Professional Documents
Culture Documents
Final Drawings For Firozabad
Final Drawings For Firozabad
F F
3M x 5M x 4M
E WINDROW PLATFORM-1 E
5755 SQM
NOTES:-
D LANDFILL SITE D
14703 SQM
C C
WINDROW
PLATFORM-2
6825 SQM
ENTRY
B B
LAYOUT OF LANDFILL A
SITE AT FIROZABAD
A
8 7 6 5 4 3 2 1
RAIN WATER HARVESTING TANK
A A
2.5MTR DIA
MS GRILL COVERING
AT TOP GL
GL GL
100mm thick M15 PCC
1.20m
0.1
0.65
450mm thick RSM Wall
SAND
0.20
SOLING BOULDERS
SECTION AT A-A
Details of Internal & Approach Road
5.75
2:1 2:1
E W Embankment Consolidated
CL
200mm Plain cement concrete pavement (M-30)
2:1 2:1
E W Embankment Consolidated
1.67
100 MM THK. R.C.C SLAB
1.00
G.L. G.L.
A A
0.97 SOAK PIT
3.00
230MM THIK DRY
BRICK WORK
2.31 (HONEY COMB
WALL)
150MM
THK.
1.76 SAND FILL SOAK PIT PLAN
1.00
2.06
1.46
SECTION A-A