Structural Bill of Quantity Villa 60m

Villa 60m

No. Description Unit Quantity Quantity Risk Labor Labor Material Total/ Labor

A. Foundation
1. Pile (0.3x0.3)
1 Driven Pile 9m m 1,035.00 1,035.00 - - -
2 Driven Pile 20m m 240.00 240.00 - - -
3 Pilling Cutting m 135.00 135.00 2.00 2.00 270.00
4 2. Earthwork -
5 Soil Excavation for Pile cap m3 55.02 55.02 5.00 - 275.10
6 Sand Back Fill m3 66.02 66.02 5.00 10.00 330.12
3. Footing -
Formwork -
7 Footing form work m2 84.00 88.20 5.00 6.00 5.00 529.20
Concrete work -
8 Footing Lean concrete m3 4.65 4.88 18.00 21.60 68.00 105.46
9 Footing Concrete m3 39.30 41.27 18.00 21.60 68.00 891.32
10 Stone 4x6 m³ 12.20 13.42 6.00 7.20 8.00 96.62
Reinforcement bar -
11 DB10 kg 98.00 107.80 0.18 0.22 0.68 23.28
12 DB12 kg 2,050.00 2,255.00 0.18 0.22 0.68 487.08
13 DB14 kg 156.00 171.60 0.18 0.22 0.68 37.07
14 DB16 kg 946.00 1,040.60 0.18 0.22 0.68 224.77
15 DB18 kg 1,410.00 1,551.00 0.18 0.22 0.68 335.02
16 DB20 kg 647.00 711.70 0.18 0.22 0.68 153.73
4. Stump Column -
Formwork -
17 Stump Column m² 155.00 162.75 5.00 6.00 5.00 976.50
Concrete work -
18 Concrete for Stump column m³ 9.92 10.42 18.00 21.60 68.00 224.99
Stump Column Reinforcement bar -
19 DB18 kg 1,717.00 1,888.70 0.18 0.22 0.67 407.96
Total A 5,368
B. Ground Floor (GF) 4m
Formwork
20 GF-Column m2 198.0 207.90 5.00 6.00 5.00 1,247.40
21 GF-beam m2 187.0 196.35 5.00 6.00 5.00 1,178.10
22 GF-Wall m2 80.0 84.00 5.00 6.00 5.00 504.00
23 GF-Stair case m2 17.7 18.56 5.00 6.00 5.00 111.37
24 Brick Form m² 272.0 285.60 3.50 3.50 5.00 999.60
Concrete work -
25 Concrete for GF column m3 14.45 15.17 18.00 21.60 68.00 327.73
26 Concrete for GF beam m3 22.82 23.96 18.00 21.60 68.00 517.56
27 Lean Concrete for GF beam m3 5.90 6.20 18.00 21.60 68.00 133.81
28 Concrete for GF slab m3 30.80 32.34 18.00 21.60 68.00 698.54

29 Supply and laying clear plastic sheet to m² 288.00 288.00 0.30 0.36 5.00
cover compacted Sand 103.68
No. Description Unit Quantity Quantity Risk Labor Labor Material Total/ Labor

30 Concrete for GF Staircase m3 5.8812 6.18 18.00 21.60 68.00 133.39


31 Concrete for GF Rc Wall m3 8 8.40 18.00 21.60 68.00 181.44
Reinforcement bar -
32 RB8(GF column) kg 760.00 836.00 0.18 0.22 0.68 180.58
32 DB18(GF column) kg 3,264.00 3,590.40 0.18 0.22 0.68 775.53
33 RB6(GF beam) kg 909.00 999.90 0.18 0.22 0.68 215.98
34 RB8(GF beam) kg 282.00 310.20 0.18 0.22 0.68 67.00
35 DB16(GF beam) kg 2,882.00 3,170.20 0.18 0.22 0.68 684.76
36 DB20(GF beam) kg 554.00 609.40 0.18 0.22 0.68 131.63
37 DB10 (GF slab) kg 3,449.60 3,794.56 0.18 0.22 0.68 819.62
38 DB12 (GF Staircase) kg 999.80 1,099.78 0.18 0.22 0.68 237.55
39 DB12 (GF wall) kg 1,178.24 1,296.06 0.18 0.22 0.68 279.95
40 DB20 (GF wall) kg 189.39 208.33 0.18 0.22 0.68 45.00
41 Wire Tied kg 318.30 350.13 0.18 0.22 1.00 75.63
Total B 9,650
C. 1F Floor (1F) 3.5m
Formwork
42 1F-Column m2 151.00 158.55 5.00 6.00 5.00 951.30
43 1F-beam m2 312.00 327.60 5.00 6.00 5.00 1,965.60
44 1F-Slab m2 523 549.15 5.00 6.00 5.00 3,294.90
45 1F-Wall m2 70 73.50 5.00 6.00 5.00 441.00
46 1F-Stair case m2 17.6778 18.56 5.00 6.00 5.00 111.37
Concrete work -
47 Concrete for 1F floor column m3 10.90 11.45 18.00 21.60 68.00 247.21
48 Concrete for 1F beam m3 26.30 27.62 18.00 21.60 68.00 596.48
49 Concrete for 1F slab m3 57.53 60.41 18.00 21.60 68.00 1,304.78
50 Concrete for 1F Staircase m3 5.8812 6.18 18.00 21.60 68.00 133.39
51 Concrete for 1F Rc Wall m3 7 7.35 18.00 21.60 68.00 158.76
Reinforcement bar -
52 RB8(1F column) kg 665.00 731.50 0.18 0.22 0.68 158.00
52 DB18(1F column) kg 2,580.00 2,838.00 0.18 0.22 0.68 613.01
53 RB6(1F beam) kg 878.00 965.80 0.18 0.22 0.68 208.61
54 RB8(1F beam) kg 87.00 95.70 0.18 0.22 0.68 20.67
53 DB14(1F beam) kg 52.00 57.20 0.18 0.22 0.68 12.36
55 DB16(1F beam) kg 4,509.00 4,959.90 0.18 0.22 0.68 1,071.34
56 DB10 (1F slab) kg 5,689.60 6,258.56 0.18 0.22 0.68 1,351.85
57 DB12 (1F slab) kg 574.00 631.40 0.18 0.22 0.68 136.38
58 DB12 (1F Staircase) kg 999.80 1,099.78 0.18 0.22 0.68 237.55
59 DB12 (1F wall) kg 1,049.44 1,154.38 0.18 0.22 0.68 249.35
60 DB20 (1F wall) kg 169.66 186.63 0.18 0.22 0.68 40.31
61 Wire Tied kg 379.58 417.53 - 1.00 -
Total C 13,304
D. 2F Floor (2F) 3.5m
Formwork
62 2F-Column m2 109.00 114.45 5.00 6.00 5.00 686.70
63 2F-beam m2 202.00 212.10 5.00 6.00 5.00 1,272.60
64 2F-Slab m2 279.5 293.48 5.00 6.00 5.00 1,760.85
65 2F-Wall m2 70 73.50 5.00 6.00 5.00 441.00
66 2F-Stair case m2 17.6778 18.56 5.00 6.00 5.00 111.37
Concrete work -
67 Concrete for 2F column m3 9.80 10.29 18.00 21.60 68.00 222.26
68 Concrete for 2F beam m3 17.10 17.96 18.00 21.60 68.00 387.83
69 Concrete for 2F slab m3 30.75 32.28 18.00 21.60 68.00 697.30
70 Concrete for 2F Staircase m3 5.8812 6.18 18.00 21.60 68.00 133.39
71 Concrete for 2F Rc Wall m3 7 7.35 18.00 21.60 68.00 158.76
Reinforcement bar -
72 RB8(2F column) kg 433.00 476.30 0.18 0.22 0.68 102.88
73 DB18(2F column) kg 1,562.00 1,718.20 0.18 0.22 0.68 371.13
74 RB6(2F beam) kg 536.00 589.60 0.18 0.22 0.68 127.35
75 RB8(2F beam) kg 89.00 97.90 0.18 0.22 0.68 21.15
76 DB16(2F beam) kg 2,942.00 3,236.20 0.18 0.22 0.68 699.02
77 DB10 (2F slab) kg 3,443.44 3,787.78 0.18 0.22 0.68 818.16
No. Description Unit Quantity Quantity Risk Labor Labor Material Total/ Labor

