This document provides an activity hazards analysis for a project. It identifies potential hazards that could occur during different job steps and lists actions to eliminate or minimize the hazards. Personnel involved in the activity are identified, along with required equipment, training, and inspections. The overall risk assessment code is determined based on a risk assessment matrix and indicates the highest level of risk identified during the analysis.
This document provides an activity hazards analysis for a project. It identifies potential hazards that could occur during different job steps and lists actions to eliminate or minimize the hazards. Personnel involved in the activity are identified, along with required equipment, training, and inspections. The overall risk assessment code is determined based on a risk assessment matrix and indicates the highest level of risk identified during the analysis.
This document provides an activity hazards analysis for a project. It identifies potential hazards that could occur during different job steps and lists actions to eliminate or minimize the hazards. Personnel involved in the activity are identified, along with required equipment, training, and inspections. The overall risk assessment code is determined based on a risk assessment matrix and indicates the highest level of risk identified during the analysis.
(Use highest code) Date: Project: Risk Assessment Code Matrix E = Extremely High Risk Activity: H = High Risk Probability M = Moderate Risk L = Low Risk Frequent Likely Occasional Seldom Unlikely Activity Location: S Catastrophic E E H H M e v Prepared By: e Critical E H H M L r i Marginal H M M L L t y Negligible M L L L L
Add Identified Hazards
JOB STEPS HAZARDS ACTIONS TO ELIMINATE OR MINIMIZE HAZARDS RAC