Mohammad A.

Farhat Est For Construction

DAILY REPORT
PROJECT: TAJ JEDDAH
PROJECT START: 01 / 06 /2016
DATE: 06 / 11 / 2019 DAY: Wednesday REF: 200
TYPE TECHNICAL STAFF MANPOWER
Engineer Formen Labours
Construction Manger

Technical Engineer

Insulation Labour
Concrete Labour

Skilled Labours
Steel Fixer Ass.
Mech Engineer

Carpenter Ass.
Elect Engineer

Civil Engineer

Labours Mech
Formen Mech

Labours Elect

Labours Civil
Formen Civil
Formen Elec

TOTAL
Steel Fixer
Carpenter
Surveior

Drivers
Mason
JOB.
NO.

1 1 4 6

WORKS ACTIVITIES TODAY ACTIVITIED EXPECTED TOMORROW


ELECTRICAL WORKS ELECTRICAL WORKS
1- Install UPVC pipe for power and low current system in site 1- Install UPVC pipe for power and low current system in site (new
(new works) works)

2- Install earthing cables in lower main gate . 2- Install earthing cables in guests building.

3- Install warning tape for power and low current system in


site.

OBSTACLES AFFECTING ON ACTIVITIES


1- The Owner Requested the Suspension of the Install the Light Points in the Men's Majles Building.
2- There are no Drawing for the Interior Design of the Princesses Building, the Gazebo and the Guests.
3-
4-
5-
6-
Equipents Resource materials for the site FMC Manpower
TYPE NO Materials Qty. NAME Position
Generator 1- Ibrahim Radwan Elect. Eng.
Viprators 2- Shobran Ahmed Forman Elect.
Total 3- Nazem Abas Electrician
Station 4- Rezaul Alam Electrician
Cars 5- khaled Abd Albaqe Labours Elect
6- Hussein Elmahla Labours Elect

WEATHER
RAINY CLOUDY MODERATE SUUNY
X
Notes:
1-

SITE ENGINEER: PROJECT MANGER: CONSTRUCTION MANGER: