PROJECT TITLE: EXTERNAL CHILLED WATER PIPING NETWORK -- MAHAWI

PROJECT NO: AD- 16 - 4061 E


DAILY PROGRESS REPORT
Date: 23-May-16 Weather: Sunny Temperature:

A. Manpower report as on 22-May-16 Total Manpower:


B. Equipment report as on 22-May-16 Total Equipment:
C. Progress Report - Executive Summary
Sl No. Activities Done On 22-May-16

1 ETS Piping final Painting


2 ETS 1, 2 Valve Pit Final Positioning and Tightening of fastners
3 Block works and plastering for ETS 2
4 Painting work for ETS 3, 1, 2
5 FOC Cable pulling from ETS 3 to Plant
6 Instrumentation work started inside ETS rooms 1, 2,3, and B

Previous in
Activity Current in mtr/no mtr/no
1 Excavation 0 3580
2 Bedding 0 3570
3 Pipe Laying 0 7178
4 Joint Insulation 0 3570
5 UPVC Sleeve Laying 0 7160
6 Intial Backfilling 0 3570
7 Back filling Layer - 1 0 3570
8 Back filling Layer - 2 0 3570
9 Back filling Layer - 3 0 3570
10 Back filling Layer - 4 0 3570
11 Final Backfilling 0 3450
12 Blow Down Piping 0 1350
13 ETS Internal Piping fitup (yard) 0 386
14 ETS Internal Piping Weld (yard) 0 386
15 ETS Internal Piping fitup (field) 0 83
16 ETS Internal Piping Weld (field) 0 83
17 Welodolet for instrumentation 10 156
Contractor Sign & Stamp Client Sign & Stam
D. Today Planned Activities 23-May-16
1 Plastering works for ETS -A
2 Instrumentation work inside ETS rooms 1, 2,3, and B
3 Painting in ETS 2
4 Thermal block shifting ETS A
5 Brick work for ETS A
6 DB fixing inside ETS 3. 1.2.B
7 Preparation for NDRC 1
8 Interlock compaction work around ETS B, 3
9 Backfillinginside military school zone 4
10 Painting work inside ETS 3

Other Activity:
1 Plant Valve Pit TEE painting On Progress
2 Housekeeping On Progress
3 shifting of scaffolding materials On Progress
4 Laying of Blow Down Piping (HDPE Pipe) Zone 2 On Progress
5 plastering in ets A On Progress
6 Backfilling of Trench at Zone-5 and 4 On Progress
7 Backfilling of Trench at Zone-2 On Progress
8 thermal block work for ETS A On Progress
9 NDRC drilling in Zone-1 Area [NDRC-1] On Progress
24ºC Working Time: 7 am to 6:00pm

Total Manpower: 85
Total Equipment: 57

22-May-16 Remarks

On Progress
On Progress
On Progress Total Excavation
Completed in
On Progress Mtr
On Progress 3580
On Progress

Total in
mtr/no
3580
3570
7178
3570
7160
3570
3570
3570
3570
3570
3450
1350
386
386
83
83
166
Client Sign & Stamp
23-May-16
On Progress
On Progress
On Progress
On Progress
On Progress
On Progress
On Progress
On Progress
On Progress
On Progress

On Progress
On Progress
On Progress
On Progress
On Progress
On Progress
On Progress
On Progress
On Progress
PROJECT TITLE: EXTERNAL CHILLED WATER PIPING NETWORK -- MAHAWI
PROJECT NO: AD- 16 - 4061 E
DAILY PROGRESS REPORT
Date: 23-May-16

Manpower Details Equipment Details


Sl No. Designation Qty Sl No. Equipments Qty
Indirect Manpower 20 Welding machine 3
1 Project Manager 1 21 Grinding machine 8
2 Piping Engineer 1 22 JCB 1
3 Electrical Engineer 1 23 Gas Cutters 2
4 Civil engineer 0 24 Wheel Excavator 0
5 QHSE Engineer 1 25 3 ton pick up 1
6 Planning Engineer 0 26 1 ton pick up 2
7 Draftsman 0 27 32 seat bus 1
8 Surveyor 0 28 Generators 2
Direct Manpower 29 Pipe Cutters 1
9 Mechanical Supervisor 1 30 Electric oven - 50 Kg 1
10 Safety Officer 1
31 Portable Oven 5
11 Welder / Taka welder 4 32 SHOVEL 0
12 Fitter 1 33 25 ton Crane 1
13 Sheet Fabricator 1 34 Water Tanker 1
14 Helper 8
15 Mason/Carpenter 4
16 Excavator & Shovel Operator 0
17 JCB Operator 1
18 Electrician 8
19 BUS DRIVER 1
20 Carpenter 3
Total 37 Total 29
SubContractor - Emirates Engineering LLC
Manpower Details Equipment Detail
Sl No. Designation Qty Sl No. Equipments Qty
Emirates Engineering
1 Project Engineer 0 9 Mini Bus 0
2 Site Engineer 1 10 Wheel Excavator 0
3 Safety Officer 0 11 Roller Compactor 0
4 Site Foreman 0 12 SHOVEL 0
5 Fitter 0 13 25 ton Crane 0
6 Tak Welder 0 14 Diesel Welding machine 1
7 General Workers 3 15 Electric Welding machine 3
8 BUS DRIVER 0 16 Electric oven - 50 Kg 1
9 Welders 6G 0 17 Portable Oven 3
10 Fabricator 0 18 50 ton Crane 0
11 QC Inspector 0 one ton pickup 1
12 Operators 0
13 Electrican 0
14 Rigger 0
Total 4 Total 9
Total Manpower 57 Total Equipments 38
Contractor Sign & Stamp Client Sign & Stamp
SubContractor - Richmond - J&J
Manpower Details Equipment Detail
Sl No. Designation Qty Sl No. Equipments Qty
Richmond - J&J
1 Project Engineer 1 9 Mini Bus 1
2 Engineer 0 10 grinding machine 2
3 Document Controller 1 11 Roller Compactor 1
4 Office Asst 0 12 SHOWEL 0
5 Site Foreman 2 13 3 ton pick up 1
6 Mason 3 14 Steel Cutting Machine 1
7 Helper 6 15 Steel Bending machine 1
8 Carpenter 3 16 JCB 1
9 BUS DRIVER 1 17 2 ton roller compactor 1
10 Steel Worker 3 Drill machine 2
11 Painter 1 Hilti machine 1
12 Hired Manpower 6 wood cutter 3
13 Safety Officer 1 generator 4
14 Excavator & Shovel Operator
Total 28 Total 19
Total Manpower Total Equipments 19

HSE Issues:
F. HSE Issues:
1 Excavation in ETS-A was barricaded with Mesh and installed signages board and barriers
2 Proper Installation of Scaffolding at ETS-1, B & 3 Area for Painting activities
3 Proper Installation of Scaffolding at ETS-A & 2 Area for Block Works
4 Provided signages board near road area
5 Provided mesh along with the crush barriers and safety cones beside the road
6 Pipes and Fibre Optic Cables are covered with tarpolin
7 Excavation at near (ETS A) area barricaded with barriers &orange mesh
8 Excavation at ETS-2 are barricaded with orange Mesh
9 Installed Crush Barriers with water beside the road side area Safety Signages were posted
10 Barricades provided near road area (Near Plant Area)
MAHAWI

Working Time: 7 am to 6:00pm

Other Details
Sl No. Others Qty

Direct Manpower
20 Rigger 3

21 Pipe Fabricator 5
22 Multi Skill Helper 5
23 Electrican 1
24 Crane Operator 1
25 Tanker Driver 1

Total 16
LLC
Other Details
Sl No. Others Qty

15 Shovel Operator 0
16 Crane Operator
17 Draughts man 0
18 BUS DRIVER 0
19 Site Surveyor 0
Total 0

Client Sign & Stamp


Other Details
Sl No. Others Qty

Total 0

Done
Done
Done
Done
Done
Done
Done
Done
Done
Done
PROJECT TITLE: EXTERNAL CHILLED WATER PIPING NETWORK -- MAHAWI
PROJECT NO: AD- 16 - 4061 E
DAILY PROGRESS REPORT
Date: 22-May-16 Weather: Sunny Temperature:

A. Manpower report as on 21-May-16 Total Manpower:


B. Equipment report as on 21-May-16 Total Equipment:
C. Progress Report - Executive Summary
Sl No. Activities Done On 21-May-16

1 ETS Piping final Painting


2 Back filling of network pipelines
3 Block works and plastering for ETS 2
4 Painting work for ETS 3, 1, 2
5 FOC Cable pulling from ETS 3 to Plant
6 Instrumentation work started inside ETS rooms 1, 2,3, and B

Previous in
Activity Current in mtr/no mtr/no
1 Excavation 0 3580
2 Bedding 0 3570
3 Pipe Laying 0 7178
4 Joint Insulation 0 3570
5 UPVC Sleeve Laying 0 7160
6 Intial Backfilling 0 3570
7 Back filling Layer - 1 0 3570
8 Back filling Layer - 2 0 3570
9 Back filling Layer - 3 0 3570
10 Back filling Layer - 4 0 3570
11 Final Backfilling 0 3450
12 Blow Down Piping 0 1350
13 ETS Internal Piping fitup (yard) 0 386
14 ETS Internal Piping Weld (yard) 0 386
15 ETS Internal Piping fitup (field) 0 83
16 ETS Internal Piping Weld (field) 0 83
17 Welodolet for instrumentation 10 156
Contractor Sign & Stamp Client Sign & Stam
D. Today Planned Activities 22-May-16
1 Plastering works for ETS -A
2 Instrumentation work inside ETS rooms 1, 2,3, and B
3 Painting in ETS 2
4 Thermal block shifting ETS A
5 Brick work for ETS A
6 DB fixing inside ETS 3. 1.2.B
7 Preparation for NDRC 1
8 Interlock compaction work around ETS B, 3
9 Repairing of irrigation water line leakage near NDRC1
10 Painting work inside ETS 3

Other Activity:
1 upvc duct installation On Progress
2 Housekeeping On Progress
3 shifting of scaffolding materials On Progress
4 Laying of Blow Down Piping (HDPE Pipe) Zone 2 On Progress
5 plastering in ets A On Progress
6 Backfilling of Trench at Zone-5 and 4 On Progress
7 Backfilling of Trench at Zone-2 On Progress
8 thermal block work for ETS A On Progress
9 NDRC drilling in Zone-1 Area [NDRC-1] On Progress
24ºC Working Time: 7 am to 6:00pm

Total Manpower: 85
Total Equipment: 57

21-May-16 Remarks

On Progress
On Progress
On Progress Total Excavation
Completed in
On Progress Mtr
On Progress 3580
On Progress

Total in
mtr/no
3580
3570
7178
3570
7160
3570
3570
3570
3570
3570
3450
1350
386
386
83
83
166
Client Sign & Stamp
22-May-16
On Progress
On Progress
On Progress
On Progress
On Progress
On Progress
On Progress
On Progress
On Progress
On Progress

On Progress
On Progress
On Progress
On Progress
On Progress
On Progress
On Progress
On Progress
On Progress
PROJECT TITLE: EXTERNAL CHILLED WATER PIPING NETWORK -- MAHAWI
PROJECT NO: AD- 16 - 4061 E
DAILY PROGRESS REPORT
Date: 22-May-16

Manpower Details Equipment Details


Sl No. Designation Qty Sl No. Equipments Qty
Indirect Manpower 20 Welding machine 3
1 Project Manager 1 21 Grinding machine 8
2 Piping Engineer 1 22 JCB 1
3 Electrical Engineer 1 23 Gas Cutters 2
4 Civil engineer 0 24 Wheel Excavator 0
5 QHSE Engineer 1 25 3 ton pick up 1
6 Planning Engineer 0 26 1 ton pick up 2
7 Draftsman 0 27 32 seat bus 1
8 Surveyor 0 28 Generators 2
Direct Manpower 29 Pipe Cutters 1
9 Mechanical Supervisor 1 30 Electric oven - 50 Kg 1
10 Safety Officer 1
31 Portable Oven 5
11 Welder / Taka welder 4 32 SHOVEL 0
12 Fitter 1 33 25 ton Crane 1
13 Sheet Fabricator 1 34 Water Tanker 1
14 Helper 8
15 Mason/Carpenter 4
16 Excavator & Shovel Operator 0
17 JCB Operator 1
18 Electrician 8
19 BUS DRIVER 1
20 Carpenter 3
Total 37 Total 29
SubContractor - Emirates Engineering LLC
Manpower Details Equipment Detail
Sl No. Designation Qty Sl No. Equipments Qty
Emirates Engineering
1 Project Engineer 0 9 Mini Bus 0
2 Site Engineer 1 10 Wheel Excavator 0
3 Safety Officer 0 11 Roller Compactor 0
4 Site Foreman 0 12 SHOVEL 0
5 Fitter 0 13 25 ton Crane 0
6 Tak Welder 0 14 Diesel Welding machine 1
7 General Workers 3 15 Electric Welding machine 3
8 BUS DRIVER 0 16 Electric oven - 50 Kg 1
9 Welders 6G 0 17 Portable Oven 3
10 Fabricator 0 18 50 ton Crane 0
11 QC Inspector 0 one ton pickup 1
12 Operators 0
13 Electrican 0
14 Rigger 0
Total 4 Total 9
Total Manpower 57 Total Equipments 38
Contractor Sign & Stamp Client Sign & Stamp
SubContractor - Richmond - J&J
Manpower Details Equipment Detail
Sl No. Designation Qty Sl No. Equipments Qty
Richmond - J&J
1 Project Engineer 1 9 Mini Bus 1
2 Engineer 0 10 grinding machine 2
3 Document Controller 1 11 Roller Compactor 1
4 Office Asst 0 12 SHOWEL 0
5 Site Foreman 2 13 3 ton pick up 1
6 Mason 3 14 Steel Cutting Machine 1
7 Helper 6 15 Steel Bending machine 1
8 Carpenter 3 16 JCB 1
9 BUS DRIVER 1 17 2 ton roller compactor 1
10 Steel Worker 3 Drill machine 2
11 Painter 1 Hilti machine 1
12 Hired Manpower 6 wood cutter 3
13 Safety Officer 1 generator 4
14 Excavator & Shovel Operator
Total 28 Total 19
Total Manpower Total Equipments 19

HSE Issues:
F. HSE Issues:
1 Excavation in ETS-A was barricaded with Mesh and installed signages board and barriers
2 Proper Installation of Scaffolding at ETS-1, B & 3 Area for Painting activities
3 Proper Installation of Scaffolding at ETS-A & 2 Area for Block Works
4 Provided signages board near road area
5 Provided mesh along with the crush barriers and safety cones beside the road
6 Pipes and Fibre Optic Cables are covered with tarpolin
7 Excavation at near (ETS A) area barricaded with barriers &orange mesh
8 Excavation at ETS-2 are barricaded with orange Mesh
9 Installed Crush Barriers with water beside the road side area Safety Signages were posted
10 Barricades provided near road area (Near Plant Area)
MAHAWI

Working Time: 7 am to 6:00pm

Other Details
Sl No. Others Qty

Direct Manpower
20 Rigger 3

21 Pipe Fabricator 5
22 Multi Skill Helper 5
23 Electrican 1
24 Crane Operator 1
25 Tanker Driver 1

Total 16
LLC
Other Details
Sl No. Others Qty

15 Shovel Operator 0
16 Crane Operator
17 Draughts man 0
18 BUS DRIVER 0
19 Site Surveyor 0
Total 0

Client Sign & Stamp


Other Details
Sl No. Others Qty

Total 0

Done
Done
Done
Done
Done
Done
Done
Done
Done
Done
PROJECT TITLE: EXTERNAL CHILLED WATER PIPING NETWORK -- MAHAWI
PROJECT NO: AD- 16 - 4061 E
DAILY PROGRESS REPORT
Date: 21-May-16 Weather: Sunny Temperature:

A. Manpower report as on 20-May-16 Total Manpower:


B. Equipment report as on 20-May-16 Total Equipment:
C. Progress Report - Executive Summary
Sl No. Activities Done On 20-May-16

1 ETS Piping final Painting


2 Back filling of network pipelines
3 Block works and plastering for ETS 2
4 Painting work for ETS 3, 1, 2
5 FOC Cable pulling from ETS B to ETS1
6 Instrumentation work started inside ETS rooms 1, 2,3, and B

Previous in
Activity Current in mtr/no mtr/no
1 Excavation 0 3580
2 Bedding 0 3570
3 Pipe Laying 0 7178
4 Joint Insulation 0 3570
5 UPVC Sleeve Laying 0 7160
6 Intial Backfilling 0 3570
7 Back filling Layer - 1 0 3570
8 Back filling Layer - 2 0 3570
9 Back filling Layer - 3 0 3570
10 Back filling Layer - 4 0 3570
11 Final Backfilling 0 3450
12 Blow Down Piping 0 1350
13 ETS Internal Piping fitup (yard) 0 386
14 ETS Internal Piping Weld (yard) 0 386
15 ETS Internal Piping fitup (field) 0 83
16 ETS Internal Piping Weld (field) 0 83
17 Welodolet for instrumentation 5 151
Contractor Sign & Stamp Client Sign & Stam
D. Today Planned Activities 21-May-16
1 concreting works for ETS -A
2 Instrumentation work inside ETS rooms 1, 2,3, and B
3 Painting in ETS 2
4 Thermal block shifting ETS A
5 Brick work for ETS A
6 DB fixing inside ETS 3. 1.2.B
7 Angle fixing in electrical room for ETS B, 1,3
8 Interlock compaction work around ETS B
9 Backfillinginside military school zone 4
10 Painting work inside ETS 3

Other Activity:
1 upvc duct installation On Progress
2 Housekeeping On Progress
3 shifting of scaffolding materials On Progress
4 Laying of Blow Down Piping (HDPE Pipe) Zone 2 On Progress
5 plastering in ets 2 On Progress
6 Backfilling of Trench at Zone-5 and 4 On Progress
7 Backfilling of Trench at Zone-2 On Progress
8 thermal block work for ETS A On Progress
9 NDRC drilling in Zone-1 Area [NDRC-1] On Progress
24ºC Working Time: 7 am to 6:00pm

Total Manpower: 85
Total Equipment: 57

20-May-16 Remarks

On Progress
On Progress
On Progress Total Excavation
Completed in
On Progress Mtr
On Progress 3580
On Progress

Total in
mtr/no
3580
3570
7178
3570
7160
3570
3570
3570
3570
3570
3450
1350
386
386
83
83
156
Client Sign & Stamp
21-May-16
On Progress
On Progress
On Progress
On Progress
On Progress
On Progress
On Progress
On Progress
On Progress
On Progress

On Progress
On Progress
On Progress
On Progress
On Progress
On Progress
On Progress
On Progress
On Progress
PROJECT TITLE: EXTERNAL CHILLED WATER PIPING NETWORK -- MAHAWI
PROJECT NO: AD- 16 - 4061 E
DAILY PROGRESS REPORT
Date: 21-May-16

