Major Modication Job @ PTPS Site, Haryana

T he Project team at PTPS Site has identified and replaced the


Cradle Platform in Wagon Tippler #4 at CHM II. Client
permitted to complete the job within 20 days and the project team
completed the cradle platform replacement work from 17th November 2017 to 2nd
December 2017. The team
consist of Project In-charge
Mr.Aranganathan, Sr. Foreman
Mr.Somanathan and their team and
Mechanical In-charge Mr.Chandra
Shekara Thakur and his team. SE
Mr.M.P.Sharma, CE Mr.S.K.Vathava, CHP II
Exen Mr.Ashish Dul, CHP III Exen Mr. Shuraj Bhan
along with PTPS Resident Manager Mr.J.Gopinath
appreciated the project team for completed the replacement
work within the short time period.

01
Modication Works @ Balco 540 MW Site, Chhattisgarh

CBM Department of Balco 540 MW Site has Sprocket and completed the job within 12 hours. DGM
identified the Hammer in damaged condition at Crusher #B Mr.Vinoth Singh, Operation AGM Mr.CD Singh along with
and informed to Mechanical team. The Mechanical team Resident Manager Mr.C.Balakrishnan and Dy. Resident
planned to replace the Teeth Hammer (18 nos.) and Ring Manager Mr.P.Senthilkumar appreciated the Mechanical In-
Hammer (16 nos.) totally 34 Hammers on 29th November charge Mr.Ranjan Kumar, Engineer Mr.Manikandan, Fitter
2017. Similarly, on 4th December 2017, the Mechanical team Mr.Mukesh Sharma and Mr.Dinesh for their better formance.
replaced the Rotor #2 & #3 in Screen #B the damaged

Benchmarking Performance @ TSPL Site, Punjab Benchmarking Performance @ PPT Site,


Odisha

PPT team
achieved a new
milestone for coal
loading through Ship
Loader. On 11th
December 2017, PPT
team handled the vessel
named “MV Vishva
TSPL site team accomplished the new record in Cheta and MV MP
unloading the coal through Rack. The team unloaded Panamax” and loaded
141 nos. of rack within 6 hours 45 minutes against the 51,000 MT coal in first
th
earlier unloading of 141 nos. of rack within 7 hours for shift. On11 June 2016,
the month of November 2017. As a token of the team loaded the coal
appreciation, CHP Head Mr.Sampasivrao along with at 50,000 MT which was
Director Mr.V.R.Ramu, Resident Manager the highest record at PPT Site. As a token of appreciation, SE
Mr.N.Kalyanasundaram and all the Higher Officials Mr.Deepak Rath, Exen Mr.R.N.Sahoo, Assistant Exen
appreciated the team. Mr.P.K.Sathpaty along with Resident Manager Mr.A.Ramesh
appreciated the team's excellent co-ordination.

02
Safety Awareness Training Program @ JSW Phase II Site, Maharastra

On 5th December 2017, Special Safety Awareness training program has been
conducted by Safety Officer Mr.Anup Roy for all Department night shift employees. They
covered various topics during the training session, i.e. Basic fire safety, Basic Height work
safety precaution, About Machine guarding & Near-miss, awareness at work place, how to
avoid such type of incidents at work place, Do's & Don't while performing such activities at
work place. Finally discussed about the Near-miss incidents & its reporting system as well as
how could we minimize the incidents at work place by maximum near-miss information. On
that occasion, Dy. Resident Manager Mr.K.Jayapal, Operation In-charge Mr.Ashish Pandey,
all the shift In-charges along with 60 employees have participated.

Major Works Completed @ VIPL Site, Maharastra Appreciation Moments @ JPL Site, Haryana

Similarly, the Mechanical & Electrical departments replaced the


Mr. Rajkumar (Operation Department)
Head End Drive motor bearing at Conveyor #7A and Gearbox alignment
th
got an appreciation card named “Thank You
was completed on 7 December 2017. After the work, trial was taken and
Card” for assistance during CHP Operation day to
found successful with safely. CHP Maintenance Head Mr.Rajesh th
day activities on 5 December 2017. The
Krishnan Pillai, Operation Head Mr.Mohendra Bhagat, O&M Head
discipline and extra effort shown was really
Mr.Mohanadasa Pai & Electrical Head Mr.Srinivasadev appreciated the
appreciated by CHP Manager Mr.Praveen Khatri
team for best observations in CBM Department and good efforts in
along with Resident Manager Mr.T.Lakshmanan
Mechanical team. Mechanical team of VIPL site has completed the two
and Operation Dy. Manager Mr.P.Muthusamy.
major works on last week. On 4th December 2017, the Mechanical team
identified the coal getting struck up in Crusher #1A receiving and feed-
rate affected and mother plate
damaged. The team observed and
enlarged the Mother Plate in Chute
at Crusher #1A and modified the
Chute from bolt & nut system. The
Mechanical team completed the
work within 22 hours against the
time frame of 24 hours.

