Grey Structure Material Cost
Grey Structure Material Cost
Coarse
Coarse Aggregate
Sr. # Description Unit Quantity Cement (Bags) Aggregate 3/4" Sand (Cft) Water (Lit) Chemical (Lit)
1/2" (Cft)
(Cft)
1 PCC In Foundation 1:4:8 Cft 100.00 9.50 94.80 - 47.40 170.00 -
5 R.C.C Columns (5000 psi) - 536 kg/cum Cft 100.00 30.40 19.60 45.40 43.70 571.70 12.56
6 R.C.C Columns (5000 psi) - 550 kg/cum Cft 100.00 31.10 19.30 44.70 43.10 585.00 12.85
7 Foundations (4,000 psi) - 415 kg/cum Cft 100.00 23.50 21.10 48.90 47.10 548.90 11.65
8 Foundations (4,000 psi) - 450 kg/cum Cft 100.00 25.50 21.00 48.60 43.00 589.20 12.64
9 Lift Walls (4000 psi) Cft 100.00 23.50 21.10 48.90 47.10 548.90 11.65
10 Slabs, Beams, Stair, Parapet (3000 psi) Cft 100.00 19.80 22.10 51.20 49.30 521.40 11.45
11 RETAINING WALLS (3000 psi) - 350 kg/cum Cft 100.00 19.80 22.10 51.20 49.30 521.40 11.45
12 RETAINING WALLS (3000 psi) - 400 kg/cum Cft 100.00 22.70 20.80 48.30 46.50 586.70 13.13
13 Ramps (3000 psi) Cft 100.00 19.80 22.10 51.20 49.30 521.40 11.45
Total =
For 9" Wall
Cement Sand
CSM Ratio = 1 : 5
Wastage (%) = 0
CSM Ratio = 1 : 5
Wastage (%) = 0
CSM Ratio = 1 : 5
Wastage (%) = 0
CSM Ratio = 1 : 6
Wastage (%) = 0
Cement (Bags) 1
Sand (cft) 1
Crush (cft) 10