Report No.

: SERVICE PIPE-WM
LILAMA 18
WELD MAP Date : 12-Sep.2-2019
JSC
Rev : 01 1

PROJECT : COMPLEJO INDUCTRIAL PUERTOLLANO ITEM: SERVICE PIPE FOR HB4 & HB5 Drawing Tittle : HB-4-707-R1 & HB-5-707-R1

CLIENT : GBA FLARE SYSEMS P.O.: 567/006/2019

NDE Method Remark


Weld Weld Welding Length Thick
NAME WPS Material OD
No. type Process (mm) (mm) MT
PMI RT
PT

1.ITEM : PILOT GAS 1"- N14A

LLM18/WPS/004/19 A106 Gr.B to


PILOT GAS 1"-N14A SP26-W1 SVB GTAW 105 3.38+3.38 33.4 PT RT
Rev. 0 A105
LLM18/WPS/004/19 A106 Gr.B to
PILOT GAS 1"-N14A SP26-W2 SVB GTAW 105 3.38+3.38 33.4 PT
Rev. 0 A105
LLM18/WPS/004/19 A106 Gr.B to
PILOT GAS 1"-N14A SP14-W1 SVB GTAW 105 3.38+3.38 33.4 PT
Rev. 0 A105
LLM18/WPS/004/19 A106 Gr.B to
PILOT GAS 1"-N14A SP14-W2 SVB GTAW 105 3.38+3.38 33.4 PT
Rev. 0 A106 Gr.B
LLM18/WPS/004/19 A106 Gr.B to
PILOT GAS 1"-N14A SP14-W3 SVB GTAW 105 3.38+3.38 33.4 PT
Rev. 0 A106 Gr.B
LLM18/WPS/004/19 A106 Gr.B to
PILOT GAS 1"-N14A SP14-W4 SVB GTAW 105 3.38+3.38 33.4 PT
Rev. 0 A106 Gr.B
SP14-W5 LLM18/WPS/004/19 A106 Gr.B to
PILOT GAS 1"-N14A SVB GTAW 105 3.38+3.38 33.4 PT Site Weld
(FFW) Rev. 0 A106 Gr.B
LLM18/WPS/004/19 A106 Gr.B to
PILOT GAS 1"-N14A A77-W1 SVB GTAW 105 3.38+3.38 33.4 PT
Rev. 0 A106 Gr.B
LLM18/WPS/004/19 A106 Gr.B to
PILOT GAS 1"-N14A A77-W2 SVB GTAW 105 3.38+3.38 33.4 PT
Rev. 0 A106 Gr.B
LLM18/WPS/004/19 A106 Gr.B to
PILOT GAS 1"-N14A A77-W3 SVB GTAW 105 3.38+3.38 33.4 PT
Rev. 0 A106 Gr.B
LLM18/WPS/004/19 A106 Gr.B to
PILOT GAS 1"-N14A A77-W4 SVB GTAW 105 3.38+3.38 33.4 PT
Rev. 0 A106 Gr.B

Page 38 of 38
Report No.: SERVICE PIPE-WM
LILAMA 18
WELD MAP Date : 12-Sep.2-2019
JSC
Rev : 01 1

PROJECT : COMPLEJO INDUCTRIAL PUERTOLLANO ITEM: SERVICE PIPE FOR HB4 & HB5 Drawing Tittle : HB-4-707-R1 & HB-5-707-R1

CLIENT : GBA FLARE SYSEMS P.O.: 567/006/2019

NDE Method Remark


Weld Weld Welding Length Thick
NAME WPS Material OD
No. type Process (mm) (mm) MT
PMI RT
PT
LLM18/WPS/004/19 A106 Gr.B to
PILOT GAS 1"-N14A A77-W5 SVB GTAW 105 3.38+3.38 33.4 PT RT
Rev. 0 A106 Gr.B
A77-W6 LLM18/WPS/004/19 A106 Gr.B to
PILOT GAS 1"-N14A SVB GTAW 105 3.38+3.38 33.4 PT Site Weld
(FFW) Rev. 0 A106 Gr.B
LLM18/WPS/004/19 A106 Gr.B to
PILOT GAS 1"-N14A A18-W1 SVB GTAW 105 3.38+3.38 33.4 PT
Rev. 0 A106 Gr.B
LLM18/WPS/004/19 A106 Gr.B to
PILOT GAS 1"-N14A A18-W2 SVB GTAW 105 3.38+3.38 33.4 PT
Rev. 0 A106 Gr.B
LLM18/WPS/004/19 A106 Gr.B to
PILOT GAS 1"-N14A A18-W3 SVB GTAW 105 3.38+3.38 33.4 PT
Rev. 0 A106 Gr.B
A18-W4 LLM18/WPS/004/19 A106 Gr.B to
PILOT GAS 1"-N14A SVB GTAW 105 3.38+3.38 33.4 PT Site Weld
(FFW) Rev. 0 A106 Gr.B
LLM18/WPS/004/19 A106 Gr.B to
PILOT GAS 1"-N14A A75-W1 SVB GTAW 105 3.38+3.38 33.4 PT
Rev. 0 A106 Gr.B
LLM18/WPS/004/19 A106 Gr.B to
PILOT GAS 1"-N14A A75-W2 SVB GTAW 105 3.38+3.38 33.4 PT
Rev. 0 A106 Gr.B
LLM18/WPS/004/19 A106 Gr.B to
PILOT GAS 1"-N14A A75-W3 SVB GTAW 105 3.38+3.38 33.4 PT
Rev. 0 A106 Gr.B
LLM18/WPS/004/19 A106 Gr.B to
PILOT GAS 1"-N14A A75-W4 SVB GTAW 105 3.38+3.38 33.4 PT
Rev. 0 A106 Gr.B
A75-W5 LLM18/WPS/004/19 A106 Gr.B to
PILOT GAS 1"-N14A SVB GTAW 105 3.38+3.38 33.4 PT Site Weld
(FFW) Rev. 0 A106 Gr.B
LLM18/WPS/004/19 A106 Gr.B to
PILOT GAS 1"-N14A SP18-W1 SVB GTAW 105 3.38+3.38 33.4 PT
Rev. 0 A106 Gr.B

Page 38 of 38
Report No.: SERVICE PIPE-WM
LILAMA 18
WELD MAP Date : 12-Sep.2-2019
JSC
Rev : 01 1

PROJECT : COMPLEJO INDUCTRIAL PUERTOLLANO ITEM: SERVICE PIPE FOR HB4 & HB5 Drawing Tittle : HB-4-707-R1 & HB-5-707-R1

CLIENT : GBA FLARE SYSEMS P.O.: 567/006/2019

NDE Method Remark


Weld Weld Welding Length Thick
NAME WPS Material OD
No. type Process (mm) (mm) MT
PMI RT
PT
LLM18/WPS/004/19 A106 Gr.B to
PILOT GAS 1"-N14A SP18-W2 SVB GTAW 105 3.38+3.38 33.4 PT RT
Rev. 0 A105

2.ITEM : PILOT GAS 1"- N15A

LLM18/WPS/004/19 A106 Gr.B to


PILOT GAS 1"-N15A SP4-W1 SVB GTAW 105 3.38+3.38 33.4 PT
Rev. 0 A105
LLM18/WPS/004/19 A106 Gr.B to
PILOT GAS 1"-N15A SP4-W2 SVB GTAW 105 3.38+3.38 33.4 PT
Rev. 0 A105
LLM18/WPS/004/19 A106 Gr.B to
PILOT GAS 1"-N15A SP13-W1 SVB GTAW 105 3.38+3.38 33.4 PT
Rev. 0 A105
LLM18/WPS/004/19 A106 Gr.B to
PILOT GAS 1"-N15A SP13-W2 SVB GTAW 105 3.38+3.38 33.4 PT
Rev. 0 A106 Gr.B
LLM18/WPS/004/19 A106 Gr.B to
PILOT GAS 1"-N15A SP13-W3 SVB GTAW 105 3.38+3.38 33.4 PT
Rev. 0 A106 Gr.B
LLM18/WPS/004/19 A106 Gr.B to
PILOT GAS 1"-N15A SP13-W4 SVB GTAW 105 3.38+3.38 33.4 PT
Rev. 0 A106 Gr.B
SP13-W5 LLM18/WPS/004/19 A106 Gr.B to
PILOT GAS 1"-N15A SVB GTAW 105 3.38+3.38 33.4 PT Site Weld
(FFW) Rev. 0 A106 Gr.B
LLM18/WPS/004/19 A106 Gr.B to
PILOT GAS 1"-N15A A77-W1 SVB GTAW 105 3.38+3.38 33.4 PT
Rev. 0 A106 Gr.B
LLM18/WPS/004/19 A106 Gr.B to
PILOT GAS 1"-N15A A77-W2 SVB GTAW 105 3.38+3.38 33.4 PT
Rev. 0 A106 Gr.B
LLM18/WPS/004/19 A106 Gr.B to
PILOT GAS 1"-N15A A77-W3 SVB GTAW 105 3.38+3.38 33.4 PT
Rev. 0 A106 Gr.B

Page 38 of 38
Report No.: SERVICE PIPE-WM
LILAMA 18
WELD MAP Date : 12-Sep.2-2019
JSC
Rev : 01 1

PROJECT : COMPLEJO INDUCTRIAL PUERTOLLANO ITEM: SERVICE PIPE FOR HB4 & HB5 Drawing Tittle : HB-4-707-R1 & HB-5-707-R1

CLIENT : GBA FLARE SYSEMS P.O.: 567/006/2019

NDE Method Remark


Weld Weld Welding Length Thick
NAME WPS Material OD
No. type Process (mm) (mm) MT
PMI RT
PT
LLM18/WPS/004/19 A106 Gr.B to
PILOT GAS 1"-N15A A77-W4 SVB GTAW 105 3.38+3.38 33.4 PT RT
Rev. 0 A106 Gr.B
LLM18/WPS/004/19 A106 Gr.B to
PILOT GAS 1"-N15A A77-W5 SVB GTAW 105 3.38+3.38 33.4 PT
Rev. 0 A106 Gr.B
A77-W6 LLM18/WPS/004/19 A106 Gr.B to
PILOT GAS 1"-N15A SVB GTAW 105 3.38+3.38 33.4 PT Site Weld
(FFW) Rev. 0 A106 Gr.B
LLM18/WPS/004/19 A106 Gr.B to
PILOT GAS 1"-N15A A18-W1 SVB GTAW 105 3.38+3.38 33.4 PT
Rev. 0 A106 Gr.B
LLM18/WPS/004/19 A106 Gr.B to
PILOT GAS 1"-N15A A18-W2 SVB GTAW 105 3.38+3.38 33.4 PT
Rev. 0 A106 Gr.B
LLM18/WPS/004/19 A106 Gr.B to
PILOT GAS 1"-N15A A18-W3 SVB GTAW 105 3.38+3.38 33.4 PT
Rev. 0 A106 Gr.B
A18-W4 LLM18/WPS/004/19 A106 Gr.B to
PILOT GAS 1"-N15A SVB GTAW 105 3.38+3.38 33.4 PT Site Weld
(FFW) Rev. 0 A106 Gr.B
LLM18/WPS/004/19 A106 Gr.B to
PILOT GAS 1"-N15A A75-W1 SVB GTAW 105 3.38+3.38 33.4 PT
Rev. 0 A106 Gr.B
LLM18/WPS/004/19 A106 Gr.B to
PILOT GAS 1"-N15A A75-W2 SVB GTAW 105 3.38+3.38 33.4 PT
Rev. 0 A106 Gr.B
LLM18/WPS/004/19 A106 Gr.B to
PILOT GAS 1"-N15A A75-W3 SVB GTAW 105 3.38+3.38 33.4 PT
Rev. 0 A106 Gr.B
LLM18/WPS/004/19 A106 Gr.B to
PILOT GAS 1"-N15A A75-W4 SVB GTAW 105 3.38+3.38 33.4 PT
Rev. 0 A106 Gr.B
A75-W5 LLM18/WPS/004/19 A106 Gr.B to
PILOT GAS 1"-N15A SVB GTAW 105 3.38+3.38 33.4 PT Site Weld
(FFW) Rev. 0 A106 Gr.B

Page 38 of 38
Report No.: SERVICE PIPE-WM
LILAMA 18
WELD MAP Date : 12-Sep.2-2019
JSC
Rev : 01 1

PROJECT : COMPLEJO INDUCTRIAL PUERTOLLANO ITEM: SERVICE PIPE FOR HB4 & HB5 Drawing Tittle : HB-4-707-R1 & HB-5-707-R1

CLIENT : GBA FLARE SYSEMS P.O.: 567/006/2019

NDE Method Remark


Weld Weld Welding Length Thick
NAME WPS Material OD
No. type Process (mm) (mm) MT
PMI RT
PT
LLM18/WPS/004/19 A106 Gr.B to
PILOT GAS 1"-N15A SP17-W1 SVB GTAW 105 3.38+3.38 33.4 PT
Rev. 0 A106 Gr.B
LLM18/WPS/004/19 A106 Gr.B to
PILOT GAS 1"-N15A SP17-W2 SVB GTAW 105 3.38+3.38 33.4 PT RT
Rev. 0 A105

3.ITEM : PILOT GAS 1"- N13A

LLM18/WPS/004/19 A106 Gr.B to


PILOT GAS 1"-N13A SP7-W1 SVB GTAW 105 3.38+3.38 33.4 PT
Rev. 0 A105
LLM18/WPS/004/19 A106 Gr.B to
PILOT GAS 1"-N13A SP7-W2 SVB GTAW 105 3.38+3.38 33.4 PT
Rev. 0 A105
LLM18/WPS/004/19 A106 Gr.B to
PILOT GAS 1"-N13A SP13-W1 SVB GTAW 105 3.38+3.38 33.4 PT
Rev. 0 A105
LLM18/WPS/004/19 A106 Gr.B to
PILOT GAS 1"-N13A SP13-W2 SVB GTAW 105 3.38+3.38 33.4 PT
Rev. 0 A106 Gr.B
LLM18/WPS/004/19 A106 Gr.B to
PILOT GAS 1"-N13A SP13-W3 SVB GTAW 105 3.38+3.38 33.4 PT
Rev. 0 A106 Gr.B
LLM18/WPS/004/19 A106 Gr.B to
PILOT GAS 1"-N13A SP13-W4 SVB GTAW 105 3.38+3.38 33.4 PT
Rev. 0 A106 Gr.B
SP13-W5 LLM18/WPS/004/19 A106 Gr.B to
PILOT GAS 1"-N13A SVB GTAW 105 3.38+3.38 33.4 PT Site Weld
(FFW) Rev. 0 A106 Gr.B
LLM18/WPS/004/19 A106 Gr.B to
PILOT GAS 1"-N13A A77-W1 SVB GTAW 105 3.38+3.38 33.4 PT
Rev. 0 A106 Gr.B
LLM18/WPS/004/19 A106 Gr.B to
PILOT GAS 1"-N13A A77-W2 SVB GTAW 105 3.38+3.38 33.4 PT
Rev. 0 A106 Gr.B

