COSTING CALCULATIONS: LOCATION: NCR DATE:

REVISION: 0
CLIEN ENQUIRY 78 Galary-3

ENQUIRY 78 Gala 25 feet 900 5 4500 630 5130

MEZZ 0 0 0 0 0

RAFTER 0 0 0 0 0

0 0

EXCISE
STRUCTURAL COMPONENTS WEIGHT UNIT RATE VALUE CESS(%) SALES TAX (%)
DUTY(%)

WEIGHT OF BUILT-UPS = 5130 75.00 384,750.00 0 0 0


END WALL COLUMN 0 75.00 0.00 0 0 0
STAIR CASE 1 NOS. 0 75.00 0.00 0 0 0
ANCHOR BOLT = 513 75.00 38,475.00 0 0 0
JACK BEAM 1550 75.00 116,250.00 0 0 0
STUD PIPE 0 75.00 0.00 0 0 0
RAILING 50X50 SQR 75.00 0.00 0 0 0
CADGE LEDDER 0 75.00 0.00 0 0 0
CANOPY 3 MTR. WIDE 10 NOS. 75.00 0.00 0 0 0
CANOPY 6 MTR. WIDE 2 NOS. 75.00 0.00 0 0 0
WEIGHT OF COLDFORMS = 1636 75.00 122,723.04 0 0 0
WEIGHT OF ACCESSORIES = 655 75.00 49,089.22 0 0 0
WEIGHT OF DECKING = 0 75.00 0.00 0 0 0
WEIGHT OF HARDWARES = 191 120.00 22,953.50 0 0 0

TOTAL WEIGHT = 9675 (Kg) TOTAL VALUE =


SHEET METAL
SHEETING COMPONENTS AREA UNIT RATE VALUE EXCISE DUTY(%) CESS(%) SALES TAX (%)
ROOFING = HIGH RIB 0.47 350 350.00 122,388.09 0 0 0
SIDE CLADDING = HIGH RIB 0 88 380.00 33,365.85 0 0 0
SKYLIGHT = POLY SHEET 2 MM THK. 14 850.00 11,889.13 0 0 0
CLADDING POLY SHEET 2 MM THK. 0 850.00 0.00 0 0 0
LOUVERS 1500X3000 4 NOS. 0 0.00 0.00 0 0 0
FLASHINGS = CAZ (SQM) 52 400.00 20,999.29 0 0 0
DOWN TEK PIPE CAZ (SQM) 97 400.00 38,926.83 0 0 0
VALLEY GUTTER & D/P 4MM THK. FIBER SHEET IN MTR. 0 0.00 0.00 0 0 0
S RIDGE VENT 600 IN RMTR. 0 4500.00 0.00 0 0 0
FOAM CLOSURE (LENGTHWISE) (NOS.) 0 0.00 0.00 0 0 0

TOTAL AREA = 318 (Sqm) 3.7 (Kg/Sq Ft) TOTAL VALUE =


CALCULATION OF FRIEGHT
ENQUIRY 78 Galary-3 12655.76
WEIGHT OF SHEETING = 2.98 81.00
WEIGHT OF STRUCTURES = 9.6751

lsscindia.com
TOTAL WEIGHT = 12.6558 113.00

NUMBER OF TRUCKS REQUIRED = 114.849


FREIGHT PER TRUCK = 0
TOTAL FREIGHT =

TOTAL VALUE =

ADD 10 PERCENT :

PRICE TO QUOTE =
INSTALLATION CHARGES

INSTALLATION OF STRUCTURES& SHEETING = @ 5

TOTAL COST =
COST PER SQUARE FEET (SUPPLY) = 282

TOTAL = 299.68906

Basic Building Dimensions : NCR


LOCATION:
ENQUIRY 78 Galary-3

Building Type CS Revision = 0


Width = 9.15 m C/C Length O/O = 34.76 m I/O
Roof slope = 1 :10 Eaves ht. =
Bay Spacing= 8.689 m Clear Height = 6.71 m
NO. OF BAYS = 4
End Bay number = 1
End Bay sp. = 9.146 m Max rafter depth= 0.60 m
Purlin spacing = 1.5 m No. of braced bay= 0.00
Girt spc. = 1.5 m Base Condition PINNED
FEW Brick Wall ht. = 6.00 m BUILDING CONDITION ENCLOSED
BEW Brick Wall ht. = 6.00 m Built-up Material Yeild Stress 345.00 MPa
LSW Brick Wall ht. = 6.00 m Cold Formed Material Yeild Stress 345.00 MPa
RSW Brick Wall ht. = 6.00 m SKYLIGHT SHEETS 4 % OF ROOF AREA
Wind Speed = 47 m/s

