Download as pdf
Download as pdf
You are on page 1of 1
AUTHORIZATION LETTER 21 June 2019 To :+ Master of MV. CRISTAL WIND - ARUTMIN North Pulau Laut Coal Terminal - Geoservices cc : Rwood Subject : MV. CRISTAL WIND Dear Sir: For your Information, we have been appointed by Rwood to observe the Loading, Draft Survey on board Mother Vessel and Sampling operation We hereby authorize PT. Surveyor Indonesia, Surveyor Frianata (0813-4939-5049), Sampler Fariz Syahidi, Ahmad Rifaini, Achmadi, and Pajar Kumiawan to attend to the following scope of work to do Witness Draft survey cargo vessel Observe the loading operation Witness the sampling activities at vessel Witness umpire sample at Geoservices laboratory Witness double seal all gross samples taken at vessel Witness the preparation process at Geoservices laboratory Taking split sample from vessel Perform joint sampling sealing for umpire ‘Our delegates will also take pictures for all activity attended (as permited) Request Sizing Data Form Geoservices Please also kindly provide accommodation to our surveyor for the duration of stay on board mother vessel. ; The above personnel are subject to regulation implemented at NPLCT and on board vessel and strictly observe its safety rules. For anything unclear, please feel free to contact our Jakarta's office or email to candra.minba@gmail.com or mm.londodou@amail.com Thank you for your consideration and approval 24 June 2018 PT. Surveyor Indonesia Candra Arie Nugrahanto

You might also like