Download as pdf or txt
Download as pdf or txt
You are on page 1of 2

ISOMETRIC VIEW

SCALE 1:40

OWNER : CONTRACTOR : NO REVISION DATE SIGN PROJECT : DRAWING TITLE : APPROVED BY : SHEET NO. SHEET QTY.

0 ISSUED FOR REVIEW 9/9/19 DATE :


1 FOR APPROVAL 27/10/19
EPC TUBAN JETTY SEGMENT A CHECKED BY : ERWIN HIDAYAT
1 2

PT. PGAS SOLUTION PERMANENT RECOVERY ARRANGEMENT DATE : SCALE


DIVISI OPERASI GEDUNG 2
PROPOSED BY : MUHAMMAD HADI
JL. KYAI H. ZAINUL ARIFIN NO.20 1:100
RT08/RW07, KRUKUT, TAMANSARI KOTA, JAKARTA BARAT
DAERAH KHUSUS IBUKOTA JAKARTA 11140 DRAWING NO : PGAS-C024-3172-DG-STR-GA-002 DATE :
610
B2 (500 X 1289.1)
B1 (500 X 1289.1)

B3 (500 X 1614.1)
1470

300
300

B2 (500 X 1289.1)
RAILING
BARRIER SEE : STR-BR-001
1470

SEE : STR-BR-001

300 6528.4 300 2471.6


+6.0946
B2 (500 X 1289.1) SLAB FLOOR
9600

SEE : STR-SF-001
+5.4196 +5.345
SLOPE 1.05%

389.1
1470

B3 (500 X 1614.1)

1350
B2 (500 X 1289.1)

860 1970 1970 1970 1970 860


1470

EAST VIEW
SCALE 1:50

B2 (500 X 1289.1)
610

1220 2000 2000 2000 1220

TOP VIEW
SCALE 1:50

OWNER : CONTRACTOR : NO REVISION DATE SIGN PROJECT : DRAWING TITLE : APPROVED BY : SHEET NO. SHEET QTY.

0 ISSUED FOR REVIEW 9/9/19 DATE :


1 FOR APPROVAL 27/10/19
EPC TUBAN JETTY SEGMENT A CHECKED BY : ERWIN HIDAYAT
2 2

PT. PGAS SOLUTION PERMANENT RECOVERY ARRANGEMENT DATE : SCALE


DIVISI OPERASI GEDUNG 2
PROPOSED BY : MUHAMMAD HADI
JL. KYAI H. ZAINUL ARIFIN NO.20 1:100
RT08/RW07, KRUKUT, TAMANSARI KOTA, JAKARTA BARAT
DAERAH KHUSUS IBUKOTA JAKARTA 11140 DRAWING NO : PGAS-C024-3172-DG-STR-GA-002 DATE :

You might also like