Manpower Details Equipment Details


Sl No. Designation Qty Sl No. Equipments Qty
Indirect Manpower 20 Welding machine 3
1 Project Manager 1 21 Grinding machine 8
2 Piping Engineer 1 22 JCB 1
3 Electrical Engineer 1 23 Gas Cutters 2
4 Civil engineer 0 24 Wheel Excavator 0
5 QHSE Engineer 1 25 3 ton pick up 1
6 Planning Engineer 0 26 1 ton pick up 2
7 Draftsman 0 27 32 seat bus 1
8 Surveyor 0 28 Generators 2
Direct Manpower 29 Pipe Cutters 1
9 Mechanical Supervisor 1 30 Electric oven - 50 Kg 1
10 Safety Officer 1
31 Portable Oven 5
11 Welder / Taka welder 4 32 SHOVEL 0
12 Fitter 1 33 25 ton Crane 1
13 Sheet Fabricator 1 34 Water Tanker 1
14 Helper 8
15 Mason/Carpenter 4
16 Excavator & Shovel Operator 0
17 JCB Operator 1
18 Electrician 8
19 BUS DRIVER 1
20 Carpenter 3
Total 37 Total 29
SubContractor - Emirates Engineering LLC
Manpower Details Equipment Detail
Sl No. Designation Qty Sl No. Equipments Qty
Emirates Engineering
1 Project Engineer 0 9 Mini Bus 0
2 Site Engineer 1 10 Wheel Excavator 0
3 Safety Officer 0 11 Roller Compactor 0
4 Site Foreman 0 12 SHOVEL 0
5 Fitter 0 13 25 ton Crane 0
6 Tak Welder 0 14 Diesel Welding machine 1
7 General Workers 3 15 Electric Welding machine 3
8 BUS DRIVER 0 16 Electric oven - 50 Kg 1
9 Welders 6G 0 17 Portable Oven 3
10 Fabricator 0 18 50 ton Crane 0
11 QC Inspector 0 one ton pickup 1
12 Operators 0
13 Electrican 0
14 Rigger 0
Total 4 Total 9
Total Manpower 57 Total Equipments 38
Contractor Sign & Stamp Client Sign & Stamp
SubContractor - Richmond - J&J
Manpower Details Equipment Detail
Sl No. Designation Qty Sl No. Equipments Qty
Richmond - J&J
1 Project Engineer 1 9 Mini Bus 1
2 Engineer 0 10 grinding machine 2
3 Document Controller 1 11 Roller Compactor 1
4 Office Asst 0 12 SHOWEL 0
5 Site Foreman 2 13 3 ton pick up 1
6 Mason 3 14 Steel Cutting Machine 1
7 Helper 6 15 Steel Bending machine 1
8 Carpenter 3 16 JCB 1
9 BUS DRIVER 1 17 2 ton roller compactor 1
10 Steel Worker 3 Drill machine 2
11 Painter 1 Hilti machine 1
12 Hired Manpower 6 wood cutter 3
13 Safety Officer 1 generator 4
14 Excavator & Shovel Operator
Total 28 Total 19
Total Manpower Total Equipments 19

HSE Issues:
F. HSE Issues:
1 Excavation in ETS-2 was barricaded with Mesh and installed signages board and barriers
2 Proper Installation of Scaffolding at ETS-1, B & 3 Area for Painting activities
3 Proper Installation of Scaffolding at ETS-B & 3 Area for Block Works
4 Provided signages board near road area
5 Provided mesh along with the crush barriers and safety cones beside the road
6 Pipes and Fibre Optic Cables are covered with tarpolin
7 Excavation at near (ETS A) area barricaded with barriers &orange mesh
8 Excavation at ETS-2 are barricaded with orange Mesh
9 Installed Crush Barriers with water beside the road side area Safety Signages were posted
10 Barricades provided near road area (Near Plant Area)
MAHAWI

Working Time: 7 am to 6:00pm

Other Details
Sl No. Others Qty

Direct Manpower
20 Rigger 3

21 Pipe Fabricator 5
22 Multi Skill Helper 5
23 Electrican 1
24 Crane Operator 1
25 Tanker Driver 1

Total 16
LLC
Other Details
Sl No. Others Qty

15 Shovel Operator 0
16 Crane Operator
17 Draughts man 0
18 BUS DRIVER 0
19 Site Surveyor 0
Total 0

Client Sign & Stamp


Other Details
Sl No. Others Qty

Total 0

Done
Done
Done
Done
Done
Done
Done
Done
Done
Done
PROJECT TITLE: EXTERNAL CHILLED WATER PIPING NETWORK -- MAHAWI
PROJECT NO: AD- 16 - 4061 E
DAILY PROGRESS REPORT
Date: 19-May-16 Weather: Sunny Temperature:

A. Manpower report as on 18-May-16 Total Manpower:


B. Equipment report as on 18-May-16 Total Equipment:
C. Progress Report - Executive Summary
Sl No. Activities Done On 18-May-16

1 ETS Piping final Painting


2 Back filling of network pipelines
3 Block works and plastering for ETS 2
4 Painting work for ETS 3, 1, 2
5 OFC Cable pulling from ETS 3 to Plant
6 Instrumentation work started inside ETS rooms 1, 2,3, and B

Previous in
Activity Current in mtr/no mtr/no
1 Excavation 0 3580
2 Bedding 0 3570
3 Pipe Laying 0 7178
4 Joint Insulation 0 3570
5 UPVC Sleeve Laying 70 7090
6 Intial Backfilling 0 3570
7 Back filling Layer - 1 0 3570
8 Back filling Layer - 2 30 3540
9 Back filling Layer - 3 70 3500
10 Back filling Layer - 4 70 3500
11 Final Backfilling 50 3400
12 Blow Down Piping 0 1350
13 ETS Internal Piping fitup (yard) 0 386
14 ETS Internal Piping Weld (yard) 0 386
15 ETS Internal Piping fitup (field) 0 83
16 ETS Internal Piping Weld (field) 0 83
17 Welodolet for instrumentation 25 126
Contractor Sign & Stamp Client Sign & Stam
D. Today Planned Activities 19-May-16
1 concreting works for ETS -A
2 Instrumentation work inside ETS rooms 1, 2,3, and B
3 Painting in ETS 2
4 Thermal block shifting ETS A
5 Brick work for ETS A
6 DB fixing inside ETS 3. 1.2.B
7 Angle fixing in electrical room for ETS B, 1,3
8 Interlock compaction work around ETS B
9 Backfillinginside military school zone 4
10 Painting work inside ETS 3
11 Pneumatic Test Trial for ETS B

Other Activity:
1 upvc duct installation On Progress
2 Housekeeping On Progress
3 shifting of scaffolding materials On Progress
4 Laying of Blow Down Piping (HDPE Pipe) Zone 2 On Progress
5 plastering in ets 2 On Progress
6 Backfilling of Trench at Zone-5 and 4 On Progress
7 Backfilling of Trench at Zone-2 On Progress
8 thermal block work for ETS A On Progress
9 NDRC drilling in Zone-1 Area [NDRC-1] On Progress
24ºC Working Time: 7 am to 6:00pm

Total Manpower: 100


Total Equipment: 64

18-May-16 Remarks

On Progress
On Progress
On Progress Total Excavation
Completed in
On Progress Mtr
On Progress 3580
On Progress

Total in
mtr/no
3580
3570
7178
3570
7160
3570
3570
3570
3570
3570
3450
1350
386
386
83
83
151
Client Sign & Stamp
19-May-16
On Progress
On Progress
On Progress
On Progress
On Progress
On Progress
On Progress
On Progress
On Progress
On Progress
On Progress

On Progress
On Progress
On Progress
On Progress
On Progress
On Progress
On Progress
On Progress
On Progress
PROJECT TITLE: EXTERNAL CHILLED WATER PIPING NETWORK -- MAHAWI
PROJECT NO: AD- 16 - 4061 E
DAILY PROGRESS REPORT
Date: 19-May-16

Manpower Details Equipment Details


Sl No. Designation Qty Sl No. Equipments Qty
Indirect Manpower 20 Welding machine 3
1 Project Manager 1 21 Grinding machine 8
2 Piping Engineer 1 22 JCB 1
3 Electrical Engineer 1 23 Gas Cutters 2
4 Civil engineer 1 24 Wheel Excavator 1
5 QHSE Engineer 1 25 3 ton pick up 1
6 Planning Engineer 0 26 1 ton pick up 2
7 Draftsman 0 27 32 seat bus 1
8 Surveyor 0 28 Generators 3
Direct Manpower 29 Pipe Cutters 1
9 Mechanical Supervisor 1 30 Electric oven - 50 Kg 1
10 Safety Officer 1
31 Portable Oven 5
11 Welder / Taka welder 5 32 SHOVEL 0
12 Fitter 1 33 25 ton Crane 1
13 Sheet Fabricator 1 34 Water Tanker 1
14 Helper 11
15 Mason/Carpenter 4
16 Excavator & Shovel Operator 1
17 JCB Operator 0
18 Electrician 8
19 BUS DRIVER 1
20 Carpenter 3
Total 42 Total 31
SubContractor - Emirates Engineering LLC
Manpower Details Equipment Detail
Sl No. Designation Qty Sl No. Equipments Qty
Emirates Engineering
1 Project Engineer 0 9 Mini Bus 1
2 Site Engineer 1 10 Wheel Excavator 0
3 Safety Officer 0 11 Roller Compactor 0
4 Site Foreman 0 12 SHOVEL 1
5 Fitter 0 13 25 ton Crane 0
6 Tak Welder 0 14 Diesel Welding machine 2
7 General Workers 3 15 Electric Welding machine 3
8 BUS DRIVER 0 16 Electric oven - 50 Kg 1
9 Welders 6G 0 17 Portable Oven 5
10 Fabricator 0 18 50 ton Crane 0
11 QC Inspector 0 one ton pickup 1
12 Operators 0
13 Electrican 0
14 Rigger 0
Total 4 Total 14
Total Manpower 62 Total Equipments 45
Contractor Sign & Stamp Client Sign & Stamp
SubContractor - Richmond - J&J
Manpower Details Equipment Detail
Sl No. Designation Qty Sl No. Equipments Qty
Richmond - J&J
1 Project Engineer 1 9 Mini Bus 1
2 Engineer 0 10 grinding machine 2
3 Document Controller 1 11 Roller Compactor 1
4 Office Asst 0 12 SHOWEL 0
5 Site Foreman 2 13 3 ton pick up 1
6 Mason 4 14 Steel Cutting Machine 1
7 Helper 10 15 Steel Bending machine 1
8 Carpenter 5 16 JCB 1
9 BUS DRIVER 1 17 2 ton roller compactor 1
10 Steel Worker 4 Drill machine 2
11 Painter 1 Hilti machine 1
12 Hired Manpower 8 wood cutter 3
13 Safety Officer 1 generator 4
14 Excavator & Shovel Operator
Total 38 Total 19
Total Manpower Total Equipments 19

HSE Issues:
F. HSE Issues:
1 Excavation in ETS-2 was barricaded with Mesh and installed signages board and barriers
2 Proper Installation of Scaffolding at ETS-1, B & 3 Area for Painting activities
3 Proper Installation of Scaffolding at ETS-B & 3 Area for Block Works
4 Provided signages board near road area
5 Provided mesh along with the crush barriers and safety cones beside the road
6 Pipes and Fibre Optic Cables are covered with tarpolin
7 Excavation at near (ETS A) area barricaded with barriers &orange mesh
8 Excavation at ETS-2 are barricaded with orange Mesh
9 Installed Crush Barriers with water beside the road side area Safety Signages were posted
10 Barricades provided near road area (Near Plant Area)
MAHAWI

Working Time: 7 am to 6:00pm

Other Details
Sl No. Others Qty

Direct Manpower
20 Rigger 3

21 Pipe Fabricator 5
22 Multi Skill Helper 5
23 Electrican 1
24 Crane Operator 1
25 Tanker Driver 1

Total 16
LLC
Other Details
Sl No. Others Qty

15 Shovel Operator 0
16 Crane Operator
17 Draughts man 0
18 BUS DRIVER 0
19 Site Surveyor 0
Total 0

Client Sign & Stamp


Other Details
Sl No. Others Qty

Total 0

Done
Done
Done
Done
Done
Done
Done
Done
Done
Done
PROJECT TITLE: EXTERNAL CHILLED WATER PIPING NETWORK -- MAHAWI
PROJECT NO: AD- 16 - 4061 E
DAILY PROGRESS REPORT
Date: 18-May-16 Weather: Sunny Temperature:

A. Manpower report as on 17-May-16 Total Manpower:


B. Equipment report as on 17-May-16 Total Equipment:
C. Progress Report - Executive Summary
Sl No. Activities Done On 17-May-16

1 ETS Piping final Painting


2 Back filling of network pipelines
3 Block works and plastering for ETS 2
4 Painting work for ETS 3, 1, 2
5 FOC Cable pulling from ETS 3 to Plant
6 Instrumentation work started inside ETS rooms 1, 2,3, and B

Previous in
Activity Current in mtr/no mtr/no
1 Excavation 0 3580
2 Bedding 0 3570
3 Pipe Laying 0 7178
4 Joint Insulation 0 3570
5 UPVC Sleeve Laying 70 7020
6 Intial Backfilling 20 3550
7 Back filling Layer - 1 35 3535
8 Back filling Layer - 2 50 3490
9 Back filling Layer - 3 80 3420
10 Back filling Layer - 4 100 3400
11 Final Backfilling 50 3350
12 Blow Down Piping 0 1350
13 ETS Internal Piping fitup (yard) 0 386
14 ETS Internal Piping Weld (yard) 0 386
15 ETS Internal Piping fitup (field) 0 83
16 ETS Internal Piping Weld (field) 0 83
17 Welodolet for instrumentation 25 101
Contractor Sign & Stamp Client Sign & Stam
D. Today Planned Activities 18-May-16
1 concreting works for ETS -A
2 Instrumentation work inside ETS rooms 1, 2,3, and B
3 Painting in ETS 2
4 Thermal block shifting ETS A
5 Brick work for ETS A
6 DB fixing inside ETS 3. 1.2.B
7 Angle fixing in electrical room for ETS B, 1,3
8 Interlock compaction work around ETS B
9 Backfillinginside military school zone 4
10 Painting work inside ETS 3

Other Activity:
1 upvc duct installation On Progress
2 Housekeeping On Progress
3 shifting of scaffolding materials On Progress
4 Laying of Blow Down Piping (HDPE Pipe) Zone 2 On Progress
5 plastering in ets 2 On Progress
6 Backfilling of Trench at Zone-5 and 4 On Progress
7 Backfilling of Trench at Zone-2 On Progress
8 thermal block work for ETS A On Progress
9 NDRC drilling in Zone-1 Area [NDRC-1] On Progress
24ºC Working Time: 7 am to 6:00pm

Total Manpower: 100


Total Equipment: 64

17-May-16 Remarks

On Progress
On Progress
On Progress Total Excavation
Completed in
On Progress Mtr
On Progress 3580
On Progress

Total in
mtr/no
3580
3570
7178
3570
7090
3570
3570
3540
3500
3500
3400
1350
386
386
83
83
126
Client Sign & Stamp
18-May-16
On Progress
On Progress
On Progress
On Progress
On Progress
On Progress
On Progress
On Progress
On Progress
On Progress

On Progress
On Progress
On Progress
On Progress
On Progress
On Progress
On Progress
On Progress
On Progress
PROJECT TITLE: EXTERNAL CHILLED WATER PIPING NETWORK -- MAHAWI
PROJECT NO: AD- 16 - 4061 E
DAILY PROGRESS REPORT
Date: 18-May-16

Manpower Details Equipment Details


Sl No. Designation Qty Sl No. Equipments Qty
Indirect Manpower 20 Welding machine 3
1 Project Manager 1 21 Grinding machine 8
2 Piping Engineer 1 22 JCB 1
3 Electrical Engineer 1 23 Gas Cutters 2
4 Civil engineer 1 24 Wheel Excavator 1
5 QHSE Engineer 1 25 3 ton pick up 1
6 Planning Engineer 0 26 1 ton pick up 2
7 Draftsman 0 27 32 seat bus 1
8 Surveyor 0 28 Generators 3
Direct Manpower 29 Pipe Cutters 1
9 Mechanical Supervisor 1 30 Electric oven - 50 Kg 1
10 Safety Officer 1
31 Portable Oven 5
11 Welder / Taka welder 5 32 SHOVEL 0
12 Fitter 1 33 25 ton Crane 1
13 Sheet Fabricator 1 34 Water Tanker 1
14 Helper 11
15 Mason/Carpenter 4
16 Excavator & Shovel Operator 1
17 JCB Operator 0
18 Electrician 8
19 BUS DRIVER 1
20 Carpenter 3
Total 42 Total 31
SubContractor - Emirates Engineering LLC
Manpower Details Equipment Detail
Sl No. Designation Qty Sl No. Equipments Qty
Emirates Engineering
1 Project Engineer 0 9 Mini Bus 1
2 Site Engineer 1 10 Wheel Excavator 0
3 Safety Officer 0 11 Roller Compactor 0
4 Site Foreman 0 12 SHOVEL 1
5 Fitter 0 13 25 ton Crane 0
6 Tak Welder 0 14 Diesel Welding machine 2
7 General Workers 3 15 Electric Welding machine 3
8 BUS DRIVER 0 16 Electric oven - 50 Kg 1
9 Welders 6G 0 17 Portable Oven 5
10 Fabricator 0 18 50 ton Crane 0
11 QC Inspector 0 one ton pickup 1
12 Operators 0
13 Electrican 0
14 Rigger 0
Total 4 Total 14
Total Manpower 62 Total Equipments 45
Contractor Sign & Stamp Client Sign & Stamp
SubContractor - Richmond - J&J
Manpower Details Equipment Detail
Sl No. Designation Qty Sl No. Equipments Qty
Richmond - J&J
1 Project Engineer 1 9 Mini Bus 1
2 Engineer 0 10 grinding machine 2
3 Document Controller 1 11 Roller Compactor 1
4 Office Asst 0 12 SHOWEL 0
5 Site Foreman 2 13 3 ton pick up 1
6 Mason 4 14 Steel Cutting Machine 1
7 Helper 10 15 Steel Bending machine 1
8 Carpenter 5 16 JCB 1
9 BUS DRIVER 1 17 2 ton roller compactor 1
10 Steel Worker 4 Drill machine 2
11 Painter 1 Hilti machine 1
12 Hired Manpower 8 wood cutter 3
13 Safety Officer 1 generator 4
14 Excavator & Shovel Operator
Total 38 Total 19
Total Manpower Total Equipments 19

HSE Issues:
F. HSE Issues:
1 Excavation in ETS-2 was barricaded with Mesh and installed signages board and barriers
2 Proper Installation of Scaffolding at ETS-1, B & 3 Area for Painting activities
3 Proper Installation of Scaffolding at ETS-B & 3 Area for Block Works
4 Provided signages board near road area
5 Provided mesh along with the crush barriers and safety cones beside the road
6 Pipes and Fibre Optic Cables are covered with tarpolin
7 Excavation at near (ETS A) area barricaded with barriers &orange mesh
8 Excavation at ETS-2 are barricaded with orange Mesh
9 Installed Crush Barriers with water beside the road side area Safety Signages were posted
10 Barricades provided near road area (Near Plant Area)
MAHAWI

Working Time: 7 am to 6:00pm

Other Details
Sl No. Others Qty

Direct Manpower
20 Rigger 3

21 Pipe Fabricator 5
22 Multi Skill Helper 5
23 Electrican 1
24 Crane Operator 1
25 Tanker Driver 1

Total 16
LLC
Other Details
Sl No. Others Qty

15 Shovel Operator 0
16 Crane Operator
17 Draughts man 0
18 BUS DRIVER 0
19 Site Surveyor 0
Total 0

Client Sign & Stamp


Other Details
Sl No. Others Qty

Total 0

Done
Done
Done
Done
Done
Done
Done
Done
Done
Done
PROJECT TITLE: EXTERNAL CHILLED WATER PIPING NETWORK -- MAHAWI
PROJECT NO: AD- 16 - 4061 E
DAILY PROGRESS REPORT
Date: 17-May-16 Weather: Sunny Temperature:

A. Manpower report as on 16-May-16 Total Manpower:


B. Equipment report as on 16-May-16 Total Equipment:
C. Progress Report - Executive Summary
Sl No. Activities Done On 16-May-16