78 DB12 (2F Staircase) kg 999.80 1,099.78 0.18 0.22 0.68 237.55


79 DB12 (2F wall) kg 1,049.44 1,154.38 0.18 0.22 0.68 249.35
80 DB20 (2F wall) kg 169.66 186.63 0.18 0.22 0.68 40.31
81 Wire Tied kg 247.09 271.80 - - 1.00 -
Total D $ 8,538.96
E. 3F Floor (3F) 3.5m
Formwork
82 3F-Column m2 100.00 105.00 5.00 6.00 5.00 630.00
83 3F-beam m2 185.00 194.25 5.00 6.00 5.00 1,165.50
84 3F-Slab m2 268.5 281.93 5.00 6.00 5.00 1,691.55
85 3F-Wall m2 70 73.50 5.00 6.00 5.00 441.00
86 3F-Stair case m2 17.6778 18.56 5.00 6.00 5.00 111.37
Concrete work -
87 Concrete for 3F floor column m3 10.20 10.71 18.00 21.60 68.00 231.34
88 Concrete for 3F beam m3 15.70 16.49 18.00 21.60 68.00 356.08
89 Concrete for 3F slab m3 29.54 31.01 18.00 21.60 68.00 669.85
90 Concrete for 3F Staircase m3 5.8812 6.18 18.00 21.60 68.00 133.39
91 Concrete for 3F Rc Wall m3 7 7.35 18.00 21.60 68.00 158.76
Reinforcement bar -
92 RB8(3F column) kg 437.00 480.70 0.18 0.22 0.68 103.83
93 DB18(3F column) kg 1,630.00 1,793.00 0.18 0.22 0.68 387.29
94 RB6(3F beam) kg 528.00 580.80 0.18 0.22 0.68 125.45
95 RB8(3F beam) kg 172.00 189.20 0.18 0.22 0.68 40.87
96 DB16(3F beam) kg 2,581.00 2,839.10 0.18 0.22 0.68 613.25
97 DB18(3F beam) kg 308.00 338.80 0.18 0.22 0.68 73.18
98 DB10 (3F slab) kg 3,307.92 3,638.71 0.18 0.22 0.68 785.96
99 DB12 (3F Staircase) kg 999.80 1,099.78 0.18 0.22 0.68 237.55
100 DB12 (3F wall) kg 1,049.44 1,154.38 0.18 0.22 0.68 249.35
101 DB20 (3F wall) kg 169.66 186.63 0.18 0.22 0.68 40.31
102 Wire Tied kg 246.02 270.62 - - 1.00 -
Total E $ 8,245.87
F. TF Floor (TF) 3.5m
Formwork
103 TF-Column m2 117.00 122.85 5.00 6.00 5.00 737.10
104 TF-beam m2 148.00 155.40 5.00 6.00 5.00 932.40
105 TF-Slab m2 266 279.30 5.00 6.00 5.00 1,675.80
Concrete work -
106 Concrete for TF floor column m3 10.20 10.71 18.00 21.60 68.00 231.34
107 Concrete for TF beam m3 14.17 14.88 18.00 21.60 68.00 321.38
108 Concrete for TF slab m3 29.26 30.72 18.00 21.60 68.00 663.62
Reinforcement bar -
RB8(TF column) kg 387.00 425.70 0.18 0.22 0.68 91.95
109 DB18(TF column) kg 1,630.00 1,793.00 0.18 0.22 0.68 387.29
110 RB6(TF beam) kg 331.00 364.10 0.18 0.22 0.68 78.65
111 RB8(TF beam) kg 49.00 53.90 0.18 0.22 0.68 11.64
112 DB16(TF beam) kg 2,177.00 2,394.70 0.18 0.22 0.68 517.26
113 DB10 (TF slab) kg 3,277.12 3,604.83 0.18 0.22 0.68 778.64
114 Wire Tied kg 173.90 191.29 - - 1.00 -
Total F $ 6,427.05
G. RF Floor (TF)
Formwork
115 RF-Column m2 48.00 50.40 5.00 6.00 5.00 302.40
116 RF-beam m2 124.00 130.20 5.00 6.00 5.00 781.20
117 RF-Slab m2 92.6 97.23 5.00 6.00 5.00 583.38
Concrete work -
118 Concrete for RF floor column m3 2.40 2.52 18.00 21.60 68.00 54.43
119 Concrete for RF beam m3 11.76 12.35 18.00 21.60 68.00 266.72
120 Concrete for RF slab m3 9.90 10.40 18.00 21.60 68.00 224.53
Reinforcement bar -
RB6(RF column) kg 85.85 94.43 0.18 0.22 0.68 20.40
121 DB16(RF column) kg 560.00 616.00 0.18 0.22 0.68 133.06
No. Description Unit Quantity Quantity Risk Labor Labor Material Total/ Labor

122 RB6(RF beam) kg 386.00 424.60 0.18 0.22 0.68 91.71


123 DB16(RF beam) kg 1,295.00 1,424.50 0.18 0.22 0.68 307.69
124 DB10 (RF slab) kg 1,108.80 1,219.68 0.18 0.22 0.68 263.45
125 Wire Tied kg 75.58 83.14 - - 1.00 -
Total G 3,029
Grand Total A+B+C+D+E+F+G $ 54,563

Note : Not incloud Roof Steel Fram


: Not including Pilling Work
Total /Material Amount

Quantity Risk
- - form 5% 1.05
- - con 5% 1.05
270.00 540.00 rebar 10% 1.1
Labor Risk
- 275.10 Form 20% 1.2
660.24 990.36 Con 20% 1.2
Rebar 20% 1.2

441.00 970.20

332.01 437.47
2,806.02 3,697.34
107.36 203.98
rebar total 5,837.70
73.30 92.71 Form total 88.20
1,533.40 1,939.30
116.69 147.58
707.61 894.92
1,054.68 1,333.86
483.96 612.06
-

813.75 1,790.25

708.29 933.27

1,265.43 1,673.39 Labor/m³ Material/m³ Toal $/m³


11,374 16,742 99.65 201.08 300.73
- not incloud Pilling
-
1,039.50 2,286.90
981.75 2,159.85
420.00 924.00
92.81 204.18
1,428.00 2,427.60
-
1,031.73 1,359.46
1,629.35 2,146.91
421.26 555.07
2,199.12 2,897.66

1,440.00 1,543.68
Total /Material Amount

419.92 553.30
571.20 752.64
-
568.48 749.06
2,441.47 3,217.00 5,089.70
679.93 895.91
210.94 277.94
2,155.74 2,840.50
414.39 546.02
2,580.30 3,399.93
747.85 985.41
881.32 1,161.27
141.66 186.66 Labor/m³ Material/m³ Toal $/m³
350.13 425.75
22,847 32,497 109.84 247.68 357.52
-
-
792.75 1,744.05
1,638.00 3,603.60
2,745.75 6,040.65
367.50 808.50
92.81 204.18
-
778.26 1,025.47 For 1m³=60$
1,877.82 2,474.30 Form $ 29.93
4,107.64 5,412.42 Bar $ 17.00
419.92 553.30 Con $ 13.00
499.80 658.56 $ 59.93
-
497.42 655.42
1,929.84 2,542.85 3,569.50
656.74 865.36
65.08 85.75 36.69
38.90 51.25 173.42
3,372.73 4,444.07 98.89796628
4,255.82 5,607.67
429.35 565.73
747.85 985.41
784.98 1,034.33 Labor/m³ Material/m³ Toal $/m³
126.91 167.22 123.63 235.7995356 359.43
417.53 417.53
26,643 39,948
-
-
572.25 1,258.95
1,060.50 2,333.10
1,467.38 3,228.23
367.50 808.50
92.81 204.18 3,923.70
-
699.72 921.98 For 1m³=60$/m³
1,220.94 1,608.77 Form $ 28.85
2,195.19 2,892.49 Bar $ 16.70
419.92 553.30 Con $ 13.00
499.80 658.56 $ 58.55
-
323.88 426.76
1,168.38 1,539.51
400.93 528.28
66.57 87.72
2,200.62 2,899.64
2,575.69 3,393.85 Labor/m³ Material/m³ Toal $/m³
Total /Material Amount

