01
Modication Works @ Balco 540 MW Site, Chhattisgarh
CBM Department of Balco 540 MW Site has Sprocket and completed the job within 12 hours. DGM
identified the Hammer in damaged condition at Crusher #B Mr.Vinoth Singh, Operation AGM Mr.CD Singh along with
and informed to Mechanical team. The Mechanical team Resident Manager Mr.C.Balakrishnan and Dy. Resident
planned to replace the Teeth Hammer (18 nos.) and Ring Manager Mr.P.Senthilkumar appreciated the Mechanical In-
Hammer (16 nos.) totally 34 Hammers on 29th November charge Mr.Ranjan Kumar, Engineer Mr.Manikandan, Fitter
2017. Similarly, on 4th December 2017, the Mechanical team Mr.Mukesh Sharma and Mr.Dinesh for their better formance.
replaced the Rotor #2 & #3 in Screen #B the damaged
PPT team
achieved a new
milestone for coal
loading through Ship
Loader. On 11th
December 2017, PPT
team handled the vessel
named “MV Vishva
TSPL site team accomplished the new record in Cheta and MV MP
unloading the coal through Rack. The team unloaded Panamax” and loaded
141 nos. of rack within 6 hours 45 minutes against the 51,000 MT coal in first
th
earlier unloading of 141 nos. of rack within 7 hours for shift. On11 June 2016,
the month of November 2017. As a token of the team loaded the coal
appreciation, CHP Head Mr.Sampasivrao along with at 50,000 MT which was
Director Mr.V.R.Ramu, Resident Manager the highest record at PPT Site. As a token of appreciation, SE
Mr.N.Kalyanasundaram and all the Higher Officials Mr.Deepak Rath, Exen Mr.R.N.Sahoo, Assistant Exen
appreciated the team. Mr.P.K.Sathpaty along with Resident Manager Mr.A.Ramesh
appreciated the team's excellent co-ordination.
02
Safety Awareness Training Program @ JSW Phase II Site, Maharastra
On 5th December 2017, Special Safety Awareness training program has been
conducted by Safety Officer Mr.Anup Roy for all Department night shift employees. They
covered various topics during the training session, i.e. Basic fire safety, Basic Height work
safety precaution, About Machine guarding & Near-miss, awareness at work place, how to
avoid such type of incidents at work place, Do's & Don't while performing such activities at
work place. Finally discussed about the Near-miss incidents & its reporting system as well as
how could we minimize the incidents at work place by maximum near-miss information. On
that occasion, Dy. Resident Manager Mr.K.Jayapal, Operation In-charge Mr.Ashish Pandey,
all the shift In-charges along with 60 employees have participated.
Major Works Completed @ VIPL Site, Maharastra Appreciation Moments @ JPL Site, Haryana
03
W Welcome Corner
Mr.Sudesh Patel Mr.Ajit kumar Behera Mr.Sujit Kumar Sahoo Mr.Chinmay Hota Mr.Giradharee
JSGCPP Site JSGCPP Site JSGCPP Site SECLC Site JHABUA Site
Mr.Naveen Kumar Dwivedi Mr.Anurag malviya Mr.Md Aaref Mr.Badha Arajan Manashi Mr.P.Balamurugan
JHABUA Site APL Site JSWPHII Site APSEZL Port ICF
Mr.Ravi Kumar Singh Mr.Jagadesan Thangavel Mr.Dusmanta Kumar Nahak Mr.Chandan Kumar Behera Mr.Sadhan Tantubay
APRL Site MTPS Site APSEZL Port PPTMNTCE Site JSGIPP Site
Mr.Rasananda Jena Mr.Tapas Kumar Gorai Mr.Kajal Gorai Mr.Komara Karthik Mr.Santosh Singh
JSGIPP Site JSGIPP Site JSGIPP Site PPTHMC Site TSPL Site
Mr.Tapan Kumar Pradhan Mr.Raju Kumar Singh Mr.Rajnikant Sahoo Mr.Shiba Prasad Panda Mr.Lokanath Dhada
JSW Site JHABUA Site JITPL Site JITPL Site JITPL Site
Mr.Palaniappan Alagappan Mr.Ananda Madeli Mr.Vignesh Kaliyamoorthy Mr.Bhaktacharan Sikha Mr.Manoj Antony Jesukumar
JSWPHII Site JSW Site JSW Site APSEZL Port MTPS Site
04
Entertainment Area
Ques on and Answer
1. Vicat's apparatus is used for
help desk
A. Fineness test Help Desk Beneficiaries
B. Consistency test
No Of
Status
C. Se ng me test S.No Site
Compliant
Remark
Close Open
D. Soundness test Ans:(B)
1 ILFS 1 1 0
2. Plas c asphalt is
A. Used as a water proofing layer over roof 2 JITPL 1 1 0
B. A mixture of cement and asphalt
3 LG 3 2 1 Under Process
C. A natural asphalt
D. A refinery product Ans:(B) 4 MAPORT 2 0 2 Under Process
3. Laterite is a/an
5 PNPIOCL 1 0 1 Under Process
A. Volcanic rock
B. Argillaceous rock 6 PTPS 1 0 1 Under Process
05