A. Foundation 1. Pile (0.3x0.3)
A. Foundation 1. Pile (0.3x0.3)
Villa 60m
No. Description Unit Quantity Quantity Risk Labor Labor Material Total/ Labor
A. Foundation
1. Pile (0.3x0.3)
1 Driven Pile 9m m 1,035.00 1,035.00 - - -
2 Driven Pile 20m m 240.00 240.00 - - -
3 Pilling Cutting m 135.00 135.00 2.00 2.00 270.00
4 2. Earthwork -
5 Soil Excavation for Pile cap m3 55.02 55.02 5.00 - 275.10
6 Sand Back Fill m3 66.02 66.02 5.00 10.00 330.12
3. Footing -
Formwork -
7 Footing form work m2 84.00 88.20 5.00 6.00 5.00 529.20
Concrete work -
8 Footing Lean concrete m3 4.65 4.88 18.00 21.60 68.00 105.46
9 Footing Concrete m3 39.30 41.27 18.00 21.60 68.00 891.32
10 Stone 4x6 m³ 12.20 13.42 6.00 7.20 8.00 96.62
Reinforcement bar -
11 DB10 kg 98.00 107.80 0.18 0.22 0.68 23.28
12 DB12 kg 2,050.00 2,255.00 0.18 0.22 0.68 487.08
13 DB14 kg 156.00 171.60 0.18 0.22 0.68 37.07
14 DB16 kg 946.00 1,040.60 0.18 0.22 0.68 224.77
15 DB18 kg 1,410.00 1,551.00 0.18 0.22 0.68 335.02
16 DB20 kg 647.00 711.70 0.18 0.22 0.68 153.73
4. Stump Column -
Formwork -
17 Stump Column m² 155.00 162.75 5.00 6.00 5.00 976.50
Concrete work -
18 Concrete for Stump column m³ 9.92 10.42 18.00 21.60 68.00 224.99
Stump Column Reinforcement bar -
19 DB18 kg 1,717.00 1,888.70 0.18 0.22 0.67 407.96
Total A 5,368
B. Ground Floor (GF) 4m
Formwork
20 GF-Column m2 198.0 207.90 5.00 6.00 5.00 1,247.40
21 GF-beam m2 187.0 196.35 5.00 6.00 5.00 1,178.10
22 GF-Wall m2 80.0 84.00 5.00 6.00 5.00 504.00
23 GF-Stair case m2 17.7 18.56 5.00 6.00 5.00 111.37
24 Brick Form m² 272.0 285.60 3.50 3.50 5.00 999.60
Concrete work -
25 Concrete for GF column m3 14.45 15.17 18.00 21.60 68.00 327.73
26 Concrete for GF beam m3 22.82 23.96 18.00 21.60 68.00 517.56
27 Lean Concrete for GF beam m3 5.90 6.20 18.00 21.60 68.00 133.81
28 Concrete for GF slab m3 30.80 32.34 18.00 21.60 68.00 698.54
29 Supply and laying clear plastic sheet to m² 288.00 288.00 0.30 0.36 5.00
cover compacted Sand 103.68
No. Description Unit Quantity Quantity Risk Labor Labor Material Total/ Labor
Quantity Risk
- - form 5% 1.05
- - con 5% 1.05
270.00 540.00 rebar 10% 1.1
Labor Risk
- 275.10 Form 20% 1.2
660.24 990.36 Con 20% 1.2
Rebar 20% 1.2
441.00 970.20
332.01 437.47
2,806.02 3,697.34
107.36 203.98
rebar total 5,837.70
73.30 92.71 Form total 88.20
1,533.40 1,939.30
116.69 147.58
707.61 894.92
1,054.68 1,333.86
483.96 612.06
-
813.75 1,790.25
708.29 933.27
1,440.00 1,543.68
Total /Material Amount
419.92 553.30
571.20 752.64
-
568.48 749.06
2,441.47 3,217.00 5,089.70
679.93 895.91
