Document No:VPPL-CK/EHS/FMT/01

Rev No: 0/0


Effective Date: 01.08.2018

EHS, DWM AND 1S /2S LEADERSHIP AUDIT SCHEDULED


Aug'18 Sept'18 Oct'18
Team Members 24th Aug 31st Aug 7th Sept 14th Sept 21st Sept 28th Sept 5th Oct 12th Oct 29th Oct 26th Oct
HR Manager A S R Q P O N M L K
Mould Shop Manager B A S R Q P O N M L
Maintenance Manager C B A S R Q P O N M
Paint Shop Manager D C B A S R Q P O N
Stores and Dispacth E D C B A S R Q P O
Manager
Assymbly Shop Manager F E D C B A S R Q P
Quality Manager G F E D C B A S R Q
Finance Dept H G F E D C B A S R
ME Engineer I H G F E D C B A S
EHS officer J I H G F E D C B A
Stores Manager K J I H G F E D C B
TPM Executive L K J I H G F E D C
HR Officer M L K J I H G F E D
Mould Shop Engineer N M L K J I H G F E
Maintenance Engineer O N M L K J I H G F
Paint Shop Engineer P O N M L K J I H G
Stores and Dispacth Q P O N M L K J I H
Engineer
Assymbly Shop Engineer R Q P O N M L K J I
Quality Engineer S R Q P O N M L K J