Page 38 of 38
Report No.: SERVICE PIPE-WM
LILAMA 18
WELD MAP Date : 12-Sep.2-2019
JSC
Rev : 01 1

PROJECT : COMPLEJO INDUCTRIAL PUERTOLLANO ITEM: SERVICE PIPE FOR HB4 & HB5 Drawing Tittle : HB-4-707-R1 & HB-5-707-R1

CLIENT : GBA FLARE SYSEMS P.O.: 567/006/2019

NDE Method Remark


Weld Weld Welding Length Thick
NAME WPS Material OD
No. type Process (mm) (mm) MT
PMI RT
PT
LLM18/WPS/004/19 A106 Gr.B to
PILOT GAS 1"-N13A A77-W3 SVB GTAW 105 3.38+3.38 33.4 PT
Rev. 0 A106 Gr.B
LLM18/WPS/004/19 A106 Gr.B to
PILOT GAS 1"-N13A A77-W4 SVB GTAW 105 3.38+3.38 33.4 PT RT
Rev. 0 A106 Gr.B
LLM18/WPS/004/19 A106 Gr.B to
PILOT GAS 1"-N13A A77-W5 SVB GTAW 105 3.38+3.38 33.4 PT
Rev. 0 A106 Gr.B
A77-W6 LLM18/WPS/004/19 A106 Gr.B to
PILOT GAS 1"-N13A SVB GTAW 105 3.38+3.38 33.4 PT Site Weld
(FFW) Rev. 0 A106 Gr.B
LLM18/WPS/004/19 A106 Gr.B to
PILOT GAS 1"-N13A A18-W1 SVB GTAW 105 3.38+3.38 33.4 PT
Rev. 0 A106 Gr.B
LLM18/WPS/004/19 A106 Gr.B to
PILOT GAS 1"-N13A A18-W2 SVB GTAW 105 3.38+3.38 33.4 PT
Rev. 0 A106 Gr.B
LLM18/WPS/004/19 A106 Gr.B to
PILOT GAS 1"-N13A A18-W3 SVB GTAW 105 3.38+3.38 33.4 PT
Rev. 0 A106 Gr.B
A18-W4 LLM18/WPS/004/19 A106 Gr.B to
PILOT GAS 1"-N13A SVB GTAW 105 3.38+3.38 33.4 PT Site Weld
(FFW) Rev. 0 A106 Gr.B
LLM18/WPS/004/19 A106 Gr.B to
PILOT GAS 1"-N13A A75-W1 SVB GTAW 105 3.38+3.38 33.4 PT
Rev. 0 A106 Gr.B
LLM18/WPS/004/19 A106 Gr.B to
PILOT GAS 1"-N13A A75-W2 SVB GTAW 105 3.38+3.38 33.4 PT
Rev. 0 A106 Gr.B
LLM18/WPS/004/19 A106 Gr.B to
PILOT GAS 1"-N13A A75-W3 SVB GTAW 105 3.38+3.38 33.4 PT
Rev. 0 A106 Gr.B
LLM18/WPS/004/19 A106 Gr.B to
PILOT GAS 1"-N13A A75-W4 SVB GTAW 105 3.38+3.38 33.4 PT
Rev. 0 A106 Gr.B

Page 38 of 38
Report No.: SERVICE PIPE-WM
LILAMA 18
WELD MAP Date : 12-Sep.2-2019
JSC
Rev : 01 1

PROJECT : COMPLEJO INDUCTRIAL PUERTOLLANO ITEM: SERVICE PIPE FOR HB4 & HB5 Drawing Tittle : HB-4-707-R1 & HB-5-707-R1

CLIENT : GBA FLARE SYSEMS P.O.: 567/006/2019

NDE Method Remark


Weld Weld Welding Length Thick
NAME WPS Material OD
No. type Process (mm) (mm) MT
PMI RT
PT
A75-W5 LLM18/WPS/004/19 A106 Gr.B to
PILOT GAS 1"-N13A SVB GTAW 105 3.38+3.38 33.4 PT Site Weld
(FFW) Rev. 0 A106 Gr.B
LLM18/WPS/004/19 A106 Gr.B to
PILOT GAS 1"-N13A SP17-W1 SVB GTAW 105 3.38+3.38 33.4 PT
Rev. 0 A106 Gr.B
LLM18/WPS/004/19 A106 Gr.B to
PILOT GAS 1"-N13A SP17-W2 SVB GTAW 105 3.38+3.38 33.4 PT RT
Rev. 0 A105

4.ITEM : IGNITION GAS 1"- N10A

IGNITION GAS 1"- LLM18/WPS/005/19 A312 TP304L to


SP23-W1 SVB GTAW 105 3.38+3.38 33.4 PT PMI
N10A Rev.0 A182 TP304
IGNITION GAS 1"- LLM18/WPS/005/19 A312 TP304L to
SP23-W2 SVB GTAW 105 3.38+3.38 33.4 PT PMI
N10A Rev.0 A182 TP304
IGNITION GAS 1"- LLM18/WPS/005/19 A312 TP304L to
SP6-W1 SVB GTAW 105 3.38+3.38 33.4 PT PMI
N10A Rev.0 A182 TP304
IGNITION GAS 1"- LLM18/WPS/005/19 A312 TP304L to
SP6-W2 SVB GTAW 105 3.38+3.38 33.4 PT PMI
N10A Rev.0 A312 TP304L
IGNITION GAS 1"- LLM18/WPS/005/19 A312 TP304L to
SP6-W3 SVB GTAW 105 3.38+3.38 33.4 PT PMI
N10A Rev.0 A312 TP304L
IGNITION GAS 1"- LLM18/WPS/005/19 A312 TP304L to
SP6-W4 SVB GTAW 105 3.38+3.38 33.4 PT PMI
N10A Rev.0 A312 TP304L
IGNITION GAS 1"- SP6-W5 LLM18/WPS/005/19 A312 TP304L to
SVB GTAW 105 3.38+3.38 33.4 PT PMI Site Weld
N10A (FFW) Rev.0 A312 TP304L
IGNITION GAS 1"- LLM18/WPS/005/19 A312 TP304L to
A70-W1 SVB GTAW 105 3.38+3.38 33.4 PT PMI
N10A Rev.0 A312 TP304L

Page 38 of 38
Report No.: SERVICE PIPE-WM
LILAMA 18
WELD MAP Date : 12-Sep.2-2019
JSC
Rev : 01 1

PROJECT : COMPLEJO INDUCTRIAL PUERTOLLANO ITEM: SERVICE PIPE FOR HB4 & HB5 Drawing Tittle : HB-4-707-R1 & HB-5-707-R1

CLIENT : GBA FLARE SYSEMS P.O.: 567/006/2019

NDE Method Remark


Weld Weld Welding Length Thick
NAME WPS Material OD
No. type Process (mm) (mm) MT
PMI RT
PT
IGNITION GAS 1"- LLM18/WPS/005/19 A312 TP304L to
A70-W2 SVB GTAW 105 3.38+3.38 33.4 PT PMI
N10A Rev.0 A312 TP304L
IGNITION GAS 1"- LLM18/WPS/005/19 A312 TP304L to
A70-W3 SVB GTAW 105 3.38+3.38 33.4 PT PMI
N10A Rev.0 A312 TP304L
IGNITION GAS 1"- LLM18/WPS/005/19 A312 TP304L to
A70-W4 SVB GTAW 105 3.38+3.38 33.4 PT PMI RT
N10A Rev.0 A312 TP304L
IGNITION GAS 1"- LLM18/WPS/005/19 A312 TP304L to
A70-W5 SVB GTAW 105 3.38+3.38 33.4 PT PMI
N10A Rev.0 A312 TP304L
IGNITION GAS 1"- A70-W6 LLM18/WPS/005/19 A312 TP304L to
SVB GTAW 105 3.38+3.38 33.4 PT PMI Site Weld
N10A (FFW) Rev.0 A312 TP304L
IGNITION GAS 1"- LLM18/WPS/005/19 A312 TP304L to
A47-W1 SVB GTAW 105 3.38+3.38 33.4 PT PMI
N10A Rev.0 A312 TP304L
IGNITION GAS 1"- LLM18/WPS/005/19 A312 TP304L to
A47-W2 SVB GTAW 105 3.38+3.38 33.4 PT PMI
N10A Rev.0 A312 TP304L
IGNITION GAS 1"- LLM18/WPS/005/19 A312 TP304L to
A47-W3 SVB GTAW 105 3.38+3.38 33.4 PT PMI
N10A Rev.0 A312 TP304L
IGNITION GAS 1"- A47-W4 LLM18/WPS/005/19 A312 TP304L to
SVB GTAW 105 3.38+3.38 33.4 PT PMI Site Weld
N10A (FFW) Rev.0 A312 TP304L
IGNITION GAS 1"- LLM18/WPS/005/19 A312 TP304L to
A45-W1 SVB GTAW 105 3.38+3.38 33.4 PT PMI
N10A Rev.0 A312 TP304L
IGNITION GAS 1"- LLM18/WPS/005/19 A312 TP304L to
A45-W2 SVB GTAW 105 3.38+3.38 33.4 PT PMI
N10A Rev.0 A312 TP304L
IGNITION GAS 1"- LLM18/WPS/005/19 A312 TP304L to
A45-W3 SVB GTAW 105 3.38+3.38 33.4 PT PMI
N10A Rev.0 A312 TP304L

Page 38 of 38
Report No.: SERVICE PIPE-WM
LILAMA 18
WELD MAP Date : 12-Sep.2-2019
JSC
Rev : 01 1

PROJECT : COMPLEJO INDUCTRIAL PUERTOLLANO ITEM: SERVICE PIPE FOR HB4 & HB5 Drawing Tittle : HB-4-707-R1 & HB-5-707-R1

CLIENT : GBA FLARE SYSEMS P.O.: 567/006/2019

NDE Method Remark


Weld Weld Welding Length Thick
NAME WPS Material OD
No. type Process (mm) (mm) MT
PMI RT
PT
IGNITION GAS 1"- LLM18/WPS/005/19 A312 TP304L to
A45-W4 SVB GTAW 105 3.38+3.38 33.4 PT PMI
N10A Rev.0 A312 TP304L
IGNITION GAS 1"- A45-W5 LLM18/WPS/005/19 A312 TP304L to
SVB GTAW 105 3.38+3.38 33.4 PT PMI Site Weld
N10A (FFW) Rev.0 A312 TP304L
IGNITION GAS 1"- LLM18/WPS/005/19 A312 TP304L to
SP10-W1 SVB GTAW 105 3.38+3.38 33.4 PT PMI
N10A Rev.0 A312 TP304L
IGNITION GAS 1"- LLM18/WPS/005/19 A312 TP304L to
SP10-W2 SVB GTAW 105 3.38+3.38 33.4 PT PMI RT
N10A Rev.0 A182 TP304

5.ITEM : IGNITION GAS 1"- N12A

IGNITION GAS 1"- LLM18/WPS/005/19 A312 TP304L to


SP3-W1 SVB GTAW 105 3.38+3.38 33.4 PT PMI
N12A Rev.0 A182 TP304
IGNITION GAS 1"- LLM18/WPS/005/19 A312 TP304L to
SP3-W2 SVB GTAW 105 3.38+3.38 33.4 PT PMI
N12A Rev.0 A182 TP304
IGNITION GAS 1"- LLM18/WPS/005/19 A312 TP304L to
SP5-W1 SVB GTAW 105 3.38+3.38 33.4 PT PMI
N12A Rev.0 A182 TP304
IGNITION GAS 1"- LLM18/WPS/005/19 A312 TP304L to
SP5-W2 SVB GTAW 105 3.38+3.38 33.4 PT PMI
N12A Rev.0 A312 TP304L
IGNITION GAS 1"- LLM18/WPS/005/19 A312 TP304L to
SP5-W3 SVB GTAW 105 3.38+3.38 33.4 PT PMI
N12A Rev.0 A312 TP304L
IGNITION GAS 1"- LLM18/WPS/005/19 A312 TP304L to
SP5-W4 SVB GTAW 105 3.38+3.38 33.4 PT PMI
N12A Rev.0 A312 TP304L
IGNITION GAS 1"- SP5-W5 LLM18/WPS/005/19 A312 TP304L to
SVB GTAW 105 3.38+3.38 33.4 PT PMI Site Weld
N12A (FFW) Rev.0 A312 TP304L

Page 38 of 38
Report No.: SERVICE PIPE-WM
LILAMA 18
WELD MAP Date : 12-Sep.2-2019
JSC
Rev : 01 1

PROJECT : COMPLEJO INDUCTRIAL PUERTOLLANO ITEM: SERVICE PIPE FOR HB4 & HB5 Drawing Tittle : HB-4-707-R1 & HB-5-707-R1

CLIENT : GBA FLARE SYSEMS P.O.: 567/006/2019

NDE Method Remark


Weld Weld Welding Length Thick
NAME WPS Material OD
No. type Process (mm) (mm) MT
PMI RT
PT
IGNITION GAS 1"- LLM18/WPS/005/19 A312 TP304L to
A70-W1 SVB GTAW 105 3.38+3.38 33.4 PT PMI
N12A Rev.0 A312 TP304L
IGNITION GAS 1"- LLM18/WPS/005/19 A312 TP304L to
A70-W2 SVB GTAW 105 3.38+3.38 33.4 PT PMI
N12A Rev.0 A312 TP304L
IGNITION GAS 1"- LLM18/WPS/005/19 A312 TP304L to
A70-W3 SVB GTAW 105 3.38+3.38 33.4 PT PMI
N12A Rev.0 A312 TP304L
IGNITION GAS 1"- LLM18/WPS/005/19 A312 TP304L to
A70-W4 SVB GTAW 105 3.38+3.38 33.4 PT PMI RT
N12A Rev.0 A312 TP304L
IGNITION GAS 1"- LLM18/WPS/005/19 A312 TP304L to
A70-W5 SVB GTAW 105 3.38+3.38 33.4 PT PMI
N12A Rev.0 A312 TP304L
IGNITION GAS 1"- A70-W6 LLM18/WPS/005/19 A312 TP304L to
SVB GTAW 105 3.38+3.38 33.4 PT PMI Site Weld
N12A (FFW) Rev.0 A312 TP304L
IGNITION GAS 1"- LLM18/WPS/005/19 A312 TP304L to
A47-W1 SVB GTAW 105 3.38+3.38 33.4 PT PMI
N12A Rev.0 A312 TP304L
IGNITION GAS 1"- LLM18/WPS/005/19 A312 TP304L to
A47-W2 SVB GTAW 105 3.38+3.38 33.4 PT PMI
N12A Rev.0 A312 TP304L
IGNITION GAS 1"- LLM18/WPS/005/19 A312 TP304L to
A47-W3 SVB GTAW 105 3.38+3.38 33.4 PT PMI
N12A Rev.0 A312 TP304L
IGNITION GAS 1"- A47-W4 LLM18/WPS/005/19 A312 TP304L to
SVB GTAW 105 3.38+3.38 33.4 PT PMI Site Weld
N12A (FFW) Rev.0 A312 TP304L
IGNITION GAS 1"- LLM18/WPS/005/19 A312 TP304L to
A45-W1 SVB GTAW 105 3.38+3.38 33.4 PT PMI
N12A Rev.0 A312 TP304L
IGNITION GAS 1"- LLM18/WPS/005/19 A312 TP304L to
A45-W2 SVB GTAW 105 3.38+3.38 33.4 PT PMI
N12A Rev.0 A312 TP304L

