INSTALLATION & MAINTENANCE PROGRAMME

FOR WEATHER AND SPRAYTIGHT DOORS, ACCORDING TO NS6090 AND NS6091. Page 1 of 2

Rapp Bomek Weather and Spraytight Doors


INSTALLATION & MAINTENANCE PROGRAMME.

Rev./Status 0
INSTALLATION & MAINTENANCE PROGRAMME
FOR WEATHER AND SPRAYTIGHT DOORS, ACCORDING TO NS6090 AND NS6091. Page 2 of 2

Installation procedure

Door leaf and frame to be in closed position and the handles are tightened. Ensure that the bulkhead
is aligned before installation.When installing door and frame, check diagonals and ensure that frame
profiles is applying pressure in the middle of the gasket (see door drawing).

The door/frame is then placed in position in bulkhead and tack welded in each corner and all sides,
Thereafter seal welding, see typical welding sequence on the sketch.

The frame must be continually controlled for straightness during welding.

Maintenance procedure

The hinges and tightening handles must be


greased each month and the gasket checked
for damaged at the same time.

Tack welding sequence, 1-2-3

Seal welding.

Rev./Status 0