Amplus Sun Solution Pvt Ltd

CONCRETE POUR CARD

PROJECT 50MW NEO Project, Khanak DATE


AREA POUR CARED NO
LOCATION REF. DRAWING
MIX GRADE QUANTITYT
ACTIVITY OBSERVATION REMARKS

FOUNDATION / STRUCTURE

a) PCC Top Level

b) Centre line checked

REINFORCEMENT

a) Dia & Shape

b) Extra Reinforcement

(Apart from Drawing )


BEFORE CONCRETING

c) No. of Chairs & Length

d) Binding / Welding

e) Cover to Reinforcement

FORMWORK

a) Center lines

b) Shuttering line, Level & Plumb

c) Demoulding agent applied

d) Leakage Proof

e) Concrete top level

f) Supports adequecy

EMBEDED ITEMS

a) Bolts

c) Inserts ( Plates, Structural )


CLEARED FOR POUR

EPC REPRESENTATIVE

CHECK Remark

a) Mix grade
DURING CONCRETING

b) Slump

c) Time of concrete start

e) Time of concrete end

f) No. of cubes for sampling

g) Cube identification

Remarks :

EPC Project Engineer Consultant Engineer Amplus Site Engineer