747.85 985.41 121.07 233.13 354.20


784.98 1,034.33
126.91 167.22
271.80 271.80
$ 17,263.61 $ 25,802.57
-
-
525.00 1,155.00
971.25 2,136.75
1,409.63 3,101.18
367.50 808.50
92.81 204.18
-
728.28 959.62 For 1m³=60$
1,120.98 1,477.06 Form $ 28.16
2,108.80 2,778.65 Bar $ 16.70
419.92 553.30 Con $ 13.00
499.80 658.56 $ 57.86
-
326.88 430.71 3,947.90
1,219.24 1,606.53
394.94 520.40
128.66 169.52
1,930.59 2,543.83 Labor/m³ Material/m³ Toal $/m³
230.38 303.56 120.70 235.31 356.01
2,474.32 3,260.29
747.85 985.41
784.98 1,034.33
126.91 167.22
270.62 270.62
$ 16,879.34 $ 25,125.21
-
-
614.25 1,351.35
777.00 1,709.40
1,396.50 3,072.30
-
728.28 959.62
1,011.74 1,333.11 Labor/m³ Material/m³ Toal $/m³
2,089.16 2,752.78 114.13 225.19 339.33
-
289.48 381.43
1,219.24 1,606.53
247.59 326.23
36.65 48.29
1,628.40 2,145.65
2,451.29 3,229.93
191.29 191.29
$ 12,680.86 $ 19,107.92
-
-
252.00 554.40
651.00 1,432.20
486.15 1,069.53
- Labor/m³ Material/m³ Toal $/m³
171.36 225.79 119.90 228.00 347.90
839.66 1,106.38
706.86 931.39 Area 1584.76
- Price/m2 $ 106.02
64.21 84.61
418.88 551.94
Total /Material Amount

288.73 380.44
968.66 1,276.35
829.38 1,092.83 Floor Area
83.14 83.14 GF 336
5,760 8,789 1F 521.46
$ 113,448 $ 168,011 2F 279.5
3F 268.5
Roof Steel Frame & Roof Tile TF 133
Pilling Work Roof Top 46.3
Total 1584.76 m²

Material Total In Building


Total Con 455.94 m³
Total Rebar 73,923.90 kg
Total Form 3,715.26 m²
Structural Bill of Quantity BOUTIQUE HOTEL
No. Description Unit Quantity Rate Amount
Method of mesaurment
The mesurement is base on the drawing only other required work or
material shall be lumpsump in the quantity below.
Contractor to refer to the specification of structure work for quoting.
Concrete price shall be including labour, scalfold, Plastic sheet for RC slab
and other material required to complete the work
All soil backfilling shall including compaction price as per specification

Steel work Shall weld as specify in drawing and specification, including


anti rush coating minimum 5years warranty.
Any othe necessary to complet the steel structure shall included in the unit
price
A. Foundation
Earthwork
1 Soil Excavation for Bore Pile cap m3 674.44 5.00 3,372.20
2 Soil Backfill for Bore Pile cap (as specification) m3 621.52 5.00 3,107.60
Ground compaction with crush stone to receive lean concrete for 0F slab,
3 m3 62.14 30.00 1,864.20
Basement slab and Drainage Pit slab (200mm thk)
4 Back filling around Building (Provisional) m3 118.70 5.00 593.50
Sheet Pile 28m from existing
Sheet Pile ( Length 60m ) drive and take out 3months duration
5 (Provisional) m 1,650.00 8.00 13,200.00
Bore Pile From -28.5m to
6 Bore Pile Ø0.7m (28m depth from existing level) m 109.00 120.00 #N/A
Bore Pile
7 Bore Pile Ø0.8m (28m depth from existing level) m 184.00 140.00 #N/A
Ø0.7m
8 Bore Pile Ø0.9m (28m depth from existing level) m 489.00 160.00 #N/A
Ø0.8m
9 Bore Pile Ø1.0m (28m depth from existing level) m 53.00 180.00 #N/A
Ø0.9m
10 Static Load Test pcs 3.00 1,000.00 #N/A
Ø1.0m
11 Ultimate Load Test pcs 2.00 1,200.00 #N/A
12 Sonic Test pcs 8.00 500.00 #N/A
13 Shock Test pcs 30.00 50.00 #N/A
14 Cut Bore Pile head pcs 30.00 20.00 #N/A
Bore Pile cap
15 Bore Pile cap form work m2 122.78 13.00 1,596.14
16 Bore Pile cap Lean concrete m3 4.31 60.00 258.70
17 Bore Pile cap Concrete m3 61.58 85.00 5,234.13
Pile cap Reinforcement bar
18 DB20(BPC) kg 10,619.34 1.20 12,743.20
B. Stump-Column
19 Formwork-Stump Column m2 21.75 13.00 282.75
20 Concrete-Stump-Column m3 2.75 85.00 233.54
Reinforcement bar
21 DB10(Stump column) kg 295.85 1.20 355.02
22 DB20(Stump column) kg 246.60 1.20 295.92
23 DB25(Stump column) kg 1,356.26 1.20 1,627.51
24 DB32(Stump column) kg 1,060.58 1.20 1,272.70
C. Basement Floor
Formwork
25 BF-Column m2 71.10 13.00 924.30
26 BF-Slab m2 14.25 13.00 185.25
27 BF-Stair case m2 11.16 13.00 145.08
28 Drainage Pit wall m2 8.84 13.00 114.92