Page 38 of 38
Report No.: SERVICE PIPE-WM
LILAMA 18
WELD MAP Date : 12-Sep.2-2019
JSC
Rev : 01 1

PROJECT : COMPLEJO INDUCTRIAL PUERTOLLANO ITEM: SERVICE PIPE FOR HB4 & HB5 Drawing Tittle : HB-4-707-R1 & HB-5-707-R1

CLIENT : GBA FLARE SYSEMS P.O.: 567/006/2019

NDE Method Remark


Weld Weld Welding Length Thick
NAME WPS Material OD
No. type Process (mm) (mm) MT
PMI RT
PT
IGNITION GAS 1"- LLM18/WPS/005/19 A312 TP304L to
A45-W3 SVB GTAW 105 3.38+3.38 33.4 PT PMI
N12A Rev.0 A312 TP304L
IGNITION GAS 1"- LLM18/WPS/005/19 A312 TP304L to
A45-W4 SVB GTAW 105 3.38+3.38 33.4 PT PMI
N12A Rev.0 A312 TP304L
IGNITION GAS 1"- A45-W5 LLM18/WPS/005/19 A312 TP304L to
SVB GTAW 105 3.38+3.38 33.4 PT PMI Site Weld
N12A (FFW) Rev.0 A312 TP304L
IGNITION GAS 1"- LLM18/WPS/005/19 A312 TP304L to
SP9-W1 SVB GTAW 105 3.38+3.38 33.4 PT PMI
N12A Rev.0 A312 TP304L
IGNITION GAS 1"- LLM18/WPS/005/19 A312 TP304L to
SP9-W2 SVB GTAW 105 3.38+3.38 33.4 PT PMI RT
N12A Rev.0 A182 TP304

6.ITEM : IGNITION GAS 1"- N11A

IGNITION GAS 1"- LLM18/WPS/005/19 A312 TP304L to


SP12-W1 SVB GTAW 105 3.38+3.38 33.4 PT PMI
N11A Rev.0 A182 TP304
IGNITION GAS 1"- LLM18/WPS/005/19 A312 TP304L to
SP12-W2 SVB GTAW 105 3.38+3.38 33.4 PT PMI
N11A Rev.0 A182 TP304
IGNITION GAS 1"- LLM18/WPS/005/19 A312 TP304L to
SP5-W1 SVB GTAW 105 3.38+3.38 33.4 PT PMI
N11A Rev.0 A182 TP304
IGNITION GAS 1"- LLM18/WPS/005/19 A312 TP304L to
SP5-W2 SVB GTAW 105 3.38+3.38 33.4 PT PMI
N11A Rev.0 A312 TP304L
IGNITION GAS 1"- LLM18/WPS/005/19 A312 TP304L to
SP5-W3 SVB GTAW 105 3.38+3.38 33.4 PT PMI
N11A Rev.0 A312 TP304L
IGNITION GAS 1"- LLM18/WPS/005/19 A312 TP304L to
SP5-W4 SVB GTAW 105 3.38+3.38 33.4 PT PMI
N11A Rev.0 A312 TP304L

Page 38 of 38
Report No.: SERVICE PIPE-WM
LILAMA 18
WELD MAP Date : 12-Sep.2-2019
JSC
Rev : 01 1

PROJECT : COMPLEJO INDUCTRIAL PUERTOLLANO ITEM: SERVICE PIPE FOR HB4 & HB5 Drawing Tittle : HB-4-707-R1 & HB-5-707-R1

CLIENT : GBA FLARE SYSEMS P.O.: 567/006/2019

NDE Method Remark


Weld Weld Welding Length Thick
NAME WPS Material OD
No. type Process (mm) (mm) MT
PMI RT
PT
IGNITION GAS 1"- SP5-W5 LLM18/WPS/005/19 A312 TP304L to
SVB GTAW 105 3.38+3.38 33.4 PT PMI Site Weld
N11A (FFW) Rev.0 A312 TP304L
IGNITION GAS 1"- LLM18/WPS/005/19 A312 TP304L to
A70-W1 SVB GTAW 105 3.38+3.38 33.4 PT PMI
N11A Rev.0 A312 TP304L
IGNITION GAS 1"- LLM18/WPS/005/19 A312 TP304L to
A70-W2 SVB GTAW 105 3.38+3.38 33.4 PT PMI
N11A Rev.0 A312 TP304L
IGNITION GAS 1"- LLM18/WPS/005/19 A312 TP304L to
A70-W3 SVB GTAW 105 3.38+3.38 33.4 PT PMI
N11A Rev.0 A312 TP304L
IGNITION GAS 1"- LLM18/WPS/005/19 A312 TP304L to
A70-W4 SVB GTAW 105 3.38+3.38 33.4 PT PMI RT
N11A Rev.0 A312 TP304L
IGNITION GAS 1"- LLM18/WPS/005/19 A312 TP304L to
A70-W5 SVB GTAW 105 3.38+3.38 33.4 PT PMI
N11A Rev.0 A312 TP304L
IGNITION GAS 1"- A70-W6 LLM18/WPS/005/19 A312 TP304L to
SVB GTAW 105 3.38+3.38 33.4 PT PMI Site Weld
N11A (FFW) Rev.0 A312 TP304L
IGNITION GAS 1"- LLM18/WPS/005/19 A312 TP304L to
A47-W1 SVB GTAW 105 3.38+3.38 33.4 PT PMI
N11A Rev.0 A312 TP304L
IGNITION GAS 1"- LLM18/WPS/005/19 A312 TP304L to
A47-W2 SVB GTAW 105 3.38+3.38 33.4 PT PMI
N11A Rev.0 A312 TP304L
IGNITION GAS 1"- LLM18/WPS/005/19 A312 TP304L to
A47-W3 SVB GTAW 105 3.38+3.38 33.4 PT PMI
N11A Rev.0 A312 TP304L
IGNITION GAS 1"- A47-W4 LLM18/WPS/005/19 A312 TP304L to
SVB GTAW 105 3.38+3.38 33.4 PT PMI Site Weld
N11A (FFW) Rev.0 A312 TP304L
IGNITION GAS 1"- LLM18/WPS/005/19 A312 TP304L to
A45-W1 SVB GTAW 105 3.38+3.38 33.4 PT PMI
N11A Rev.0 A312 TP304L

Page 38 of 38
Report No.: SERVICE PIPE-WM
LILAMA 18
WELD MAP Date : 12-Sep.2-2019
JSC
Rev : 01 1

PROJECT : COMPLEJO INDUCTRIAL PUERTOLLANO ITEM: SERVICE PIPE FOR HB4 & HB5 Drawing Tittle : HB-4-707-R1 & HB-5-707-R1

CLIENT : GBA FLARE SYSEMS P.O.: 567/006/2019

NDE Method Remark


Weld Weld Welding Length Thick
NAME WPS Material OD
No. type Process (mm) (mm) MT
PMI RT
PT
IGNITION GAS 1"- LLM18/WPS/005/19 A312 TP304L to
A45-W2 SVB GTAW 105 3.38+3.38 33.4 PT PMI
N11A Rev.0 A312 TP304L
IGNITION GAS 1"- LLM18/WPS/005/19 A312 TP304L to
A45-W3 SVB GTAW 105 3.38+3.38 33.4 PT PMI
N11A Rev.0 A312 TP304L
IGNITION GAS 1"- LLM18/WPS/005/19 A312 TP304L to
A45-W4 SVB GTAW 105 3.38+3.38 33.4 PT PMI
N11A Rev.0 A312 TP304L
IGNITION GAS 1"- A45-W5 LLM18/WPS/005/19 A312 TP304L to
SVB GTAW 105 3.38+3.38 33.4 PT PMI Site Weld
N11A (FFW) Rev.0 A312 TP304L
IGNITION GAS 1"- LLM18/WPS/005/19 A312 TP304L to
SP9-W1 SVB GTAW 105 3.38+3.38 33.4 PT PMI
N11A Rev.0 A312 TP304L
IGNITION GAS 1"- LLM18/WPS/005/19 A312 TP304L to
SP9-W2 SVB GTAW 105 3.38+3.38 33.4 PT PMI RT
N11A Rev.0 A182 TP304

7.ITEM : STEAM 3"- N9

LLM18/WPS/004/19 A106 Gr.B to


STEAM PIPE 3"-N9 A37-W1 SVB GTAW 279 7.62+7.62 88.9 PT
Rev. 0 A105
LLM18/WPS/004/19 A106 Gr.B to
STEAM PIPE 3"-N9 A37-W2 SVB GTAW 279 7.62+7.62 88.9 PT -
Rev. 0 A234 Gr.WP
LLM18/WPS/004/19 A106 Gr.B to
STEAM PIPE 3"-N9 A37-W3 SVB GTAW 279 7.62+7.62 88.9 PT -
Rev. 0 A234 Gr.WP
LLM18/WPS/004/19 A106 Gr.B to
STEAM PIPE 3"-N9 A37-W4 SVB GTAW 279 7.62+7.62 88.9 PT -
Rev. 0 A234 Gr.WP
LLM18/WPS/004/19 A106 Gr.B to
STEAM PIPE 3"-N9 A37-W5 SVB GTAW 279 7.62+7.62 88.9 PT -
Rev. 0 A234 Gr.WP

Page 38 of 38
Report No.: SERVICE PIPE-WM
LILAMA 18
WELD MAP Date : 12-Sep.2-2019
JSC
Rev : 01 1

PROJECT : COMPLEJO INDUCTRIAL PUERTOLLANO ITEM: SERVICE PIPE FOR HB4 & HB5 Drawing Tittle : HB-4-707-R1 & HB-5-707-R1

CLIENT : GBA FLARE SYSEMS P.O.: 567/006/2019

NDE Method Remark


Weld Weld Welding Length Thick
NAME WPS Material OD
No. type Process (mm) (mm) MT
PMI RT
PT
LLM18/WPS/004/19 A106 Gr.B to
STEAM PIPE 3"-N9 A37-W6 SVB GTAW 279 7.62+7.62 88.9 PT -
Rev. 0 A234 Gr.WP
LLM18/WPS/004/19 A106 Gr.B to
STEAM PIPE 3"-N9 A37-W7 SVB GTAW 279 7.62+7.62 88.9 PT -
Rev. 0 A234 Gr.WP
LLM18/WPS/004/19 A106 Gr.B to
STEAM PIPE 3"-N9 A37-W8 SVB GTAW 279 7.62+7.62 88.9 PT -
Rev. 0 A234 Gr.WP
LLM18/WPS/004/19 A106 Gr.B to
STEAM PIPE 3"-N9 A37-W9 SVB GTAW 279 7.62+7.62 88.9 PT -
Rev. 0 A234 Gr.WP
LLM18/WPS/004/19 A106 Gr.B to
STEAM PIPE 3"-N9 A37-W10 SVB GTAW 279 7.62+7.62 88.9 PT RT
Rev. 0 A234 Gr.WP
LLM18/WPS/004/19 A106 Gr.B to
STEAM PIPE 3"-N9 A37-W11 SVB GTAW 279 7.62+7.62 88.9 PT -
Rev. 0 A234 Gr.WP
LLM18/WPS/004/19 A106 Gr.B to
STEAM PIPE 3"-N9 A37-W12 SVB GTAW 279 7.62+7.62 88.9 PT -
Rev. 0 A234 Gr.WP
LLM18/WPS/004/19 A106 Gr.B to
STEAM PIPE 3"-N9 A37-W13 SVB GTAW 279 7.62+7.62 88.9 PT -
Rev. 0 A234 Gr.WP
LLM18/WPS/004/19 A106 Gr.B to
STEAM PIPE 3"-N9 A37-W14 SVB GTAW 279 7.62+7.62 88.9 PT -
Rev. 0 A234 Gr.WP
LLM18/WPS/004/19 A106 Gr.B to
STEAM PIPE 3"-N9 A37-W15 SVB GTAW 279 7.62+7.62 88.9 PT -
Rev. 0 A234 Gr.WP
LLM18/WPS/004/19 A106 Gr.B to
STEAM PIPE 3"-N9 A37-W16 SVB GTAW 279 7.62+7.62 88.9 PT -
Rev. 0 A234 Gr.WP
LLM18/WPS/004/19 A106 Gr.B to
STEAM PIPE 3"-N9 A37-W17 SVB GTAW 279 7.62+7.62 88.9 PT -
Rev. 0 A234 Gr.WP

Page 38 of 38
Report No.: SERVICE PIPE-WM
LILAMA 18
WELD MAP Date : 12-Sep.2-2019
JSC
Rev : 01 1