Roof cladding material: HI RIB


Wall cladding material: HI RIB
CRANE CAPACITY 0 TONS 0 CRANE IN EACH WIDTH MODULE
CRANE BRACKET HEIGHT 0 m
MEZZANIANE AREA 0 m (W) 0.00 m (L) = 0.00
MEZANIANE DEAD LOAD 0 KN/SQM
MEZANIANE LIVE LOAD 0 KN/SQM
MEZZANIANE GRID 0 MX 0M
BUILDING CONDITION ENCLOSED

lsscindia.com
Design Code MBMA 2012 Additional Important Notes to be followed
Deflection Limit Span/180 Eh/100 1
Dead load on roof= 15 Kg/m² 2
Live Load 57 Kg/m² 3
Collateral load on roof= 0 Kg/m² 4
Roof Purlin Size, Z 230 1.8 5
Girt Size, Z 230 1.8 6

Cross - Sectional Reference

lsscindia.com
TOTAL VALUE

384,750.00
0.00
0.00
38,475.00
116,250.00
0.00
0.00
0.00
0.00
0.00
122,723.04
49,089.22
0.00
22,953.50

734,240.76

TOTAL VALUE
122,388.09
33,365.85
11,889.13
0.00
0.00
20,999.29
38,926.83
0.00
0.00
0.00

227,569.19

lsscindia.com
0

961,810

961,810

63,279

1,025,089

lsscindia.com
COSTING CALCULATIONS: LOCATION: NCR DATE:
REVISION: 0
CLIEN ENQUIRY 78SHED-2

ENQUIRY 78SHED 25 feet 1560 5 7800 936 8736

MEZZ 0 0 0 0 0

RAFTER 0 0 0 0 0

0 0

EXCISE
STRUCTURAL COMPONENTS WEIGHT UNIT RATE VALUE CESS(%) SALES TAX (%)
DUTY(%)

WEIGHT OF BUILT-UPS = 8736 75.00 655,200.00 0 0 0


END WALL COLUMN 1500 75.00 112,500.00 0 0 0
STAIR CASE 1 NOS. 0 75.00 0.00 0 0 0
ANCHOR BOLT = 358 75.00 26,869.50 0 0 0
JOIST 0 75.00 0.00 0 0 0
STUD PIPE 0 75.00 0.00 0 0 0
RAILING 50X50 SQR 75.00 0.00 0 0 0
CADGE LEDDER 0 75.00 0.00 0 0 0
CANOPY 3 MTR. WIDE 10 NOS. 75.00 0.00 0 0 0
CANOPY 6 MTR. WIDE 2 NOS. 75.00 0.00 0 0 0
WEIGHT OF COLDFORMS = 4584 75.00 343,792.33 0 0 0
WEIGHT OF ACCESSORIES = 1528 75.00 114,597.44 0 0 0
WEIGHT OF DECKING = 0 75.00 0.00 0 0 0
WEIGHT OF HARDWARES = 295 120.00 35,449.90 0 0 0

TOTAL WEIGHT = 17002 (Kg) TOTAL VALUE =


SHEET METAL
SHEETING COMPONENTS AREA UNIT RATE VALUE EXCISE DUTY(%) CESS(%) SALES TAX (%)
ROOFING = HIGH RIB 0.47 921 350.00 322,288.63 0 0 0
SIDE CLADDING = HIGH RIB 0 487 380.00 184,948.78 0 0 0
SKYLIGHT = POLY SHEET 2 MM THK. 37 850.00 31,308.04 0 0 0
CLADDING POLY SHEET 2 MM THK. 0 850.00 0.00 0 0 0
LOUVERS 1500X3000 4 NOS. 0 0.00 0.00 0 0 0
FLASHINGS = CAZ (SQM) 211 400.00 84,451.92 0 0 0
DOWN TEK PIPE CAZ (SQM) 97 400.00 38,926.83 0 0 0
VALLEY GUTTER & D/P 4MM THK. FIBER SHEET IN MTR. 0 0.00 0.00 0 0 0
S RIDGE VENT 600 IN RMTR. 0 4500.00 0.00 0 0 0
FOAM CLOSURE (LENGTHWISE) (NOS.) 0 0.00 0.00 0 0 0

