4/2/19 a+d+munshi+ laldev- providing w/L board from bjo- hldr by trolly
5/2/19 a+s+h+s- providing of W/L board from mzm- bjo,m+ p- with pwi at cps see km 32/ 5-6
6/2/19 a+d+h+L- providing of W/L board from hldr- cps,m+ p- with pwi at cps sej km 32/ 5-6
7/2/19 a+m- with pwi check bridge no.64&78a l-xing by pickup, p- painting of board at 50B,h-rest
8/2/19 a+m+p+h-with pwi check bridge no.64 by pickup & provide sathi at lc from 68-82,
11/2/19 a+m+p-with pwi by pickup at l-xing12/c check rail provided & griending of rail at 2/c,h-leave
12/2/19 a+h+p-with pwi by pickup at l-xing21/c,29,50/B check rail provided ,m-over halling 78a
13/2/19 a+h+p-with pwi by pickup at l-xing21/c,29,50/B check rail provided ,m-over halling 78a
15/2/19 a+h+p+h-with pwi by pickup accompanying with crs/ndls from gjl-mzm5:25-7:40 9:50-
16:50,back17:15-18:40
18/2/19 a+m+p-with pwi at hldr yd measurements of CST& TSR site km 50/7-8 9,h-rest
21/2/19 a+m+h- ballast DMT unloading km hldr-cps 14:47 - 16:40,16:50-20:10 cps- host,p- at bridges
no.64 rail leading to 64/b
23/2/19 a+m-rail making bridges no.64,h-rest ,h- je/bjo,p- material lead to cps
25/2/19 a+p+h- rail making bridges no.64,m- nbd for material of bridge 64
SSE/P.WAY/BJO