PROJECT : COMPLEJO INDUCTRIAL PUERTOLLANO ITEM: SERVICE PIPE FOR HB4 & HB5 Drawing Tittle : HB-4-707-R1 & HB-5-707-R1

CLIENT : GBA FLARE SYSEMS P.O.: 567/006/2019

NDE Method Remark


Weld Weld Welding Length Thick
NAME WPS Material OD
No. type Process (mm) (mm) MT
PMI RT
PT
A37-W18 LLM18/WPS/004/19 A106 Gr.B to
STEAM PIPE 3"-N9 SVB GTAW 279 7.62+7.62 88.9 PT - Site Weld
(FFW) Rev. 0 A106 Gr.B
A44-W1 LLM18/WPS/004/19 A106 Gr.B to
STEAM PIPE 3"-N9 SVB GTAW 279 7.62+7.62 88.9 PT - Site Weld
(FFW) Rev. 0 A106 Gr.B
LLM18/WPS/004/19 A106 Gr.B to
STEAM PIPE 3"-N9 A44-W2 SVB GTAW 279 7.62+7.62 88.9 PT -
Rev. 0 A234 Gr.WP
LLM18/WPS/004/19 A106 Gr.B to
STEAM PIPE 3"-N9 A44-W3 SVB GTAW 279 7.62+7.62 88.9 PT -
Rev. 0 A234 Gr.WP
LLM18/WPS/004/19 A106 Gr.B to
STEAM PIPE 3"-N9 A44-W4 SVB GTAW 279 7.62+7.62 88.9 PT RT
Rev. 0 A234 Gr.WP
LLM18/WPS/004/19 A106 Gr.B to
STEAM PIPE 3"-N9 A44-W5 SVB GTAW 279 7.62+7.62 88.9 PT -
Rev. 0 A234 Gr.WP
LLM18/WPS/004/19 A106 Gr.B to
STEAM PIPE 3"-N9 A44-W6 SVB GTAW 279 7.62+7.62 88.9 PT -
Rev. 0 A234 Gr.WP
LLM18/WPS/004/19 A106 Gr.B to
STEAM PIPE 3"-N9 A44-W7 SVB GTAW 279 7.62+7.62 88.9 PT -
Rev. 0 A234 Gr.WP
LLM18/WPS/004/19 A106 Gr.B to
STEAM PIPE 3"-N9 A44-W8 SVB GTAW 279 7.62+7.62 88.9 PT -
Rev. 0 A234 Gr.WP
LLM18/WPS/004/19 A106 Gr.B to
STEAM PIPE 3"-N9 A44-W9 SVB GTAW 279 7.62+7.62 88.9 PT -
Rev. 0 A234 Gr.WP
A44-W10 LLM18/WPS/004/19 A106 Gr.B to
STEAM PIPE 3"-N9 SVB GTAW 279 7.62+7.62 88.9 PT - Site Weld
(FFW) Rev. 0 A106 Gr.B
LLM18/WPS/004/19 A106 Gr.B to
STEAM PIPE 3"-N9 A35-W1 SVB GTAW 279 7.62+7.62 88.9 PT -
Rev. 0 A234 Gr.WP

Page 38 of 38
Report No.: SERVICE PIPE-WM
LILAMA 18
WELD MAP Date : 12-Sep.2-2019
JSC
Rev : 01 1

PROJECT : COMPLEJO INDUCTRIAL PUERTOLLANO ITEM: SERVICE PIPE FOR HB4 & HB5 Drawing Tittle : HB-4-707-R1 & HB-5-707-R1

CLIENT : GBA FLARE SYSEMS P.O.: 567/006/2019

NDE Method Remark


Weld Weld Welding Length Thick
NAME WPS Material OD
No. type Process (mm) (mm) MT
PMI RT
PT
LLM18/WPS/004/19 A106 Gr.B to
STEAM PIPE 3"-N9 A35-W2 SVB GTAW 279 7.62+7.62 88.9 PT -
Rev. 0 A234 Gr.WP
LLM18/WPS/004/19 A106 Gr.B to
STEAM PIPE 3"-N9 A35-W3 SVB GTAW 279 7.62+7.62 88.9 PT -
Rev. 0 A234 Gr.WP
LLM18/WPS/004/19 A106 Gr.B to
STEAM PIPE 3"-N9 A35-W4 SVB GTAW 279 7.62+7.62 88.9 PT -
Rev. 0 A234 Gr.WP
LLM18/WPS/004/19 A106 Gr.B to
STEAM PIPE 3"-N9 A35-W5 SVB GTAW 279 7.62+7.62 88.9 PT RT
Rev. 0 A234 Gr.WP
LLM18/WPS/004/19 A106 Gr.B to
STEAM PIPE 3"-N9 A35-W6 SVB GTAW 279 7.62+7.62 88.9 PT -
Rev. 0 A234 Gr.WP
LLM18/WPS/004/19 A106 Gr.B to
STEAM PIPE 3"-N9 A35-W7 SVB GTAW 279 7.62+7.62 88.9 PT -
Rev. 0 A234 Gr.WP
LLM18/WPS/004/19 A106 Gr.B to
STEAM PIPE 3"-N9 A35-W8 SVB GTAW 279 7.62+7.62 88.9 PT -
Rev. 0 A234 Gr.WP
A35-W9 LLM18/WPS/004/19 A106 Gr.B to
STEAM PIPE 3"-N9 SVB GTAW 279 7.62+7.62 88.9 PT - Site Weld
(FFW) Rev. 0 A106 Gr.B
LLM18/WPS/004/19 A106 Gr.B to
STEAM PIPE 3"-N9 A40-W1 SVB GTAW 279 7.62+7.62 88.9 PT -
Rev. 0 A234 Gr.WP
LLM18/WPS/004/19 A106 Gr.B to
STEAM PIPE 3"-N9 A40-W2 SVB GTAW 279 7.62+7.62 88.9 PT -
Rev. 0 A234 Gr.WP
LLM18/WPS/004/19 A106 Gr.B to
STEAM PIPE 3"-N9 A40-W3 SVB GTAW 279 7.62+7.62 88.9 PT -
Rev. 0 A234 Gr.WP
LLM18/WPS/004/19 A106 Gr.B to
STEAM PIPE 3"-N9 A40-W4 SVB GTAW 279 7.62+7.62 88.9 PT -
Rev. 0 A234 Gr.WP

Page 38 of 38
Report No.: SERVICE PIPE-WM
LILAMA 18
WELD MAP Date : 12-Sep.2-2019
JSC
Rev : 01 1

PROJECT : COMPLEJO INDUCTRIAL PUERTOLLANO ITEM: SERVICE PIPE FOR HB4 & HB5 Drawing Tittle : HB-4-707-R1 & HB-5-707-R1

CLIENT : GBA FLARE SYSEMS P.O.: 567/006/2019

NDE Method Remark


Weld Weld Welding Length Thick
NAME WPS Material OD
No. type Process (mm) (mm) MT
PMI RT
PT
LLM18/WPS/004/19 A106 Gr.B to
STEAM PIPE 3"-N9 A40-W5 SVB GTAW 279 7.62+7.62 88.9 PT -
Rev. 0 A234 Gr.WP
LLM18/WPS/004/19 A106 Gr.B to
STEAM PIPE 3"-N9 A40-W6 SVB GTAW 279 7.62+7.62 88.9 PT -
Rev. 0 A234 Gr.WP
LLM18/WPS/004/19 A106 Gr.B to
STEAM PIPE 3"-N9 A40-W7 SVB GTAW 279 7.62+7.62 88.9 PT RT
Rev. 0 A234 Gr.WP
LLM18/WPS/004/19 A106 Gr.B to
STEAM PIPE 3"-N9 A40-W8 SVB GTAW 279 7.62+7.62 88.9 PT -
Rev. 0 A234 Gr.WP
A40-W9 LLM18/WPS/004/19 A106 Gr.B to
STEAM PIPE 3"-N9 SVB GTAW 279 7.62+7.62 88.9 PT - Site Weld
(FFW) Rev. 0 A106 Gr.B
LLM18/WPS/004/19 A106 Gr.B to
STEAM PIPE 3"-N9 B36-W1 SVB GTAW 279 7.62+7.62 88.9 PT -
Rev. 0 A234 Gr.WP
LLM18/WPS/004/19 A106 Gr.B to
STEAM PIPE 3"-N9 B36-W2 SVB GTAW 279 7.62+7.62 88.9 PT -
Rev. 0 A234 Gr.WP
LLM18/WPS/004/19 A106 Gr.B to
STEAM PIPE 3"-N9 B36-W3 SVB GTAW 279 7.62+7.62 88.9 PT -
Rev. 0 A234 Gr.WP
LLM18/WPS/004/19 A106 Gr.B to
STEAM PIPE 3"-N9 B36-W4 SVB GTAW 279 7.62+7.62 88.9 PT -
Rev. 0 A234 Gr.WP
LLM18/WPS/004/19 A106 Gr.B to
STEAM PIPE 3"-N9 B36-W5 SVB GTAW 279 7.62+7.62 88.9 PT -
Rev. 0 A105
LLM18/WPS/003/19 A106 Gr.B to
STEAM PIPE 3"-N9 FW1 FW SMAW 279 - - PT -
Rev. 0 A106 Gr.B
A106 Gr.B to
STEAM PIPE 3"-N9 FW2 FW WPS-136-002.19;Rev.0 SMAW 279 - - PT -
S275JR

Page 38 of 38
Report No.: SERVICE PIPE-WM
LILAMA 18
WELD MAP Date : 12-Sep.2-2019
JSC
Rev : 01 1

PROJECT : COMPLEJO INDUCTRIAL PUERTOLLANO ITEM: SERVICE PIPE FOR HB4 & HB5 Drawing Tittle : HB-4-707-R1 & HB-5-707-R1

CLIENT : GBA FLARE SYSEMS P.O.: 567/006/2019

NDE Method Remark


Weld Weld Welding Length Thick
NAME WPS Material OD
No. type Process (mm) (mm) MT
PMI RT
PT
A106 Gr.B to
STEAM PIPE 3"-N9 FW3 FW WPS-136-002.19;Rev.0 SMAW 279 - - PT -
S275 J0
A106 Gr.B to
STEAM PIPE 3"-N9 FW4 FW WPS-136-002.19;Rev.0 SMAW 279 - - PT -
S275 J0
A106 Gr.B to
STEAM PIPE 3"-N9 FW5 FW WPS-136-002.19;Rev.0 SMAW 279 - - PT -
S275 J0
A106 Gr.B to
STEAM PIPE 3"-N9 FW6 FW WPS-136-002.19;Rev.0 SMAW 279 - - PT -
S275 J0
LLM18/WPS/003/19 A106 Gr.B to
STEAM PIPE 3"-N9 FW7 FW SMAW 279 - - PT -
Rev. 0 A106 Gr.B
A106 Gr.B to
STEAM PIPE 3"-N9 FW8 FW WPS-136-002.19;Rev.0 SMAW 279 - - PT -
S275 J0
A106 Gr.B to
STEAM PIPE 3"-N9 FW9 FW WPS-136-002.19;Rev.0 SMAW 279 - - PT -
S275 J0
A106 Gr.B to
STEAM PIPE 3"-N9 FW10 FW WPS-136-002.19;Rev.0 SMAW 279 - - PT -
S275 J0
A106 Gr.B to
STEAM PIPE 3"-N9 FW11 FW WPS-136-002.19;Rev.0 SMAW 279 - - PT -
S275 J0
LLM18/WPS/003/19 A106 Gr.B to
STEAM PIPE 3"-N9 FW12 FW SMAW 279 - - PT -
Rev. 0 A106 Gr.B
A106 Gr.B to
STEAM PIPE 3"-N9 FW13 FW WPS-136-002.19;Rev.0 SMAW 279 - - PT -
S275 J0
A106 Gr.B to
STEAM PIPE 3"-N9 FW14 FW WPS-136-002.19;Rev.0 SMAW 279 - - PT -
S275 J0

Page 38 of 38
Report No.: SERVICE PIPE-WM
LILAMA 18
WELD MAP Date : 12-Sep.2-2019
JSC
Rev : 01 1

PROJECT : COMPLEJO INDUCTRIAL PUERTOLLANO ITEM: SERVICE PIPE FOR HB4 & HB5 Drawing Tittle : HB-4-707-R1 & HB-5-707-R1

CLIENT : GBA FLARE SYSEMS P.O.: 567/006/2019

NDE Method Remark


Weld Weld Welding Length Thick
NAME WPS Material OD
No. type Process (mm) (mm) MT
PMI RT
PT
LLM18/WPS/003/19 A106 Gr.B to
STEAM PIPE 3"-N9 FW15 FW SMAW 279 - - PT -
Rev. 0 A106 Gr.B
A106 Gr.B to
STEAM PIPE 3"-N9 FW16 FW WPS-136-002.19;Rev.0 SMAW 279 - - PT -
S275 J0
A106 Gr.B to
STEAM PIPE 3"-N9 FW17 FW WPS-136-002.19;Rev.0 SMAW 279 - - PT -
S275 J0
A106 Gr.B to
STEAM PIPE 3"-N9 FW18 FW WPS-136-002.19;Rev.0 SMAW 279 - - PT -
S275 J0
A106 Gr.B to
STEAM PIPE 3"-N9 FW19 FW WPS-136-002.19;Rev.0 SMAW 279 - - PT -
S275 J0
LLM18/WPS/003/19 A106 Gr.B to
STEAM PIPE 3"-N9 FW20 FW SMAW 279 - - PT -
Rev. 0 A106 Gr.B
A106 Gr.B to
STEAM PIPE 3"-N9 FW21 FW WPS-136-002.19;Rev.0 SMAW 279 - - PT -
S275 J0
LLM18/WPS/003/19 A106 Gr.B to
STEAM PIPE 3"-N9 FW22 FW SMAW 279 - - PT -
Rev. 0 A106 Gr.B

8.ITEM : STEAM 6"- N8

LLM18/WPS/003/19 GTAW A106 Gr.B to


STEAM PIPE 6"--N8 A51-W1 SVB 528 7.11+7.11 168.3 PT -
Rev. 0 SMAW A105
LLM18/WPS/003/19 GTAW A106 Gr.B to
STEAM PIPE 6"--N8 A51-W2 SVB 528 7.11+7.11 168.3 PT -
Rev. 0 SMAW A234 Gr.WP
LLM18/WPS/003/19 GTAW A106 Gr.B to
STEAM PIPE 6"--N8 A51-W3 SVB 528 7.11+7.11 168.3 PT -
Rev. 0 SMAW A234 Gr.WP

Page 38 of 38
Report No.: SERVICE PIPE-WM
LILAMA 18
WELD MAP Date : 12-Sep.2-2019
JSC
Rev : 01 1

