Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 4

Republic of the Philippines

City Government of Valenzuela


Metropolitan Manila

VALENZUELA CITY DISASTER RISK REDUCTION AND MANAGEMENT OFFICE

FORMAT FOR BRGY DRILL REPORTS


PROCEDURAL/ STEP BY STEP NARRATIVE REPORTS
WORD DOCs.
Font: ARIAL 12
Size: LONG ( 8.5”x 13”)
Send via email : vcdrrmo.planning@gmail.com
Subject name: Brgy. ______ Drill Assessment Report (Month, Year)

i. Front Page
Include the following:
Brgy Name:
Zone:
Title of Report:
Ex: 3rd Quarter Drill Assessment
PB Name:
PB Signature (E-Sign)

Header of Brgy.

_________________
________________
City Logo Brgy. Maysan, Zone 4
Brgy. Logo

(Title of Report)

(E- Signature)
PB. Danilo Cantillon
ii. NARRATIVE REPORTS

In line with the campaign of the National Government in equipping every Barangay with
the knowledge, proper attitude and skills on what to do just in case of a manmade and
natural disaster like earthquake, Barangay PULO participated to the National
Simultaneous Earthquake Drill held last November 14, 2019.

The orientation with the participants and persons assigned in different phases started at
8:30 in the morning headed by Barangay Kagawad Roque L. Cruz, Alfredo A. de Leon,
Ruben A. Lichauco, and Jennielyniza F. Allen. All the needed information and procedures
to be done were clearly stated and demonstrated during the orientation.

The assigned person with the alarm system Ex-O Jimmy Oreta started the drill with the
first alarm. The participants (Barangay officials, employees, Tanod, Bantay Bayan,
residents, 4Ps members) did the duck, cover, and hold position then was followed by
three consecutive alarms of few seconds interval. After the third alarm, the participants
left the building on a duck position and proceeded to the designated evacuation area.

After reaching the evacuation area, head counting followed immediately. With the
assigned responders and prepared equipments, evacuees were checked for possible
injuries, damages or casualties. After the evacuation and response phases, Kagawad
Cruz with the BDRRMC made and discussed their own assessment of the drill. The drill
ended at 9:09 A.M. Total number of evacuees – 88.

Narrative Report

____________________________
Prepared by: ____________________________
____________________________
_______________________________ ____________________________
____________________________
Brgy. Sec/ Commitee on DRRM (Kgd.) ____________________________
____________________________

Approved By:
___________
__________________ ___________

Barangay Captain
iii. BDRRMC ORG STRUCTURE

Incident Commander

Deputy IC

Liaison Officer

Safety Officer

Public Information
Officer

Operations Section Chief Planning Section Chief Logistics Section Chief Admin and Finance
Section Chief

BDRMM Org Structure


iv. Picture Documentation with Caption (3PAGES)
(3 pictures with Caption per page)

Picture Documentation
w/ Caption (3pics per
page with at least 1
paragraph narrative
description)

v. Annexes
a. Drill Evaluation Form conducted by DRRM Outside. (SCANNED COPY)
b. EVACUATION MAP
c. ATTENDANCE SHEET (SCANNED COPY)

Evacuation Maps Drill Evaluation Form Attendance Sheet

(Scanned Copy)

You might also like