1 ETS Piping fiting and Welding Activities on field ETS 1, 3, B,2 and A
2 Back filling of network pipelines
3 Block works for ETS A
4 Painting work for ETS 3, 1, 2
5 FOC Cable pulling from ETS 3 to Plant
6 Instrumentation work started inside ETS rooms 1, 2,3, and B

Previous in
Activity Current in mtr/no mtr/no
1 Excavation 0 3580
2 Bedding 0 3570
3 Pipe Laying 50 7128
4 Joint Insulation 0 3570
5 UPVC Sleeve Laying 100 6920
6 Intial Backfilling 0 3550
7 Back filling Layer - 1 0 3535
8 Back filling Layer - 2 0 3490
9 Back filling Layer - 3 0 3420
10 Back filling Layer - 4 30 3370
11 Final Backfilling 50 3300
12 Blow Down Piping 0 1350
13 ETS Internal Piping fitup (yard) 0 386
14 ETS Internal Piping Weld (yard) 0 386
15 ETS Internal Piping fitup (field) 0 83
16 ETS Internal Piping Weld (field) 0 83
17 Welodolet for instrumentation 20 81
Contractor Sign & Stamp Client Sign & Stam
D. Today Planned Activities 17-May-16
1 concreting works for ETS -A
2 Instrumentation work inside ETS rooms 1, 2,3, and B
3 Painting in ETS 2
4 Thermal block shifting ETS A
5 Brick work for ETS A
6 DB fixing inside ETS 3. 1.2.B
7 Angle fixing in electrical room for ETS B, 1,3
8 Interlock compaction work around ETS B
9 Backfillinginside military school zone 4
10 Painting work inside ETS 3

Other Activity:
1 upvc duct installation On Progress
2 Housekeeping On Progress
3 shifting of scaffolding materials On Progress
4 Laying of Blow Down Piping (HDPE Pipe) Zone 2 On Progress
5 plastering in ets 2 On Progress
6 Backfilling of Trench at Zone-5 and 4 On Progress
7 Backfilling of Trench at Zone-2 On Progress
8 thermal block work for ETS A On Progress
9 NDRC drilling in Zone-1 Area [NDRC-1] On Progress
24ºC Working Time: 7 am to 6:00pm

Total Manpower: 100


Total Equipment: 64

16-May-16 Remarks

On Progress
On Progress
On Progress Total Excavation
Completed in
On Progress Mtr
On Progress 3580
On Progress

Total in
mtr/no
3580
3570
7178
3570
7020
3550
3535
3490
3420
3400
3350
1350
386
386
83
83
101
Client Sign & Stamp
17-May-16
On Progress
On Progress
On Progress
On Progress
On Progress
On Progress
On Progress
On Progress
On Progress
On Progress

On Progress
On Progress
On Progress
On Progress
On Progress
On Progress
On Progress
On Progress
On Progress
PROJECT TITLE: EXTERNAL CHILLED WATER PIPING NETWORK -- MAHAWI
PROJECT NO: AD- 16 - 4061 E
DAILY PROGRESS REPORT
Date: 17-May-16

Manpower Details Equipment Details


Sl No. Designation Qty Sl No. Equipments Qty
Indirect Manpower 20 Welding machine 3
1 Project Manager 1 21 Grinding machine 8
2 Piping Engineer 1 22 JCB 1
3 Electrical Engineer 1 23 Gas Cutters 2
4 Civil engineer 1 24 Wheel Excavator 1
5 QHSE Engineer 1 25 3 ton pick up 1
6 Planning Engineer 0 26 1 ton pick up 2
7 Draftsman 0 27 32 seat bus 1
8 Surveyor 0 28 Generators 3
Direct Manpower 29 Pipe Cutters 1
9 Mechanical Supervisor 1 30 Electric oven - 50 Kg 1
10 Safety Officer 1
31 Portable Oven 5
11 Welder / Taka welder 5 32 SHOVEL 0
12 Fitter 1 33 25 ton Crane 1
13 Sheet Fabricator 1 34 Water Tanker 1
14 Helper 11
15 Mason/Carpenter 4
16 Excavator & Shovel Operator 1
17 JCB Operator 0
18 Electrician 8
19 BUS DRIVER 1
20 Carpenter 3
Total 42 Total 31
SubContractor - Emirates Engineering LLC
Manpower Details Equipment Detail
Sl No. Designation Qty Sl No. Equipments Qty
Emirates Engineering
1 Project Engineer 0 9 Mini Bus 1
2 Site Engineer 1 10 Wheel Excavator 0
3 Safety Officer 0 11 Roller Compactor 0
4 Site Foreman 0 12 SHOVEL 1
5 Fitter 0 13 25 ton Crane 0
6 Tak Welder 0 14 Diesel Welding machine 2
7 General Workers 3 15 Electric Welding machine 3
8 BUS DRIVER 0 16 Electric oven - 50 Kg 1
9 Welders 6G 0 17 Portable Oven 5
10 Fabricator 0 18 50 ton Crane 0
11 QC Inspector 0 one ton pickup 1
12 Operators 0
13 Electrican 0
14 Rigger 0
Total 4 Total 14
Total Manpower 62 Total Equipments 45
Contractor Sign & Stamp Client Sign & Stamp
SubContractor - Richmond - J&J
Manpower Details Equipment Detail
Sl No. Designation Qty Sl No. Equipments Qty
Richmond - J&J
1 Project Engineer 1 9 Mini Bus 1
2 Engineer 0 10 grinding machine 2
3 Document Controller 1 11 Roller Compactor 1
4 Office Asst 0 12 SHOWEL 0
5 Site Foreman 2 13 3 ton pick up 1
6 Mason 4 14 Steel Cutting Machine 1
7 Helper 10 15 Steel Bending machine 1
8 Carpenter 5 16 JCB 1
9 BUS DRIVER 1 17 2 ton roller compactor 1
10 Steel Worker 4 Drill machine 2
11 Painter 1 Hilti machine 1
12 Hired Manpower 8 wood cutter 3
13 Safety Officer 1 generator 4
14 Excavator & Shovel Operator
Total 38 Total 19
Total Manpower Total Equipments 19

HSE Issues:
F. HSE Issues:
1 Excavation in ETS-2 was barricaded with Mesh and installed signages board and barriers
2 Proper Installation of Scaffolding at ETS-1, B & 3 Area for Painting activities
3 Proper Installation of Scaffolding at ETS-B & 3 Area for Block Works
4 Provided signages board near road area
5 Provided mesh along with the crush barriers and safety cones beside the road
6 Pipes and Fibre Optic Cables are covered with tarpolin
7 Excavation at near (ETS A) area barricaded with barriers &orange mesh
8 Excavation at ETS-2 are barricaded with orange Mesh
9 Installed Crush Barriers with water beside the road side area Safety Signages were posted
10 Barricades provided near road area (Near Plant Area)
MAHAWI

Working Time: 7 am to 6:00pm

Other Details
Sl No. Others Qty

Direct Manpower
20 Rigger 3

21 Pipe Fabricator 5
22 Multi Skill Helper 5
23 Electrican 1
24 Crane Operator 1
25 Tanker Driver 1

Total 16
LLC
Other Details
Sl No. Others Qty

15 Shovel Operator 0
16 Crane Operator
17 Draughts man 0
18 BUS DRIVER 0
19 Site Surveyor 0
Total 0

Client Sign & Stamp


Other Details
Sl No. Others Qty

Total 0

Done
Done
Done
Done
Done
Done
Done
Done
Done
Done
PROJECT TITLE: EXTERNAL CHILLED WATER PIPING NETWORK -- MAHAWI
PROJECT NO: AD- 16 - 4061 E
DAILY PROGRESS REPORT
Date: 16-May-16 Weather: Sunny Temperature:

A. Manpower report as on 15-May-16 Total Manpower:


B. Equipment report as on 15-May-16 Total Equipment:
C. Progress Report - Executive Summary
Sl No. Activities Done On 15-May-16

1 ETS Piping fiting and Welding Activities on field ETS 1, 3, B,2 and A
2 Back filling of network pipelines
3 outside painting for ETS 2
4 Painting work for ETS 3, 1, 2
5 material shifting and houskeeping ETS 1 and 2
6 Instrumentation work started inside ETS rooms 1, 2,3, and B
7 FOC Cable pulling from ETS 3 to Plant

Previous in
Activity Current in mtr/no mtr/no
1 Excavation 0 3580
2 Bedding 0 3570
3 Pipe Laying 0 7128
4 Joint Insulation 0 3570
5 UPVC Sleeve Laying 50 6870
6 Intial Backfilling 0 3550
7 Back filling Layer - 1 0 3535
8 Back filling Layer - 2 0 3490
9 Back filling Layer - 3 50 3370
10 Back filling Layer - 4 50 3320
11 Final Backfilling 50 3250
12 Blow Down Piping 0 1350
13 ETS Internal Piping fitup (yard) 0 386
14 ETS Internal Piping Weld (yard) 0 386
15 ETS Internal Piping fitup (field) 0 83
16 ETS Internal Piping Weld (field) 0 83
17 Welodolet for instrumentation 23 58
Contractor Sign & Stamp Client Sign & Stam
D. Today Planned Activities 16-May-16
1 concreting works for ETS -A
2 Instrumentation work inside ETS rooms 1, 2,3, and B
3 Painting in ETS 2
4 Thermal block shifting ETS A
5 Brick work for ETS A
6 DB fixing inside ETS 3. 1.2.B
7 Angle fixing in electrical room for ETS B, 1,3
8 Interlock compaction work around ETS B
9 Backfillinginside military school zone 4
10 Painting work inside ETS 3

Other Activity:
1 upvc duct installation On Progress
2 Housekeeping On Progress
3 shifting of scaffolding materials On Progress
4 Laying of Blow Down Piping (HDPE Pipe) Zone 2 On Progress
5 plastering in ets 2 On Progress
6 Backfilling of Trench at Zone-5 and 4 On Progress
7 Backfilling of Trench at Zone-2 On Progress
8 thermal block work for ETS A On Progress
9 NDRC drilling in Zone-1 Area [NDRC-1] On Progress
24ºC Working Time: 7 am to 6:00pm

Total Manpower: 100


Total Equipment: 64

15-May-16 Remarks

On Progress
On Progress
On Progress Total Excavation
Completed in
On Progress Mtr
On Progress 3580
On Progress
On Progress

Total in
mtr/no
3580
3570
7128
3570
6920
3550
3535
3490
3420
3370
3300
1350
386
386
83
83
81
Client Sign & Stamp
16-May-16
On Progress
On Progress
On Progress
On Progress
On Progress
On Progress
On Progress
On Progress
On Progress
On Progress

On Progress
On Progress
On Progress
On Progress
On Progress
On Progress
On Progress
On Progress
On Progress
PROJECT TITLE: EXTERNAL CHILLED WATER PIPING NETWORK -- MAHAWI
PROJECT NO: AD- 16 - 4061 E
DAILY PROGRESS REPORT
Date: 16-May-16

Manpower Details Equipment Details


Sl No. Designation Qty Sl No. Equipments Qty
Indirect Manpower 20 Welding machine 3
1 Project Manager 1 21 Grinding machine 8
2 Piping Engineer 1 22 JCB 1
3 Electrical Engineer 1 23 Gas Cutters 2
4 Civil engineer 1 24 Wheel Excavator 1
5 QHSE Engineer 1 25 3 ton pick up 1
6 Planning Engineer 0 26 1 ton pick up 2
7 Draftsman 0 27 32 seat bus 1
8 Surveyor 0 28 Generators 3
Direct Manpower 29 Pipe Cutters 1
9 Mechanical Supervisor 1 30 Electric oven - 50 Kg 1
10 Safety Officer 1
31 Portable Oven 5
11 Welder / Taka welder 5 32 SHOVEL 0
12 Fitter 1 33 25 ton Crane 1
13 Sheet Fabricator 1 34 Water Tanker 1
14 Helper 11
15 Mason/Carpenter 4
16 Excavator & Shovel Operator 1
17 JCB Operator 0
18 Electrician 8
19 BUS DRIVER 1
20 Carpenter 3
Total 42 Total 31
SubContractor - Emirates Engineering LLC
Manpower Details Equipment Detail
Sl No. Designation Qty Sl No. Equipments Qty
Emirates Engineering
1 Project Engineer 0 9 Mini Bus 1
2 Site Engineer 1 10 Wheel Excavator 0
3 Safety Officer 0 11 Roller Compactor 0
4 Site Foreman 0 12 SHOVEL 1
5 Fitter 0 13 25 ton Crane 0
6 Tak Welder 0 14 Diesel Welding machine 2
7 General Workers 3 15 Electric Welding machine 3
8 BUS DRIVER 0 16 Electric oven - 50 Kg 1
9 Welders 6G 0 17 Portable Oven 5
10 Fabricator 0 18 50 ton Crane 0
11 QC Inspector 0 one ton pickup 1
12 Operators 0
13 Electrican 0
14 Rigger 0
Total 4 Total 14
Total Manpower 62 Total Equipments 45
Contractor Sign & Stamp Client Sign & Stamp
SubContractor - Richmond - J&J
Manpower Details Equipment Detail
Sl No. Designation Qty Sl No. Equipments Qty
Richmond - J&J
1 Project Engineer 1 9 Mini Bus 1
2 Engineer 0 10 grinding machine 2
3 Document Controller 1 11 Roller Compactor 1
4 Office Asst 0 12 SHOWEL 0
5 Site Foreman 2 13 3 ton pick up 1
6 Mason 4 14 Steel Cutting Machine 1
7 Helper 10 15 Steel Bending machine 1
8 Carpenter 5 16 JCB 1
9 BUS DRIVER 1 17 2 ton roller compactor 1
10 Steel Worker 4 Drill machine 2
11 Painter 1 Hilti machine 1
12 Hired Manpower 8 wood cutter 3
13 Safety Officer 1 generator 4
14 Excavator & Shovel Operator
Total 38 Total 19
Total Manpower Total Equipments 19

HSE Issues:
F. HSE Issues:
1 Excavation in ETS-2 was barricaded with Mesh and installed signages board and barriers
2 Proper Installation of Scaffolding at ETS-1, B & 3 Area for Painting activities
3 Proper Installation of Scaffolding at ETS-B & 3 Area for Block Works
4 Provided signages board near road area
5 Provided mesh along with the crush barriers and safety cones beside the road
6 Pipes and Fibre Optic Cables are covered with tarpolin
7 Excavation at near (ETS A) area barricaded with barriers &orange mesh
8 Excavation at ETS-2 are barricaded with orange Mesh
9 Installed Crush Barriers with water beside the road side area Safety Signages were posted
10 Barricades provided near road area (Near Plant Area)
MAHAWI

Working Time: 7 am to 6:00pm

Other Details
Sl No. Others Qty

Direct Manpower
20 Rigger 3

21 Pipe Fabricator 5
22 Multi Skill Helper 5
23 Electrican 1
24 Crane Operator 1
25 Tanker Driver 1

Total 16
LLC
Other Details
Sl No. Others Qty

15 Shovel Operator 0
16 Crane Operator
17 Draughts man 0
18 BUS DRIVER 0
19 Site Surveyor 0
Total 0

Client Sign & Stamp


Other Details
Sl No. Others Qty

Total 0

Done
Done
Done
Done
Done
Done
Done
Done
Done
Done
PROJECT TITLE: EXTERNAL CHILLED WATER PIPING NETWORK -- MAHAWI
PROJECT NO: AD- 16 - 4061 E
DAILY PROGRESS REPORT
Date: 15-May-16 Weather: Sunny Temperature:

A. Manpower report as on 14-May-16 Total Manpower:


B. Equipment report as on 14-May-16 Total Equipment:
C. Progress Report - Executive Summary
Sl No. Activities Done On 14-May-16

1 ETS Piping fiting and Welding Activities on field ETS 1, 3, B,2 and A
2 Back filling of network pipelines
3 Block works and plastering for ETS 2
4 Painting work for ETS 3, 1, 2
5 FOC Cable pulling from ETS 3 to Plant
6 Instrumentation work started inside ETS rooms 1, 2,3, and B

Previous in
Activity Current in mtr/no mtr/no
1 Excavation 0 3580
2 Bedding 0 3570
3 Pipe Laying 0 7128
4 Joint Insulation 0 3570
5 UPVC Sleeve Laying 50 6820
6 Intial Backfilling 0 3550
7 Back filling Layer - 1 0 3535
8 Back filling Layer - 2 0 3490
9 Back filling Layer - 3 0 3370
10 Back filling Layer - 4 0 3320
11 Final Backfilling 0 3250
12 Blow Down Piping 0 1350
13 ETS Internal Piping fitup (yard) 0 386
14 ETS Internal Piping Weld (yard) 0 386
15 ETS Internal Piping fitup (field) 0 83
16 ETS Internal Piping Weld (field) 0 83
17 Welodolet for instrumentation 25 33
Contractor Sign & Stamp Client Sign & Sta
D. Today Planned Activities 15-May-16
1 concreting works for ETS -A
2 ETS 3, 1, B, 2 and A piping fit up and welding inside building
3 plastering in ETS 2
4 Thermal block shifting ETS A
5 concreting for equipment foundation ETS A
6 Conduit chipping inside ETS 3. 1.2.B
7 Angle fixing in electrical room for ETS B, 1,3
8 Backfilling near ETS1 connection point
9 Backfillinginside military school zone 4
10 Painting work inside ETS 3

Other Activity:
1 upvc duct installation On Progress
2 Housekeeping On Progress
3 shifting of scaffolding materials On Progress
4 Laying of Blow Down Piping (HDPE Pipe) Zone 2 On Progress
5 plastering in ets 2 On Progress
6 Backfilling of Trench at Zone-5 and 4 On Progress
7 Backfilling of Trench at Zone-2 On Progress
8 thermal block work for ETS A On Progress
9 NDRC drilling in Zone-1 Area [NDRC-1] On Progress
24ºC Working Time: 7 am to 6:00pm

Total Manpower: 100


Total Equipment: 64

14-May-16 Remarks

On Progress
On Progress
Done Total Excavation
Completed in
On Progress Mtr
On Progress 3580
Done

Total in
mtr/no
3580
3570
7128
3570
6870
3550
3535
3490
3370
3320
3250
1350
386
386
83
83
58
Client Sign & Stamp
15-May-16
On Progress
On Progress
On Progress
On Progress
On Progress
On Progress
On Progress
On Progress
On Progress
On Progress

On Progress
On Progress
On Progress
On Progress
On Progress
On Progress
On Progress
On Progress
On Progress
PROJECT TITLE: EXTERNAL CHILLED WATER PIPING NETWORK -- MAHAWI
PROJECT NO: AD- 16 - 4061 E
DAILY PROGRESS REPORT
Date: 15-May-16