TOTAL AREA = 837 (Sqm) 2.85 (Kg/Sq Ft) TOTAL VALUE =


CALCULATION OF FRIEGHT
ENQUIRY 78SHED-2 25604.51
WEIGHT OF SHEETING = 8.60 81.17
WEIGHT OF STRUCTURES = 17.0015 114.8488

lsscindia.com
TOTAL WEIGHT = 25.6045

NUMBER OF TRUCKS REQUIRED =


FREIGHT PER TRUCK = 0
TOTAL FREIGHT =

TOTAL VALUE =

ADD 10 PERCENT :

PRICE TO QUOTE =
INSTALLATION CHARGES

INSTALLATION OF STRUCTURES& SHEETING = @ 5

TOTAL COST =
COST PER SQUARE FEET (SUPPLY) = 217

TOTAL = 230.74028

Basic Building Dimensions : NCR


LOCATION:
ENQUIRY 78SHED-2

Building Type CS Revision = 0


Width = 24.09 m C/C Length O/O = 34.76 m I/O
Roof slope = 1 :10 Eaves ht. =
Bay Spacing= 8.689 m Clear Height = 7.32 m
NO. OF BAYS = 4
End Bay number = 4
End Bay sp. = 6.021 m Max rafter depth= 0.60 m
Purlin spacing = 1.5 m No. of braced bay= 0.00
Girt spc. = 1.5 m Base Condition PINNED
FEW Brick Wall ht. = 3.66 m BUILDING CONDITION ENCLOSED
BEW Brick Wall ht. = 3.66 m Built-up Material Yeild Stress 345.00 MPa
LSW Brick Wall ht. = 3.66 m Cold Formed Material Yeild Stress 345.00 MPa
RSW Brick Wall ht. = 3.66 m SKYLIGHT SHEETS 4 % OF ROOF AREA
Wind Speed = 47 m/s

Roof cladding material: HI RIB


Wall cladding material: HI RIB
CRANE CAPACITY 0 TONS 0 CRANE IN EACH WIDTH MODULE
CRANE BRACKET HEIGHT 0 m
MEZZANIANE AREA 0 m (W) 0.00 m (L) = 0.00
MEZANIANE DEAD LOAD 0 KN/SQM
MEZANIANE LIVE LOAD 0 KN/SQM
MEZZANIANE GRID 0 MX 0M
BUILDING CONDITION ENCLOSED

lsscindia.com
Design Code MBMA 2012 Additional Important Notes to be followed
Deflection Limit Span/180 Eh/100 1
Dead load on roof= 15 Kg/m² 2
Live Load 57 Kg/m² 3
Collateral load on roof= 0 Kg/m² 4
Roof Purlin Size, Z 230 1.8 5
Girt Size, Z 230 1.8 6

Cross - Sectional Reference

lsscindia.com
TOTAL VALUE

655,200.00
112,500.00
0.00
26,869.50
0.00
0.00
0.00
0.00
0.00
0.00
343,792.33
114,597.44
0.00
35,449.90

1,288,409.17

TOTAL VALUE
322,288.63
184,948.78
31,308.04
0.00
0.00
84,451.92
38,926.83
0.00
0.00
0.00

661,924.20

lsscindia.com
0

1,950,333

1,950,333

128,023

2,078,356

lsscindia.com
COSTING CALCULATIONS: LOCATION: NCR DATE:
REVISION: 0
CLIEN ENQUIRY 78 SHED-1

ENQUIRY 78 SHE 25 feet 2620 10 26200 3144 29344

MEZZ 0 0 0 0 0

RAFTER 0 0 0 0 0

0 0

EXCISE
STRUCTURAL COMPONENTS WEIGHT UNIT RATE VALUE CESS(%) SALES TAX (%)
DUTY(%)

WEIGHT OF BUILT-UPS = 29344 75.00 2,200,800.00 0 0 0


END WALL COLUMN 2400 75.00 180,000.00 0 0 0
STAIR CASE 1 NOS. 0 75.00 0.00 0 0 0
ANCHOR BOLT = 1111 75.00 83,328.00 0 0 0
JOIST 75.00 0.00 0 0 0
STUD PIPE 75.00 0.00 0 0 0
RAILING 50X50 SQR 75.00 0.00 0 0 0
CADGE LEDDER 0 75.00 0.00 0 0 0
CANOPY 3 MTR. WIDE 10 NOS. 75.00 0.00 0 0 0
CANOPY 6 MTR. WIDE 2 NOS. 75.00 0.00 0 0 0
WEIGHT OF COLDFORMS = 15010 75.00 1,125,727.25 0 0 0
WEIGHT OF ACCESSORIES = 3752 75.00 281,431.81 0 0 0
WEIGHT OF DECKING = 0 75.00 0.00 0 0 0
WEIGHT OF HARDWARES = 915 120.00 109,822.39 0 0 0