PROJECT : COMPLEJO INDUCTRIAL PUERTOLLANO ITEM: SERVICE PIPE FOR HB4 & HB5 Drawing Tittle : HB-4-707-R1 & HB-5-707-R1

CLIENT : GBA FLARE SYSEMS P.O.: 567/006/2019

NDE Method Remark


Weld Weld Welding Length Thick
NAME WPS Material OD
No. type Process (mm) (mm) MT
PMI RT
PT
LLM18/WPS/003/19 GTAW A106 Gr.B to
STEAM PIPE 6"--N8 A51-W4 SVB 528 7.11+7.11 168.3 PT RT
Rev. 0 SMAW A234 Gr.WP
LLM18/WPS/003/19 GTAW A106 Gr.B to
STEAM PIPE 6"--N8 A51-W5 SVB 528 7.11+7.11 168.3 PT -
Rev. 0 SMAW A234 Gr.WP
LLM18/WPS/003/19 GTAW A106 Gr.B to
STEAM PIPE 6"--N8 A51-W6 SVB 528 7.11+7.11 168.3 PT -
Rev. 0 SMAW A234 Gr.WP
LLM18/WPS/003/19 GTAW A106 Gr.B to
STEAM PIPE 6"--N8 A51-W7 SVB 528 7.11+7.11 168.3 PT -
Rev. 0 SMAW A234 Gr.WP
LLM18/WPS/003/19 GTAW A106 Gr.B to
STEAM PIPE 6"--N8 A51-W8 SVB 528 7.11+7.11 168.3 PT -
Rev. 0 SMAW A234 Gr.WP
LLM18/WPS/003/19 GTAW A106 Gr.B to
STEAM PIPE 6"--N8 A51-W9 SVB 528 7.11+7.11 168.3 PT -
Rev. 0 SMAW A234 Gr.WP
LLM18/WPS/003/19 GTAW A106 Gr.B to
STEAM PIPE 6"--N8 A51-W10 SVB 528 7.11+7.11 168.3 PT -
Rev. 0 SMAW A234 Gr.WP
LLM18/WPS/003/19 GTAW A106 Gr.B to
STEAM PIPE 6"--N8 A51-W11 SVB 528 7.11+7.11 168.3 PT -
Rev. 0 SMAW A234 Gr.WP
LLM18/WPS/003/19 GTAW A106 Gr.B to
STEAM PIPE 6"--N8 A51-W12 SVB 528 7.11+7.11 168.3 PT -
Rev. 0 SMAW A234 Gr.WP
LLM18/WPS/003/19 GTAW A106 Gr.B to
STEAM PIPE 6"--N8 A51-W13 SVB 528 7.11+7.11 168.3 PT -
Rev. 0 SMAW A234 Gr.WP
LLM18/WPS/003/19 GTAW A106 Gr.B to
STEAM PIPE 6"--N8 A51-W14 SVB 528 7.11+7.11 168.3 PT RT
Rev. 0 SMAW A234 Gr.WP
LLM18/WPS/003/19 GTAW A106 Gr.B to
STEAM PIPE 6"--N8 A51-W15 SVB 528 7.11+7.11 168.3 PT -
Rev. 0 SMAW A234 Gr.WP

Page 38 of 38
Report No.: SERVICE PIPE-WM
LILAMA 18
WELD MAP Date : 12-Sep.2-2019
JSC
Rev : 01 1

PROJECT : COMPLEJO INDUCTRIAL PUERTOLLANO ITEM: SERVICE PIPE FOR HB4 & HB5 Drawing Tittle : HB-4-707-R1 & HB-5-707-R1

CLIENT : GBA FLARE SYSEMS P.O.: 567/006/2019

NDE Method Remark


Weld Weld Welding Length Thick
NAME WPS Material OD
No. type Process (mm) (mm) MT
PMI RT
PT
LLM18/WPS/003/19 GTAW A106 Gr.B to
STEAM PIPE 6"--N8 A51-W16 SVB 528 7.11+7.11 168.3 PT -
Rev. 0 SMAW A234 Gr.WP
LLM18/WPS/003/19 GTAW A106 Gr.B to
STEAM PIPE 6"--N8 A51-W17 SVB 528 7.11+7.11 168.3 PT -
Rev. 0 SMAW A234 Gr.WP
A51-W18 LLM18/WPS/003/19 GTAW A106 Gr.B to
STEAM PIPE 6"--N8 SVB 528 7.11+7.11 168.3 PT - Site Weld
(FFW) Rev. 0 SMAW A106 Gr.B
LLM18/WPS/003/19 GTAW A106 Gr.B to
STEAM PIPE 6"--N8 A50-W1 SVB 528 7.11+7.11 168.3 PT -
Rev. 0 SMAW A234 Gr.WP
LLM18/WPS/003/19 GTAW A106 Gr.B to
STEAM PIPE 6"--N8 A50-W2 SVB 528 7.11+7.11 168.3 PT -
Rev. 0 SMAW A234 Gr.WP
LLM18/WPS/003/19 GTAW A106 Gr.B to
STEAM PIPE 6"--N8 A50-W3 SVB 528 7.11+7.11 168.3 PT -
Rev. 0 SMAW A234 Gr.WP
LLM18/WPS/003/19 GTAW A106 Gr.B to
STEAM PIPE 6"--N8 A50-W4 SVB 528 7.11+7.11 168.3 PT -
Rev. 0 SMAW A234 Gr.WP
LLM18/WPS/003/19 GTAW A106 Gr.B to
STEAM PIPE 6"--N8 A50-W5 SVB 528 7.11+7.11 168.3 PT -
Rev. 0 SMAW A234 Gr.WP
LLM18/WPS/003/19 GTAW A106 Gr.B to
STEAM PIPE 6"--N8 A50-W6 SVB 528 7.11+7.11 168.3 PT RT
Rev. 0 SMAW A234 Gr.WP
LLM18/WPS/003/19 GTAW A106 Gr.B to
STEAM PIPE 6"--N8 A50-W7 SVB 528 7.11+7.11 168.3 PT -
Rev. 0 SMAW A234 Gr.WP
LLM18/WPS/003/19 GTAW A106 Gr.B to
STEAM PIPE 6"--N8 A50-W8 SVB 528 7.11+7.11 168.3 PT -
Rev. 0 SMAW A234 Gr.WP
LLM18/WPS/003/19 GTAW A106 Gr.B to
STEAM PIPE 6"--N8 A50-W9 SVB 528 7.11+7.11 168.3 PT -
Rev. 0 SMAW A234 Gr.WP

Page 38 of 38
Report No.: SERVICE PIPE-WM
LILAMA 18
WELD MAP Date : 12-Sep.2-2019
JSC
Rev : 01 1

PROJECT : COMPLEJO INDUCTRIAL PUERTOLLANO ITEM: SERVICE PIPE FOR HB4 & HB5 Drawing Tittle : HB-4-707-R1 & HB-5-707-R1

CLIENT : GBA FLARE SYSEMS P.O.: 567/006/2019

NDE Method Remark


Weld Weld Welding Length Thick
NAME WPS Material OD
No. type Process (mm) (mm) MT
PMI RT
PT
A50-W10 LLM18/WPS/003/19 GTAW A106 Gr.B to
STEAM PIPE 6"--N8 SVB 528 7.11+7.11 168.3 PT - Site Weld
(FFW) Rev. 0 SMAW A106 Gr.B
LLM18/WPS/003/19 GTAW A106 Gr.B to
STEAM PIPE 6"--N8 A49-W1 SVB 528 7.11+7.11 168.3 PT -
Rev. 0 SMAW A234 Gr.WP
LLM18/WPS/003/19 GTAW A106 Gr.B to
STEAM PIPE 6"--N8 A49-W2 SVB 528 7.11+7.11 168.3 PT -
Rev. 0 SMAW A234 Gr.WP
LLM18/WPS/003/19 GTAW A106 Gr.B to
STEAM PIPE 6"--N8 A49-W3 SVB 528 7.11+7.11 168.3 PT -
Rev. 0 SMAW A234 Gr.WP
LLM18/WPS/003/19 GTAW A106 Gr.B to
STEAM PIPE 6"--N8 A49-W4 SVB 528 7.11+7.11 168.3 PT -
Rev. 0 SMAW A234 Gr.WP
LLM18/WPS/003/19 GTAW A106 Gr.B to
STEAM PIPE 6"--N8 A49-W5 SVB 528 7.11+7.11 168.3 PT -
Rev. 0 SMAW A234 Gr.WP
LLM18/WPS/003/19 GTAW A106 Gr.B to
STEAM PIPE 6"--N8 A49-W6 SVB 528 7.11+7.11 168.3 PT -
Rev. 0 SMAW A234 Gr.WP
LLM18/WPS/003/19 GTAW A106 Gr.B to
STEAM PIPE 6"--N8 A49-W7 SVB 528 7.11+7.11 168.3 PT RT
Rev. 0 SMAW A234 Gr.WP
LLM18/WPS/003/19 GTAW A106 Gr.B to
STEAM PIPE 6"--N8 A49-W8 SVB 528 7.11+7.11 168.3 PT -
Rev. 0 SMAW A234 Gr.WP
A49-W9 LLM18/WPS/003/19 GTAW A106 Gr.B to
STEAM PIPE 6"--N8 SVB 528 7.11+7.11 168.3 PT - Site Weld
(FFW) Rev. 0 SMAW A106 Gr.B
LLM18/WPS/003/19 GTAW A106 Gr.B to
STEAM PIPE 6"--N8 A48-W1 SVB 528 7.11+7.11 168.3 PT -
Rev. 0 SMAW A234 Gr.WP
LLM18/WPS/003/19 GTAW A106 Gr.B to
STEAM PIPE 6"--N8 A48-W2 SVB 528 7.11+7.11 168.3 PT -
Rev. 0 SMAW A234 Gr.WP

Page 38 of 38
Report No.: SERVICE PIPE-WM
LILAMA 18
WELD MAP Date : 12-Sep.2-2019
JSC
Rev : 01 1

PROJECT : COMPLEJO INDUCTRIAL PUERTOLLANO ITEM: SERVICE PIPE FOR HB4 & HB5 Drawing Tittle : HB-4-707-R1 & HB-5-707-R1

CLIENT : GBA FLARE SYSEMS P.O.: 567/006/2019

NDE Method Remark


Weld Weld Welding Length Thick
NAME WPS Material OD
No. type Process (mm) (mm) MT
PMI RT
PT
LLM18/WPS/003/19 GTAW A106 Gr.B to
STEAM PIPE 6"--N8 A48-W3 SVB 528 7.11+7.11 168.3 PT -
Rev. 0 SMAW A234 Gr.WP
LLM18/WPS/003/19 GTAW A106 Gr.B to
STEAM PIPE 6"--N8 A48-W4 SVB 528 7.11+7.11 168.3 PT -
Rev. 0 SMAW A234 Gr.WP
LLM18/WPS/003/19 GTAW A106 Gr.B to
STEAM PIPE 6"--N8 A48-W5 SVB 528 7.11+7.11 168.3 PT -
Rev. 0 SMAW A234 Gr.WP
LLM18/WPS/003/19 GTAW A106 Gr.B to
STEAM PIPE 6"--N8 A48-W6 SVB 528 7.11+7.11 168.3 PT -
Rev. 0 SMAW A234 Gr.WP
LLM18/WPS/003/19 GTAW A106 Gr.B to
STEAM PIPE 6"--N8 A48-W7 SVB 528 7.11+7.11 168.3 PT -
Rev. 0 SMAW A234 Gr.WP
LLM18/WPS/003/19 GTAW A106 Gr.B to
STEAM PIPE 6"--N8 A48-W8 SVB 528 7.11+7.11 168.3 PT -
Rev. 0 SMAW A234 Gr.WP
A48-W9 LLM18/WPS/003/19 GTAW A106 Gr.B to
STEAM PIPE 6"--N8 SVB 528 7.11+7.11 168.3 PT - Site Weld
(FFW) Rev. 0 SMAW A106 Gr.B
LLM18/WPS/003/19 GTAW A106 Gr.B to
STEAM PIPE 6"--N8 B35-W1 SVB 528 7.11+7.11 168.3 PT RT
Rev. 0 SMAW A234 Gr.WP
LLM18/WPS/003/19 GTAW A106 Gr.B to
STEAM PIPE 6"--N8 B35-W2 SVB 528 7.11+7.11 168.3 PT -
Rev. 0 SMAW A234 Gr.WP
LLM18/WPS/003/19 GTAW A106 Gr.B to
STEAM PIPE 6"--N8 B35-W3 SVB 528 7.11+7.11 168.3 PT -
Rev. 0 SMAW A234 Gr.WP
LLM18/WPS/003/19 GTAW A106 Gr.B to
STEAM PIPE 6"--N8 B35-W4 SVB 528 7.11+7.11 168.3 PT -
Rev. 0 SMAW A234 Gr.WP
LLM18/WPS/003/19 GTAW A106 Gr.B to
STEAM PIPE 6"--N8 B35-W5 SVB 528 7.11+7.11 168.3 PT -
Rev. 0 SMAW A105

Page 38 of 38
Report No.: SERVICE PIPE-WM
LILAMA 18
WELD MAP Date : 12-Sep.2-2019
JSC
Rev : 01 1

PROJECT : COMPLEJO INDUCTRIAL PUERTOLLANO ITEM: SERVICE PIPE FOR HB4 & HB5 Drawing Tittle : HB-4-707-R1 & HB-5-707-R1

CLIENT : GBA FLARE SYSEMS P.O.: 567/006/2019

NDE Method Remark


Weld Weld Welding Length Thick
NAME WPS Material OD
No. type Process (mm) (mm) MT
PMI RT
PT
A106 Gr.B to
STEAM PIPE 6"--N8 FW1 FW WPS-136-002.19;Rev.0 SMAW 528 - - PT -
S275 J0
A106 Gr.B to
STEAM PIPE 6"--N8 FW2 FW WPS-136-002.19;Rev.0 SMAW 528 - - PT -
S275 J0
A106 Gr.B to
STEAM PIPE 6"--N8 FW3 FW WPS-136-002.19;Rev.0 SMAW 528 - - PT -
S275 J0
A106 Gr.B to
STEAM PIPE 6"--N8 FW4 FW WPS-136-002.19;Rev.0 SMAW 528 - - PT -
S275 J0
A106 Gr.B to
STEAM PIPE 6"--N8 FW5 FW WPS-136-002.19;Rev.0 SMAW 528 - - PT -
S275 J0
A106 Gr.B to
STEAM PIPE 6"--N8 FW6 FW WPS-136-002.19;Rev.0 SMAW 528 - - PT -
S275 J0
A106 Gr.B to
STEAM PIPE 6"--N8 FW7 FW WPS-136-002.19;Rev.0 SMAW 528 - - PT -
S275 J0
A106 Gr.B to
STEAM PIPE 6"--N8 FW8 FW WPS-136-002.19;Rev.0 SMAW 528 - - PT -
S275 J0
A106 Gr.B to
STEAM PIPE 6"--N8 FW9 FW WPS-136-002.19;Rev.0 SMAW 528 - - PT -
S275 J0
A106 Gr.B to
STEAM PIPE 6"--N8 FW10 FW WPS-136-002.19;Rev.0 SMAW 528 - - PT -
S275 J0
A106 Gr.B to
STEAM PIPE 6"--N8 FW11 FW WPS-136-002.19;Rev.0 SMAW 528 - - PT -
S275 J0
A106 Gr.B to
STEAM PIPE 6"--N8 FW12 FW WPS-136-002.19;Rev.0 SMAW 528 - - PT -
S275 J0