Carried to Collection 1: Total #N/A


No. Description Unit Quantity Rate Amount
29 BF-Wall m2 493.02 13.00 6,409.26
30 BF-Slab for elevator pit m2 11.34 13.00 147.42
Concrete work
31 Concrete for BF floor column m3 #N/A 85.00 #N/A
32 Concrete for basement slab m3 #N/A 85.00 #N/A
33 Concrete staircase m3 #N/A 85.00 #N/A
34 Concrete Wall m3 #N/A 85.00 #N/A
35 Concrete slab for elevator pit m3 #N/A 85.00 #N/A
36 Concrete slab and wall for Drainage Pit m3 #N/A 85.00 #N/A
37 Lean Concrete for basement slab, 0F slab and Drainage pit slab m3 #N/A 60.00 #N/A
38 Reinforcement bar
DB10(BFcolumn) kg #N/A 1.20 #N/A
39 DB20(BF column) kg #N/A 1.20 #N/A
40 DB25(BFcolumn) kg #N/A 1.20 #N/A
41 DB32(BF column) kg #N/A 1.20 #N/A
42 DB12 (BF slab) kg #N/A 1.20 #N/A
43 DB12 (slab for elevator pit) kg #N/A 1.20 #N/A
44 DB10 Staircase kg #N/A 1.20 #N/A
45 DB12 Staircase kg #N/A 1.20 #N/A
46 DB10 (BF wall) link of wall and stirrup at Coner kg #N/A 1.20 #N/A
47 DB12 (BF wall) kg #N/A 1.20 #N/A
48 DB14 (BF wall) kg #N/A 1.20 #N/A
49 DB16 (BF wall) kg #N/A 1.20 #N/A
50 DB12 and DB10 (Drainage Pit slab and wall) kg #N/A 1.20 #N/A
51 Water Stop
52 Water Stop(Basementand Water tank wall)200mm height m 99.75 5.00 498.75###
53 Water Proof ###
Water Proof(Basement,Water tank, wall&slab both side) m2 465.62 15.00 6,984.36###
54 D. Ground Floor (0F) OF BEAM
55 Formwork Side form wor
56 0F-Column m2 171.36 13.00 2,227.68 Bottom form w
0F-beam m2 118.26 13.00 1,537.37 Concrete
0F-Slab m2 285.86 13.00 3,716.18 RB6
57 0F-Stair case m2 11.16 13.00 145.08 RB8
58 0F-Elevator Wall m2 200.80 13.00 2,610.40 DB14
59 Concrete work DB16
60 Concrete for 0F floor column m3 21.16 85.00 1,798.60 DB20
61 Concrete for 0F beam m3 10.04 85.00 853.29
Concrete for 0F slab m3 34.90 85.00 2,966.13
62 Concrete for 0F Staircase m3 1.08 85.00 91.80
63 Concrete Elevator Wall m3 25.10 85.00 2,133.50
64 Reinforcement bar
65 DB10(0Fcolumn) kg #N/A 1.20 #N/A
66 DB20(0F column) kg #N/A 1.20 #N/A
DB25(0Fcolumn) kg #N/A 1.20 #N/A
67 DB32(0F column) kg #N/A 1.20 #N/A
68 RB6 (0F beam) kg #N/A 1.20 #N/A
69 RB8 (0F beam) kg #N/A 1.20 #N/A
70 DB14(0F beam) kg #N/A 1.20 #N/A
71 DB16(0F beam) kg #N/A 1.20 #N/A

Carried to Collection 2: Total #N/A


No. Description Unit Quantity Rate Amount
72 DB20(0F beam) kg #N/A 1.20 #N/A
73 RB8 (0F slab) kg #N/A 1.20 #N/A
74 DB10 (0F slab) kg #N/A 1.20 #N/A
75 DB10 (0F Staircase) kg #N/A 1.20 #N/A
76 DB12 (0F Staircase) kg #N/A 1.20 #N/A
77 DB10 (0F wall) link of wall and stirrup at Coner kg #N/A 1.20 #N/A
78 DB12 (0F wall) kg #N/A 1.20 #N/A
79 DB14 (0F wall) kg #N/A 1.20 #N/A
80 DB16 (0F wall) kg #N/A 1.20 #N/A
E. Mezzanine Floor (0M) OM BEAM
Formwork Side form wor
81 0M-Column m2 164.28 13.00 2,135.64 Bottom form w
82 0M-beam m2 212.98 13.00 2,768.75 Concrete
83 0M-Slab m2 201.70 13.00 2,622.10 RB6
84 0M-Stair case m2 11.16 13.00 145.08 RB8
85 0M-Elevator Wall m2 200.80 13.00 2,610.40 DB14
Concrete work DB16
86 Concrete for 0M floor column m3 20.69 85.00 1,758.65 DB20
87 Concrete for 0M beam m3 17.99 85.00 1,529.31 DB25
88 Concrete for 0M slab m3 25.60 85.00 2,176.00
89 Concrete for 0M Staircase m3 1.08 85.00 91.80
90 Concrete Elevator Wall m3 25.10 85.00 2,133.50
Reinforcement bar
91 DB10(0Mcolumn) kg 2,122.55 1.20 2,547.06
92 DB20(0M column) kg 493.20 1.20 591.84
93 DB25(0Mcolumn) kg 2,959.10 1.20 3,550.92
94 DB32(0M column) kg 1,818.14 1.20 2,181.77
95 RB6 (0M beam) kg #N/A 1.20 #N/A
96 RB8 (0M beam) kg #N/A 1.20 #N/A
97 DB14(0Mbeam) kg #N/A 1.20 #N/A
98 DB16(0M beam) kg #N/A 1.20 #N/A
99 DB20(0M beam) kg #N/A 1.20 #N/A
100 DB25(0M beam) kg #N/A 1.20 #N/A
101 RB8 (0M slab) kg #N/A 1.20 #N/A
102 DB10 (0M slab) kg #N/A 1.20 #N/A
103 DB10 (0M Staircase) kg #N/A 1.20 #N/A
104 DB12 (0M Staircase) kg #N/A 1.20 #N/A
105 DB10 (0M wall) link of wall and stirrup at Coner kg #N/A 1.20 #N/A
106 DB12 (0M wall) kg #N/A 1.20 #N/A
107 DB14 (0M wall) kg #N/A 1.20 #N/A
108 DB16 (0M wall) kg #N/A 1.20 #N/A
F. First Floor (1F) 1F BEAM
Formwork Side form wor
109 1F-Column m2 165.08 13.00 2,146.04 Bottom form w
110 1F-beam m2 456.05 13.00 5,928.64 Concrete
111 1F-Slab m2 361.26 13.00 4,696.38 RB6
112 1F-Stair case m2 11.16 13.00 145.08 RB8
113 1F-Elevator Wall m2 200.80 13.00 2,610.40 DB12
Concrete work DB14
114 Concrete for 1F floor column m3 18.39 85.00 1,563.15 DB16
DB20
Carried to Collection 3: Total #N/A DB25
DB32
115 Concrete for 1F beam m3 47.24 85.00 4,015.37
116 Concrete for 1F slab m3 43.35 85.00 3,684.85
No. Description Unit Quantity Rate Amount
117 Concrete for 1F Staircase m3 1.08 85.00 91.80
118 Concrete Elevator Wall m3 25.10 85.00 2,133.50
Reinforcement bar
119 DB10(1F column) kg 1,827.18 1.20 2,192.62
120 DB20(1F column) kg 907.49 1.20 1,088.99
121 DB25(1F column) kg 2,250.15 1.20 2,700.18
122 DB32(1F column) kg 1,060.58 1.20 1,272.70
123 RB6 (1F beam) kg #N/A 1.20 #N/A
124 RB8 (1F beam) kg #N/A 1.20 #N/A
125 DB12(1Fbeam) kg #N/A 1.20 #N/A
126 DB14(1Fbeam) kg #N/A 1.20 #N/A
127 DB16(1F beam) kg #N/A 1.20 #N/A
128 DB20(1F beam) kg #N/A 1.20 #N/A
129 DB25(1F beam) kg #N/A 1.20 #N/A
130 DB32(1F beam) kg #N/A 1.20 #N/A
131 RB8 (1F slab) kg #N/A 1.20 #N/A
132 DB10 (1F slab) kg #N/A 1.20 #N/A
133 DB10 (1F Staircase) kg #N/A 1.20 #N/A
134 DB12 (1F Staircase) kg #N/A 1.20 #N/A
135 DB10 (1F wall) link of wall and stirrup at Coner kg #N/A 1.20 #N/A
136 DB12 (1F wall) kg #N/A 1.20 #N/A
137 DB14 (1F wall) kg #N/A 1.20 #N/A
138 DB16 (1F wall) kg #N/A 1.20 #N/A
G. Second Floor (2F) 2F BEAM
Formwork Side form wor
139 2F-Column m2 165.08 13.00 2,146.04 Bottom form w
140 2F-beam m2 304.21 13.00 3,954.75 Concrete
141 2F-Slab m2 364.23 13.00 4,734.99 RB6
142 2F-Stair case m2 11.16 13.00 145.08 RB8
143 2F-Elevator Wall m2 200.80 13.00 2,610.40 DB14
Concrete work DB16
144 Concrete for 2F floor column m3 18.39 85.00 1,563.15 DB20
145 Concrete for 2F beam m3 25.41 85.00 2,159.73 DB25
146 Concrete for 2F slab m3 46.23 85.00 3,929.35 DB32
147 Concrete for 2F Staircase m3 1.08 85.00 91.80
148 Concrete Elevator Wall m3 25.10 85.00 2,133.50
Reinforcement bar
149 DB10(2F column) kg 1,827.18 1.20 2,192.62
150 DB20(2F column) kg 907.49 1.20 1,088.99
151 DB25(2F column) kg 2,250.15 1.20 2,700.18
152 DB32(2F column) kg 1,060.58 1.20 1,272.70
153 RB6 (2F beam) kg #N/A 1.20 #N/A
154 RB8 (2F beam) kg #N/A 1.20 #N/A
155 DB14(2F beam) kg #N/A 1.20 #N/A
156 DB16(2F beam) kg #N/A 1.20 #N/A
157 DB20(2F beam) kg #N/A 1.20 #N/A
158 DB25(2F beam) kg #N/A 1.20 #N/A
159 DB32(2F beam) kg #N/A 1.20 #N/A

