1. S.N. Construction Co., Ltd. received a quotation from Chot Lanamthiang for fabricating and supplying a vertical surge tank.
2. The quotation included items for fabricating pipes, sandblasting/painting, fabrication of strainer and pump skids, and engineering data records.
3. The total price quoted was 573,000 Thai Baht excluding VAT, with payment terms of 30% down payment and 70% cash before transportation, and delivery within 3 weeks of receiving an official order.
1. S.N. Construction Co., Ltd. received a quotation from Chot Lanamthiang for fabricating and supplying a vertical surge tank.
2. The quotation included items for fabricating pipes, sandblasting/painting, fabrication of strainer and pump skids, and engineering data records.
3. The total price quoted was 573,000 Thai Baht excluding VAT, with payment terms of 30% down payment and 70% cash before transportation, and delivery within 3 weeks of receiving an official order.
1. S.N. Construction Co., Ltd. received a quotation from Chot Lanamthiang for fabricating and supplying a vertical surge tank.
2. The quotation included items for fabricating pipes, sandblasting/painting, fabrication of strainer and pump skids, and engineering data records.
3. The total price quoted was 573,000 Thai Baht excluding VAT, with payment terms of 30% down payment and 70% cash before transportation, and delivery within 3 weeks of receiving an official order.
Address : Head office นายโชติ ลานํ "าเที&ยง 120/10 Moo 3 Khong Hae Sub Distric,Hatyai Distric Songkla 90110 หมายเลขบัตรประชาชน 3450600788271 Tax.ID 093556000095 Tel : 064-9385888 ATTN : Sawanthira C. E-mail: chot_200159@hotmail.com Operation Secretary Tel : Tel. 091-489-5035 Date : 28 October 2019 E-mail : Sawanthira.c@pichainavee.com Quotation No. : 1910CH005 Revision. : 0 Dear Sirs, Page : 1/1 With reference to your requirement, we are pleased to offer you our best price as the following : Unit Price Amount Item Description Q'ty (THB) (THB)
Vertical surge tank
1 Pipe Fabrication 3" 4" SCH40 FLG WELD NECK #150 450 DB 1 270,000.0 270,000.0 Extra sharge for Addition 600Bath/DB 2 Sandblast/Painting 1 28,000.0 28,000.0 3 Fabrication Strainner skid MPI/Yard/Load test transportation 1 140,000.0 140,000.0 4 Fabrication skid pump MPI/Yard/Load test transportation 1 120,000.0 105,000.0 5 Engineering Data Record 1 30,000.0 30,000.0
Not include on side installation
Not include Piping/Support Piping/Strainer/Pump//Inline Equipment Transportation Rayong to Lanbrabue by costomer Load test by customer
TERMS & CONDITIONS: Subtotal 573,000.0
Payment 30% Down payment , Cash Discount - 70% Cash before transportation at yard Exclude VAT 573,000.0 VAT 7% - Grand total 573,000.0 Validity 15 Days Delivery Within 3 weeks, after receiving official order and completed material
We hope that our offer will be of your acceptance and look forward to your continued support.
Yours faithfully Order Confirmation
L. Chot Kindly enclose and confirmation
Chot Lanamthiang PO. No. ……………………………….
Tel : 064-9385888 Name ………………………………. E-mail: chot_200159@hotmail.com Date ……………………………….