1.0 Use of PPE's: 4.0 Use of Tools, Equipment & Safety Devices

You might also like

Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 2

INEOS STYROLUTION (INDIA OPERATIONS) PLANT SAFETY

Time Area Observation made on 7


Date: 30.07.18 16:00 GPPS ground floor
Hrs.: Visited: numbers of persons:
Name of observer 13869 Dept. of
Mechanical Signature of
& Code No.: Observer: Observer:
Activity in Routine / Start-up / Shut- Routine
Insulation work at GPPS ground floor
progress: down:
√ at “safe” or ‘At-Risk” or “NA (Not Applicable)” at each observation below:
Sr.No. Item Safe At-Risk NA Sr.No. Item Safe At-Risk NA
1.0 Use of PPE’s: 4.0 Use of tools, equipment & Safety devices:
Defective and Not inspected
1.1 Body protection √ 4.1 √
tools / Equipment’s
Fire extinguishers
1.2 Eye / Face protection  √ 4.2 √
discharged / missing
Improper use / section of
1.3 Fall protection  √ 4.3 √
tool
Safety device missing or
1.4 Foot protection √ 4.4 √
mislabeled
Operating method /
1.5 Hand protection √ 4.5 √
Instruction
1.6 Head protection √ 5.0 General House keeping
1.7 Hearing (Ear) protection √ 5.1 Clutter ( Inside) √
1.8 Respiratory protection √ 5.2 Improper storage / Labeling √
Improper ventilation /
2.0 Actions: 5.3 √
exhaust
2.1 Ascending / Descending √ 5.4 Slipping & trip hazards √
2.2 Eyes on path √ 6.0 Office / Ergonomics / Body positioning:
2.3 Eyes on work √ 6.1 Chair / sitting arrangement √
2.4 Lifting / Lowering √ 6.2 Fire / cabinets / filing issue √
2.5 Line of fire √ 6.3 Keyboard typing √
3.0 Job planning and support system 6.4 Monitor √
Proper access to the
3.1 Work permit √ 6.5 √
working space
3.2 Barricade placement √ 7.0 Others:
Communication/Radios
3.3 √ 7.1
etc.
3.4 Work site inspection √ 7.2

Sr. No. Item (Safe / Positive ) Comments by observer Action taken


3 company employees
whom were doing the
insulation work having the
1 Appreciate them for following the safety precations.
required PPEs & proper
tools.

4
Sr. No. Item (At-Risk) Comments by observer Action taken

3 company employees
Those persons were using the glass wool material
whom were doing the After the conversation with those persons they
for insulation work which having the fine glass
1 insulation work having the understand the consequences of the Job & wore
particles, if a small content insert on eyes it can
required PPEs but one of the safety glass.
be harmful for eyes.
them didn’t wear the safety
glass.
At the same place 4
contract workmen were
working to clean the scrap
Surface of the area where they were working was
glass wool materials, all of After the conversation It was found that 1 of the
slippery due to oil content If any one slip there &
2 them wore all required contract workman safety helmet condition was not
don’t wear the proper safety helmet can be
PPEs,2 out of 4 persons good & helmet strip was broken
dangerous for him.
wore the helmet but didn’t
buckled the helmet strip

4
Name of the Department / Contract agency of the person on which
Shreyansh Insulation
observations are made:
Department ( Area visited)
Ground floor GPPS area Signature:
In charge comments:
BEAHVIOR BASED SAFETY OBSERVATION CARD

You might also like