Manpower Details Equipment Details


Sl No. Designation Qty Sl No. Equipments Qty
Indirect Manpower 20 Welding machine 3
1 Project Manager 1 21 Grinding machine 8
2 Piping Engineer 1 22 JCB 1
3 Electrical Engineer 1 23 Gas Cutters 2
4 Civil engineer 1 24 Wheel Excavator 1
5 QHSE Engineer 1 25 3 ton pick up 1
6 Planning Engineer 0 26 1 ton pick up 2
7 Draftsman 0 27 32 seat bus 1
8 Surveyor 0 28 Generators 3
Direct Manpower 29 Pipe Cutters 1
9 Mechanical Supervisor 1 30 Electric oven - 50 Kg 1
10 Safety Officer 1
31 Portable Oven 5
11 Welder / Taka welder 5 32 SHOVEL 0
12 Fitter 1 33 25 ton Crane 1
13 Sheet Fabricator 1 34 Water Tanker 1
14 Helper 11
15 Mason/Carpenter 4
16 Excavator & Shovel Operator 1
17 JCB Operator 0
18 Electrician 8
19 BUS DRIVER 1
20 Carpenter 3
Total 42 Total 31
SubContractor - Emirates Engineering LLC
Manpower Details Equipment Detail
Sl No. Designation Qty Sl No. Equipments Qty
Emirates Engineering
1 Project Engineer 0 9 Mini Bus 1
2 Site Engineer 1 10 Wheel Excavator 0
3 Safety Officer 0 11 Roller Compactor 0
4 Site Foreman 0 12 SHOVEL 1
5 Fitter 0 13 25 ton Crane 0
6 Tak Welder 0 14 Diesel Welding machine 2
7 General Workers 3 15 Electric Welding machine 3
8 BUS DRIVER 0 16 Electric oven - 50 Kg 1
9 Welders 6G 0 17 Portable Oven 5
10 Fabricator 0 18 50 ton Crane 0
11 QC Inspector 0 one ton pickup 1
12 Operators 0
13 Electrican 0
14 Rigger 0
Total 4 Total 14
Total Manpower 62 Total Equipments 45
Contractor Sign & Stamp Client Sign & Stamp
SubContractor - Richmond - J&J
Manpower Details Equipment Detail
Sl No. Designation Qty Sl No. Equipments Qty
Richmond - J&J
1 Project Engineer 1 9 Mini Bus 1
2 Engineer 0 10 grinding machine 2
3 Document Controller 1 11 Roller Compactor 1
4 Office Asst 0 12 SHOWEL 0
5 Site Foreman 2 13 3 ton pick up 1
6 Mason 4 14 Steel Cutting Machine 1
7 Helper 10 15 Steel Bending machine 1
8 Carpenter 5 16 JCB 1
9 BUS DRIVER 1 17 2 ton roller compactor 1
10 Steel Worker 4 Drill machine 2
11 Painter 1 Hilti machine 1
12 Hired Manpower 8 wood cutter 3
13 Safety Officer 1 generator 4
14 Excavator & Shovel Operator
Total 38 Total 19
Total Manpower Total Equipments 19

HSE Issues:
F. HSE Issues:
1 Excavation in ETS-2 was barricaded with Mesh and installed signages board and barriers
2 Proper Installation of Scaffolding at ETS-1, B & 3 Area for Painting activities
3 Proper Installation of Scaffolding at ETS-B & 3 Area for Block Works
4 Provided signages board near road area
5 Provided mesh along with the crush barriers and safety cones beside the road
6 Pipes and Fibre Optic Cables are covered with tarpolin
7 Excavation at near (ETS A) area barricaded with barriers &orange mesh
8 Excavation at ETS-2 are barricaded with orange Mesh
9 Installed Crush Barriers with water beside the road side area Safety Signages were posted
10 Barricades provided near road area (Near Plant Area)
MAHAWI

Working Time: 7 am to 6:00pm

Other Details
Sl No. Others Qty

Direct Manpower
20 Rigger 3

21 Pipe Fabricator 5
22 Multi Skill Helper 5
23 Electrican 1
24 Crane Operator 1
25 Tanker Driver 1

Total 16
LLC
Other Details
Sl No. Others Qty

15 Shovel Operator 0
16 Crane Operator
17 Draughts man 0
18 BUS DRIVER 0
19 Site Surveyor 0
Total 0

Client Sign & Stamp


Other Details
Sl No. Others Qty

Total 0

Done
Done
Done
Done
Done
Done
Done
Done
Done
Done
PROJECT TITLE: EXTERNAL CHILLED WATER PIPING NETWORK -- MAHAWI
PROJECT NO: AD- 16 - 4061 E
DAILY PROGRESS REPORT
Date: 14-May-16 Weather: Sunny Temperature:

A. Manpower report as on 12-May-16 Total Manpower:


B. Equipment report as on 12-May-16 Total Equipment:
C. Progress Report - Executive Summary
Sl No. Activities Done On 12-May-16

1 ETS Piping fiting and Welding Activities on field ETS 1, 3, B,2 and A
2 Back filling of network pipelines
3 Block works and plastering for ETS 2
4 Painting work for ETS 3, 1, 2
5 FOC Cable pulling from ETS 3 to Plant
6 Instrumentation work started inside ETS rooms 1, 2,3, and B

Previous in
Activity Current in mtr/no mtr/no
1 Excavation 0 3580
2 Bedding 0 3570
3 Pipe Laying 50 7078
4 Joint Insulation 22 3548
5 UPVC Sleeve Laying 50 6770
6 Intial Backfilling 0 3550
7 Back filling Layer - 1 0 3535
8 Back filling Layer - 2 0 3490
9 Back filling Layer - 3 0 3370
10 Back filling Layer - 4 50 3270
11 Final Backfilling 50 3200
12 Blow Down Piping 0 1350
13 ETS Internal Piping fitup (yard) 0 386
14 ETS Internal Piping Weld (yard) 0 386
15 ETS Internal Piping fitup (field) 0 83
16 ETS Internal Piping Weld (field) 0 83
17 Welodolet for instrumentation 18 15
Contractor Sign & Stamp Client Sign & Sta
D. Today Planned Activities 14-May-16
1 concreting works for ETS -A
2 ETS 3, 1, B, 2 and A piping fit up and welding inside building
3 plastering in ETS 2
4 Thermal block shifting ETS A
5 concreting for equipment foundation ETS A
6 Conduit chipping inside ETS 3. 1.2.B
7 Angle fixing in electrical room for ETS B, 1,3
8 Backfilling near ETS1 connection point
9 Backfillinginside military school zone 4
10 Painting work inside ETS 3

Other Activity:
1 upvc duct installation On Progress
2 Housekeeping On Progress
3 shifting of scaffolding materials On Progress
4 Laying of Blow Down Piping (HDPE Pipe) Zone 2 On Progress
5 plastering in ets 2 On Progress
6 Backfilling of Trench at Zone-5 and 4 On Progress
7 Backfilling of Trench at Zone-2 On Progress
8 thermal block work for ETS A On Progress
9 NDRC drilling in Zone-1 Area [NDRC-1] On Progress
24ºC Working Time: 7 am to 6:00pm

Total Manpower: 100


Total Equipment: 64

12-May-16 Remarks

On Progress
On Progress
On Progress Total Excavation
Completed in
On Progress Mtr
On Progress 3580
On Progress

Total in
mtr/no
3580
3570
7128
3570
6820
3550
3535
3490
3370
3320
3250
1350
386
386
83
83
33
Client Sign & Stamp
14-May-16
On Progress
On Progress
On Progress
On Progress
On Progress
On Progress
On Progress
On Progress
On Progress
On Progress

On Progress
On Progress
On Progress
On Progress
On Progress
On Progress
On Progress
On Progress
On Progress
PROJECT TITLE: EXTERNAL CHILLED WATER PIPING NETWORK -- MAHAWI
PROJECT NO: AD- 16 - 4061 E
DAILY PROGRESS REPORT
Date: 14-May-16

Manpower Details Equipment Details


Sl No. Designation Qty Sl No. Equipments Qty
Indirect Manpower 20 Welding machine 3
1 Project Manager 1 21 Grinding machine 8
2 Piping Engineer 1 22 JCB 1
3 Electrical Engineer 1 23 Gas Cutters 2
4 Civil engineer 1 24 Wheel Excavator 1
5 QHSE Engineer 1 25 3 ton pick up 1
6 Planning Engineer 0 26 1 ton pick up 2
7 Draftsman 0 27 32 seat bus 1
8 Surveyor 0 28 Generators 3
Direct Manpower 29 Pipe Cutters 1
9 Mechanical Supervisor 1 30 Electric oven - 50 Kg 1
10 Safety Officer 1
31 Portable Oven 5
11 Welder / Taka welder 5 32 SHOVEL 0
12 Fitter 1 33 25 ton Crane 1
13 Sheet Fabricator 1 34 Water Tanker 1
14 Helper 10
15 Mason/Carpenter 4
16 Excavator & Shovel Operator 1
17 JCB Operator 0
18 Electrician 3
19 BUS DRIVER 1
20 Carpenter 1
Total 34 Total 31
SubContractor - Emirates Engineering LLC
Manpower Details Equipment Detail
Sl No. Designation Qty Sl No. Equipments Qty
Emirates Engineering
1 Project Engineer 1 9 Mini Bus 1
2 Site Engineer 1 10 Wheel Excavator 0
3 Safety Officer 0 11 Roller Compactor 0
4 Site Foreman 0 12 SHOVEL 1
5 Fitter 0 13 25 ton Crane 0
6 Tak Welder 1 14 Diesel Welding machine 2
7 General Workers 1 15 Electric Welding machine 3
8 BUS DRIVER 0 16 Electric oven - 50 Kg 1
9 Welders 6G 2 17 Portable Oven 5
10 Fabricator 2 18 50 ton Crane 0
11 QC Inspector 1 one ton pickup 1
12 Operators 1
13 Electrican 1
14 Rigger 1
Total 12 Total 14
Total Manpower 62 Total Equipments 45
Contractor Sign & Stamp Client Sign & Stamp
SubContractor - Richmond - J&J
Manpower Details Equipment Detail
Sl No. Designation Qty Sl No. Equipments Qty
Richmond - J&J
1 Project Engineer 1 9 Mini Bus 1
2 Engineer 0 10 grinding machine 2
3 Document Controller 1 11 Roller Compactor 1
4 Office Asst 0 12 SHOWEL 0
5 Site Foreman 2 13 3 ton pick up 1
6 Mason 4 14 Steel Cutting Machine 1
7 Helper 10 15 Steel Bending machine 1
8 Carpenter 5 16 JCB 1
9 BUS DRIVER 1 17 2 ton roller compactor 1
10 Steel Worker 4 Drill machine 2
11 Painter 1 Hilti machine 1
12 Hired Manpower 8 wood cutter 3
13 Safety Officer 1 generator 4
14 Excavator & Shovel Operator
Total 38 Total 19
Total Manpower Total Equipments 19

HSE Issues:
F. HSE Issues:
1 Excavation in ETS-2 was barricaded with Mesh and installed signages board and barriers
2 Proper Installation of Scaffolding at ETS-1, B & 3 Area for Painting activities
3 Proper Installation of Scaffolding at ETS-B & 3 Area for Block Works
4 Provided signages board near road area
5 Provided mesh along with the crush barriers and safety cones beside the road
6 Pipes and Fibre Optic Cables are covered with tarpolin
7 Excavation at near (ETS A) area barricaded with barriers &orange mesh
8 Excavation at ETS-2 are barricaded with orange Mesh
9 Installed Crush Barriers with water beside the road side area Safety Signages were posted
10 Barricades provided near road area (Near Plant Area)
MAHAWI

Working Time: 7 am to 6:00pm

Other Details
Sl No. Others Qty

Direct Manpower
20 Rigger 3

21 Pipe Fabricator 5
22 Multi Skill Helper 5
23 Electrican 1
24 Crane Operator 1
25 Tanker Driver 1

Total 16
LLC
Other Details
Sl No. Others Qty

15 Shovel Operator 0
16 Crane Operator
17 Draughts man 0
18 BUS DRIVER 0
19 Site Surveyor 0
Total 0

Client Sign & Stamp


Other Details
Sl No. Others Qty

Total 0

Done
Done
Done
Done
Done
Done
Done
Done
Done
Done
PROJECT TITLE: EXTERNAL CHILLED WATER PIPING NETWORK -- MAHAWI
PROJECT NO: AD- 16 - 4061 E
DAILY PROGRESS REPORT
Date: 12-May-16 Weather: Sunny Temperature:

A. Manpower report as on 11-May-16 Total Manpower:


B. Equipment report as on 11-May-16 Total Equipment:
C. Progress Report - Executive Summary
Sl No. Activities Done On 11-May-16

1 ETS Piping fiting and Welding Activities on field ETS 1, 3, B,2 and A
2 Back filling of network pipelines
3 Block works and plastering for ETS 2
4 Painting work for ETS 3, 1, 2
5 FOC Cable pulling from ETS B to ETS 1
6 Instrumentation work started inside ETS rooms 1, 2,3, and B

Previous in
Activity Current in mtr/no mtr/no
1 Excavation 0 3580
2 Bedding 0 3570
3 Pipe Laying 50 7028
4 Joint Insulation 20 3528
5 UPVC Sleeve Laying 50 6720
6 Intial Backfilling 0 3550
7 Back filling Layer - 1 50 3485
8 Back filling Layer - 2 50 3440
9 Back filling Layer - 3 50 3320
10 Back filling Layer - 4 0 3270
11 Final Backfilling 0 3200
12 Blow Down Piping 0 1350
13 ETS Internal Piping fitup (yard) 0 386
14 ETS Internal Piping Weld (yard) 0 386
15 ETS Internal Piping fitup (field) 0 83
16 ETS Internal Piping Weld (field) 0 83
17 Welodolet for instrumentation 15 0
Contractor Sign & Stamp Client Sign & Sta
D. Today Planned Activities 12-May-16
1 concreting works for ETS -A
2 ETS 3, 1, B, 2 and A piping fit up and welding inside building
3 plastering in ETS 2
4 Thermal block shifting ETS A
5 concreting for equipment foundation ETS A
6 Conduit chipping inside ETS 3. 1.2.B
7 Angle fixing in electrical room for ETS B, 1,3
8 Backfilling near ETS1 connection point
9 Backfillinginside military school zone 4
10 Painting work inside ETS 3
11 Fitup and welding of drain & Vent on network line

Other Activity:
1 upvc duct installation On Progress
2 Housekeeping On Progress
3 shifting of scaffolding materials On Progress
4 Laying of Blow Down Piping (HDPE Pipe) Zone 2 On Progress
5 plastering in ets 2 On Progress
6 Backfilling of Trench at Zone-5 and 4 On Progress
7 Backfilling of Trench at Zone-2 On Progress
8 thermal block work for ETS A On Progress
9 NDRC drilling in Zone-1 Area [NDRC-1] On Progress
24ºC Working Time: 7 am to 6:00pm

Total Manpower: 100


Total Equipment: 64

11-May-16 Remarks

On Progress
On Progress
On Progress Total Excavation
Completed in
On Progress Mtr
On Progress 3580
On Progress

Total in
mtr/no
3580
3570
7078
3548
6770
3550
3535
3490
3370
3270
3200
1350
386
386
83
83
15
Client Sign & Stamp
12-May-16
On Progress
On Progress
On Progress
On Progress
On Progress
On Progress
On Progress
On Progress
On Progress
On Progress
On Progress

On Progress
On Progress
On Progress
On Progress
On Progress
On Progress
On Progress
On Progress
On Progress
PROJECT TITLE: EXTERNAL CHILLED WATER PIPING NETWORK -- MAHAWI
PROJECT NO: AD- 16 - 4061 E
DAILY PROGRESS REPORT
Date: 12-May-16

Manpower Details Equipment Details


Sl No. Designation Qty Sl No. Equipments Qty
Indirect Manpower 20 Welding machine 3
1 Project Manager 1 21 Grinding machine 8
2 Piping Engineer 1 22 JCB 1
3 Electrical Engineer 1 23 Gas Cutters 2
4 Civil engineer 1 24 Wheel Excavator 1
5 QHSE Engineer 1 25 3 ton pick up 1
6 Planning Engineer 0 26 1 ton pick up 2
7 Draftsman 0 27 32 seat bus 1
8 Surveyor 0 28 Generators 3
Direct Manpower 29 Pipe Cutters 1
9 Mechanical Supervisor 1 30 Electric oven - 50 Kg 1
10 Safety Officer 1
31 Portable Oven 5
11 Welder / Taka welder 5 32 SHOVEL 0
12 Fitter 1 33 25 ton Crane 1
13 Sheet Fabricator 1 34 Water Tanker 1
14 Helper 10
15 Mason/Carpenter 4
16 Excavator & Shovel Operator 1
17 JCB Operator 0
18 Electrician 3
19 BUS DRIVER 1
20 Carpenter 1
Total 34 Total 31
SubContractor - Emirates Engineering LLC
Manpower Details Equipment Detail
Sl No. Designation Qty Sl No. Equipments Qty
Emirates Engineering
1 Project Engineer 1 9 Mini Bus 1
2 Site Engineer 1 10 Wheel Excavator 0
3 Safety Officer 0 11 Roller Compactor 0
4 Site Foreman 0 12 SHOVEL 1
5 Fitter 0 13 25 ton Crane 0
6 Tak Welder 1 14 Diesel Welding machine 2
7 General Workers 1 15 Electric Welding machine 3
8 BUS DRIVER 0 16 Electric oven - 50 Kg 1
9 Welders 6G 2 17 Portable Oven 5
10 Fabricator 2 18 50 ton Crane 0
11 QC Inspector 1 one ton pickup 1
12 Operators 1
13 Electrican 1
14 Rigger 1
Total 12 Total 14
Total Manpower 62 Total Equipments 45
Contractor Sign & Stamp Client Sign & Stamp
SubContractor - Richmond - J&J
Manpower Details Equipment Detail
Sl No. Designation Qty Sl No. Equipments Qty
Richmond - J&J
1 Project Engineer 1 9 Mini Bus 1
2 Engineer 0 10 grinding machine 2
3 Document Controller 1 11 Roller Compactor 1
4 Office Asst 0 12 SHOWEL 0
5 Site Foreman 2 13 3 ton pick up 1
6 Mason 4 14 Steel Cutting Machine 1
7 Helper 10 15 Steel Bending machine 1
8 Carpenter 5 16 JCB 1
9 BUS DRIVER 1 17 2 ton roller compactor 1
10 Steel Worker 4 Drill machine 2
11 Painter 1 Hilti machine 1
12 Hired Manpower 8 wood cutter 3
13 Safety Officer 1 generator 4
14 Excavator & Shovel Operator
Total 38 Total 19
Total Manpower Total Equipments 19

HSE Issues:
F. HSE Issues:
1 Excavation in ETS-2 was barricaded with Mesh and installed signages board and barriers
2 Proper Installation of Scaffolding at ETS-1, B & 3 Area for Painting activities
3 Proper Installation of Scaffolding at ETS-B & 3 Area for Block Works
4 Provided signages board near road area
5 Provided mesh along with the crush barriers and safety cones beside the road
6 Pipes and Fibre Optic Cables are covered with tarpolin
7 Excavation at near (ETS A) area barricaded with barriers &orange mesh
8 Excavation at ETS-2 are barricaded with orange Mesh
9 Installed Crush Barriers with water beside the road side area Safety Signages were posted
10 Barricades provided near road area (Near Plant Area)
MAHAWI

Working Time: 7 am to 6:00pm

Other Details
Sl No. Others Qty

Direct Manpower
20 Rigger 3

21 Pipe Fabricator 5
22 Multi Skill Helper 5
23 Electrican 1
24 Crane Operator 1
25 Tanker Driver 1

Total 16
LLC
Other Details
Sl No. Others Qty

15 Shovel Operator 0
16 Crane Operator
17 Draughts man 0
18 BUS DRIVER 0
19 Site Surveyor 0
Total 0

Client Sign & Stamp


Other Details
Sl No. Others Qty

Total 0

Done
Done
Done
Done
Done
Done
Done
Done
Done
Done
PROJECT TITLE: EXTERNAL CHILLED WATER PIPING NETWORK -- MAHAWI
PROJECT NO: AD- 16 - 4061 E
DAILY PROGRESS REPORT
Date: 11-May-16 Weather: Sunny Temperature:

A. Manpower report as on 10-May-16 Total Manpower:


B. Equipment report as on 10-May-16 Total Equipment:
C. Progress Report - Executive Summary
Sl No. Activities Done On 10-May-16

