Professional Documents
Culture Documents
H2/CO2 Cylinder Unloading and Loading Checklist
H2/CO2 Cylinder Unloading and Loading Checklist
H2/CO2 Cylinder Unloading and Loading Checklist
10
11
12
13
14
15
Date:
Signature:
H2/CO2 Cylinder unloading and loading Checklist
To ensure that all mobile phones are switched OFF and kept away from storage
shed
To Ensure that the gas cylinders are closed with Valve caps before
Loading/unloading activities.
To Ensure that rubber mat is available for cylinder unloading to protect cylinder
from mechanical shock
To Ensure spark proof tools to be used in cylinder handling and testing process
To ensureCylinders should not be stored or kept uneven surfaces so that falling of
cylinder can be avoided
To Ensure that all the full cylinders and empty cylinders are kept are seperately in
designated location of storage shed
To Ensure all cylinders store in vertical position with stoppers in place before
closing the Storage shed.
Date:
Signature:
Tick the box
ü x