Page 38 of 38
Report No.: SERVICE PIPE-WM
LILAMA 18
WELD MAP Date : 12-Sep.2-2019
JSC
Rev : 01 1

PROJECT : COMPLEJO INDUCTRIAL PUERTOLLANO ITEM: SERVICE PIPE FOR HB4 & HB5 Drawing Tittle : HB-4-707-R1 & HB-5-707-R1

CLIENT : GBA FLARE SYSEMS P.O.: 567/006/2019

NDE Method Remark


Weld Weld Welding Length Thick
NAME WPS Material OD
No. type Process (mm) (mm) MT
PMI RT
PT
A106 Gr.B to
STEAM PIPE 6"--N8 FW13 FW WPS-136-002.19;Rev.0 SMAW 528 - - PT -
S275 J0
A106 Gr.B to
STEAM PIPE 6"--N8 FW14 FW WPS-136-002.19;Rev.0 SMAW 528 - - PT -
S275 J0
A106 Gr.B to
STEAM PIPE 6"--N8 FW15 FW WPS-136-002.19;Rev.0 SMAW 528 - - PT -
S275 J0
A106 Gr.B to
STEAM PIPE 6"--N8 FW16 FW WPS-136-002.19;Rev.0 SMAW 528 - - PT -
S275 J0
A106 Gr.B to
STEAM PIPE 6"--N8 FW17 FW WPS-136-002.19;Rev.0 SMAW 528 - - PT -
S275 J0
A106 Gr.B to
STEAM PIPE 6"--N8 FW18 FW WPS-136-002.19;Rev.0 SMAW 528 - - PT -
S275 J0
A106 Gr.B to
STEAM PIPE 6"--N8 FW19 FW WPS-136-002.19;Rev.0 SMAW 528 - - PT -
S275 J0
A106 Gr.B to
STEAM PIPE 6"--N8 FW20 FW WPS-136-002.19;Rev.0 SMAW 528 - - PT -
S275 J0
A106 Gr.B to
STEAM PIPE 6"--N8 FW21 FW WPS-136-002.19;Rev.0 SMAW 528 - - PT -
S275 J0
A106 Gr.B to
STEAM PIPE 6"--N8 FW22 FW WPS-136-002.19;Rev.0 SMAW 528 - - PT -
S275 J0

7.ITEM : PILOT GAS 1"- N3A

LLM18/WPS/004/19 A106 Gr.B to


PILOT GAS 1"-N3A SP20-W1 SVB GTAW 105 3.38+3.38 33.4 PT
Rev. 0 A105

Page 38 of 38
Report No.: SERVICE PIPE-WM
LILAMA 18
WELD MAP Date : 12-Sep.2-2019
JSC
Rev : 01 1

PROJECT : COMPLEJO INDUCTRIAL PUERTOLLANO ITEM: SERVICE PIPE FOR HB4 & HB5 Drawing Tittle : HB-4-707-R1 & HB-5-707-R1

CLIENT : GBA FLARE SYSEMS P.O.: 567/006/2019

NDE Method Remark


Weld Weld Welding Length Thick
NAME WPS Material OD
No. type Process (mm) (mm) MT
PMI RT
PT
LLM18/WPS/004/19 A106 Gr.B to
PILOT GAS 1"-N3A SP20-W2 SVB GTAW 105 3.38+3.38 33.4 PT
Rev. 0 A105
LLM18/WPS/004/19 A106 Gr.B to
PILOT GAS 1"-N3A A28-W1 SVB GTAW 105 3.38+3.38 33.4 PT
Rev. 0 A105
LLM18/WPS/004/19 A106 Gr.B to
PILOT GAS 1"-N3A A28-W2 SVB GTAW 105 3.38+3.38 33.4 PT
Rev. 0 A106 Gr.B
LLM18/WPS/004/19 A106 Gr.B to
PILOT GAS 1"-N3A A28-W3 SVB GTAW 105 3.38+3.38 33.4 PT
Rev. 0 A106 Gr.B
LLM18/WPS/004/19 A106 Gr.B to
PILOT GAS 1"-N3A A28-W4 SVB GTAW 105 3.38+3.38 33.4 PT RT
Rev. 0 A106 Gr.B
LLM18/WPS/004/19 A106 Gr.B to
PILOT GAS 1"-N3A A28-W5 SVB GTAW 105 3.38+3.38 33.4 PT
Rev. 0 A106 Gr.B
LLM18/WPS/004/19 A106 Gr.B to
PILOT GAS 1"-N3A A77-W1 SVB GTAW 105 3.38+3.38 33.4 PT Site Weld
Rev. 0 A106 Gr.B
LLM18/WPS/004/19 A106 Gr.B to
PILOT GAS 1"-N3A A77-W2 SVB GTAW 105 3.38+3.38 33.4 PT
Rev. 0 A106 Gr.B
LLM18/WPS/004/19 A106 Gr.B to
PILOT GAS 1"-N3A A77-W3 SVB GTAW 105 3.38+3.38 33.4 PT
Rev. 0 A106 Gr.B
LLM18/WPS/004/19 A106 Gr.B to
PILOT GAS 1"-N3A A77-W4 SVB GTAW 105 3.38+3.38 33.4 PT
Rev. 0 A106 Gr.B
LLM18/WPS/004/19 A106 Gr.B to
PILOT GAS 1"-N3A A77-W5 SVB GTAW 105 3.38+3.38 33.4 PT
Rev. 0 A106 Gr.B
LLM18/WPS/004/19 A106 Gr.B to
PILOT GAS 1"-N3A A18-W1 SVB GTAW 105 3.38+3.38 33.4 PT Site Weld
Rev. 0 A106 Gr.B

Page 38 of 38
Report No.: SERVICE PIPE-WM
LILAMA 18
WELD MAP Date : 12-Sep.2-2019
JSC
Rev : 01 1

PROJECT : COMPLEJO INDUCTRIAL PUERTOLLANO ITEM: SERVICE PIPE FOR HB4 & HB5 Drawing Tittle : HB-4-707-R1 & HB-5-707-R1

CLIENT : GBA FLARE SYSEMS P.O.: 567/006/2019

NDE Method Remark


Weld Weld Welding Length Thick
NAME WPS Material OD
No. type Process (mm) (mm) MT
PMI RT
PT
LLM18/WPS/004/19 A106 Gr.B to
PILOT GAS 1"-N3A A18-W2 SVB GTAW 105 3.38+3.38 33.4 PT
Rev. 0 A106 Gr.B
LLM18/WPS/004/19 A106 Gr.B to
PILOT GAS 1"-N3A A18-W3 SVB GTAW 105 3.38+3.38 33.4 PT
Rev. 0 A106 Gr.B
LLM18/WPS/004/19 A106 Gr.B to
PILOT GAS 1"-N3A A18-W4 SVB GTAW 105 3.38+3.38 33.4 PT
Rev. 0 A106 Gr.B
LLM18/WPS/004/19 A106 Gr.B to
PILOT GAS 1"-N3A A75-W1 SVB GTAW 105 3.38+3.38 33.4 PT Site Weld
Rev. 0 A106 Gr.B
LLM18/WPS/004/19 A106 Gr.B to
PILOT GAS 1"-N3A A75-W2 SVB GTAW 105 3.38+3.38 33.4 PT
Rev. 0 A106 Gr.B
LLM18/WPS/004/19 A106 Gr.B to
PILOT GAS 1"-N3A A75-W3 SVB GTAW 105 3.38+3.38 33.4 PT RT
Rev. 0 A106 Gr.B
LLM18/WPS/004/19 A106 Gr.B to
PILOT GAS 1"-N3A A75-W4 SVB GTAW 105 3.38+3.38 33.4 PT
Rev. 0 A106 Gr.B
LLM18/WPS/004/19 A106 Gr.B to
PILOT GAS 1"-N3A A75-W5 SVB GTAW 105 3.38+3.38 33.4 PT
Rev. 0 A106 Gr.B
LLM18/WPS/004/19 A106 Gr.B to
PILOT GAS 1"-N3A SP19-W1 SVB GTAW 105 3.38+3.38 33.4 PT Site Weld
Rev. 0 A106 Gr.B
LLM18/WPS/004/19 A106 Gr.B to
PILOT GAS 1"-N3A SP19-W2 SVB GTAW 105 3.38+3.38 33.4 PT
Rev. 0 A106 Gr.B
LLM18/WPS/004/19 A106 Gr.B to
PILOT GAS 1"-N3A SP19-W3 FW SMAW 105 3.38+3.38 33.4 PT
Rev. 0 A105

8.ITEM : PILOT GAS 1"- N4A

Page 38 of 38
Report No.: SERVICE PIPE-WM
LILAMA 18
WELD MAP Date : 12-Sep.2-2019
JSC
Rev : 01 1

PROJECT : COMPLEJO INDUCTRIAL PUERTOLLANO ITEM: SERVICE PIPE FOR HB4 & HB5 Drawing Tittle : HB-4-707-R1 & HB-5-707-R1

CLIENT : GBA FLARE SYSEMS P.O.: 567/006/2019

NDE Method Remark


Weld Weld Welding Length Thick
NAME WPS Material OD
No. type Process (mm) (mm) MT
PMI RT
PT
LLM18/WPS/004/19 A106 Gr.B to
PILOT GAS 1"-N4A SP24-W1 SVB GTAW 105 3.38+3.38 33.4 PT
Rev. 0 A105
LLM18/WPS/004/19 A106 Gr.B to
PILOT GAS 1"-N4A SP24-W2 SVB GTAW 105 3.38+3.38 33.4 PT
Rev. 0 A105
LLM18/WPS/004/19 A106 Gr.B to
PILOT GAS 1"-N4A A27-W1 SVB GTAW 105 3.38+3.38 33.4 PT
Rev. 0 A105
LLM18/WPS/004/19 A106 Gr.B to
PILOT GAS 1"-N4A A27-W2 SVB GTAW 105 3.38+3.38 33.4 PT
Rev. 0 A106 Gr.B
LLM18/WPS/004/19 A106 Gr.B to
PILOT GAS 1"-N4A A27-W3 SVB GTAW 105 3.38+3.38 33.4 PT
Rev. 0 A106 Gr.B
LLM18/WPS/004/19 A106 Gr.B to
PILOT GAS 1"-N4A A27-W4 SVB GTAW 105 3.38+3.38 33.4 PT
Rev. 0 A106 Gr.B
LLM18/WPS/004/19 A106 Gr.B to
PILOT GAS 1"-N4A A27-W5 SVB GTAW 105 3.38+3.38 33.4 PT RT
Rev. 0 A106 Gr.B
LLM18/WPS/004/19 A106 Gr.B to
PILOT GAS 1"-N4A A77-W1 SVB GTAW 105 3.38+3.38 33.4 PT Site Weld
Rev. 0 A106 Gr.B
LLM18/WPS/004/19 A106 Gr.B to
PILOT GAS 1"-N4A A77-W2 SVB GTAW 105 3.38+3.38 33.4 PT
Rev. 0 A106 Gr.B
LLM18/WPS/004/19 A106 Gr.B to
PILOT GAS 1"-N4A A77-W3 SVB GTAW 105 3.38+3.38 33.4 PT
Rev. 0 A106 Gr.B
LLM18/WPS/004/19 A106 Gr.B to
PILOT GAS 1"-N4A A77-W4 SVB GTAW 105 3.38+3.38 33.4 PT
Rev. 0 A106 Gr.B
LLM18/WPS/004/19 A106 Gr.B to
PILOT GAS 1"-N4A A77-W5 SVB GTAW 105 3.38+3.38 33.4 PT
Rev. 0 A106 Gr.B

Page 38 of 38
Report No.: SERVICE PIPE-WM
LILAMA 18
WELD MAP Date : 12-Sep.2-2019
JSC
Rev : 01 1

PROJECT : COMPLEJO INDUCTRIAL PUERTOLLANO ITEM: SERVICE PIPE FOR HB4 & HB5 Drawing Tittle : HB-4-707-R1 & HB-5-707-R1

CLIENT : GBA FLARE SYSEMS P.O.: 567/006/2019

NDE Method Remark


Weld Weld Welding Length Thick
NAME WPS Material OD
No. type Process (mm) (mm) MT
PMI RT
PT
LLM18/WPS/004/19 A106 Gr.B to
PILOT GAS 1"-N4A A18-W1 SVB GTAW 105 3.38+3.38 33.4 PT
Rev. 0 A106 Gr.B
LLM18/WPS/004/19 A106 Gr.B to
PILOT GAS 1"-N4A A18-W2 SVB GTAW 105 3.38+3.38 33.4 PT
Rev. 0 A106 Gr.B
LLM18/WPS/004/19 A106 Gr.B to
PILOT GAS 1"-N4A A18-W3 SVB GTAW 105 3.38+3.38 33.4 PT
Rev. 0 A106 Gr.B
LLM18/WPS/004/19 A106 Gr.B to
PILOT GAS 1"-N4A A18-W4 SVB GTAW 105 3.38+3.38 33.4 PT
Rev. 0 A106 Gr.B
LLM18/WPS/004/19 A106 Gr.B to
PILOT GAS 1"-N4A A75-W1 SVB GTAW 105 3.38+3.38 33.4 PT Site Weld
Rev. 0 A106 Gr.B
LLM18/WPS/004/19 A106 Gr.B to
PILOT GAS 1"-N4A A75-W2 SVB GTAW 105 3.38+3.38 33.4 PT
Rev. 0 A106 Gr.B
LLM18/WPS/004/19 A106 Gr.B to
PILOT GAS 1"-N4A A75-W3 SVB GTAW 105 3.38+3.38 33.4 PT RT
Rev. 0 A106 Gr.B
LLM18/WPS/004/19 A106 Gr.B to
PILOT GAS 1"-N4A A75-W4 SVB GTAW 105 3.38+3.38 33.4 PT
Rev. 0 A106 Gr.B
LLM18/WPS/004/19 A106 Gr.B to
PILOT GAS 1"-N4A A75-W5 SVB GTAW 105 3.38+3.38 33.4 PT
Rev. 0 A106 Gr.B
LLM18/WPS/004/19 A106 Gr.B to
PILOT GAS 1"-N4A SP15-W1 SVB GTAW 105 3.38+3.38 33.4 PT Site Weld
Rev. 0 A106 Gr.B
LLM18/WPS/004/19 A106 Gr.B to
PILOT GAS 1"-N4A SP15-W2 SVB GTAW 105 3.38+3.38 33.4 PT
Rev. 0 A106 Gr.B
LLM18/WPS/003/19 A106 Gr.B to
PILOT GAS 1"-N4A SP15-W3 FW SMAW 105 3.38+3.38 33.4 PT
Rev. 0 A105