1 ETS Piping fiting and Welding Activities on field ETS 1, 3, B,2 and A
2 Back filling of network pipelines
3 Block works and plastering for ETS 2
4 Painting work for ETS 3, 1, 2
5 FOC Cable pulling from ETS B to ETS 1
6 Instrumentation work started inside ETS rooms 1, 2,3, and B

Previous in
Activity Current in mtr/no mtr/no
1 Excavation 0 3580
2 Bedding 0 3570
3 Pipe Laying 0 7028
4 Joint Insulation 20 3508
5 UPVC Sleeve Laying 0 6720
6 Intial Backfilling 50 3500
7 Back filling Layer - 1 50 3435
8 Back filling Layer - 2 100 3340
9 Back filling Layer - 3 100 3220
10 Back filling Layer - 4 50 3220
11 Final Backfilling 0 3200
12 Blow Down Piping 0 1350
13 ETS Internal Piping fitup (yard) 0 386
14 ETS Internal Piping Weld (yard) 0 386
15 ETS Internal Piping fitup (field) 0 83
16 ETS Internal Piping Weld (field) 1 82
Contractor Sign & Stamp Client Sign & Stam
D. Today Planned Activities 11-May-16
1 concreting works for ETS -A
2 ETS 3, 1, B, 2 and A piping fit up and welding inside building
3 plastering in ETS 2
4 Thermal block shifting ETS A
5 concreting for equipment foundation ETS A
6 Conduit chipping inside ETS 3. 1.2.B
7 Angle fixing in electrical room for ETS B, 1,3
8 Backfilling near ETS1 connection point
9 Backfillinginside military school zone 4
10 Painting work inside ETS 3
11 Fitup and welding of drain & Vent on network line

Other Activity:
1 upvc duct installation On Progress
2 Housekeeping On Progress
3 shifting of scaffolding materials On Progress
4 Laying of Blow Down Piping (HDPE Pipe) Zone 2 On Progress
5 plastering in ets 2 On Progress
6 Backfilling of Trench at Zone-5 and 4 On Progress
7 Backfilling of Trench at Zone-2 On Progress
8 thermal block work for ETS A On Progress
9 NDRC drilling in Zone-1 Area [NDRC-1] On Progress
24ºC Working Time: 7 am to 6:00pm

Total Manpower: 100


Total Equipment: 64

10-May-16 Remarks

On Progress
On Progress
On Progress Total Excavation
Completed in
On Progress Mtr
On Progress 3580
On Progress

Total in
mtr/no
3580
3570
7028
3528
6720
3550
3485
3440
3320
3270
3200
1350
386
386
83
83
Client Sign & Stamp
11-May-16
On Progress
On Progress
On Progress
On Progress
On Progress
On Progress
On Progress
On Progress
On Progress
On Progress
On Progress

On Progress
On Progress
On Progress
On Progress
On Progress
On Progress
On Progress
On Progress
On Progress
PROJECT TITLE: EXTERNAL CHILLED WATER PIPING NETWORK -- MAHAWI
PROJECT NO: AD- 16 - 4061 E
DAILY PROGRESS REPORT
Date: 11-May-16

Manpower Details Equipment Details


Sl No. Designation Qty Sl No. Equipments Qty
Indirect Manpower 20 Welding machine 3
1 Project Manager 1 21 Grinding machine 8
2 Piping Engineer 1 22 JCB 1
3 Electrical Engineer 1 23 Gas Cutters 2
4 Civil engineer 1 24 Wheel Excavator 1
5 QHSE Engineer 1 25 3 ton pick up 1
6 Planning Engineer 0 26 1 ton pick up 2
7 Draftsman 0 27 32 seat bus 1
8 Surveyor 0 28 Generators 3
Direct Manpower 29 Pipe Cutters 1
9 Mechanical Supervisor 1 30 Electric oven - 50 Kg 1
10 Safety Officer 1
31 Portable Oven 5
11 Welder / Taka welder 5 32 SHOVEL 0
12 Fitter 1 33 25 ton Crane 1
13 Sheet Fabricator 1 34 Water Tanker 1
14 Helper 10
15 Mason/Carpenter 4
16 Excavator & Shovel Operator 1
17 JCB Operator 0
18 Electrician 3
19 BUS DRIVER 1
20 Carpenter 1
Total 34 Total 31
SubContractor - Emirates Engineering LLC
Manpower Details Equipment Detail
Sl No. Designation Qty Sl No. Equipments Qty
Emirates Engineering
1 Project Engineer 1 9 Mini Bus 1
2 Site Engineer 1 10 Wheel Excavator 0
3 Safety Officer 0 11 Roller Compactor 0
4 Site Foreman 0 12 SHOVEL 1
5 Fitter 0 13 25 ton Crane 0
6 Tak Welder 1 14 Diesel Welding machine 2
7 General Workers 1 15 Electric Welding machine 3
8 BUS DRIVER 0 16 Electric oven - 50 Kg 1
9 Welders 6G 2 17 Portable Oven 5
10 Fabricator 2 18 50 ton Crane 0
11 QC Inspector 1 one ton pickup 1
12 Operators 1
13 Electrican 1
14 Rigger 1
Total 12 Total 14
Total Manpower 62 Total Equipments 45
Contractor Sign & Stamp Client Sign & Stamp
SubContractor - Richmond - J&J
Manpower Details Equipment Detail
Sl No. Designation Qty Sl No. Equipments Qty
Richmond - J&J
1 Project Engineer 1 9 Mini Bus 1
2 Engineer 0 10 grinding machine 2
3 Document Controller 1 11 Roller Compactor 1
4 Office Asst 0 12 SHOWEL 0
5 Site Foreman 2 13 3 ton pick up 1
6 Mason 4 14 Steel Cutting Machine 1
7 Helper 10 15 Steel Bending machine 1
8 Carpenter 5 16 JCB 1
9 BUS DRIVER 1 17 2 ton roller compactor 1
10 Steel Worker 4 Drill machine 2
11 Painter 1 Hilti machine 1
12 Hired Manpower 8 wood cutter 3
13 Safety Officer 1 generator 4
14 Excavator & Shovel Operator
Total 38 Total 19
Total Manpower Total Equipments 19

HSE Issues:
F. HSE Issues:
1 Excavation in ETS-2 was barricaded with Mesh and installed signages board and barriers
2 Proper Installation of Scaffolding at ETS-1, B & 3 Area for Painting activities
3 Proper Installation of Scaffolding at ETS-B & 3 Area for Block Works
4 Provided signages board near road area
5 Provided mesh along with the crush barriers and safety cones beside the road
6 Pipes and Fibre Optic Cables are covered with tarpolin
7 Excavation at near (ETS A) area barricaded with barriers &orange mesh
8 Excavation at ETS-2 are barricaded with orange Mesh
9 Installed Crush Barriers with water beside the road side area Safety Signages were posted
10 Barricades provided near road area (Near Plant Area)
MAHAWI

Working Time: 7 am to 6:00pm

Other Details
Sl No. Others Qty

Direct Manpower
20 Rigger 3

21 Pipe Fabricator 5
22 Multi Skill Helper 5
23 Electrican 1
24 Crane Operator 1
25 Tanker Driver 1

Total 16
LLC
Other Details
Sl No. Others Qty

15 Shovel Operator 0
16 Crane Operator
17 Draughts man 0
18 BUS DRIVER 0
19 Site Surveyor 0
Total 0

Client Sign & Stamp


Other Details
Sl No. Others Qty

Total 0

Done
Done
Done
Done
Done
Done
Done
Done
Done
Done
PROJECT TITLE: EXTERNAL CHILLED WATER PIPING NETWORK -- MAHAWI
PROJECT NO: AD- 16 - 4061 E
DAILY PROGRESS REPORT
Date: 10-May-16 Weather: Sunny Temperature:

A. Manpower report as on 9-May-16 Total Manpower:


B. Equipment report as on 9-May-16 Total Equipment:
C. Progress Report - Executive Summary
Sl No. Activities Done On 9-May-16

1 ETS Piping fiting and Welding Activities on field ETS 1, 3, B,2 and A
2 Back filling of network pipelines
3 Block works and plastering for ETS 2
4 Painting work for ETS 3, 1, 2
5 FOC Cable pulling from ETS B to ETS 1
6 Pipe Laying and fitup for ETS A Network line

Previous in
Activity Current in mtr/no mtr/no
1 Excavation 0 3580
2 Bedding 0 3570
3 Pipe Laying 0 7028
4 Joint Insulation 50 3458
5 UPVC Sleeve Laying 50 6670
6 Intial Backfilling 50 3450
7 Back filling Layer - 1 0 3435
8 Back filling Layer - 2 0 3340
9 Back filling Layer - 3 0 3220
10 Back filling Layer - 4 0 3220
11 Final Backfilling 0 3200
12 Blow Down Piping 0 1350
13 ETS Internal Piping fitup (yard) 0 386
14 ETS Internal Piping Weld (yard) 0 386
15 ETS Internal Piping fitup (field) 2 81
16 ETS Internal Piping Weld (field) 2 80
Contractor Sign & Stamp Client Sign & Stam
D. Today Planned Activities 10-May-16
1 concreting works for ETS -A
2 ETS 3, 1, B, 2 and A piping fit up and welding inside building
3 plastering in ETS 2
4 Thermal block shifting ETS A
5 concreting for equipment foundation ETS A
6 Conduit chipping inside ETS 3. 1.2.B
7 Angle fixing in electrical room for ETS B, 1,3
8 Backfilling near ETS1 connection point
9 Backfillinginside military school zone 4
8 Painting work inside ETS 3
10 Fitup and welding of drain & Vent on network line

Other Activity:
1 upvc duct installation On Progress
2 Housekeeping On Progress
3 shifting of scaffolding materials On Progress
4 Laying of Blow Down Piping (HDPE Pipe) Zone 2 On Progress
5 plastering in ets 2 On Progress
6 Backfilling of Trench at Zone-5 and 4 On Progress
7 Backfilling of Trench at Zone-2 On Progress
8 thermal block work for ETS A On Progress
9 NDRC drilling in Zone-1 Area [NDRC-1] On Progress
24ºC Working Time: 7 am to 6:00pm

Total Manpower: 100


Total Equipment: 64

9-May-16 Remarks

On Progress
On Progress
On Progress Total Excavation
Completed in
On Progress Mtr
On Progress 3580
Done

Total in
mtr/no
3580
3570
7028
3508
6720
3500
3435
3340
3220
3220
3200
1350
386
386
83
82
Client Sign & Stamp
10-May-16
On Progress
On Progress
On Progress
On Progress
On Progress
On Progress
On Progress
On Progress
On Progress
On Progress
On Progress

On Progress
On Progress
On Progress
On Progress
On Progress
On Progress
On Progress
On Progress
On Progress
PROJECT TITLE: EXTERNAL CHILLED WATER PIPING NETWORK -- MAHAWI
PROJECT NO: AD- 16 - 4061 E
DAILY PROGRESS REPORT
Date: 10-May-16

Manpower Details Equipment Details


Sl No. Designation Qty Sl No. Equipments Qty
Indirect Manpower 20 Welding machine 3
1 Project Manager 1 21 Grinding machine 8
2 Piping Engineer 1 22 JCB 1
3 Electrical Engineer 1 23 Gas Cutters 2
4 Civil engineer 1 24 Wheel Excavator 1
5 QHSE Engineer 1 25 3 ton pick up 1
6 Planning Engineer 0 26 1 ton pick up 2
7 Draftsman 0 27 32 seat bus 1
8 Surveyor 0 28 Generators 3
Direct Manpower 29 Pipe Cutters 1
9 Mechanical Supervisor 1 30 Electric oven - 50 Kg 1
10 Safety Officer 1
31 Portable Oven 5
11 Welder / Taka welder 5 32 SHOVEL 0
12 Fitter 1 33 25 ton Crane 1
13 Sheet Fabricator 1 34 Water Tanker 1
14 Helper 10
15 Mason/Carpenter 4
16 Excavator & Shovel Operator 1
17 JCB Operator 0
18 Electrician 3
19 BUS DRIVER 1
20 Carpenter 1
Total 34 Total 31
SubContractor - Emirates Engineering LLC
Manpower Details Equipment Detail
Sl No. Designation Qty Sl No. Equipments Qty
Emirates Engineering
1 Project Engineer 1 9 Mini Bus 1
2 Site Engineer 1 10 Wheel Excavator 0
3 Safety Officer 0 11 Roller Compactor 0
4 Site Foreman 0 12 SHOVEL 1
5 Fitter 0 13 25 ton Crane 0
6 Tak Welder 1 14 Diesel Welding machine 2
7 General Workers 1 15 Electric Welding machine 3
8 BUS DRIVER 0 16 Electric oven - 50 Kg 1
9 Welders 6G 2 17 Portable Oven 5
10 Fabricator 2 18 50 ton Crane 0
11 QC Inspector 1 one ton pickup 1
12 Operators 1
13 Electrican 1
14 Rigger 1
Total 12 Total 14
Total Manpower 62 Total Equipments 45
Contractor Sign & Stamp Client Sign & Stamp
SubContractor - Richmond - J&J
Manpower Details Equipment Detail
Sl No. Designation Qty Sl No. Equipments Qty
Richmond - J&J
1 Project Engineer 1 9 Mini Bus 1
2 Engineer 0 10 grinding machine 2
3 Document Controller 1 11 Roller Compactor 1
4 Office Asst 0 12 SHOWEL 0
5 Site Foreman 2 13 3 ton pick up 1
6 Mason 4 14 Steel Cutting Machine 1
7 Helper 10 15 Steel Bending machine 1
8 Carpenter 5 16 JCB 1
9 BUS DRIVER 1 17 2 ton roller compactor 1
10 Steel Worker 4 Drill machine 2
11 Painter 1 Hilti machine 1
12 Hired Manpower 8 wood cutter 3
13 Safety Officer 1 generator 4
14 Excavator & Shovel Operator
Total 38 Total 19
Total Manpower Total Equipments 19

HSE Issues:
F. HSE Issues:
1 Excavation in ETS-2 was barricaded with Mesh and installed signages board and barriers
2 Proper Installation of Scaffolding at ETS-1, B & 3 Area for Painting activities
3 Proper Installation of Scaffolding at ETS-B & 3 Area for Block Works
4 Provided signages board near road area
5 Provided mesh along with the crush barriers and safety cones beside the road
6 Pipes and Fibre Optic Cables are covered with tarpolin
7 Excavation at near (ETS A) area barricaded with barriers &orange mesh
8 Excavation at ETS-2 are barricaded with orange Mesh
9 Installed Crush Barriers with water beside the road side area Safety Signages were posted
10 Barricades provided near road area (Near Plant Area)
MAHAWI

Working Time: 7 am to 6:00pm

Other Details
Sl No. Others Qty

Direct Manpower
20 Rigger 3

21 Pipe Fabricator 5
22 Multi Skill Helper 5
23 Electrican 1
24 Crane Operator 1
25 Tanker Driver 1

Total 16
LLC
Other Details
Sl No. Others Qty

15 Shovel Operator 0
16 Crane Operator
17 Draughts man 0
18 BUS DRIVER 0
19 Site Surveyor 0
Total 0

Client Sign & Stamp


Other Details
Sl No. Others Qty

Total 0

Done
Done
Done
Done
Done
Done
Done
Done
Done
Done
PROJECT TITLE: EXTERNAL CHILLED WATER PIPING NETWORK -- MAHAWI
PROJECT NO: AD- 16 - 4061 E
DAILY PROGRESS REPORT
Date: 8-May-16 Weather: Sunny Temperature:

A. Manpower report as on 7-May-16 Total Manpower:


B. Equipment report as on 7-May-16 Total Equipment:
C. Progress Report - Executive Summary
Sl No. Activities Done On 7-May-16

1 ETS Piping fiting and Welding Activities on field ETS 1, 3, B,2 and A
2 Back filling of network pipelines
3 Block works and plastering for ETS 2
4 Painting work for ETS 3, 1, 2
5 FOC Cable pulling from ETS B to ETS 1
6 Pipe Laying and fitup for ETS A Network line
7 20" fitup and welding NDRC2

Previous in
Activity Current in mtr/no mtr/no
1 Excavation 30 3550
2 Bedding 100 3470
3 Pipe Laying 100 6928
4 Joint Insulation 20 3438
5 UPVC Sleeve Laying 0 6670
6 Intial Backfilling 0 3450
7 Back filling Layer - 1 0 3435
8 Back filling Layer - 2 0 3340
9 Back filling Layer - 3 0 3220
10 Back filling Layer - 4 0 3220
11 Final Backfilling 0 3200
12 Blow Down Piping 0 1350
13 ETS Internal Piping fitup (yard) 0 386
14 ETS Internal Piping Weld (yard) 0 386
15 ETS Internal Piping fitup (field) 2 79
16 ETS Internal Piping Weld (field) 2 78
Contractor Sign & Stamp Client Sign & Stam
D. Today Planned Activities 8-May-16
1 concreting works for ETS -A
2 ETS 3, 1, B, 2 and A piping fit up and welding inside building
3 plastering in ETS 2
4 Thermal block shifting ETS A
5 concreting for equipment foundation ETS A
6 Conduit chipping inside ETS 3. 1.2.B
7 Angle fixing in electrical room for ETS B, 1,3
8 Backfilling near ETS1 connection point
9 Backfillinginside military school zone 4
8 Painting work inside ETS 3
10 Fitup and welding of drain & Vent on network line

Other Activity:
1 upvc duct installation On Progress
2 Housekeeping On Progress
3 shifting of scaffolding materials On Progress
4 Laying of Blow Down Piping (HDPE Pipe) Zone 2 On Progress
5 plastering in ets 2 On Progress
6 Backfilling of Trench at Zone-5 and 4 On Progress
7 Insulation of vent and drain On Progress
8 thermal block work for ETS A On Progress
9 NDRC drilling in Zone-1 Area [NDRC-1] On Progress
24ºC Working Time: 7 am to 6:00pm

Total Manpower: 100


Total Equipment: 64

7-May-16 Remarks

On Progress
On Progress
On Progress Total Excavation
Completed in
On Progress Mtr
On Progress 3580
On Progress
On Progress

Total in
mtr/no
3580
3570
7028
3458
6670
3450
3435
3340
3220
3220
3200
1350
386
386
81
80
Client Sign & Stamp
8-May-16
On Progress
On Progress
On Progress
On Progress
On Progress
On Progress
On Progress
On Progress
On Progress
On Progress
On Progress

On Progress
On Progress
On Progress
On Progress
On Progress
On Progress
On Progress
On Progress
On Progress
PROJECT TITLE: EXTERNAL CHILLED WATER PIPING NETWORK -- MAHAWI
PROJECT NO: AD- 16 - 4061 E
DAILY PROGRESS REPORT
Date: 8-May-16

