Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 6

DAILY INSPECTION STATUS

No. DATE BLOCK No. KIND OF INSPECTION


GU6-P Block Final re-inspection
1 11/15/2019
TL8-P Block Final inspection
2 11/15/2019
SC4-SS1A-S Block sub-assembly inspection
3 11/15/2019
UD8-P&s STOOL Block sub-assembly inspection
4 11/15/2019
GS10-TT1A-P Block sub-assembly re-
5 11/15/2019 inspection
GU10-HT1A-P Block sub-assembly re-
6 11/15/2019 inspection
UD6-P Block Final inspection
7 11/15/2019
UD6-S Block Final inspection
8 11/15/2019
UD3-P Block Final Re-inspection
9 11/15/2019
SS7-P Block Final Re-inspection
10 11/15/2019
SS5+UD5/TS5 P Pre-erection final inspection
11 11/15/2019

Block FINAL AND Sub-assembly inspection


Rudder blade internal structure final inspection

UD3-P&s block sub-assembly inspection

SS5 P block final inspection

UD5-S block final inspection


COMMENT

Previous comments not ready Not Accept

No comments Accept
Accept With
fresh water are pspc comments to be attend comments
No comments Accept

frame fairing, lug piece griding ,vertical down Not Accept


hand welding to be repair to be confim again

shell plate grinding points to be attends Accept

Previous comments found satisfactory Accept

mark places W+G points to be attend Accept

k FINAL AND Sub-assembly inspection


nternal structure final inspection

3-P&s block sub-assembly inspection

You might also like