Page 38 of 38
Report No.: SERVICE PIPE-WM
LILAMA 18
WELD MAP Date : 12-Sep.2-2019
JSC
Rev : 01 1

PROJECT : COMPLEJO INDUCTRIAL PUERTOLLANO ITEM: SERVICE PIPE FOR HB4 & HB5 Drawing Tittle : HB-4-707-R1 & HB-5-707-R1

CLIENT : GBA FLARE SYSEMS P.O.: 567/006/2019

NDE Method Remark


Weld Weld Welding Length Thick
NAME WPS Material OD
No. type Process (mm) (mm) MT
PMI RT
PT

9.ITEM : IGNITOR GAS 1"- N5A

LLM18/WPS/005/19 A312 TP304L to


IGNITOR GAS 1"- N5A SP21-W1 SVB GTAW 105 3.38+3.38 33.4 PT PMI
Rev.0 A182 TP304
LLM18/WPS/005/19 A312 TP304L to
IGNITOR GAS 1"- N5A SP21-W2 SVB GTAW 105 3.38+3.38 33.4 PT PMI
Rev.0 A182 TP304
LLM18/WPS/005/19 A312 TP304L to
IGNITOR GAS 1"- N5A A25-W1 SVB GTAW 105 3.38+3.38 33.4 PT PMI
Rev.0 A182 TP304
LLM18/WPS/005/19 A312 TP304L to
IGNITOR GAS 1"- N5A A25-W2 SVB GTAW 105 3.38+3.38 33.4 PT PMI
Rev.0 A312 TP304L
LLM18/WPS/005/19 A312 TP304L to
IGNITOR GAS 1"- N5A A25-W3 SVB GTAW 105 3.38+3.38 33.4 PT PMI
Rev.0 A312 TP304L
LLM18/WPS/005/19 A312 TP304L to
IGNITOR GAS 1"- N5A A25-W4 SVB GTAW 105 3.38+3.38 33.4 PT PMI RT
Rev.0 A312 TP304L
LLM18/WPS/005/19 A312 TP304L to
IGNITOR GAS 1"- N5A A25-W5 SVB GTAW 105 3.38+3.38 33.4 PT PMI
Rev.0 A312 TP304L
LLM18/WPS/005/19 A312 TP304L to
IGNITOR GAS 1"- N5A A70-W1 SVB GTAW 105 3.38+3.38 33.4 PT PMI Site Weld
Rev.0 A312 TP304L
LLM18/WPS/005/19 A312 TP304L to
IGNITOR GAS 1"- N5A A70-W2 SVB GTAW 105 3.38+3.38 33.4 PT PMI
Rev.0 A312 TP304L
LLM18/WPS/005/19 A312 TP304L to
IGNITOR GAS 1"- N5A A70-W3 SVB GTAW 105 3.38+3.38 33.4 PT PMI
Rev.0 A312 TP304L
LLM18/WPS/005/19 A312 TP304L to
IGNITOR GAS 1"- N5A A70-W4 SVB GTAW 105 3.38+3.38 33.4 PT PMI
Rev.0 A312 TP304L

Page 38 of 38
Report No.: SERVICE PIPE-WM
LILAMA 18
WELD MAP Date : 12-Sep.2-2019
JSC
Rev : 01 1

PROJECT : COMPLEJO INDUCTRIAL PUERTOLLANO ITEM: SERVICE PIPE FOR HB4 & HB5 Drawing Tittle : HB-4-707-R1 & HB-5-707-R1

CLIENT : GBA FLARE SYSEMS P.O.: 567/006/2019

NDE Method Remark


Weld Weld Welding Length Thick
NAME WPS Material OD
No. type Process (mm) (mm) MT
PMI RT
PT
LLM18/WPS/005/19 A312 TP304L to
IGNITOR GAS 1"- N5A A70-W5 SVB GTAW 105 3.38+3.38 33.4 PT PMI
Rev.0 A312 TP304L
LLM18/WPS/005/19 A312 TP304L to
IGNITOR GAS 1"- N5A A47-W1 SVB GTAW 105 3.38+3.38 33.4 PT PMI Site Weld
Rev.0 A312 TP304L
LLM18/WPS/005/19 A312 TP304L to
IGNITOR GAS 1"- N5A A47-W2 SVB GTAW 105 3.38+3.38 33.4 PT PMI
Rev.0 A312 TP304L
LLM18/WPS/005/19 A312 TP304L to
IGNITOR GAS 1"- N5A A47-W3 SVB GTAW 105 3.38+3.38 33.4 PT PMI
Rev.0 A312 TP304L
LLM18/WPS/005/19 A312 TP304L to
IGNITOR GAS 1"- N5A A47-W4 SVB GTAW 105 3.38+3.38 33.4 PT PMI
Rev.0 A312 TP304L
LLM18/WPS/005/19 A312 TP304L to
IGNITOR GAS 1"- N5A A45-W1 SVB GTAW 105 3.38+3.38 33.4 PT PMI Site Weld
Rev.0 A312 TP304L
LLM18/WPS/005/19 A312 TP304L to
IGNITOR GAS 1"- N5A A45-W2 SVB GTAW 105 3.38+3.38 33.4 PT PMI
Rev.0 A312 TP304L
LLM18/WPS/005/19 A312 TP304L to
IGNITOR GAS 1"- N5A A45-W3 SVB GTAW 105 3.38+3.38 33.4 PT PMI RT
Rev.0 A312 TP304L
LLM18/WPS/005/19 A312 TP304L to
IGNITOR GAS 1"- N5A A45-W4 SVB GTAW 105 3.38+3.38 33.4 PT PMI
Rev.0 A312 TP304L
LLM18/WPS/005/19 A312 TP304L to
IGNITOR GAS 1"- N5A A45-W5 SVB GTAW 105 3.38+3.38 33.4 PT PMI
Rev.0 A312 TP304L
LLM18/WPS/005/19 A312 TP304L to
IGNITOR GAS 1"- N5A SP11-W1 SVB GTAW 105 3.38+3.38 33.4 PT PMI
Rev.0 A312 TP304L
LLM18/WPS/005/19 A312 TP304L to
IGNITOR GAS 1"- N5A SP11-W2 SVB GTAW 105 3.38+3.38 33.4 PT PMI
Rev.0 A312 TP304L

Page 38 of 38
Report No.: SERVICE PIPE-WM
LILAMA 18
WELD MAP Date : 12-Sep.2-2019
JSC
Rev : 01 1

PROJECT : COMPLEJO INDUCTRIAL PUERTOLLANO ITEM: SERVICE PIPE FOR HB4 & HB5 Drawing Tittle : HB-4-707-R1 & HB-5-707-R1

CLIENT : GBA FLARE SYSEMS P.O.: 567/006/2019

NDE Method Remark


Weld Weld Welding Length Thick
NAME WPS Material OD
No. type Process (mm) (mm) MT
PMI RT
PT
LLM18/WPS/005/19 A312 TP304L to
IGNITOR GAS 1"- N5A SP11-W3 FW GTAW 105 3.38+3.38 33.4 PT PMI
Rev.0 A182 TP304

10.ITEM : IGNITOR GAS 1"- N6A

LLM18/WPS/005/19 A312 TP304L to


IGNITOR GAS 1"- N6A SP25-W1 SVB GTAW 105 3.38+3.38 33.4 PT PMI
Rev.0 A182 TP304
LLM18/WPS/005/19 A312 TP304L to
IGNITOR GAS 1"- N6A SP25-W2 SVB GTAW 105 3.38+3.38 33.4 PT PMI
Rev.0 A182 TP304
LLM18/WPS/005/19 A312 TP304L to
IGNITOR GAS 1"- N6A A26-W1 SVB GTAW 105 3.38+3.38 33.4 PT PMI
Rev.0 A182 TP304
LLM18/WPS/005/19 A312 TP304L to
IGNITOR GAS 1"- N6A A26-W2 SVB GTAW 105 3.38+3.38 33.4 PT PMI
Rev.0 A312 TP304L
LLM18/WPS/005/19 A312 TP304L to
IGNITOR GAS 1"- N6A A26-W3 SVB GTAW 105 3.38+3.38 33.4 PT PMI
Rev.0 A312 TP304L
LLM18/WPS/005/19 A312 TP304L to
IGNITOR GAS 1"- N6A A26-W4 SVB GTAW 105 3.38+3.38 33.4 PT PMI RT
Rev.0 A312 TP304L
LLM18/WPS/005/19 A312 TP304L to
IGNITOR GAS 1"- N6A A26-W5 SVB GTAW 105 3.38+3.38 33.4 PT PMI
Rev.0 A312 TP304L
LLM18/WPS/005/19 A312 TP304L to
IGNITOR GAS 1"- N6A A70-W1 SVB GTAW 105 3.38+3.38 33.4 PT PMI Site Weld
Rev.0 A312 TP304L
LLM18/WPS/005/19 A312 TP304L to
IGNITOR GAS 1"- N6A A70-W2 SVB GTAW 105 3.38+3.38 33.4 PT PMI
Rev.0 A312 TP304L
LLM18/WPS/005/19 A312 TP304L to
IGNITOR GAS 1"- N6A A70-W3 SVB GTAW 105 3.38+3.38 33.4 PT PMI
Rev.0 A312 TP304L

Page 38 of 38
Report No.: SERVICE PIPE-WM
LILAMA 18
WELD MAP Date : 12-Sep.2-2019
JSC
Rev : 01 1

PROJECT : COMPLEJO INDUCTRIAL PUERTOLLANO ITEM: SERVICE PIPE FOR HB4 & HB5 Drawing Tittle : HB-4-707-R1 & HB-5-707-R1

CLIENT : GBA FLARE SYSEMS P.O.: 567/006/2019

NDE Method Remark


Weld Weld Welding Length Thick
NAME WPS Material OD
No. type Process (mm) (mm) MT
PMI RT
PT
LLM18/WPS/005/19 A312 TP304L to
IGNITOR GAS 1"- N6A A70-W4 SVB GTAW 105 3.38+3.38 33.4 PT PMI
Rev.0 A312 TP304L
LLM18/WPS/005/19 A312 TP304L to
IGNITOR GAS 1"- N6A A70-W5 SVB GTAW 105 3.38+3.38 33.4 PT PMI
Rev.0 A312 TP304L
LLM18/WPS/005/19 A312 TP304L to
IGNITOR GAS 1"- N6A A47-W1 SVB GTAW 105 3.38+3.38 33.4 PT PMI Site Weld
Rev.0 A312 TP304L
LLM18/WPS/005/19 A312 TP304L to
IGNITOR GAS 1"- N6A A47-W2 SVB GTAW 105 3.38+3.38 33.4 PT PMI
Rev.0 A312 TP304L
LLM18/WPS/005/19 A312 TP304L to
IGNITOR GAS 1"- N6A A47-W3 SVB GTAW 105 3.38+3.38 33.4 PT PMI
Rev.0 A312 TP304L
LLM18/WPS/005/19 A312 TP304L to
IGNITOR GAS 1"- N6A A47-W4 SVB GTAW 105 3.38+3.38 33.4 PT PMI
Rev.0 A312 TP304L
LLM18/WPS/005/19 A312 TP304L to
IGNITOR GAS 1"- N6A A45-W1 SVB GTAW 105 3.38+3.38 33.4 PT PMI Site Weld
Rev.0 A312 TP304L
LLM18/WPS/005/19 A312 TP304L to
IGNITOR GAS 1"- N6A A45-W2 SVB GTAW 105 3.38+3.38 33.4 PT PMI
Rev.0 A312 TP304L
LLM18/WPS/005/19 A312 TP304L to
IGNITOR GAS 1"- N6A A45-W3 SVB GTAW 105 3.38+3.38 33.4 PT PMI RT
Rev.0 A312 TP304L
LLM18/WPS/005/19 A312 TP304L to
IGNITOR GAS 1"- N6A A45-W4 SVB GTAW 105 3.38+3.38 33.4 PT PMI
Rev.0 A312 TP304L
LLM18/WPS/005/19 A312 TP304L to
IGNITOR GAS 1"- N6A A45-W5 SVB GTAW 105 3.38+3.38 33.4 PT PMI
Rev.0 A312 TP304L
LLM18/WPS/005/19 A312 TP304L to
IGNITOR GAS 1"- N6A SP18-W1 SVB GTAW 105 3.38+3.38 33.4 PT PMI Site Weld
Rev.0 A312 TP304L

Page 38 of 38
Report No.: SERVICE PIPE-WM
LILAMA 18
WELD MAP Date : 12-Sep.2-2019
JSC
Rev : 01 1

PROJECT : COMPLEJO INDUCTRIAL PUERTOLLANO ITEM: SERVICE PIPE FOR HB4 & HB5 Drawing Tittle : HB-4-707-R1 & HB-5-707-R1

CLIENT : GBA FLARE SYSEMS P.O.: 567/006/2019

NDE Method Remark


Weld Weld Welding Length Thick
NAME WPS Material OD
No. type Process (mm) (mm) MT
PMI RT
PT
LLM18/WPS/005/19 A312 TP304L to
IGNITOR GAS 1"- N6A SP18-W2 SVB GTAW 105 3.38+3.38 33.4 PT PMI
Rev.0 A312 TP304L
LLM18/WPS/005/19 A312 TP304L to
IGNITOR GAS 1"- N6A SP18-W3 FW GTAW 105 3.38+3.38 33.4 PT PMI
Rev.0 A182 TP304