Carried to Collection 4: Total #N/A

160 RB8 (2F slab) kg #N/A 1.20 #N/A


161 DB10 (2F slab) kg #N/A 1.20 #N/A
162 DB10 (2F Staircase) kg #N/A 1.20 #N/A
163 DB12 (2F Staircase) kg #N/A 1.20 #N/A
164 DB10 (2F wall) link of wall and stirrup at Coner kg #N/A 1.20 #N/A
No. Description Unit Quantity Rate Amount
165 DB12 (2F wall) kg #N/A 1.20 #N/A
166 DB14 (2F wall) kg #N/A 1.20 #N/A
167 DB16 (2F wall) kg #N/A 1.20 #N/A
H. Third Floor (3F) 3F BEAM
Formwork Side form wor
168 3F-Column m2 165.08 13.00 2,146.04 Bottom form w
169 3F-beam m2 304.21 13.00 3,954.75 Concrete
170 3F-Slab m2 364.23 13.00 4,734.99 RB6
171 3F-Stair case m2 11.16 13.00 145.08 RB8
172 3F-Elevator Wall m2 200.80 13.00 2,610.40 DB14
Concrete work DB16
173 Concrete for 3F floor column m3 18.39 85.00 1,563.15 DB20
174 Concrete for 3F beam m3 25.41 85.00 2,159.73 DB25
175 Concrete for 3F slab m3 46.04 85.00 3,913.74 DB32
176 Concrete for 3F Staircase m3 1.08 85.00 91.80
177 Concrete Elevator Wall m3 25.10 85.00 2,133.50
Reinforcement bar
178 DB10(3F column) kg 1,827.18 1.20 2,192.62
179 DB20(3F column) kg 907.49 1.20 1,088.99
180 DB25(3F column) kg 2,250.15 1.20 2,700.18
181 DB32(3F column) kg 1,060.58 1.20 1,272.70
182 RB6 (3F beam) kg #N/A 1.20 #N/A
183 RB8 (3F beam) kg #N/A 1.20 #N/A
184 DB14(3F beam) kg #N/A 1.20 #N/A
185 DB16(3F beam) kg #N/A 1.20 #N/A
186 DB20(3F beam) kg #N/A 1.20 #N/A
187 DB25(3F beam) kg #N/A 1.20 #N/A
188 DB32(3F beam) kg #N/A 1.20 #N/A
189 RB8 (3F slab) kg #N/A 1.20 #N/A
190 DB10 (3F slab) kg #N/A 1.20 #N/A
191 DB10 (3F Staircase) kg #N/A 1.20 #N/A
192 DB12 (3F Staircase) kg #N/A 1.20 #N/A
193 DB10 (3F wall) link of wall and stirrup at Coner kg #N/A 1.20 #N/A
194 DB12 (3F wall) kg #N/A 1.20 #N/A
195 DB14 (3F wall) kg #N/A 1.20 #N/A
196 DB16 (3F wall) kg #N/A 1.20 #N/A
I. Fourth Floor (4F) 4F EBAM
Formwork Side form wor
197 4F-Column m2 165.08 13.00 2,146.04 Bottom form w
198 4F-beam m2 304.21 13.00 3,954.75 Concrete
199 4F-Slab m2 366.53 13.00 4,764.89 RB6
200 4F-Stair case m2 11.16 13.00 145.08 RB8
201 4F-Elevator Wall m2 200.80 13.00 2,610.40 DB14
Concrete work DB16
202 Concrete for 4F floor column m3 18.39 85.00 1,563.15 DB20
DB25
Carried to Collection 5: Total #N/A DB32

203 Concrete for 4F beam m3 25.41 85.00 2,159.73


204 Concrete for 4F slab m3 46.50 85.00 3,952.81
205 Concrete for 4F Staircase m3 1.08 85.00 91.80
206 Concrete Elevator Wall m3 25.10 85.00 2,133.50
Reinforcement bar
207 DB10(4F column) kg 1,827.18 1.20 2,192.62
208 DB20(4F column) kg 907.49 1.20 1,088.99
No. Description Unit Quantity Rate Amount
209 DB25(4F column) kg 2,250.15 1.20 2,700.18
210 DB32(4F column) kg 1,060.58 1.20 1,272.70
211 RB6 (4F beam) kg #N/A 1.20 #N/A
212 RB8 (4F beam) kg #N/A 1.20 #N/A
213 DB14(4F beam) kg #N/A 1.20 #N/A
214 DB16(4F beam) kg #N/A 1.20 #N/A
215 DB20(4F beam) kg #N/A 1.20 #N/A
216 DB25(4F beam) kg #N/A 1.20 #N/A
217 DB32(4F beam) kg #N/A 1.20 #N/A
218 RB8 (4F slab) kg #N/A 1.20 #N/A
219 DB10 (4F slab) kg #N/A 1.20 #N/A
220 DB10 (4F Staircase) kg #N/A 1.20 #N/A
221 DB12 (4F Staircase) kg #N/A 1.20 #N/A
222 DB10 (4F wall) link of wall and stirrup at Coner kg #N/A 1.20 #N/A
223 DB12 (4F wall) kg #N/A 1.20 #N/A
224 DB14 (4F wall) kg #N/A 1.20 #N/A
225 DB16 (4F wall) kg #N/A 1.20 #N/A
J. Fifth Floor (5F) 5F BEAM
Formwork Side form wor
226 5F-Column m2 153.88 13.00 2,000.44 Bottom form w
227 5F-beam m2 304.21 13.00 3,954.75 Concrete
228 5F-Slab m2 366.53 13.00 4,764.89 RB6
229 5F-Stair case m2 11.16 13.00 145.08 RB8
230 5F-Elevator Wall m2 200.80 13.00 2,610.40 DB14
Concrete work DB16
231 Concrete for 5F floor column m3 16.47 85.00 1,399.95 DB20
232 Concrete for 5F beam m3 25.41 85.00 2,159.73 DB25
233 Concrete for 5F slab m3 46.32 85.00 3,937.20 DB32
234 Concrete for 5F Staircase m3 1.08 85.00 91.80
235 Concrete Elevator Wall m3 25.10 85.00 2,133.50
Reinforcement bar
236 DB10(5F column) kg 1,571.25 1.20 1,885.50
237 DB20(5F column) kg 1,045.58 1.20 1,254.70
238 DB25(5F column) kg 1,880.26 1.20 2,256.32
239 RB6 (5F beam) kg #N/A 1.20 #N/A
240 RB8 (5F beam) kg #N/A 1.20 #N/A
241 DB14(5F beam) kg #N/A 1.20 #N/A
242 DB16(5F beam) kg #N/A 1.20 #N/A
243 DB20(5F beam) kg #N/A 1.20 #N/A
244 DB25(5F beam) kg #N/A 1.20 #N/A
245 DB32(5F beam) kg #N/A 1.20 #N/A
246 RB8 (5F slab) kg #N/A 1.20 #N/A
247 DB10 (5F slab) kg #N/A 1.20 #N/A