Manpower Details Equipment Details


Sl No. Designation Qty Sl No. Equipments Qty
Indirect Manpower 20 Welding machine 3
1 Project Manager 1 21 Grinding machine 8
2 Piping Engineer 1 22 JCB 1
3 Electrical Engineer 1 23 Gas Cutters 2
4 Civil engineer 1 24 Wheel Excavator 1
5 QHSE Engineer 1 25 3 ton pick up 1
6 Planning Engineer 0 26 1 ton pick up 2
7 Draftsman 0 27 32 seat bus 1
8 Surveyor 0 28 Generators 3
Direct Manpower 29 Pipe Cutters 1
9 Mechanical Supervisor 1 30 Electric oven - 50 Kg 1
10 Safety Officer 1
31 Portable Oven 5
11 Welder / Taka welder 5 32 SHOVEL 0
12 Fitter 1 33 25 ton Crane 1
13 Sheet Fabricator 1 34 Water Tanker 1
14 Helper 10
15 Mason/Carpenter 4
16 Excavator & Shovel Operator 1
17 JCB Operator 0
18 Electrician 3
19 BUS DRIVER 1
20 Carpenter 1
Total 34 Total 31
SubContractor - Emirates Engineering LLC
Manpower Details Equipment Detail
Sl No. Designation Qty Sl No. Equipments Qty
Emirates Engineering
1 Project Engineer 1 9 Mini Bus 1
2 Site Engineer 1 10 Wheel Excavator 0
3 Safety Officer 0 11 Roller Compactor 0
4 Site Foreman 0 12 SHOVEL 1
5 Fitter 0 13 25 ton Crane 0
6 Tak Welder 1 14 Diesel Welding machine 2
7 General Workers 1 15 Electric Welding machine 3
8 BUS DRIVER 0 16 Electric oven - 50 Kg 1
9 Welders 6G 2 17 Portable Oven 5
10 Fabricator 2 18 50 ton Crane 0
11 QC Inspector 1 one ton pickup 1
12 Operators 1
13 Electrican 1
14 Rigger 1
Total 12 Total 14
Total Manpower 62 Total Equipments 45
Contractor Sign & Stamp Client Sign & Stamp
SubContractor - Richmond - J&J
Manpower Details Equipment Detail
Sl No. Designation Qty Sl No. Equipments Qty
Richmond - J&J
1 Project Engineer 1 9 Mini Bus 1
2 Engineer 0 10 grinding machine 2
3 Document Controller 1 11 Roller Compactor 1
4 Office Asst 0 12 SHOWEL 0
5 Site Foreman 2 13 3 ton pick up 1
6 Mason 4 14 Steel Cutting Machine 1
7 Helper 10 15 Steel Bending machine 1
8 Carpenter 5 16 JCB 1
9 BUS DRIVER 1 17 2 ton roller compactor 1
10 Steel Worker 4 Drill machine 2
11 Painter 1 Hilti machine 1
12 Hired Manpower 8 wood cutter 3
13 Safety Officer 1 generator 4
14 Excavator & Shovel Operator
Total 38 Total 19
Total Manpower Total Equipments 19

HSE Issues:
F. HSE Issues:
1 Excavation in ETS-2 was barricaded with Mesh and installed signages board and barriers
2 Proper Installation of Scaffolding at ETS-1, B & 3 Area for Painting activities
3 Proper Installation of Scaffolding at ETS-B & 3 Area for Block Works
4 Provided signages board near road area
5 Provided mesh along with the crush barriers and safety cones beside the road
6 Pipes and Fibre Optic Cables are covered with tarpolin
7 Excavation at near (ETS A) area barricaded with barriers &orange mesh
8 Excavation at ETS-2 are barricaded with orange Mesh
9 Installed Crush Barriers with water beside the road side area Safety Signages were posted
10 Barricades provided near road area (Near Plant Area)
MAHAWI

Working Time: 7 am to 6:00pm

Other Details
Sl No. Others Qty

Direct Manpower
20 Rigger 3

21 Pipe Fabricator 5
22 Multi Skill Helper 5
23 Electrican 1
24 Crane Operator 1
25 Tanker Driver 1

Total 16
LLC
Other Details
Sl No. Others Qty

15 Shovel Operator 0
16 Crane Operator
17 Draughts man 0
18 BUS DRIVER 0
19 Site Surveyor 0
Total 0

Client Sign & Stamp


Other Details
Sl No. Others Qty

Total 0

Done
Done
Done
Done
Done
Done
Done
Done
Done
Done
PROJECT TITLE: EXTERNAL CHILLED WATER PIPING NETWORK -- MAHAWI
PROJECT NO: AD- 16 - 4061 E
DAILY PROGRESS REPORT
Date: 8-May-16 Weather: Sunny Temperature:

A. Manpower report as on 7-May-16 Total Manpower:


B. Equipment report as on 7-May-16 Total Equipment:
C. Progress Report - Executive Summary
Sl No. Activities Done On 7-May-16

1 ETS Piping fiting and Welding Activities on field ETS 1, 3, B,2 and A
2 Back filling of network pipelines
3 Block works and plastering for ETS 2
4 Painting work for ETS 3, 1, 2
5 FOC Cable pulling from ETS B to ETS 1
6 Pipe Laying and fitup for ETS A Network line
7 20" fitup and welding NDRC2

Previous in
Activity Current in mtr/no mtr/no
1 Excavation 0 3550
2 Bedding 0 3470
3 Pipe Laying 0 6928
4 Joint Insulation 20 3418
5 UPVC Sleeve Laying 0 6670
6 Intial Backfilling 0 3450
7 Back filling Layer - 1 0 3435
8 Back filling Layer - 2 0 3340
9 Back filling Layer - 3 0 3220
10 Back filling Layer - 4 0 3220
11 Final Backfilling 0 3200
12 Blow Down Piping 0 1350
13 ETS Internal Piping fitup (yard) 0 386
14 ETS Internal Piping Weld (yard) 0 386
15 ETS Internal Piping fitup (field) 1 78
16 ETS Internal Piping Weld (field) 2 76
Contractor Sign & Stamp Client Sign & Stam
D. Today Planned Activities 8-May-16
1 concreting works for ETS -A
2 ETS 3, 1, B, 2 and A piping fit up and welding inside building
3 plastering in ETS 2
4 Thermal block shifting ETS A
5 concreting for equipment foundation ETS A
6 Conduit chipping inside ETS 3. 1.2.B
7 Angle fixing in electrical room for ETS B, 1,3
8 Backfilling near ETS1 connection point
9 Backfillinginside military school zone 4
8 Painting work inside ETS 3
10 Fitup and welding of drain & Vent on network line

Other Activity:
1 upvc duct installation On Progress
2 Housekeeping On Progress
3 shifting of scaffolding materials On Progress
4 Laying of Blow Down Piping (HDPE Pipe) Zone 2 On Progress
5 plastering in ets 2 On Progress
6 Backfilling of Trench at Zone-5 and 4 On Progress
7 Insulation of vent and drain On Progress
8 thermal block work for ETS A On Progress
9 NDRC drilling in Zone-1 Area [NDRC-1] On Progress
24ºC Working Time: 7 am to 6:00pm

Total Manpower: 100


Total Equipment: 64

7-May-16 Remarks

On Progress
On Progress
On Progress Total Excavation
Completed in
On Progress Mtr
On Progress 3550
On Progress
On Progress

Total in
mtr/no
3550
3470
6928
3438
6670
3450
3435
3340
3220
3220
3200
1350
386
386
79
78
Client Sign & Stamp
8-May-16
On Progress
On Progress
On Progress
On Progress
On Progress
On Progress
On Progress
On Progress
On Progress
On Progress
On Progress

On Progress
On Progress
On Progress
On Progress
On Progress
On Progress
On Progress
On Progress
On Progress
PROJECT TITLE: EXTERNAL CHILLED WATER PIPING NETWORK -- MAHAWI
PROJECT NO: AD- 16 - 4061 E
DAILY PROGRESS REPORT
Date: 8-May-16

Manpower Details Equipment Details


Sl No. Designation Qty Sl No. Equipments Qty
Indirect Manpower 20 Welding machine 3
1 Project Manager 1 21 Grinding machine 8
2 Piping Engineer 1 22 JCB 1
3 Electrical Engineer 1 23 Gas Cutters 2
4 Civil engineer 1 24 Wheel Excavator 1
5 QHSE Engineer 1 25 3 ton pick up 1
6 Planning Engineer 0 26 1 ton pick up 2
7 Draftsman 0 27 32 seat bus 1
8 Surveyor 0 28 Generators 3
Direct Manpower 29 Pipe Cutters 1
9 Mechanical Supervisor 1 30 Electric oven - 50 Kg 1
10 Safety Officer 1
31 Portable Oven 5
11 Welder / Taka welder 5 32 SHOVEL 0
12 Fitter 1 33 25 ton Crane 1
13 Sheet Fabricator 1 34 Water Tanker 1
14 Helper 10
15 Mason/Carpenter 4
16 Excavator & Shovel Operator 1
17 JCB Operator 0
18 Electrician 3
19 BUS DRIVER 1
20 Carpenter 1
Total 34 Total 31
SubContractor - Emirates Engineering LLC
Manpower Details Equipment Detail
Sl No. Designation Qty Sl No. Equipments Qty
Emirates Engineering
1 Project Engineer 1 9 Mini Bus 1
2 Site Engineer 1 10 Wheel Excavator 0
3 Safety Officer 0 11 Roller Compactor 0
4 Site Foreman 0 12 SHOVEL 1
5 Fitter 0 13 25 ton Crane 0
6 Tak Welder 1 14 Diesel Welding machine 2
7 General Workers 1 15 Electric Welding machine 3
8 BUS DRIVER 0 16 Electric oven - 50 Kg 1
9 Welders 6G 2 17 Portable Oven 5
10 Fabricator 2 18 50 ton Crane 0
11 QC Inspector 1 one ton pickup 1
12 Operators 1
13 Electrican 1
14 Rigger 1
Total 12 Total 14
Total Manpower 62 Total Equipments 45
Contractor Sign & Stamp Client Sign & Stamp
SubContractor - Richmond - J&J
Manpower Details Equipment Detail
Sl No. Designation Qty Sl No. Equipments Qty
Richmond - J&J
1 Project Engineer 1 9 Mini Bus 1
2 Engineer 0 10 grinding machine 2
3 Document Controller 1 11 Roller Compactor 1
4 Office Asst 0 12 SHOWEL 0
5 Site Foreman 2 13 3 ton pick up 1
6 Mason 4 14 Steel Cutting Machine 1
7 Helper 10 15 Steel Bending machine 1
8 Carpenter 5 16 JCB 1
9 BUS DRIVER 1 17 2 ton roller compactor 1
10 Steel Worker 4 Drill machine 2
11 Painter 1 Hilti machine 1
12 Hired Manpower 8 wood cutter 3
13 Safety Officer 1 generator 4
14 Excavator & Shovel Operator
Total 38 Total 19
Total Manpower Total Equipments 19

HSE Issues:
F. HSE Issues:
1 Excavation in ETS-2 was barricaded with Mesh and installed signages board and barriers
2 Proper Installation of Scaffolding at ETS-1, B & 3 Area for Painting activities
3 Proper Installation of Scaffolding at ETS-B & 3 Area for Block Works
4 Provided signages board near road area
5 Provided mesh along with the crush barriers and safety cones beside the road
6 Pipes and Fibre Optic Cables are covered with tarpolin
7 Excavation at near (ETS A) area barricaded with barriers &orange mesh
8 Excavation at ETS-2 are barricaded with orange Mesh
9 Installed Crush Barriers with water beside the road side area Safety Signages were posted
10 Barricades provided near road area (Near Plant Area)
MAHAWI

Working Time: 7 am to 6:00pm

Other Details
Sl No. Others Qty

Direct Manpower
20 Rigger 3

21 Pipe Fabricator 5
22 Multi Skill Helper 5
23 Electrican 1
24 Crane Operator 1
25 Tanker Driver 1

Total 16
LLC
Other Details
Sl No. Others Qty

15 Shovel Operator 0
16 Crane Operator
17 Draughts man 0
18 BUS DRIVER 0
19 Site Surveyor 0
Total 0

Client Sign & Stamp


Other Details
Sl No. Others Qty

Total 0

Done
Done
Done
Done
Done
Done
Done
Done
Done
Done
PROJECT TITLE: EXTERNAL CHILLED WATER PIPING NETWORK -- MAHAWI
PROJECT NO: AD- 16 - 4061 E
DAILY PROGRESS REPORT
Date: 7-May-16 Weather: Sunny Temperature:

A. Manpower report as on 5-May-16 Total Manpower:


B. Equipment report as on 5-May-16 Total Equipment:
C. Progress Report - Executive Summary
Sl No. Activities Done On 5-May-16

1 ETS Piping fiting and Welding Activities on field ETS 1, 3, B,2 and A
2 Back filling of network pipelines
3 Block works and plastering for ETS 2
4 Painting work for ETS 3, 1, 2
5 FOC Cable pulling from ETS B to ETS 1
6 Pipe Laying and fitup for ETS A Network line
7 20" fitup and welding NDRC2

Previous in
Activity Current in mtr/no mtr/no
1 Excavation 50 3500
2 Bedding 0 3470
3 Pipe Laying 0 6928
4 Joint Insulation 20 3398
5 UPVC Sleeve Laying 0 6670
6 Intial Backfilling 0 3450
7 Back filling Layer - 1 0 3435
8 Back filling Layer - 2 0 3340
9 Back filling Layer - 3 0 3220
10 Back filling Layer - 4 0 3220
11 Final Backfilling 50 3150
12 Blow Down Piping 0 1350
13 ETS Internal Piping fitup (yard) 0 386
14 ETS Internal Piping Weld (yard) 0 386
15 ETS Internal Piping fitup (field) 3 75
16 ETS Internal Piping Weld (field) 2 74
Contractor Sign & Stamp Client Sign & Stam
D. Today Planned Activities 7-May-16
1 concreting works for ETS -A
2 ETS 3, 1, B, 2 and A piping fit up and welding inside building
3 plastering in ETS 2
4 Thermal block shifting ETS A
5 concreting for equipment foundation ETS A
6 Conduit chipping inside ETS 3. 1.2.B
7 Angle fixing in electrical room for ETS B, 1,3
8 Backfilling near ETS1 connection point
9 Backfillinginside military school zone 4
8 Painting work inside ETS 3
10 Fitup and welding of drain & Vent on network line

Other Activity:
1 upvc duct installation On Progress
2 Housekeeping On Progress
3 shifting of scaffolding materials and setting in ets B On Progress
4 Laying of Blow Down Piping (HDPE Pipe) Zone 2 On Progress
5 plastering in ets 2 On Progress
6 Backfilling of Trench at Zone-5 and 4 On Progress
7 Backfilling of Trench at Zone-2 On Progress
8 thermal block work for ETS A On Progress
9 NDRC drilling in Zone-1 Area [NDRC-1] On Progress
24ºC Working Time: 7 am to 6:00pm

Total Manpower: 100


Total Equipment: 64

5-May-16 Remarks

On Progress
On Progress
On Progress Total Excavation
Completed in
On Progress Mtr
On Progress 3550
On Progress
On Progress

Total in
mtr/no
3550
3470
6928
3418
6670
3450
3435
3340
3220
3220
3200
1350
386
386
78
76
Client Sign & Stamp
7-May-16
On Progress
On Progress
On Progress
On Progress
On Progress
On Progress
On Progress
On Progress
On Progress
On Progress
On Progress

On Progress
On Progress
On Progress
On Progress
On Progress
On Progress
On Progress
On Progress
On Progress
PROJECT TITLE: EXTERNAL CHILLED WATER PIPING NETWORK -- MAHAWI
PROJECT NO: AD- 16 - 4061 E
DAILY PROGRESS REPORT
Date: 7-May-16

Manpower Details Equipment Details


Sl No. Designation Qty Sl No. Equipments Qty
Indirect Manpower 20 Welding machine 3
1 Project Manager 1 21 Grinding machine 8
2 Piping Engineer 1 22 JCB 1
3 Electrical Engineer 1 23 Gas Cutters 2
4 Civil engineer 1 24 Wheel Excavator 1
5 QHSE Engineer 1 25 3 ton pick up 1
6 Planning Engineer 0 26 1 ton pick up 2
7 Draftsman 0 27 32 seat bus 1
8 Surveyor 0 28 Generators 3
Direct Manpower 29 Pipe Cutters 1
9 Mechanical Supervisor 1 30 Electric oven - 50 Kg 1
10 Safety Officer 1
31 Portable Oven 5
11 Welder / Taka welder 5 32 SHOVEL 0
12 Fitter 1 33 25 ton Crane 1
13 Sheet Fabricator 1 34 Water Tanker 1
14 Helper 10
15 Mason/Carpenter 4
16 Excavator & Shovel Operator 1
17 JCB Operator 0
18 Electrician 3
19 BUS DRIVER 1
20 Carpenter 1
Total 34 Total 31
SubContractor - Emirates Engineering LLC
Manpower Details Equipment Detail
Sl No. Designation Qty Sl No. Equipments Qty
Emirates Engineering
1 Project Engineer 1 9 Mini Bus 1
2 Site Engineer 1 10 Wheel Excavator 0
3 Safety Officer 0 11 Roller Compactor 0
4 Site Foreman 0 12 SHOVEL 1
5 Fitter 0 13 25 ton Crane 0
6 Tak Welder 1 14 Diesel Welding machine 2
7 General Workers 1 15 Electric Welding machine 3
8 BUS DRIVER 0 16 Electric oven - 50 Kg 1
9 Welders 6G 2 17 Portable Oven 5
10 Fabricator 2 18 50 ton Crane 0
11 QC Inspector 1 one ton pickup 1
12 Operators 1
13 Electrican 1
14 Rigger 1
Total 12 Total 14
Total Manpower 62 Total Equipments 45
Contractor Sign & Stamp Client Sign & Stamp
SubContractor - Richmond - J&J
Manpower Details Equipment Detail
Sl No. Designation Qty Sl No. Equipments Qty
Richmond - J&J
1 Project Engineer 1 9 Mini Bus 1
2 Engineer 0 10 grinding machine 2
3 Document Controller 1 11 Roller Compactor 1
4 Office Asst 0 12 SHOWEL 0
5 Site Foreman 2 13 3 ton pick up 1
6 Mason 4 14 Steel Cutting Machine 1
7 Helper 10 15 Steel Bending machine 1
8 Carpenter 5 16 JCB 1
9 BUS DRIVER 1 17 2 ton roller compactor 1
10 Steel Worker 4 Drill machine 2
11 Painter 1 Hilti machine 1
12 Hired Manpower 8 wood cutter 3
13 Safety Officer 1 generator 4
14 Excavator & Shovel Operator
Total 38 Total 19
Total Manpower Total Equipments 19

HSE Issues:
F. HSE Issues:
1 Excavation in ETS-2 was barricaded with Mesh and installed signages board and barriers
2 Proper Installation of Scaffolding at ETS-1, B & 3 Area for Painting activities
3 Proper Installation of Scaffolding at ETS-B & 3 Area for Block Works
4 Provided signages board near road area
5 Provided mesh along with the crush barriers and safety cones beside the road
6 Pipes and Fibre Optic Cables are covered with tarpolin
7 Excavation at near (ETS A) area barricaded with barriers &orange mesh
8 Excavation at ETS-2 are barricaded with orange Mesh
9 Installed Crush Barriers with water beside the road side area Safety Signages were posted
10 Barricades provided near road area (Near Plant Area)
MAHAWI

Working Time: 7 am to 6:00pm

Other Details
Sl No. Others Qty

Direct Manpower
20 Rigger 3

21 Pipe Fabricator 5
22 Multi Skill Helper 5
23 Electrican 1
24 Crane Operator 1
25 Tanker Driver 1

Total 16
LLC
Other Details
Sl No. Others Qty

15 Shovel Operator 0
16 Crane Operator
17 Draughts man 0
18 BUS DRIVER 0
19 Site Surveyor 0
Total 0

Client Sign & Stamp


Other Details
Sl No. Others Qty

Total 0

Done
Done
Done
Done
Done
Done
Done
Done
Done
Done
PROJECT TITLE: EXTERNAL CHILLED WATER PIPING NETWORK -- MAHAWI
PROJECT NO: AD- 16 - 4061 E
DAILY PROGRESS REPORT
Date: 5-May-16 Weather: Sunny Temperature:

A. Manpower report as on 4-May-16 Total Manpower:


B. Equipment report as on 4-May-16 Total Equipment:
C. Progress Report - Executive Summary
Sl No. Activities Done On 4-May-16