11.ITEM : SERVICE PIPE 3" STEAM DETAIL- N2

SERVICE PIPE 3" LLM18/WPS/003/19 GTAW A234 WPB to


A53-W1 SVB 279 7.62+7.62 88.9 PT
STEAM DETAIL- N2 Rev. 0 SMAW A105N
SERVICE PIPE 3" LLM18/WPS/003/19 GTAW A234 WPB to
A53-W2 SVB 279 7.62+7.62 88.9 PT
STEAM DETAIL- N3A Rev. 0 SMAW A106 Gr.B
SERVICE PIPE 3" LLM18/WPS/003/19 GTAW A234 WPB to
A53-W3 SVB 279 7.62+7.62 88.9 PT
STEAM DETAIL- N4A Rev. 0 SMAW A106 Gr.B
SERVICE PIPE 3" LLM18/WPS/003/19 GTAW A234 WPB to
A53-W4 SVB 279 7.62+7.62 88.9 PT
STEAM DETAIL- N5A Rev. 0 SMAW A106 Gr.B
SERVICE PIPE 3" LLM18/WPS/003/19 GTAW A234 WPB to
A53-W5 SVB 279 7.62+7.62 88.9 PT
STEAM DETAIL- N6A Rev. 0 SMAW A106 Gr.B
SERVICE PIPE 3" LLM18/WPS/003/19 GTAW A234 WPB to
A53-W6 SVB 279 7.62+7.62 88.9 PT
STEAM DETAIL- N7 Rev. 0 SMAW A106 Gr.B
SERVICE PIPE 3" LLM18/WPS/003/19 GTAW A234 WPB to
A53-W7 SVB 279 7.62+7.62 88.9 PT RT
STEAM DETAIL- N8 Rev. 0 SMAW A106 Gr.B
SERVICE PIPE 3" LLM18/WPS/003/19 GTAW A234 WPB to
A53-W8 SVB 279 7.62+7.62 88.9 PT
STEAM DETAIL- N9 Rev. 0 SMAW A106 Gr.B
SERVICE PIPE 3" LLM18/WPS/003/19 GTAW A234 WPB to
A53-W9 SVB 279 7.62+7.62 88.9 PT
STEAM DETAIL- N10A Rev. 0 SMAW A106 Gr.B

Page 38 of 38
Report No.: SERVICE PIPE-WM
LILAMA 18
WELD MAP Date : 12-Sep.2-2019
JSC
Rev : 01 1

PROJECT : COMPLEJO INDUCTRIAL PUERTOLLANO ITEM: SERVICE PIPE FOR HB4 & HB5 Drawing Tittle : HB-4-707-R1 & HB-5-707-R1

CLIENT : GBA FLARE SYSEMS P.O.: 567/006/2019

NDE Method Remark


Weld Weld Welding Length Thick
NAME WPS Material OD
No. type Process (mm) (mm) MT
PMI RT
PT
SERVICE PIPE 3" LLM18/WPS/003/19 GTAW A234 WPB to
A53-W10 SVB 279 7.62+7.62 88.9 PT
STEAM DETAIL- N11 Rev. 0 SMAW A106 Gr.B
SERVICE PIPE 3" LLM18/WPS/003/19 GTAW A234 WPB to
A53-W11 SVB 279 7.62+7.62 88.9 PT
STEAM DETAIL- N12A Rev. 0 SMAW A106 Gr.B
SERVICE PIPE 3" LLM18/WPS/003/19 GTAW A234 WPB to
B8-W1 SVB 279 7.62+7.62 88.9 PT
STEAM DETAIL- N13A Rev. 0 SMAW A106 Gr.B
SERVICE PIPE 3" LLM18/WPS/003/19 GTAW A234 WPB to
B8-W2 SVB 279 7.62+7.62 88.9 PT
STEAM DETAIL- N14A Rev. 0 SMAW A106 Gr.B
SERVICE PIPE 3" LLM18/WPS/003/19 GTAW A234 WPB to
B8-W3 SVB 279 7.62+7.62 88.9 PT
STEAM DETAIL- N15A Rev. 0 SMAW A106 Gr.B
SERVICE PIPE 3" LLM18/WPS/003/19 GTAW A234 WPB to
B8-W4 SVB 279 7.62+7.62 88.9 PT
STEAM DETAIL- N16 Rev. 0 SMAW A106 Gr.B
SERVICE PIPE 3" LLM18/WPS/003/19 GTAW A234 WPB to
B8-W5 SVB 279 7.62+7.62 88.9 PT
STEAM DETAIL- N17 Rev. 0 SMAW A106 Gr.B
SERVICE PIPE 3" LLM18/WPS/003/19 GTAW A234 WPB to
B8-W6 SVB 279 7.62+7.62 88.9 PT RT
STEAM DETAIL- N18 Rev. 0 SMAW A106 Gr.B
SERVICE PIPE 3" LLM18/WPS/003/19 GTAW A234 WPB to
B8-W7 SVB 279 7.62+7.62 88.9 PT
STEAM DETAIL- N19 Rev. 0 SMAW A106 Gr.B
SERVICE PIPE 3" LLM18/WPS/003/19 GTAW A234 WPB to
B8-W8 SVB 279 7.62+7.62 88.9 PT
STEAM DETAIL- N20 Rev. 0 SMAW A106 Gr.B
SERVICE PIPE 3" LLM18/WPS/003/19 GTAW A234 WPB to
B8-W9 SVB 279 7.62+7.62 88.9 PT
STEAM DETAIL- N21 Rev. 0 SMAW A106 Gr.B
SERVICE PIPE 3" LLM18/WPS/003/19 GTAW A234 WPB to
B29-W1 SVB 279 7.62+7.62 88.9 PT
STEAM DETAIL- N22 Rev. 0 SMAW A106 Gr.B

Page 38 of 38
Report No.: SERVICE PIPE-WM
LILAMA 18
WELD MAP Date : 12-Sep.2-2019
JSC
Rev : 01 1

PROJECT : COMPLEJO INDUCTRIAL PUERTOLLANO ITEM: SERVICE PIPE FOR HB4 & HB5 Drawing Tittle : HB-4-707-R1 & HB-5-707-R1

CLIENT : GBA FLARE SYSEMS P.O.: 567/006/2019

NDE Method Remark


Weld Weld Welding Length Thick
NAME WPS Material OD
No. type Process (mm) (mm) MT
PMI RT
PT
SERVICE PIPE 3" LLM18/WPS/003/19 GTAW A234 WPB to
B29-W2 SVB 279 7.62+7.62 88.9 PT
STEAM DETAIL- N23 Rev. 0 SMAW A106 Gr.B
SERVICE PIPE 3" LLM18/WPS/003/19 GTAW A234 WPB to
B29-W3 SVB 279 7.62+7.62 88.9 PT
STEAM DETAIL- N24 Rev. 0 SMAW A106 Gr.B
SERVICE PIPE 3" LLM18/WPS/003/19 GTAW A234 WPB to
B29-W4 SVB 279 7.62+7.62 88.9 PT
STEAM DETAIL- N25 Rev. 0 SMAW A106 Gr.B
SERVICE PIPE 3" LLM18/WPS/003/19 GTAW A234 WPB to
B29-W5 SVB 279 7.62+7.62 88.9 PT
STEAM DETAIL- N26 Rev. 0 SMAW A106 Gr.B
SERVICE PIPE 3" LLM18/WPS/003/19 GTAW A234 WPB to
B29-W6 SVB 279 7.62+7.62 88.9 PT RT
STEAM DETAIL- N27 Rev. 0 SMAW A106 Gr.B
SERVICE PIPE 3" LLM18/WPS/003/19 GTAW A234 WPB to
B29-W7 SVB 279 7.62+7.62 88.9 PT
STEAM DETAIL- N28 Rev. 0 SMAW A106 Gr.B
SERVICE PIPE 3" LLM18/WPS/003/19 GTAW A234 WPB to
B30-W1 SVB 279 7.62+7.62 88.9 PT
STEAM DETAIL- N29 Rev. 0 SMAW A106 Gr.B
SERVICE PIPE 3" LLM18/WPS/003/19 GTAW A234 WPB to
B30-W2 SVB 279 7.62+7.62 88.9 PT
STEAM DETAIL- N3A0 Rev. 0 SMAW A106 Gr.B
SERVICE PIPE 3" LLM18/WPS/003/19 GTAW A234 WPB to
B30-W3 SVB 279 7.62+7.62 88.9 PT
STEAM DETAIL- N3A1 Rev. 0 SMAW A106 Gr.B
SERVICE PIPE 3" LLM18/WPS/003/19 GTAW A234 WPB to
B30-W4 SVB 279 7.62+7.62 88.9 PT
STEAM DETAIL- N3A2 Rev. 0 SMAW A106 Gr.B
SERVICE PIPE 3" LLM18/WPS/003/19 GTAW A234 WPB to
B30-W5 SVB 279 7.62+7.62 88.9 PT
STEAM DETAIL- N3A3 Rev. 0 SMAW A106 Gr.B
SERVICE PIPE 3" LLM18/WPS/003/19 GTAW A234 WPB to
B30-W6 SVB 279 7.62+7.62 88.9 PT
STEAM DETAIL- N3A4 Rev. 0 SMAW A106 Gr.B

Page 38 of 38
Report No.: SERVICE PIPE-WM
LILAMA 18
WELD MAP Date : 12-Sep.2-2019
JSC
Rev : 01 1

PROJECT : COMPLEJO INDUCTRIAL PUERTOLLANO ITEM: SERVICE PIPE FOR HB4 & HB5 Drawing Tittle : HB-4-707-R1 & HB-5-707-R1

CLIENT : GBA FLARE SYSEMS P.O.: 567/006/2019

NDE Method Remark


Weld Weld Welding Length Thick
NAME WPS Material OD
No. type Process (mm) (mm) MT
PMI RT
PT
SERVICE PIPE 3" LLM18/WPS/003/19 GTAW A234 WPB to
B30-W7 SVB 279 7.62+7.62 88.9 PT
STEAM DETAIL- N3A5 Rev. 0 SMAW A106 Gr.B
SERVICE PIPE 3" LLM18/WPS/003/19 GTAW A234 WPB to
B28-W1 SVB 279 7.62+7.62 88.9 PT
STEAM DETAIL- N3A6 Rev. 0 SMAW A106 Gr.B
SERVICE PIPE 3" LLM18/WPS/003/19 GTAW A234 WPB to
B28-W2 SVB 279 7.62+7.62 88.9 PT RT
STEAM DETAIL- N3A7 Rev. 0 SMAW A106 Gr.B
SERVICE PIPE 3" LLM18/WPS/003/19 GTAW A234 WPB to
B28-W3 SVB 279 7.62+7.62 88.9 PT
STEAM DETAIL- N3A8 Rev. 0 SMAW A106 Gr.B
SERVICE PIPE 3" LLM18/WPS/003/19 GTAW A234 WPB to
B28-W4 SVB 279 7.62+7.62 88.9 PT
STEAM DETAIL- N3A9 Rev. 0 SMAW A106 Gr.B
SERVICE PIPE 3" LLM18/WPS/003/19 GTAW A234 WPB to
B28-W5 SVB 279 7.62+7.62 88.9 PT
STEAM DETAIL- N4A0 Rev. 0 SMAW A106 Gr.B
SERVICE PIPE 3" LLM18/WPS/003/19 GTAW A234 WPB to
B28-W6 SVB 279 7.62+7.62 88.9 PT
STEAM DETAIL- N4A1 Rev. 0 SMAW A106 Gr.B
SERVICE PIPE 3" LLM18/WPS/003/19 GTAW A234 WPB to
B28-W7 SVB 279 7.62+7.62 88.9 PT
STEAM DETAIL- N4A2 Rev. 0 SMAW A106 Gr.B
SERVICE PIPE 3" LLM18/WPS/003/19 GTAW A234 WPB to
B40-W1 SVB 279 7.62+7.62 88.9 PT
STEAM DETAIL- N4A3 Rev. 0 SMAW A106 Gr.B
SERVICE PIPE 3" LLM18/WPS/003/19 GTAW A234 WPB to
B40-W2 SVB 279 7.62+7.62 88.9 PT
STEAM DETAIL- N4A4 Rev. 0 SMAW A106 Gr.B
SERVICE PIPE 3" LLM18/WPS/003/19 GTAW A234 WPB to
B40-W3 SVB 279 7.62+7.62 88.9 PT
STEAM DETAIL- N4A5 Rev. 0 SMAW A106 Gr.B
SERVICE PIPE 3" LLM18/WPS/003/19 GTAW A234 WPB to
B40-W4 SVB 279 7.62+7.62 88.9 PT
STEAM DETAIL- N4A6 Rev. 0 SMAW A106 Gr.B

Page 38 of 38
Report No.: SERVICE PIPE-WM
LILAMA 18
WELD MAP Date : 12-Sep.2-2019
JSC
Rev : 01 1

PROJECT : COMPLEJO INDUCTRIAL PUERTOLLANO ITEM: SERVICE PIPE FOR HB4 & HB5 Drawing Tittle : HB-4-707-R1 & HB-5-707-R1

CLIENT : GBA FLARE SYSEMS P.O.: 567/006/2019

NDE Method Remark


Weld Weld Welding Length Thick
NAME WPS Material OD
No. type Process (mm) (mm) MT
PMI RT
PT
SERVICE PIPE 3" LLM18/WPS/003/19 GTAW A105N to A106
B40-W5 SVB 279 7.62+7.62 88.9 PT RT
STEAM DETAIL- N4A7 Rev. 0 SMAW Gr.B
SERVICE PIPE 3" A106 Gr.B to
1106-Wx41 FW WPS-136-002.19;Rev.0 SMAW 16400 6+7.6 PT
STEAM DETAIL- N4A7 S275 J0
SERVICE PIPE 3" LLM18/WPS/003/19 A106 Gr.B to
C17W FW SMAW 6704 7.6+5.54 88.9 PT
STEAM DETAIL- N4A7 Rev. 0 A106 Gr.B
SERVICE PIPE 3" A106 Gr.B to
1107-W FW WPS-136-002.19;Rev.0 SMAW 4320 6+5.54 PT
STEAM DETAIL- N4A7 S275 J0
SERVICE PIPE 3" A106 Gr.B to
P21-W FW WPS-136-002.19;Rev.0 SMAW 3352 8+5.54 PT
STEAM DETAIL- N4A7 S275 J0
SERVICE PIPE 3" LLM18/WPS/003/19 A106 Gr.B to
AD-W1 FW SMAW 6704 7.6+5.54 PT
STEAM DETAIL- N4A7 Rev. 0 A106 Gr.B
SERVICE PIPE 3" A106 Gr.B to
AD-W2 FW WPS-136-002.19;Rev.0 SMAW 6704 8+5.54 PT
STEAM DETAIL- N4A7 S275 J0

PREPARED BY QC ENGINEER REVIEW & APPROVED BY QA/QC MANAGER REVIEW & APPROVED BY CLIENT

Name: TRINH QUOC TUYEN Name: DANG KHAC LUONG Name:

Sign Sign: Sign:

Date 08-Aug.-2019 Date: 08-Aug.-2019 Date:

Page 38 of 38