Carried to Collection 6: Total #N/A

248 DB10 (5F Staircase) kg #N/A 1.20 #N/A


249 DB12 (5F Staircase) kg #N/A 1.20 #N/A
250 DB10 (5F wall) link of wall, stirrup at Coner and horizontal rebar kg #N/A 1.20 #N/A
251 DB12 (5F wall) kg #N/A 1.20 #N/A
252 DB14 (5F wall) kg #N/A 1.20 #N/A
K. Sixth Floor (6F) 6F BEAM
Formwork Side form wor
253 6F-Column m2 153.88 13.00 2,000.44 Bottom form w
254 6F-beam m2 304.21 13.00 3,954.75 Concrete
255 6F-Slab m2 366.53 13.00 4,764.89 RB6
No. Description Unit Quantity Rate Amount
256 6F-Stair case m2 11.16 13.00 145.08 RB8
257 6F-Elevator Wall m2 200.80 13.00 2,610.40 DB14
Concrete work DB16
258 Concrete for 6F floor column m3 16.47 85.00 1,399.95 DB20
259 Concrete for 6F beam m3 25.41 85.00 2,159.73 DB25
260 Concrete for 6F slab m3 46.32 85.00 3,937.20 DB32
261 Concrete for 6F Staircase m3 1.08 85.00 91.80
262 Concrete Elevator Wall m3 25.10 85.00 2,133.50
Reinforcement bar
263 DB10(6F column) kg 1,571.25 1.20 1,885.50
264 DB20(6F column) kg 1,045.58 1.20 1,254.70
265 DB25(6F column) kg 1,880.26 1.20 2,256.32
266 RB6 (6F beam) kg #N/A 1.20 #N/A
267 RB8 (6F beam) kg #N/A 1.20 #N/A
268 DB14(6F beam) kg #N/A 1.20 #N/A
269 DB16(6F beam) kg #N/A 1.20 #N/A
270 DB20(6F beam) kg #N/A 1.20 #N/A
271 DB25(6F beam) kg #N/A 1.20 #N/A
272 DB32(6F beam) kg #N/A 1.20 #N/A
273 RB8 (6F slab) kg #N/A 1.20 #N/A
274 DB10 (6F slab) kg #N/A 1.20 #N/A
275 DB10 (6F Staircase) kg #N/A 1.20 #N/A
276 DB12 (6F Staircase) kg #N/A 1.20 #N/A
277 DB10 (6F wall) link of wall, stirrup at Coner and horizontal rebar kg #N/A 1.20 #N/A
278 DB12 (6F wall) kg #N/A 1.20 #N/A
279 DB14 (6F wall) kg #N/A 1.20 #N/A
L. Seventh Floor (7F) 7F EBAM
Formwork Side form wor
280 7F-Column m2 153.88 13.00 2,000.44 Bottom form w
281 7F-beam m2 304.21 13.00 3,954.75 Concrete
282 7F-Slab m2 369.22 13.00 4,799.86 RB6
283 7F-Stair case m2 11.16 13.00 145.08 RB8
284 7F-Elevator Wall m2 200.80 13.00 2,610.40 DB14
Concrete work DB16
285 Concrete for 7F floor column m3 16.47 85.00 1,399.95 DB20
286 Concrete for 7F beam m3 25.41 85.00 2,159.73 DB25
287 Concrete for 7F slab m3 47.17 85.00 4,009.17 DB32
288 Concrete for 7F Staircase m3 1.08 85.00 91.80
289 Concrete Elevator Wall m3 25.10 85.00 2,133.50

Carried to Collection 7: Total #N/A

Reinforcement bar
290 DB10(7F column) kg 1,571.25 1.20 1,885.50
291 DB20(7F column) kg 1,045.58 1.20 1,254.70
292 DB25(7F column) kg 1,880.26 1.20 2,256.32
293 RB6 (7F beam) kg #N/A 1.20 #N/A
294 RB8 (7F beam) kg #N/A 1.20 #N/A
295 DB14(7F beam) kg #N/A 1.20 #N/A
296 DB16(7F beam) kg #N/A 1.20 #N/A
297 DB20(7F beam) kg #N/A 1.20 #N/A
298 DB25(7F beam) kg #N/A 1.20 #N/A
299 DB32(7F beam) kg #N/A 1.20 #N/A
300 RB8 (7F slab) kg #N/A 1.20 #N/A
301 DB10 (7F slab) kg #N/A 1.20 #N/A
No. Description Unit Quantity Rate Amount
302 DB10 (7F Staircase) kg #N/A 1.20 #N/A
303 DB12 (7F Staircase) kg #N/A 1.20 #N/A
304 DB10 (7F wall) link of wall, stirrup at Coner and horizontal rebar kg #N/A 1.20 #N/A
305 DB12 (7F wall) kg #N/A 1.20 #N/A
306 DB14 (7F wall) kg #N/A 1.20 #N/A
M. Eighth Floor (8F) 8F BEAM
Formwork Side form wor
307 8F-Column m2 153.88 13.00 2,000.44 Bottom form w
308 8F-beam m2 314.73 13.00 4,091.49 Concrete
309 8F-Slab m2 365.06 13.00 4,745.78 RB6
310 8F-Stair case m2 11.16 13.00 145.08 RB8
311 8F-Elevator Wall m2 200.80 13.00 2,610.40 DB14
Concrete work DB16
312 Concrete for 8F floor column m3 16.47 85.00 1,399.95 DB20
313 Concrete for 8F beam m3 26.21 85.00 2,227.95 DB25
314 Concrete for 8F slab m3 43.98 85.00 3,738.15 DB32
315 Concrete for 8F Staircase m3 1.08 85.00 91.80
316 Concrete Elevator Wall m3 25.10 85.00 2,133.50
Reinforcement bar
317 DB10(8F column) kg 1,571.25 1.20 1,885.50
318 DB20(8F column) kg 1,045.58 1.20 1,254.70
319 DB25(8F column) kg 1,880.26 1.20 2,256.32
320 RB6 (8F beam) kg #N/A 1.20 #N/A
321 RB8 (8F beam) kg #N/A 1.20 #N/A
322 DB14(8F beam) kg #N/A 1.20 #N/A
323 DB16(8F beam) kg #N/A 1.20 #N/A
324 DB20(8F beam) kg #N/A 1.20 #N/A
325 DB25(8F beam) kg #N/A 1.20 #N/A
326 DB32(8F beam) kg #N/A 1.20 #N/A
327 RB8 (8F slab) kg #N/A 1.20 #N/A
328 DB10 (8F slab) kg #N/A 1.20 #N/A
329 DB10 (8F Staircase) kg #N/A 1.20 #N/A
330 DB12 (8F Staircase) kg #N/A 1.20 #N/A
331 DB10 (8F wall) link of wall, stirrup at Coner and horizontal rebar kg #N/A 1.20 #N/A
332 DB12 (8F wall) kg #N/A 1.20 #N/A
333 DB14 (8F wall) kg #N/A 1.20 #N/A