1 ETS Piping fiting and Welding Activities on field ETS 1, 3, B,2 and A
2 Back filling of network pipelines
3 Block works and plastering for ETS 2
4 Painting work for ETS 3, 1, 2
5 Cable wire pulling inside ETS B,1,2,3
6 Pipe Laying and fitup for ETS A Network line
7 20" fitup and welding NDRC2

Previous in
Activity Current in mtr/no mtr/no
1 Excavation 0 3500
2 Bedding 0 3470
3 Pipe Laying 0 6928
4 Joint Insulation 20 3378
5 UPVC Sleeve Laying 0 6670
6 Intial Backfilling 0 3450
7 Back filling Layer - 1 0 3435
8 Back filling Layer - 2 0 3340
9 Back filling Layer - 3 0 3220
10 Back filling Layer - 4 0 3220
11 Final Backfilling 50 3100
12 Blow Down Piping 0 1350
13 ETS Internal Piping fitup (yard) 0 386
14 ETS Internal Piping Weld (yard) 0 386
15 ETS Internal Piping fitup (field) 2 73
16 ETS Internal Piping Weld (field) 3 71
Contractor Sign & Stamp Client Sign & Stam
D. Today Planned Activities 5-May-16
1 concreting works for ETS -A
2 ETS 3, 1, B, 2 and A piping fit up and welding inside building
3 plastering in ETS 2
4 Thermal block shifting ETS A
5 concreting for equipment foundation ETS A
6 Conduit chipping inside ETS 3. 1.2.B
7 Angle fixing in electrical room for ETS B, 1,3
8 Backfilling near ETS1 connection point
9 Backfillinginside military school zone 4
8 Painting work inside ETS 3
10 Fitup and welding of drain & Vent on network line

Other Activity:
1 upvc duct installation On Progress
2 Housekeeping On Progress
3 shifting of scaffolding materials On Progress
4 Laying of Blow Down Piping (HDPE Pipe) Zone 2 On Progress
5 plastering in ets 2 On Progress
6 Backfilling of Trench at Zone-5 and 4 On Progress
7 Backfilling of Trench at Zone-2 On Progress
8 thermal block work for ETS A On Progress
9 NDRC drilling in Zone-1 Area [NDRC-1] On Progress
24ºC Working Time: 7 am to 6:00pm

Total Manpower: 129


Total Equipment: 75

4-May-16 Remarks

On Progress
On Progress
On Progress Total Excavation
Completed in
On Progress Mtr
On Progress 3500
On Progress
On Progress

Total in
mtr/no
3500
3470
6928
3398
6670
3450
3435
3340
3220
3220
3150
1350
386
386
75
74
Client Sign & Stamp
5-May-16
On Progress
On Progress
On Progress
On Progress
On Progress
On Progress
On Progress
On Progress
On Progress
On Progress
On Progress

On Progress
On Progress
On Progress
On Progress
On Progress
On Progress
On Progress
On Progress
On Progress
PROJECT TITLE: EXTERNAL CHILLED WATER PIPING NETWORK -- MAHAWI
PROJECT NO: AD- 16 - 4061 E
DAILY PROGRESS REPORT
Date: 5-May-16

Manpower Details Equipment Details


Sl No. Designation Qty Sl No. Equipments Qty
Indirect Manpower 20 Welding machine 6
1 Project Manager 1 21 Grinding machine 8
2 Piping Engineer 1 22 JCB 0
3 Electrical Engineer 1 23 Gas Cutters 2
4 Civil engineer 1 24 Wheel Excavator 1
5 QHSE Engineer 1 25 3 ton pick up 1
6 Planning Engineer 0 26 1 ton pick up 2
7 Draftsman 0 27 32 seat bus 1
8 Surveyor 1 28 Generators 4
Direct Manpower 29 Pipe Cutters 1
9 Mechanical Supervisor 1 30 Electric oven - 50 Kg 1
10 Safety Officer 1
31 Portable Oven 5
11 Welder / Taka welder 5 32 SHOVEL 1
12 Fitter 1 33 25 ton Crane 1
13 Sheet Fabricator 1 34 Water Tanker 1
14 Helper 10
15 Mason/Carpenter 4
16 Excavator & Shovel Operator 3
17 JCB Operator 0
18 Electrician 3
19 BUS DRIVER 3
20 Carpenter 1
Total 39 Total 35
SubContractor - Emirates Engineering LLC
Manpower Details Equipment Detail
Sl No. Designation Qty Sl No. Equipments Qty
Emirates Engineering
1 Project Engineer 1 9 Mini Bus 1
2 Site Engineer 1 10 Wheel Excavator 1
3 Safety Officer 1 11 Roller Compactor 1
4 Site Foreman 0 12 SHOVEL 1
5 Fitter 0 13 25 ton Crane 1
6 Tak Welder 1 14 Diesel Welding machine 2
7 General Workers 1 15 Electric Welding machine 7
8 BUS DRIVER 1 16 Electric oven - 50 Kg 1
9 Welders 6G 4 17 Portable Oven 5
10 Fabricator 3 18 50 ton Crane 0
11 QC Inspector 1 one ton pickup 1
12 Operators 4
13 Electrican 1
14 Rigger 1
Total 20 Total 21
Total Manpower 75 Total Equipments 56
Contractor Sign & Stamp Client Sign & Stamp
SubContractor - Richmond - J&J
Manpower Details Equipment Detail
Sl No. Designation Qty Sl No. Equipments Qty
Richmond - J&J
1 Project Engineer 0 9 Mini Bus 1
2 Engineer 1 10 grinding machine 2
3 Document Controller 1 11 Roller Compactor 1
4 Office Asst 0 12 SHOWEL 0
5 Site Foreman 2 13 3 ton pick up 1
6 Mason 4 14 Steel Cutting Machine 1
7 Helper 15 15 Steel Bending machine 1
8 Carpenter 6 16 JCB 1
9 BUS DRIVER 1 17 2 ton roller compactor 1
10 Steel Worker 8 Drill machine 2
11 Painter 1 Hilti machine 1
12 Hired Manpower 14 wood cutter 3
13 Safety Officer 1 generator 4
14 Excavator & Shovel Operator
Total 54 Total 19
Total Manpower Total Equipments 19

HSE Issues:
F. HSE Issues:
1 Excavation in ETS-2 was barricaded with Mesh and installed signages board and barriers
2 Proper Installation of Scaffolding at ETS-1, B & 3 Area for Painting activities
3 Proper Installation of Scaffolding at ETS-B & 3 Area for Block Works
4 Provided signages board near road area
5 Provided mesh along with the crush barriers and safety cones beside the road
6 Pipes and Fibre Optic Cables are covered with tarpolin
7 Excavation at near (ETS A) area barricaded with barriers &orange mesh
8 Excavation at ETS-2 are barricaded with orange Mesh
9 Installed Crush Barriers with water beside the road side area Safety Signages were posted
10 Barricades provided near road area (Near Plant Area)
MAHAWI

Working Time: 7 am to 6:00pm

Other Details
Sl No. Others Qty

Direct Manpower
20 Rigger 3

21 Pipe Fabricator 5
22 Multi Skill Helper 5
23 Electrican 1
24 Crane Operator 1
25 Tanker Driver 1

Total 16
LLC
Other Details
Sl No. Others Qty

15 Shovel Operator 0
16 Crane Operator
17 Draughts man 0
18 BUS DRIVER 0
19 Site Surveyor 0
Total 0

Client Sign & Stamp


Other Details
Sl No. Others Qty

Total 0

Done
Done
Done
Done
Done
Done
Done
Done
Done
Done
PROJECT TITLE: EXTERNAL CHILLED WATER PIPING NETWORK -- MAHAWI
PROJECT NO: AD- 16 - 4061 E
DAILY PROGRESS REPORT
Date: 4-May-16 Weather: Sunny Temperature:

A. Manpower report as on 3-May-16 Total Manpower:


B. Equipment report as on 3-May-16 Total Equipment:
C. Progress Report - Executive Summary
Sl No. Activities Done On 3-May-16

1 ETS Piping fiting and Welding Activities on field ETS 1, 3, B,2 and A
2 Back filling of network pipelines
3 Block works and plastering for ETS 2
4 Painting work for ETS 3, 1, 2
5 Cable wire pulling inside ETS B,1,2,3
6 Pipe Laying and fitup for ETS A Network line
7 20" fitup and welding NDRC2

Previous in
Activity Current in mtr/no mtr/no
1 Excavation 0 3500
2 Bedding 0 3470
3 Pipe Laying 0 6928
4 Joint Insulation 20 3358
5 UPVC Sleeve Laying 0 6670
6 Intial Backfilling 50 3400
7 Back filling Layer - 1 0 3435
8 Back filling Layer - 2 0 3340
9 Back filling Layer - 3 0 3220
10 Back filling Layer - 4 0 3220
11 Final Backfilling 50 3050
12 Blow Down Piping 0 1350
13 ETS Internal Piping fitup (yard) 0 386
14 ETS Internal Piping Weld (yard) 0 386
15 ETS Internal Piping fitup (field) 3 70
16 ETS Internal Piping Weld (field) 3 68
Contractor Sign & Stamp Client Sign & Stam
D. Today Planned Activities 4-May-16
1 concreting works for ETS -A
2 ETS 3, 1, B, 2 and A piping fit up and welding inside building
3 plastering started in ETS 2
4 Thermal block shifting ETS A
5 concreting for equipment foundation ETS A
6 Conduit chipping inside ETS 3. 1.2.B
7 Angle fixing in electrical room for ETS B, 1,3
8 Backfilling near ETS1 connection point
9 Backfillinginside military school zone 4
8 Painting work inside ETS 3
10 Fitup and welding of drain & Vent on network line

Other Activity:
1 upvc duct installation On Progress
2 Housekeeping On Progress
3 shifting of scaffolding materials On Progress
4 Laying of Blow Down Piping (HDPE Pipe) Zone 2 On Progress
5 plastering in ets 2 On Progress
6 Backfilling of Trench at Zone-5 and 4 On Progress
7 Backfilling of Trench at Zone-2 On Progress
8 thermal block work for ETS A On Progress
9 NDRC drilling in Zone-1 Area [NDRC-1] On Progress
24ºC Working Time: 7 am to 6:00pm

Total Manpower: 129


Total Equipment: 75

3-May-16 Remarks

On Progress
On Progress
On Progress Total Excavation
Completed in
On Progress Mtr
On Progress 3500
On Progress
On Progress

Total in
mtr/no
3500
3470
6928
3378
6670
3450
3435
3340
3220
3220
3100
1350
386
386
73
71
Client Sign & Stamp
4-May-16
On Progress
On Progress
On Progress
On Progress
On Progress
On Progress
On Progress
On Progress
On Progress
On Progress
On Progress

On Progress
On Progress
On Progress
On Progress
On Progress
On Progress
On Progress
On Progress
On Progress
PROJECT TITLE: EXTERNAL CHILLED WATER PIPING NETWORK -- MAHAWI
PROJECT NO: AD- 16 - 4061 E
DAILY PROGRESS REPORT
Date: 4-May-16

Manpower Details Equipment Details


Sl No. Designation Qty Sl No. Equipments Qty
Indirect Manpower 20 Welding machine 6
1 Project Manager 1 21 Grinding machine 8
2 Piping Engineer 1 22 JCB 0
3 Electrical Engineer 1 23 Gas Cutters 2
4 Civil engineer 1 24 Wheel Excavator 1
5 QHSE Engineer 1 25 3 ton pick up 1
6 Planning Engineer 0 26 1 ton pick up 2
7 Draftsman 0 27 32 seat bus 1
8 Surveyor 1 28 Generators 4
Direct Manpower 29 Pipe Cutters 1
9 Mechanical Supervisor 1 30 Electric oven - 50 Kg 1
10 Safety Officer 1
31 Portable Oven 5
11 Welder / Taka welder 5 32 SHOVEL 1
12 Fitter 1 33 25 ton Crane 1
13 Sheet Fabricator 1 34 Water Tanker 1
14 Helper 10
15 Mason/Carpenter 4
16 Excavator & Shovel Operator 3
17 JCB Operator 0
18 Electrician 3
19 BUS DRIVER 3
20 Carpenter 1
Total 39 Total 35
SubContractor - Emirates Engineering LLC
Manpower Details Equipment Detail
Sl No. Designation Qty Sl No. Equipments Qty
Emirates Engineering
1 Project Engineer 1 9 Mini Bus 1
2 Site Engineer 1 10 Wheel Excavator 1
3 Safety Officer 1 11 Roller Compactor 1
4 Site Foreman 0 12 SHOVEL 1
5 Fitter 0 13 25 ton Crane 1
6 Tak Welder 1 14 Diesel Welding machine 2
7 General Workers 1 15 Electric Welding machine 7
8 BUS DRIVER 1 16 Electric oven - 50 Kg 1
9 Welders 6G 4 17 Portable Oven 5
10 Fabricator 3 18 50 ton Crane 0
11 QC Inspector 1 one ton pickup 1
12 Operators 4
13 Electrican 1
14 Rigger 1
Total 20 Total 21
Total Manpower 75 Total Equipments 56
Contractor Sign & Stamp Client Sign & Stamp
SubContractor - Richmond - J&J
Manpower Details Equipment Detail
Sl No. Designation Qty Sl No. Equipments Qty
Richmond - J&J
1 Project Engineer 0 9 Mini Bus 1
2 Engineer 1 10 grinding machine 2
3 Document Controller 1 11 Roller Compactor 1
4 Office Asst 0 12 SHOWEL 0
5 Site Foreman 2 13 3 ton pick up 1
6 Mason 4 14 Steel Cutting Machine 1
7 Helper 15 15 Steel Bending machine 1
8 Carpenter 6 16 JCB 1
9 BUS DRIVER 1 17 2 ton roller compactor 1
10 Steel Worker 8 Drill machine 2
11 Painter 1 Hilti machine 1
12 Hired Manpower 14 wood cutter 3
13 Safety Officer 1 generator 4
14 Excavator & Shovel Operator
Total 54 Total 19
Total Manpower Total Equipments 19

HSE Issues:
F. HSE Issues:
1 Excavation in ETS-2 was barricaded with Mesh and installed signages board and barriers
2 Proper Installation of Scaffolding at ETS-1, B & 3 Area for Painting activities
3 Proper Installation of Scaffolding at ETS-B & 3 Area for Block Works
4 Provided signages board near road area
5 Provided mesh along with the crush barriers and safety cones beside the road
6 Pipes and Fibre Optic Cables are covered with tarpolin
7 Excavation at near (ETS A) area barricaded with barriers &orange mesh
8 Excavation at ETS-2 are barricaded with orange Mesh
9 Installed Crush Barriers with water beside the road side area Safety Signages were posted
10 Barricades provided near road area (Near Plant Area)
MAHAWI

Working Time: 7 am to 6:00pm

Other Details
Sl No. Others Qty

Direct Manpower
20 Rigger 3

21 Pipe Fabricator 5
22 Multi Skill Helper 5
23 Electrican 1
24 Crane Operator 1
25 Tanker Driver 1

Total 16
LLC
Other Details
Sl No. Others Qty

15 Shovel Operator 0
16 Crane Operator
17 Draughts man 0
18 BUS DRIVER 0
19 Site Surveyor 0
Total 0

Client Sign & Stamp


Other Details
Sl No. Others Qty

Total 0

Done
Done
Done
Done
Done
Done
Done
Done
Done
Done
PROJECT TITLE: EXTERNAL CHILLED WATER PIPING NETWORK -- MAHAWI
PROJECT NO: AD- 16 - 4061 E
DAILY PROGRESS REPORT
Date: 3-May-16 Weather: Sunny Temperature:

A. Manpower report as on 2-May-16 Total Manpower:


B. Equipment report as on 2-May-16 Total Equipment:
C. Progress Report - Executive Summary
Sl No. Activities Done On 2-May-16

1 ETS Piping fiting and Welding Activities on field ETS 1, 3, B,2 and A
2 Back filling of network pipelines
3 Block works and plastering for ETS 2
4 Painting work for ETS 3, 1
5 Cable wire pulling inside ETS B,1,2,3
6 Pipe Laying and fitup for ETS A Network line
7 20" fitup and welding NDRC2

Previous in
Activity Current in mtr/no mtr/no
1 Excavation 0 3500
2 Bedding 0 3470
3 Pipe Laying 50 6878
4 Joint Insulation 20 3338
5 UPVC Sleeve Laying 0 6670
6 Intial Backfilling 50 3350
7 Back filling Layer - 1 100 3335
8 Back filling Layer - 2 100 3240
9 Back filling Layer - 3 100 3120
10 Back filling Layer - 4 100 3120
11 Final Backfilling 50 3000
12 Blow Down Piping 0 1350
13 ETS Internal Piping fitup (yard) 0 386
14 ETS Internal Piping Weld (yard) 0 386
15 ETS Internal Piping fitup (field) 3 67
16 ETS Internal Piping Weld (field) 3 65
Contractor Sign & Stamp Client Sign & Stam
D. Today Planned Activities 3-May-16
1 concreting works for ETS -A
2 ETS 3, 1, B, 2 and A piping fit up and welding inside building
3 plastering started in ETS 2
4 Thermal block shifting ETS A
5 concreting for equipment foundation ETS A
6 Conduit chipping inside ETS 3. 1.2.B
7 Angle fixing in electrical room for ETS B, 1,3
8 Backfilling near ETS1 connection point
9 Backfillinginside military school zone 4
8 Block work ETS 2
10 Fitup and welding of drain & Vent on network line
11 Painting work inside ETS 2 for equip foundation in ETS 2

Other Activity:
1 Inspection for the Electrical sleeves in ETS 1 and 2 Slab Done
2 Housekeeping On Progress
3 shifting of scaffolding materials On Progress
4 Laying of Blow Down Piping (HDPE Pipe) Zone 2 On Progress
5 plastering in ets 2 On Progress
6 Backfilling of Trench at Zone-5 and 4 On Progress
7 Backfilling of Trench at Zone-2 On Progress
8 thermal block work for ETS A On Progress
9 NDRC drilling in Zone-1 Area [NDRC-1] On Progress
24ºC Working Time: 7 am to 6:00pm

Total Manpower: 129


Total Equipment: 75

2-May-16 Remarks

On Progress
On Progress
On Progress Total Excavation
Completed in
On Progress Mtr
On Progress 3500
On Progress
On Progress

Total in
mtr/no
3500
3470
6928
3358
6670
3400
3435
3340
3220
3220
3050
1350
386
386
70
68
Client Sign & Stamp
3-May-16
On Progress
On Progress
On Progress
On Progress
On Progress
On Progress
On Progress
On Progress
On Progress
On Progress
On Progress

Done
On Progress
On Progress
On Progress
On Progress
On Progress
On Progress
On Progress
On Progress
PROJECT TITLE: EXTERNAL CHILLED WATER PIPING NETWORK -- MAHAWI
PROJECT NO: AD- 16 - 4061 E
DAILY PROGRESS REPORT
Date: 3-May-16