210.94 277.94
2,155.74 2,840.50
414.39 546.02
2,580.30 3,399.93
747.85 985.41
881.32 1,161.27
141.66 186.66 Labor/m³ Material/m³ Toal $/m³
350.13 425.75
22,847 32,497 109.84 247.68 357.52
-
-
792.75 1,744.05
1,638.00 3,603.60
2,745.75 6,040.65
367.50 808.50
92.81 204.18
-
778.26 1,025.47 For 1m³=60$
1,877.82 2,474.30 Form $ 29.93
4,107.64 5,412.42 Bar $ 17.00
419.92 553.30 Con $ 13.00
499.80 658.56 $ 59.93
-
497.42 655.42
1,929.84 2,542.85 3,569.50
656.74 865.36
65.08 85.75 36.69
38.90 51.25 173.42
3,372.73 4,444.07 98.89796628
4,255.82 5,607.67
429.35 565.73
747.85 985.41
784.98 1,034.33 Labor/m³ Material/m³ Toal $/m³
126.91 167.22 123.63 235.7995356 359.43
417.53 417.53
26,643 39,948
-
-
572.25 1,258.95
1,060.50 2,333.10
1,467.38 3,228.23
367.50 808.50
92.81 204.18 3,923.70
-
699.72 921.98 For 1m³=60$/m³
1,220.94 1,608.77 Form $ 28.85
2,195.19 2,892.49 Bar $ 16.70
419.92 553.30 Con $ 13.00
499.80 658.56 $ 58.55
-
323.88 426.76
1,168.38 1,539.51
400.93 528.28
66.57 87.72
2,200.62 2,899.64
2,575.69 3,393.85 Labor/m³ Material/m³ Toal $/m³
Total /Material Amount
288.73 380.44
968.66 1,276.35
829.38 1,092.83 Floor Area
83.14 83.14 GF 336
5,760 8,789 1F 521.46
$ 113,448 $ 168,011 2F 279.5
3F 268.5
Roof Steel Frame & Roof Tile TF 133
Pilling Work Roof Top 46.3
Total 1584.76 m²
Reinforcement bar
290 DB10(7F column) kg 1,571.25 1.20 1,885.50
291 DB20(7F column) kg 1,045.58 1.20 1,254.70
292 DB25(7F column) kg 1,880.26 1.20 2,256.32
293 RB6 (7F beam) kg #N/A 1.20 #N/A
294 RB8 (7F beam) kg #N/A 1.20 #N/A
295 DB14(7F beam) kg #N/A 1.20 #N/A
296 DB16(7F beam) kg #N/A 1.20 #N/A
297 DB20(7F beam) kg #N/A 1.20 #N/A
298 DB25(7F beam) kg #N/A 1.20 #N/A
299 DB32(7F beam) kg #N/A 1.20 #N/A
300 RB8 (7F slab) kg #N/A 1.20 #N/A
301 DB10 (7F slab) kg #N/A 1.20 #N/A
No. Description Unit Quantity Rate Amount
302 DB10 (7F Staircase) kg #N/A 1.20 #N/A
303 DB12 (7F Staircase) kg #N/A 1.20 #N/A
304 DB10 (7F wall) link of wall, stirrup at Coner and horizontal rebar kg #N/A 1.20 #N/A
305 DB12 (7F wall) kg #N/A 1.20 #N/A
306 DB14 (7F wall) kg #N/A 1.20 #N/A
M. Eighth Floor (8F) 8F BEAM
Formwork Side form wor
307 8F-Column m2 153.88 13.00 2,000.44 Bottom form w
308 8F-beam m2 314.73 13.00 4,091.49 Concrete
309 8F-Slab m2 365.06 13.00 4,745.78 RB6
310 8F-Stair case m2 11.16 13.00 145.08 RB8
311 8F-Elevator Wall m2 200.80 13.00 2,610.40 DB14
Concrete work DB16
312 Concrete for 8F floor column m3 16.47 85.00 1,399.95 DB20
313 Concrete for 8F beam m3 26.21 85.00 2,227.95 DB25
314 Concrete for 8F slab m3 43.98 85.00 3,738.15 DB32