Carried to Collection 8: Total #N/A

N. Ninth Floor (9F) 9F BEAM


Formwork Side form wor
334 9F-Column m2 145.88 13.00 1,896.44 Bottom form w
335 9F-beam m2 314.73 13.00 4,091.49 Concrete
336 9F-Slab m2 365.06 13.00 4,745.78 RB6
337 9F-Stair case m2 11.16 13.00 145.08 RB8
338 9F-Elevator Wall m2 200.80 13.00 2,610.40 DB14
Concrete work DB16
339 Concrete for 9F floor column m3 15.27 85.00 1,297.95 DB20
340 Concrete for 9F beam m3 26.21 85.00 2,227.95 DB25
341 Concrete for 9F slab m3 43.81 85.00 3,723.61 DB32
342 Concrete for 9F Staircase m3 1.08 85.00 91.80
343 Concrete Elevator Wall m3 25.10 85.00 2,133.50
Reinforcement bar
344 DB10(9F column) kg 1,371.96 1.20 1,646.35
No. Description Unit Quantity Rate Amount
345 DB20(9F column) kg 2,150.35 1.20 2,580.42
346 RB6 (9F beam) kg #N/A 1.20 #N/A
347 RB8 (9F beam) kg #N/A 1.20 #N/A
348 DB14(9F beam) kg #N/A 1.20 #N/A
349 DB16(9F beam) kg #N/A 1.20 #N/A
350 DB20(9F beam) kg #N/A 1.20 #N/A
351 DB25(9F beam) kg #N/A 1.20 #N/A
352 DB32(9F beam) kg #N/A 1.20 #N/A
353 RB8 (9F slab) kg #N/A 1.20 #N/A
354 DB10 (9F slab) kg #N/A 1.20 #N/A
355 DB10 (9F Staircase) kg #N/A 1.20 #N/A
356 DB12 (9F Staircase) kg #N/A 1.20 #N/A
357 DB10 (9F wall) link of wall, stirrup at Coner and horizontal rebar kg #N/A 1.20 #N/A
358 DB12 (9F wall) kg #N/A 1.20 #N/A
359 DB14 (9F wall) kg #N/A 1.20 #N/A
O. Tenth Floor (10F) 10F BEAM
Formwork Side form wor
360 10F-Column m2 145.88 13.00 1,896.44 Bottom form w
361 10F-beam m2 299.84 13.00 3,897.89 Concrete
362 10F-Slab m2 369.22 13.00 4,799.86 RB6
363 10F-Stair case m2 11.16 13.00 145.08 RB8
364 10F-Elevator Wall m2 200.80 13.00 2,610.40 DB14
Concrete work DB16
365 Concrete for 10F floor column m3 15.27 85.00 1,297.95 DB20
366 Concrete for 10F beam m3 24.97 85.00 2,122.47 DB25
367 Concrete for 10F slab m3 46.79 85.00 3,977.36 DB32
368 Concrete for 10F Staircase m3 1.08 85.00 91.80
369 Concrete Elevator Wall m3 25.10 85.00 2,133.50
Reinforcement bar
370 DB10(10F column) kg 1,371.96 1.20 1,646.35
371 DB20(10F column) kg 2,150.35 1.20 2,580.42
372 RB6 (10F beam) kg #N/A 1.20 #N/A
373 RB8 (10F beam) kg #N/A 1.20 #N/A
374 DB14(10F beam) kg #N/A 1.20 #N/A

Carried to Collection 9: Total #N/A

375 DB16(10F beam) kg #N/A 1.20 #N/A


376 DB20(10F beam) kg #N/A 1.20 #N/A
377 DB25(10F beam) kg #N/A 1.20 #N/A
378 DB32(10F beam) kg #N/A 1.20 #N/A
379 RB8 (10F slab) kg #N/A 1.20 #N/A
380 DB10 (10F slab) kg #N/A 1.20 #N/A
381 DB10 (10F Staircase) kg #N/A 1.20 #N/A
382 DB12 (10F Staircase) kg #N/A 1.20 #N/A
383 DB10 (10F wall) link of wall, stirrup at Coner and horizontal rebar kg #N/A 1.20 #N/A
384 DB12 (10F wall) kg #N/A 1.20 #N/A
385 DB14 (10F wall) kg #N/A 1.20 #N/A
P. Eleventh Floor (11F) 11F BEAM
Formwork Side form wor
386 11F-Column m2 171.41 13.00 2,228.32 Bottom form w
387 11F-beam m2 299.84 13.00 3,897.89 Concrete
388 11F-Slab m2 364.23 13.00 4,734.99 RB6
389 11F-Stair case m2 11.16 13.00 145.08 RB8
390 11F-Elevator Wall m2 235.94 13.00 3,067.22 DB14
Concrete work DB16
No. Description Unit Quantity Rate Amount
391 Concrete for 11F floor column m3 17.94 85.00 1,525.09 DB20
392 Concrete for 11F beam m3 24.97 85.00 2,122.47 DB25
393 Concrete for 11F slab m3 46.04 85.00 3,913.74 DB32
394 Concrete for 11F Staircase m3 1.08 85.00 91.80
395 Concrete Elevator Wall m3 29.49 85.00 2,506.86
Reinforcement bar
396 DB10(11F column) kg 1,573.72 1.20 1,888.46
397 DB20(11F column) kg 2,526.66 1.20 3,032.00
398 RB6 (11F beam) kg #N/A 1.20 #N/A
399 RB8 (11F beam) kg #N/A 1.20 #N/A
400 DB14(11F beam) kg #N/A 1.20 #N/A
401 DB16(11F beam) kg #N/A 1.20 #N/A
402 DB20(11F beam) kg #N/A 1.20 #N/A
403 DB25(11F beam) kg #N/A 1.20 #N/A
404 DB32(11F beam) kg #N/A 1.20 #N/A
405 RB8 (11F slab) kg #N/A 1.20 #N/A
406 DB10 (11F slab) kg #N/A 1.20 #N/A
407 DB10 (11F Staircase) kg #N/A 1.20 #N/A
408 DB12 (11F Staircase) kg #N/A 1.20 #N/A
409 DB10 (11F wall) link of wall, stirrup at Coner and horizontal rebar kg #N/A 1.20 #N/A
410 DB12 (11F wall) kg #N/A 1.20 #N/A
411 DB14 (11F wall) kg #N/A 1.20 #N/A
Q. Twelfth Floor (12F)
Formwork Side form wor
412 12F-Column m2 83.99 13.00 1,091.87 Bottom form w
413 12F-beam m2 441.63 13.00 5,741.16 Concrete
414 12F-Slab m2 382.33 13.00 4,970.29 RB6
415 12F-Stair case m2 11.16 13.00 145.08 RB8
416 12F-Elevator Wall m2 185.74 13.00 2,414.62 DB14
Concrete work DB16
417 Concrete for 12F floor column m3 5.75 85.00 489.05 DB20
DB25
Carried to Collection 10: Total #N/A