TOTAL WEIGHT = 52532 (Kg) TOTAL VALUE =


SHEET METAL
SHEETING COMPONENTS AREA UNIT RATE VALUE EXCISE DUTY(%) CESS(%) SALES TAX (%)
ROOFING = HIGH RIB 0.47 2760 350.00 965,965.00 0 0 0
SIDE CLADDING = HIGH RIB 0 1195 380.00 453,989.80 0 0 0
SKYLIGHT = POLY SHEET 2 MM THK. 110 850.00 93,836.60 0 0 0
CLADDING POLY SHEET 2 MM THK. 0 850.00 0.00 0 0 0
LOUVERS 1500X3000 4 NOS. 0 0.00 0.00 0 0 0
FLASHINGS = CAZ (SQM) 593 400.00 237,276.60 0 0 0
DOWN TEK PIPE CAZ (SQM) 207 400.00 82,745.60 0 0 0
VALLEY GUTTER & D/P 4MM THK. FIBER SHEET IN MTR. 0 0.00 0.00 0 0 0
S RIDGE VENT 600 IN RMTR. 0 4500.00 0.00 0 0 0
FOAM CLOSURE (LENGTHWISE) (NOS.) 0 0.00 0.00 0 0 0

TOTAL AREA = 2509 (Sqm) 2.84 (Kg/Sq Ft) TOTAL VALUE =


CALCULATION OF FRIEGHT
ENQUIRY 78 SHED-1 76588.50
WEIGHT OF SHEETING = 24.06 80.92
WEIGHT OF STRUCTURES = 52.5323

lsscindia.com
TOTAL WEIGHT = 76.5885

NUMBER OF TRUCKS REQUIRED =


FREIGHT PER TRUCK = 0
TOTAL FREIGHT =

TOTAL VALUE =

ADD 10 PERCENT :

PRICE TO QUOTE =
INSTALLATION CHARGES

INSTALLATION OF STRUCTURES& SHEETING = @ 5

TOTAL COST =
COST PER SQUARE FEET (SUPPLY) = 216

TOTAL = 229.57746

Basic Building Dimensions : NCR


LOCATION:
ENQUIRY 78 SHED-1

Building Type CS Revision = 0 34.4512195122


Width = 34.73 m C/C Length O/O = 73.88 m I/O 34.73
Roof slope = 1 :10 Eaves ht. = 73.7804878049
Bay Spacing= 8.209 m Clear Height = 7.32 m 73.8804878049
NO. OF BAYS = 9
End Bay number = 5
End Bay sp. = 6.946 m Max rafter depth= 0.60 m
Purlin spacing = 1.5 m No. of braced bay= 0.00
Girt spc. = 1.5 m Base Condition PINNED
FEW Brick Wall ht. = 3.66 m BUILDING CONDITION ENCLOSED
BEW Brick Wall ht. = 3.66 m Built-up Material Yeild Stress 345.00 MPa
LSW Brick Wall ht. = 3.66 m Cold Formed Material Yeild Stress 345.00 MPa
RSW Brick Wall ht. = 3.66 m SKYLIGHT SHEETS 4 % OF ROOF AREA
Wind Speed = 47 m/s

Roof cladding material: HI RIB


Wall cladding material: HI RIB
CRANE CAPACITY 0 TONS 0 CRANE IN EACH WIDTH MODULE
CRANE BRACKET HEIGHT 0 m
MEZZANIANE AREA 0 m (W) 0.00 m (L) = 0.00
MEZANIANE DEAD LOAD 0 KN/SQM
MEZANIANE LIVE LOAD 0 KN/SQM
MEZZANIANE GRID 0 MX 0M
BUILDING CONDITION ENCLOSED

lsscindia.com
Design Code MBMA 2012 Additional Important Notes to be followed
Deflection Limit Span/180 Eh/100 1
Dead load on roof= 15 Kg/m² 2
Live Load 57 Kg/m² 3
Collateral load on roof= 0 Kg/m² 4
Roof Purlin Size, Z 230 1.8 5
Girt Size, Z 230 1.8 6

Cross - Sectional Reference

lsscindia.com
TOTAL VALUE

2,200,800.00
180,000.00
0.00
83,328.00
0.00
0.00
0.00
0.00
0.00
0.00
1,125,727.25
281,431.81
0.00
109,822.39