315 Concrete for 8F Staircase m3 1.08 85.00 91.80
316 Concrete Elevator Wall m3 25.10 85.00 2,133.50
Reinforcement bar
317 DB10(8F column) kg 1,571.25 1.20 1,885.50
318 DB20(8F column) kg 1,045.58 1.20 1,254.70
319 DB25(8F column) kg 1,880.26 1.20 2,256.32
320 RB6 (8F beam) kg #N/A 1.20 #N/A
321 RB8 (8F beam) kg #N/A 1.20 #N/A
322 DB14(8F beam) kg #N/A 1.20 #N/A
323 DB16(8F beam) kg #N/A 1.20 #N/A
324 DB20(8F beam) kg #N/A 1.20 #N/A
325 DB25(8F beam) kg #N/A 1.20 #N/A
326 DB32(8F beam) kg #N/A 1.20 #N/A
327 RB8 (8F slab) kg #N/A 1.20 #N/A
328 DB10 (8F slab) kg #N/A 1.20 #N/A
329 DB10 (8F Staircase) kg #N/A 1.20 #N/A
330 DB12 (8F Staircase) kg #N/A 1.20 #N/A
331 DB10 (8F wall) link of wall, stirrup at Coner and horizontal rebar kg #N/A 1.20 #N/A
332 DB12 (8F wall) kg #N/A 1.20 #N/A
333 DB14 (8F wall) kg #N/A 1.20 #N/A
Reinforcement bar
501 DB10(wall) kg 242.97 1.20 291.57
502 DB12(wall) kg 556.33 1.20 667.60
503 DB14(wall) kg 96.64 1.20 115.97
504 DB12 (bottom slab) kg 433.88 1.20 520.65
505 DB10 (top slab) kg 301.47 1.20 361.76
V. Generator Room
Earthwork
506 Soil Excavation m3 12.00 5.00 60.00
507 Soil Backfill (as specification) m3 10.60 5.00 53.00
Soil compaction with crush stone to receive lean concrete for bottom slab
m3 0.58 30.00 17.28
508 (200mm thk)
Formwork
509 Footing m2 #N/A 13.00 #N/A
510 Column m2 #N/A 13.00 #N/A
511 Ground Beam m2 #N/A 13.00 #N/A
512 Roof Beam m2 #N/A 13.00 #N/A
513 Ground slab m2 #N/A 13.00 #N/A
514 Roof slab and flowerbed wall m2 #N/A 13.00 #N/A
Concrete work
515 Lean concrete for footing and bottom slab m3 #N/A 85.00 #N/A
516 Concrete for Footing m3 #N/A 85.00 #N/A
517 Concrete for Column m3 #N/A 85.00 #N/A
518 Concrete for Ground Beam m3 #N/A 85.00 #N/A
519 Concrete for Roof Beam m3 #N/A 85.00 #N/A
520 Concrete for Ground slab m3 #N/A 85.00 #N/A
521 Concrete for Roof slab and flowerbed wall m3 #N/A 85.00 #N/A
Reinforcement bar
No. Description Unit Quantity Rate Amount
522 DB12 (Footing) kg #N/A 1.20 #N/A
523 RB6 (Column) kg #N/A 1.20 #N/A
524 DB14 (Column) kg #N/A 1.20 #N/A
525 RB6 (Ground Beam and Roof Beam) kg #N/A 1.20 #N/A
526 DB16 (Ground Beam and Roof Beam) kg #N/A 1.20 #N/A
527 DB10 (Ground slab and Roof slab and flowerbed wall) kg #N/A 1.20 #N/A
COLLECTION
Collection 1: #N/A
Collection 2: #N/A
Collection 3: #N/A
Collection 4: #N/A
Collection 5: #N/A
Collection 6: #N/A
Collection 7: #N/A
Collection 8: #N/A
Collection 9: #N/A
Collection 10: #N/A
Collection 11: #N/A
Collection 12: #N/A
Collection 13: #N/A
TOTAL COLLECTION TOTAL #N/A
(Carried to Summary)