Manpower Details Equipment Details


Sl No. Designation Qty Sl No. Equipments Qty
Indirect Manpower 20 Welding machine 6
1 Project Manager 1 21 Grinding machine 8
2 Piping Engineer 1 22 JCB 0
3 Electrical Engineer 1 23 Gas Cutters 2
4 Civil engineer 1 24 Wheel Excavator 1
5 QHSE Engineer 1 25 3 ton pick up 1
6 Planning Engineer 0 26 1 ton pick up 2
7 Draftsman 0 27 32 seat bus 1
8 Surveyor 1 28 Generators 4
Direct Manpower 29 Pipe Cutters 1
9 Mechanical Supervisor 1 30 Electric oven - 50 Kg 1
10 Safety Officer 1
31 Portable Oven 5
11 Welder / Taka welder 5 32 SHOVEL 1
12 Fitter 1 33 25 ton Crane 1
13 Sheet Fabricator 1 34 Water Tanker 1
14 Helper 10
15 Mason/Carpenter 4
16 Excavator & Shovel Operator 3
17 JCB Operator 0
18 Electrician 3
19 BUS DRIVER 3
20 Carpenter 1
Total 39 Total 35
SubContractor - Emirates Engineering LLC
Manpower Details Equipment Detail
Sl No. Designation Qty Sl No. Equipments Qty
Emirates Engineering
1 Project Engineer 1 9 Mini Bus 1
2 Site Engineer 1 10 Wheel Excavator 1
3 Safety Officer 1 11 Roller Compactor 1
4 Site Foreman 0 12 SHOVEL 1
5 Fitter 0 13 25 ton Crane 1
6 Tak Welder 1 14 Diesel Welding machine 2
7 General Workers 1 15 Electric Welding machine 7
8 BUS DRIVER 1 16 Electric oven - 50 Kg 1
9 Welders 6G 4 17 Portable Oven 5
10 Fabricator 3 18 50 ton Crane 0
11 QC Inspector 1 one ton pickup 1
12 Operators 4
13 Electrican 1
14 Rigger 1
Total 20 Total 21
Total Manpower 75 Total Equipments 56
Contractor Sign & Stamp Client Sign & Stamp
SubContractor - Richmond - J&J
Manpower Details Equipment Detail
Sl No. Designation Qty Sl No. Equipments Qty
Richmond - J&J
1 Project Engineer 0 9 Mini Bus 1
2 Engineer 1 10 grinding machine 2
3 Document Controller 1 11 Roller Compactor 1
4 Office Asst 0 12 SHOWEL 0
5 Site Foreman 2 13 3 ton pick up 1
6 Mason 4 14 Steel Cutting Machine 1
7 Helper 15 15 Steel Bending machine 1
8 Carpenter 6 16 JCB 1
9 BUS DRIVER 1 17 2 ton roller compactor 1
10 Steel Worker 8 Drill machine 2
11 Painter 1 Hilti machine 1
12 Hired Manpower 14 wood cutter 3
13 Safety Officer 1 generator 4
14 Excavator & Shovel Operator
Total 54 Total 19
Total Manpower Total Equipments 19

HSE Issues:
F. HSE Issues:
1 Excavation in ETS-2 was barricaded with Mesh and installed signages board and barriers
2 Proper Installation of Scaffolding at ETS-1, B & 3 Area for Painting activities
3 Proper Installation of Scaffolding at ETS-B & 3 Area for Block Works
4 Provided signages board near road area
5 Provided mesh along with the crush barriers and safety cones beside the road
6 Pipes and Fibre Optic Cables are covered with tarpolin
7 Excavation at near (ETS A) area barricaded with barriers &orange mesh
8 Excavation at ETS-2 are barricaded with orange Mesh
9 Installed Crush Barriers with water beside the road side area Safety Signages were posted
10 Barricades provided near road area (Near Plant Area)
MAHAWI

Working Time: 7 am to 6:00pm

Other Details
Sl No. Others Qty

Direct Manpower
20 Rigger 3

21 Pipe Fabricator 5
22 Multi Skill Helper 5
23 Electrican 1
24 Crane Operator 1
25 Tanker Driver 1

Total 16
LLC
Other Details
Sl No. Others Qty

15 Shovel Operator 0
16 Crane Operator
17 Draughts man 0
18 BUS DRIVER 0
19 Site Surveyor 0
Total 0

Client Sign & Stamp


Other Details
Sl No. Others Qty

Total 0

Done
Done
Done
Done
Done
Done
Done
Done
Done
Done
PROJECT TITLE: EXTERNAL CHILLED WATER PIPING NETWORK -- MAHAWI
PROJECT NO: AD- 16 - 4061 E
DAILY PROGRESS REPORT
Date: 2-May-16 Weather: Sunny Temperature:

A. Manpower report as on 1-May-16 Total Manpower:


B. Equipment report as on 1-May-16 Total Equipment:
C. Progress Report - Executive Summary
Sl No. Activities Done On 1-May-16

1 ETS Piping fiting and Welding Activities on field ETS 1, 3, B,2 and A
2 Back filling of network pipelines
3 Block works and plastering for ETS 2
4 Painting work for ETS 3, 1
5 Cable wire pulling inside ETS B,1,2,3
6 Pipe Laying and fitup for ETS A Network line
7 20" fitup and welding NDRC2

Previous in
Activity Current in mtr/no mtr/no
1 Excavation 0 3500
2 Bedding 0 3470
3 Pipe Laying 0 6878
4 Joint Insulation 20 3318
5 UPVC Sleeve Laying 0 6670
6 Intial Backfilling 50 3300
7 Back filling Layer - 1 100 3235
8 Back filling Layer - 2 100 3140
9 Back filling Layer - 3 100 3020
10 Back filling Layer - 4 100 3020
11 Final Backfilling 50 2950
12 Blow Down Piping 0 1350
13 ETS Internal Piping fitup (yard) 0 386
14 ETS Internal Piping Weld (yard) 0 386
15 ETS Internal Piping fitup (field) 4 63
16 ETS Internal Piping Weld (field) 5 60
Contractor Sign & Stamp Client Sign & Stam
D. Today Planned Activities 2-May-16
1 concreting works for ETS -A
2 ETS 3, 1, B, 2 and A piping fit up and welding inside building
3 plastering started in ETS 2
4 Thermal block shifting ETS A
5 concreting for equipment foundation ETS A
6 Conduit chipping inside ETS 3. 1.2.B
7 Angle fixing in electrical room for ETS B, 1,3
8 Backfilling near ETS1 connection point
9 Backfillinginside military school zone 4
8 Painting work inside ETS 1 and equip foundation in ETS 2
10 Fitup and welding of drain & Vent on network line

Other Activity:
1 Inspection for the Electrical sleeves in ETS 1 and 2 Slab Done
2 Housekeeping On Progress
3 shifting of scaffolding materials On Progress
4 Laying of Blow Down Piping (HDPE Pipe) Zone 2 On Progress
5 plastering in ets 3, B, 1 Done
6 Backfilling of Trench at Zone-5 and 4 On Progress
7 Backfilling of Trench at Zone-2 On Progress
8 thermal block work for ETS A On Progress
9 NDRC drilling in Zone-1 Area [NDRC-1] On Progress
24ºC Working Time: 7 am to 6:00pm

Total Manpower: 129


Total Equipment: 75

1-May-16 Remarks

On Progress
On Progress
On Progress Total Excavation
Completed in
On Progress Mtr
On Progress 3500
On Progress
On Progress

Total in
mtr/no
3500
3470
6878
3338
6670
3350
3335
3240
3120
3120
3000
1350
386
386
67
65
Client Sign & Stamp
2-May-16
On Progress
On Progress
On Progress
On Progress
On Progress
On Progress
On Progress
On Progress
On Progress
On Progress
On Progress

Done
On Progress
On Progress
On Progress
Done
On Progress
On Progress
On Progress
On Progress
PROJECT TITLE: EXTERNAL CHILLED WATER PIPING NETWORK -- MAHAWI
PROJECT NO: AD- 16 - 4061 E
DAILY PROGRESS REPORT
Date: 2-May-16

Manpower Details Equipment Details


Sl No. Designation Qty Sl No. Equipments Qty
Indirect Manpower 20 Welding machine 6
1 Project Manager 1 21 Grinding machine 8
2 Piping Engineer 1 22 JCB 0
3 Electrical Engineer 1 23 Gas Cutters 2
4 Civil engineer 1 24 Wheel Excavator 1
5 QHSE Engineer 1 25 3 ton pick up 1
6 Planning Engineer 0 26 1 ton pick up 2
7 Draftsman 0 27 32 seat bus 1
8 Surveyor 1 28 Generators 4
Direct Manpower 29 Pipe Cutters 1
9 Mechanical Supervisor 1 30 Electric oven - 50 Kg 1
10 Safety Officer 1
31 Portable Oven 5
11 Welder / Taka welder 5 32 SHOVEL 1
12 Fitter 1 33 25 ton Crane 1
13 Sheet Fabricator 1 34 Water Tanker 1
14 Helper 10
15 Mason/Carpenter 4
16 Excavator & Shovel Operator 3
17 JCB Operator 0
18 Electrician 3
19 BUS DRIVER 3
20 Carpenter 1
Total 39 Total 35
SubContractor - Emirates Engineering LLC
Manpower Details Equipment Detail
Sl No. Designation Qty Sl No. Equipments Qty
Emirates Engineering
1 Project Engineer 1 9 Mini Bus 1
2 Site Engineer 1 10 Wheel Excavator 1
3 Safety Officer 1 11 Roller Compactor 1
4 Site Foreman 0 12 SHOVEL 1
5 Fitter 0 13 25 ton Crane 1
6 Tak Welder 1 14 Diesel Welding machine 2
7 General Workers 1 15 Electric Welding machine 7
8 BUS DRIVER 1 16 Electric oven - 50 Kg 1
9 Welders 6G 4 17 Portable Oven 5
10 Fabricator 3 18 50 ton Crane 0
11 QC Inspector 1 one ton pickup 1
12 Operators 4
13 Electrican 1
14 Rigger 1
Total 20 Total 21
Total Manpower 75 Total Equipments 56
Contractor Sign & Stamp Client Sign & Stamp
SubContractor - Richmond - J&J
Manpower Details Equipment Detail
Sl No. Designation Qty Sl No. Equipments Qty
Richmond - J&J
1 Project Engineer 0 9 Mini Bus 1
2 Engineer 1 10 grinding machine 2
3 Document Controller 1 11 Roller Compactor 1
4 Office Asst 0 12 SHOWEL 0
5 Site Foreman 2 13 3 ton pick up 1
6 Mason 4 14 Steel Cutting Machine 1
7 Helper 15 15 Steel Bending machine 1
8 Carpenter 6 16 JCB 1
9 BUS DRIVER 1 17 2 ton roller compactor 1
10 Steel Worker 8 Drill machine 2
11 Painter 1 Hilti machine 1
12 Hired Manpower 14 wood cutter 3
13 Safety Officer 1 generator 4
14 Excavator & Shovel Operator
Total 54 Total 19
Total Manpower Total Equipments 19

HSE Issues:
F. HSE Issues:
1 Excavation in ETS-2 was barricaded with Mesh and installed signages board and barriers
2 Proper Installation of Scaffolding at ETS-1, B & 3 Area for Painting activities
3 Proper Installation of Scaffolding at ETS-A & 2 Area for Block Works
4 Provided signages board near road area
5 Provided mesh along with the crush barriers and safety cones beside the road
6 Pipes and Fibre Optic Cables are covered with tarpolin
7 Excavation at near (ETS A) area barricaded with barriers &orange mesh
8 Excavation at ETS-2 are barricaded with orange Mesh
9 Installed Crush Barriers with water beside the road side area Safety Signages were posted
10 Barricades provided near road area (Near Plant Area)
MAHAWI

Working Time: 7 am to 6:00pm

Other Details
Sl No. Others Qty

Direct Manpower
20 Rigger 3

21 Pipe Fabricator 5
22 Multi Skill Helper 5
23 Electrican 1
24 Crane Operator 1
25 Tanker Driver 1

Total 16
LLC
Other Details
Sl No. Others Qty

15 Shovel Operator 0
16 Crane Operator
17 Draughts man 0
18 BUS DRIVER 0
19 Site Surveyor 0
Total 0

Client Sign & Stamp


Other Details
Sl No. Others Qty

Total 0

Done
Done
Done
Done
Done
Done
Done
Done
Done
Done
PROJECT TITLE: EXTERNAL CHILLED WATER PIPING NETWORK -- MAHAWI
PROJECT NO: AD- 16 - 4061 E
DAILY PROGRESS REPORT
Date: 1-May-16 Weather: Sunny Temperature:

A. Manpower report as on 30-Apr-16 Total Manpower:


B. Equipment report as on 30-Apr-16 Total Equipment:
C. Progress Report - Executive Summary
Sl No. Activities Done On 30-Apr-16

1 ETS Piping fiting and Welding Activities on field ETS 1, 3, B and A


2 Back filling of network pipelines
3 Block works and plastering for ETS 2
4 Painting work for ETS 3, 1
5 Cable wire pulling inside ETS B,1,2,3
6 Pipe Laying and fitup for ETS A Network line
7 20" fitup and welding NDRC2

Previous in
Activity Current in mtr/no mtr/no
1 Excavation 50 3450
2 Bedding 50 3420
3 Pipe Laying 50 6828
4 Joint Insulation 20 3298
5 UPVC Sleeve Laying 0 6670
6 Intial Backfilling 0 3300
7 Back filling Layer - 1 0 3235
8 Back filling Layer - 2 100 3040
9 Back filling Layer - 3 120 2900
10 Back filling Layer - 4 100 2920
11 Final Backfilling 100 2850
12 Blow Down Piping 0 1350
13 ETS Internal Piping fitup (yard) 0 386
14 ETS Internal Piping Weld (yard) 0 386
15 ETS Internal Piping fitup (field) 5 58
16 ETS Internal Piping Weld (field) 7 53
Contractor Sign & Stamp Client Sign & Stam
D. Today Planned Activities 1-May-16
1 concreting works for ETS -A
2 ETS 3, 1, B, 2 and A piping fit up and welding inside building
3 plastering started in ETS 2
4 Thermal block shifting ETS A
5 concreting for equipment foundation ETS A
6 Conduit chipping inside ETS 3. 1.2.B
7 Angle fixing in electrical room for ETS B
8 Sand bedding and Pipe laying in ETS1 connection point
9 Backfillinginside military school zone 4
8 Painting work inside ETS 3 and equip foundation in ETS 2
10 Fitup and welding of drain & Vent on network line

Other Activity:
1 Inspection for the Electrical sleeves in ETS 1 and 2 Slab On Progress
2 Housekeeping On Progress
3 shifting of scaffolding materials On Progress
4 Laying of Blow Down Piping (HDPE Pipe) Zone 2 On Progress
5 plastering in ets 3, B, 1 Done
6 Backfilling of Trench at Zone-5 and 4 On Progress
7 Backfilling of Trench at Zone-2 On Progress
8 thermal block work for ETS A On Progress
9 NDRC drilling in Zone-1 Area [NDRC-1] On Progress
24ºC Working Time: 7 am to 6:00pm

Total Manpower: 129


Total Equipment: 75

30-Apr-16 Remarks

On Progress
On Progress
On Progress Total Excavation
Completed in
On Progress Mtr
On Progress 3500
On Progress
On Progress

Total in
mtr/no
3500
3470
6878
3318
6670
3300
3235
3140
3020
3020
2950
1350
386
386
63
60
Client Sign & Stamp
1-May-16
On Progress
On Progress
On Progress
On Progress
On Progress
On Progress
On Progress
On Progress
On Progress
On Progress
On Progress

On Progress
On Progress
On Progress
On Progress
Done
On Progress
On Progress
On Progress
On Progress
PROJECT TITLE: EXTERNAL CHILLED WATER PIPING NETWORK -- MAHAWI
PROJECT NO: AD- 16 - 4061 E
DAILY PROGRESS REPORT
Date: 1-May-16

Manpower Details Equipment Details


Sl No. Designation Qty Sl No. Equipments Qty
Indirect Manpower 20 Welding machine 6
1 Project Manager 1 21 Grinding machine 8
2 Piping Engineer 1 22 JCB 0
3 Electrical Engineer 1 23 Gas Cutters 2
4 Civil engineer 1 24 Wheel Excavator 1
5 QHSE Engineer 1 25 3 ton pick up 1
6 Planning Engineer 0 26 1 ton pick up 2
7 Draftsman 0 27 32 seat bus 1
8 Surveyor 1 28 Generators 4
Direct Manpower 29 Pipe Cutters 1
9 Mechanical Supervisor 1 30 Electric oven - 50 Kg 1
10 Safety Officer 1
31 Portable Oven 5
11 Welder / Taka welder 5 32 SHOVEL 1
12 Fitter 1 33 25 ton Crane 1
13 Sheet Fabricator 1 34 Water Tanker 1
14 Helper 10
15 Mason/Carpenter 4
16 Excavator & Shovel Operator 3
17 JCB Operator 0
18 Electrician 3
19 BUS DRIVER 3
20 Carpenter 1
Total 39 Total 35
SubContractor - Emirates Engineering LLC
Manpower Details Equipment Detail
Sl No. Designation Qty Sl No. Equipments Qty
Emirates Engineering
1 Project Engineer 1 9 Mini Bus 1
2 Site Engineer 1 10 Wheel Excavator 1
3 Safety Officer 1 11 Roller Compactor 1
4 Site Foreman 0 12 SHOVEL 1
5 Fitter 0 13 25 ton Crane 1
6 Tak Welder 1 14 Diesel Welding machine 2
7 General Workers 1 15 Electric Welding machine 7
8 BUS DRIVER 1 16 Electric oven - 50 Kg 1
9 Welders 6G 4 17 Portable Oven 5
10 Fabricator 3 18 50 ton Crane 0
11 QC Inspector 1 one ton pickup 1
12 Operators 4
13 Electrican 1
14 Rigger 1
Total 20 Total 21
Total Manpower 75 Total Equipments 56
Contractor Sign & Stamp Client Sign & Stamp
SubContractor - Richmond - J&J
Manpower Details Equipment Detail
Sl No. Designation Qty Sl No. Equipments Qty
Richmond - J&J
1 Project Engineer 0 9 Mini Bus 1
2 Engineer 1 10 grinding machine 2
3 Document Controller 1 11 Roller Compactor 1
4 Office Asst 0 12 SHOWEL 0
5 Site Foreman 2 13 3 ton pick up 1
6 Mason 4 14 Steel Cutting Machine 1
7 Helper 15 15 Steel Bending machine 1
8 Carpenter 6 16 JCB 1
9 BUS DRIVER 1 17 2 ton roller compactor 1
10 Steel Worker 8 Drill machine 2
11 Painter 1 Hilti machine 1
12 Hired Manpower 14 wood cutter 3
13 Safety Officer 1 generator 4
14 Excavator & Shovel Operator
Total 54 Total 19
Total Manpower Total Equipments 19

HSE Issues:
F. HSE Issues:
1 Excavation in ETS-2 was barricaded with Mesh and installed signages board and barriers
2 Proper Installation of Scaffolding at ETS-1, B & 3 Area for Painting activities
3 Proper Installation of Scaffolding at ETS-B & 3 Area for Block Works
4 Provided signages board near road area
5 Provided mesh along with the crush barriers and safety cones beside the road
6 Pipes and Fibre Optic Cables are covered with tarpolin
7 Excavation at near (ETS A) area barricaded with barriers &orange mesh
8 Excavation at ETS-2 are barricaded with orange Mesh
9 Installed Crush Barriers with water beside the road side area Safety Signages were posted
10 Barricades provided near road area (Near Plant Area)
MAHAWI

Working Time: 7 am to 6:00pm

Other Details
Sl No. Others Qty

Direct Manpower
20 Rigger 3

21 Pipe Fabricator 5
22 Multi Skill Helper 5
23 Electrican 1
24 Crane Operator 1
25 Tanker Driver 1

Total 16
LLC
Other Details
Sl No. Others Qty

15 Shovel Operator 0
16 Crane Operator
17 Draughts man 0
18 BUS DRIVER 0
19 Site Surveyor 0
Total 0

Client Sign & Stamp


Other Details
Sl No. Others Qty

Total 0

Done