BASIS OF DESIGN
S.NO DESCRIPTION OF AREA TONNAGE REQUIRED UNIT TYPE
GROUND FLOOR
1 OFFICE 2 TR Hi wall
FIRST FLOOR
2 GUEST B.ROOM 2 TR Cassette
3 LIVING 2 TR Cassette
4 DINING & KITCHEN 4 TR Cassette
SECOND FLOOR
5 M.Bedroom 2 TR Cassette
6 KIDS B.ROOM 2 TR Cassette
THIRD FLOOR
7 HOME THEATRE 3 TR Cassette
8 KIDS B.ROOM 2 TR Hi wall
To, Date:24.08.2019
Mr.Venkat
hyderabad,
GST 28%
Total For units
BILL OF QUANTITIES - LOW SIDE
Installation Testing commissioning of split Airconditioning
1
Unit
1.1 2 Tr, 3 Tr & 4 Tr Cassette AC 6 Nos 3500
1.2 2.0Tr Hi-wall AC 2 Nos 1500
TERMS:
1) The given measurements are taken approximate, will be chainged on site condition.
2) For Low side work 18% taxes extra.
3) Civil, Scaffholding, fabrication and carpentry jobs will not be our scope.
4 ) 100% advance for machinery.
For Installation and commissioning:
50% advance on start of installation & commissioning.
Running on 40% Balance 10% after commissioning.
Amount
0
0
0
0
0
0
21000
3000
142500
19600
29100
4800
15000
2500
237500