3,981,109.46

TOTAL VALUE
965,965.00
453,989.80
93,836.60
0.00
0.00
237,276.60
82,745.60
0.00
0.00
0.00

1,833,813.60

lsscindia.com
0

5,814,923

5,814,923

382,943

6,197,866

lsscindia.com
SH1
side 5 5 34.73 44.73 29.82 5.5

end 6 6 0.00 12 8 5.5

SH2
side 5 5 24.09 34.08537 22.72358 5.5
0
end 6 6 -14.00 -2 -1.333333 5.5
LESS 6 6 4 5.5

GALLERY
side 1 1 9.15 11.14634 7.430894 5.5

end 1 1 0.00 2 1.333333 5.5


73.88 12117.06 230
0
34.73 1528.12

13645.18
1364.518
15009.7

34.76 4343.806
0
24.09 -176.626
-14.00 -308
4167.18
416.718
4583.898

34.76 1420.479
0
9.15 67.07317
0
1487.552
148.7552
1636.307
ENQ -78 REACTION SHEET FOR 34 MTR SPAN SHED-1

Load Force-X Force-Y Force-Z Moment- Moment- Moment-


Node
Combincation kN kN kN X kNm Y kNm Z kNm
1 DL+EQ+X 14.569 27.652 0 0 0 0
DL+EQ-X 16.395 28.527 0 0 0 0
DL+LL 73.819 107.286 0 0 0 0
DL+W1 -62.769 -71.119 0 0 0 0
DL+W2 -27.05 -41.895 0 0 0 0
DL+W3 -39.94 -71.552 0 0 0 0
DL+W4 -39.94 -71.552 0 0 0 0
DL+W5 -44.494 -33.917 0 0 0 0
DL+W6 -8.823 -4.764 0 0 0 0
DL+W7 -21.627 -34.322 0 0 0 0
DL+W8 -21.627 -34.322 0 0 0 0
68 DL+EQ+X -18.221 29.403 0 0 0 0
DL+EQ-X -16.395 28.527 0 0 0 0
DL+LL -73.819 107.286 0 0 0 0
DL+W1 27.05 -41.895 0 0 0 0
DL+W2 62.769 -71.119 0 0 0 0
DL+W3 39.94 -71.552 0 0 0 0
DL+W4 39.94 -71.552 0 0 0 0
DL+W5 8.823 -4.764 0 0 0 0
DL+W6 44.494 -33.917 0 0 0 0
DL+W7 21.627 -34.322 0 0 0 0
DL+W8 21.627 -34.322 0 0 0 0
NOTE: DL= DEAD LOAD, LL=LIVE LOAD, EQ= SEISMIC LOAD, W1 TO W8 WIND LOAD
ENQ -78 REACTION SHEET FOR 24 MTR SPAN SHED-2

Load Force-Y Force-Z Moment- Moment- Moment-


Node Force-X kN
Combincation kN kN X kNm Y kNm Z kNm
1 DL+EQ+X 6.736 18.025 0 0 0 0
DL+EQ-X 7.928 18.829 0 0 0 0
DL+LL 39.52 77.103 0 0 0 0
DL+W1 -44.353 -56.82 0 0 0 0
DL+W2 -6.975 -30.046 0 0 0 0
DL+W3 -15.023 -54.548 0 0 0 0
DL+W4 -15.023 -54.548 0 0 0 0
DL+W5 -38.721 -29.37 0 0 0 0
DL+W6 -1.343 -2.596 0 0 0 0
DL+W7 -9.391 -27.098 0 0 0 0
DL+W8 -9.458 -27.278 0 0 0 0
68 DL+EQ+X -9.119 19.634 0 0 0 0
DL+EQ-X -7.928 18.829 0 0 0 0
DL+LL -39.52 77.103 0 0 0 0
DL+W1 6.975 -30.046 0 0 0 0
DL+W2 44.353 -56.82 0 0 0 0
DL+W3 15.023 -54.548 0 0 0 0
DL+W4 15.023 -54.548 0 0 0 0
DL+W5 1.343 -2.596 0 0 0 0
DL+W6 38.721 -29.37 0 0 0 0
DL+W7 9.391 -27.098 0 0 0 0
DL+W8 9.458 -27.278 0 0 0 0
NOTE: DL= DEAD LOAD, LL=LIVE LOAD, EQ= SEISMIC LOAD, W1 TO W8 WIND LOAD

You might also like