CABLE LADDER NEW CABLE LADDER

PROJECT NAME: SITE ID: SITE ADD: LOCAL MOBIFONE DRW NAME: PAGE:
HUAWEI: APPROVED BY
NETWORK COVERAGE QUALITY BUILDING, TOWER, ANTENNA
CONSTRUCTION AND IMPROVEMENT IN SOUTH WEST
1
KGPQA5 _LTE LAYOUT
HUAWEI TECHNOLOGIES MACHINERY INSTALLATION AREA
VIETNAM.,LTD FOR TELECOMMUNICATION SURVEY DATE APPROVED DATE 6
CORPORATION TL DRW NO.
2400
300
700 700 700

700
1400

700

REMARK:
SIGNAL CABLE POWER CABLE GRD CABLE
OLD EQUIP NEW EQUIP EXISTING CABLE LADDER NEW CABLE LADDER

PROJECT NAME: SITE ID: SITE ADD: LOCAL MOBIFONE DRW NAME: PAGE:
HUAWEI: APPROVED BY
NETWORK COVERAGE QUALITY
CONSTRUCTION AND IMPROVEMENT IN SOUTH WEST EXISTING ROOM LAYOUT 2
KGPQA5 _LTE
HUAWEI TECHNOLOGIES MACHINERY INSTALLATION AREA
VIETNAM.,LTD FOR TELECOMMUNICATION SURVEY DATE APPROVED DATE 6
CORPORATION TL DRW NO.
2400
300
700 700 700

700
1400

700

REMARK:
SIGNAL CABLE POWER CABLE GRD CABLE
OLD EQUIP NEW EQUIP EXISTING CABLE LADDER NEW CABLE LADDER

PROJECT NAME: SITE ID: SITE ADD: LOCAL MOBIFONE DRW NAME: PAGE:
HUAWEI: APPROVED BY
NETWORK COVERAGE QUALITY
CONSTRUCTION AND IMPROVEMENT IN SOUTH WEST PROPOSAL EQUIPMENT 3
KGPQA5 _LTE ROOM LAYOUT
HUAWEI TECHNOLOGIES MACHINERY INSTALLATION AREA
VIETNAM.,LTD FOR TELECOMMUNICATION SURVEY DATE APPROVED DATE 6
CORPORATION TL DRW NO.
2400
300
700 700 700

700
1400

700

REMARK:
SIGNAL CABLE POWER CABLE GRD CABLE
OLD EQUIP NEW EQUIP EXISTING CABLE LADDER NEW CABLE LADDER

PROJECT NAME: SITE ID: SITE ADD: LOCAL MOBIFONE DRW NAME: PAGE:
HUAWEI: APPROVED BY
NETWORK COVERAGE QUALITY
CONSTRUCTION AND IMPROVEMENT IN SOUTH WEST CABLE LADDER LAYOUT 4
KGPQA5 _LTE
HUAWEI TECHNOLOGIES MACHINERY INSTALLATION AREA
VIETNAM.,LTD FOR TELECOMMUNICATION SURVEY DATE APPROVED DATE 6
CORPORATION TL DRW NO.
A-A

500
3000
2500

700 700 700


300
2400
REMARK:
SIGNAL CABLE POWER CABLE GRD CABLE
OLD EQUIP NEW EQUIP EXISTING CABLE LADDER NEW CABLE LADDER

PROJECT NAME: SITE ID: SITE ADD: LOCAL MOBIFONE DRW NAME: PAGE:
HUAWEI: APPROVED BY
NETWORK COVERAGE QUALITY VERTICAL CABLE LADDER LAYOUT
CONSTRUCTION AND IMPROVEMENT IN SOUTH WEST
5
KGPQA5 _LTE (A-A section)
HUAWEI TECHNOLOGIES MACHINERY INSTALLATION AREA
VIETNAM.,LTD FOR TELECOMMUNICATION SURVEY DATE APPROVED DATE 6
CORPORATION TL DRW NO.
2400
300
700 700 700

700
1400

700

REMARK:
SIGNAL CABLE POWER CABLE GRD CABLE
OLD EQUIP NEW EQUIP EXISTING CABLE LADDER NEW CABLE LADDER

PROJECT NAME: SITE ID: SITE ADD: LOCAL MOBIFONE DRW NAME: PAGE:
HUAWEI: APPROVED BY
NETWORK COVERAGE QUALITY
CONSTRUCTION AND IMPROVEMENT IN SOUTH WEST 0 CABLE ROUTE LAYOUT 6
KGPQA5 _LTE
HUAWEI TECHNOLOGIES MACHINERY INSTALLATION AREA
VIETNAM.,LTD FOR TELECOMMUNICATION SURVEY DATE APPROVED DATE 6
CORPORATION TL DRW NO.