418 Concrete for 12F beam m3 40.44 85.00 3,437.01


419 Concrete for 12F slab (waterproof concrete) m3 49.81 85.00 4,233.84
420 Concrete for 12F Staircase m3 1.08 85.00 91.80
421 Concrete Elevator Wall m3 23.22 85.00 1,973.49
Reinforcement bar
422 RB8(12F column) kg 312.21 1.20 374.65
423 DB20(12F column) kg 1,368.63 1.20 1,642.36
424 RB6 (12F beam) kg #N/A 1.20 #N/A
425 RB8 (12F beam) kg #N/A 1.20 #N/A
426 DB14(12F beam) kg #N/A 1.20 #N/A
427 DB16(12F beam) kg #N/A 1.20 #N/A
428 DB20(12F beam) kg #N/A 1.20 #N/A
429 DB25(12F beam) kg #N/A 1.20 #N/A
430 RB8 (12F slab) kg #N/A 1.20 #N/A
431 DB10 (12F slab) kg #N/A 1.20 #N/A
432 DB10 (12F Staircase) kg #N/A 1.20 #N/A
433 DB12 (12F Staircase) kg #N/A 1.20 #N/A
434 DB10 (12F wall) link of wall, stirrup at Coner and horizontal rebar kg #N/A 1.20 #N/A
435 DB12 (12F wall) kg #N/A 1.20 #N/A
436 DB14 (12F wall) kg #N/A 1.20 #N/A
R. Twelfth Mezzanine Floor (12M)
Formwork Side form wor
No. Description Unit Quantity Rate Amount
437 12M-Column m2 64.01 13.00 832.13 Bottom form w
438 12M-beam m2 190.34 13.00 2,474.43 Concrete
439 12M-Slab m2 177.27 13.00 2,304.51 RB6
440 12M-Stair case m2 11.16 13.00 145.08 RB8
441 12M-Elevator Wall m2 185.74 13.00 2,414.62 DB10
Concrete work DB14
442 Concrete for 12M floor column m3 4.38 85.00 372.68 DB16
443 Concrete for 12M beam m3 16.26 85.00 1,381.94 DB20
444 Concrete for 12M slab m3 21.79 85.00 1,851.73 DB25
445 Concrete for 12M Staircase m3 1.08 85.00 91.80
446 Concrete Elevator Wall m3 23.22 85.00 1,973.49
Reinforcement bar
447 RB8(12M column) kg 231.31 1.20 277.57
448 DB20(12M column) kg 1,094.90 1.20 1,313.88
449 RB6 (12M beam) kg #N/A 1.20 #N/A
450 RB8 (12M beam) kg #N/A 1.20 #N/A
451 DB10(12M beam) kg #N/A 1.20 #N/A
452 DB14(12M beam) kg #N/A 1.20 #N/A
453 DB16(12M beam) kg #N/A 1.20 #N/A
454 DB20(12M beam) kg #N/A 1.20 #N/A
455 DB25(12M beam) kg #N/A 1.20 #N/A
456 RB8 (12M slab) kg #N/A 1.20 #N/A
457 DB10 (12M slab) kg #N/A 1.20 #N/A
458 DB10 (12M Staircase) kg #N/A 1.20 #N/A
459 DB12 (12M Staircase) kg #N/A 1.20 #N/A
460 DB10 (12M wall) link of wall, stirrup at Coner and horizontal rebar kg #N/A 1.20 #N/A
461 DB12 (12M wall) kg #N/A 1.20 #N/A
462 DB14 (12M wall) kg #N/A 1.20 #N/A

Carried to Collection 11: Total #N/A

S. Thirteenth Floor (13F) 13F BEAM


Formwork Side form wor
463 13F-Column m2 18.00 13.00 234.00 Bottom form w
464 13F-beam m2 300.28 13.00 3,903.61 Concrete
465 13F-Slab m2 279.20 13.00 3,629.60 RB6
466 13F-Elevator Wall and Water Tank Wall m2 208.61 13.00 2,711.98 RB8
Concrete work DB14
467 Concrete for 13F floor column m3 1.08 85.00 91.80 DB16
468 Concrete for 13F beam m3 28.23 85.00 2,399.41 DB20
469 Concrete for 13F slab and Water Tank slab (waterproof concrete) m3 45.30 85.00 3,850.91 DB25
470 Concrete Elevator Wall and Water Tank Wall m3 24.63 85.00 2,093.24
Reinforcement bar
471 RB6(13F column) kg 35.96 1.20 43.16
472 DB16(13F column) kg 170.42 1.20 204.51
473 RB6 (13F beam) kg #N/A 1.20 #N/A
474 RB8 (13F beam) kg #N/A 1.20 #N/A
475 DB14(13F beam) kg #N/A 1.20 #N/A
476 DB16(13F beam) kg #N/A 1.20 #N/A
477 DB20(13F beam) kg #N/A 1.20 #N/A
478 DB25(13F beam) kg #N/A 1.20 #N/A
479 DB10 (13F slab) kg #N/A 1.20 #N/A
480 DB10 (13F wall) link of wall, stirrup at Coner and water tank wall kg #N/A 1.20 #N/A
481 DB12 (13F wall) and Water Tank Wall kg #N/A 1.20 #N/A
482 DB14 (13F wall) and Water Tank Wall kg #N/A 1.20 #N/A
T. Fourteenth Floor (14F)
Formwork Side form wor
No. Description Unit Quantity Rate Amount
483 14F-beam m2 32.71 13.00 425.23 Bottom form w
484 14F-Slab m2 64.00 13.00 832.00 Concrete
Concrete work RB6
485 Concrete for 14F beam m3 2.62 85.00 222.43 DB14
486 Concrete for 14F slab (waterproof concrete) m3 12.80 85.00 1,088.00 DB16
Reinforcement bar
487 RB6 (14F beam) kg 49.78 1.20 59.74
488 DB14(14F beam) kg 12.52 1.20 15.02
489 DB16(14F beam) kg 224.19 1.20 269.02
490 DB10 (14F slab) kg 947.71 1.20 1,137.25
U. Septic tank
Earthwork
491 Soil Excavation m3 66.15 5.00 330.75
492 Soil Backfill (as specification) m3 33.00 5.00 165.00
Soil compaction with crush stone to receive lean concrete for bottom slab
493 m3 3.43 30.00 102.96
(200mm thk)
Formwork
494 Bottom slab m2 4.15 13.00 53.95
495 Top slab m2 13.26 13.00 172.38
496 Wall m2 68.02 13.00 884.26
Concrete work
497 Lean concrete for bottom slab m3 0.86 85.00 72.93
498 Concrete for bottom slab m3 4.29 85.00 364.65
499 Concrete for top slab m3 2.65 85.00 225.42
500 Concrete for wall m3 34.01 85.00 2,890.85

Carried to Collection 12: Total #N/A

Reinforcement bar
501 DB10(wall) kg 242.97 1.20 291.57
502 DB12(wall) kg 556.33 1.20 667.60
503 DB14(wall) kg 96.64 1.20 115.97
504 DB12 (bottom slab) kg 433.88 1.20 520.65
505 DB10 (top slab) kg 301.47 1.20 361.76
V. Generator Room
Earthwork
506 Soil Excavation m3 12.00 5.00 60.00
507 Soil Backfill (as specification) m3 10.60 5.00 53.00
Soil compaction with crush stone to receive lean concrete for bottom slab
m3 0.58 30.00 17.28
508 (200mm thk)
Formwork
509 Footing m2 #N/A 13.00 #N/A
510 Column m2 #N/A 13.00 #N/A
511 Ground Beam m2 #N/A 13.00 #N/A
512 Roof Beam m2 #N/A 13.00 #N/A
513 Ground slab m2 #N/A 13.00 #N/A
514 Roof slab and flowerbed wall m2 #N/A 13.00 #N/A
Concrete work
515 Lean concrete for footing and bottom slab m3 #N/A 85.00 #N/A
516 Concrete for Footing m3 #N/A 85.00 #N/A
517 Concrete for Column m3 #N/A 85.00 #N/A
518 Concrete for Ground Beam m3 #N/A 85.00 #N/A
519 Concrete for Roof Beam m3 #N/A 85.00 #N/A
520 Concrete for Ground slab m3 #N/A 85.00 #N/A
521 Concrete for Roof slab and flowerbed wall m3 #N/A 85.00 #N/A
Reinforcement bar
No. Description Unit Quantity Rate Amount
522 DB12 (Footing) kg #N/A 1.20 #N/A
523 RB6 (Column) kg #N/A 1.20 #N/A
524 DB14 (Column) kg #N/A 1.20 #N/A
525 RB6 (Ground Beam and Roof Beam) kg #N/A 1.20 #N/A
526 DB16 (Ground Beam and Roof Beam) kg #N/A 1.20 #N/A
527 DB10 (Ground slab and Roof slab and flowerbed wall) kg #N/A 1.20 #N/A

Carried to Collection 13: Total #N/A

COLLECTION
Collection 1: #N/A
Collection 2: #N/A
Collection 3: #N/A
Collection 4: #N/A
Collection 5: #N/A
Collection 6: #N/A
Collection 7: #N/A
Collection 8: #N/A
Collection 9: #N/A
Collection 10: #N/A
Collection 11: #N/A
Collection 12: #N/A
Collection 13: #N/A
TOTAL COLLECTION TOTAL #N/A
(Carried to Summary)