03
W Welcome Corner

Mr.Sudesh Patel Mr.Ajit kumar Behera Mr.Sujit Kumar Sahoo Mr.Chinmay Hota Mr.Giradharee
JSGCPP Site JSGCPP Site JSGCPP Site SECLC Site JHABUA Site

Mr.Naveen Kumar Dwivedi Mr.Anurag malviya Mr.Md Aaref Mr.Badha Arajan Manashi Mr.P.Balamurugan
JHABUA Site APL Site JSWPHII Site APSEZL Port ICF

Mr.Ravi Kumar Singh Mr.Jagadesan Thangavel Mr.Dusmanta Kumar Nahak Mr.Chandan Kumar Behera Mr.Sadhan Tantubay
APRL Site MTPS Site APSEZL Port PPTMNTCE Site JSGIPP Site

Mr.Rasananda Jena Mr.Tapas Kumar Gorai Mr.Kajal Gorai Mr.Komara Karthik Mr.Santosh Singh
JSGIPP Site JSGIPP Site JSGIPP Site PPTHMC Site TSPL Site

Mr.Ram Singh Mr.Tinku Mr.Manoj Kumar Mr.Arjun Ramalingam Mr.Subhakanta Behera


TSPL Site TSPL Site TSPL Site JSW Port JSW Site

Mr.Tapan Kumar Pradhan Mr.Raju Kumar Singh Mr.Rajnikant Sahoo Mr.Shiba Prasad Panda Mr.Lokanath Dhada
JSW Site JHABUA Site JITPL Site JITPL Site JITPL Site

Mr.Palaniappan Alagappan Mr.Ananda Madeli Mr.Vignesh Kaliyamoorthy Mr.Bhaktacharan Sikha Mr.Manoj Antony Jesukumar
JSWPHII Site JSW Site JSW Site APSEZL Port MTPS Site

04
Entertainment Area
Ques on and Answer
1. Vicat's apparatus is used for
help desk
 A. Fineness test Help Desk Beneficiaries
 B. Consistency test
No Of
Status
 C. Se ng me test S.No Site
Compliant
Remark
Close Open
 D. Soundness test Ans:(B)
1 ILFS 1 1 0
2. Plas c asphalt is
 A. Used as a water proofing layer over roof 2 JITPL 1 1 0
 B. A mixture of cement and asphalt
3 LG 3 2 1 Under Process
 C. A natural asphalt
 D. A refinery product Ans:(B) 4 MAPORT 2 0 2 Under Process

3. Laterite is a/an
5 PNPIOCL 1 0 1 Under Process
 A. Volcanic rock
 B. Argillaceous rock 6 PTPS 1 0 1 Under Process

 C. Calcareous rock 7 WPCL 1 1 0


 D. Silicious rock Ans:(B)
Total 11 6 5
4. The prac cal units of work, is
 A. Erg
 B. Joule We value the utilization of the help desk and shared thoughts.

 C. Newton Mobile : 086 07 168 168


 D. Dyne Ans:(B)
5. The velocity ra o of an inclined plane of inclina on θ with
Email : helpdesk@crewpl.com
horizontal for li ing a load is
 A. Sin θ
 B. Cos θ
 C. Tan θ
 D. cosec θ Ans:(D)

These Are the 5 Most Addic ve Substances on Earth,


According to Addic on Experts

Addic on is no joke. Though we've all joked about being addicted to


"Stranger Things" or pumpkin spice or, obviously, the wonderful Curiosity app,
those things aren't out to ruin anyone's lives. Entering the realm of the world's
most addic ve substances will do just that. Research from 2007 iden fied the
top five most addic ve things on Earth.
Might As Well Face It, You're Addicted
A group of addic on experts came together in 2007 to publish a study in the
Lancet about the most addic ve substances in existence. To do this, they
developed a ra onal scale that could measure the harm of different drugs and
their poten al misuse. They averaged three factors: pleasure, psychological dependence (cravings, irritability from
withdrawal, etc.), and physical dependence (symptoms like headache, nausea, etc.). They scored each drug on a scale from
0-3, where 3 was the most addic ve and 0 the least. Here are the top five most addic ve substances:
 Heroin. Rank: 3 out of 3.
 Cocaine. Rank: 2.4 out of 3.
 Nico ne. Rank: 2.2 out of 3.
 Barbiturates. Rank: 2 out of 3.
 Alcohol. Rank: 1.9 out of 3.

05

You might also like