Concrete Bridge Reinforcement
Concrete Bridge Reinforcement
1. Kondisi Jembatan
1) Bentang, L = 25 m
2) Lebar jembatan, B = 6m
3) Lebar trotoar, d = 1m
4) Tebal plat trotoar, t = 20 cm 0.2 m
5) Jarak antar tiang sandaran, jts = 2m
6) Tebal plat lantai jembatan, tp = 20 cm 0.2 m
7) Jarak antara balok melintang, Lbm = 4 m (=Ly)
8) Tebal lapisan aspal, tas = 6 cm 0.06 m
9) Tinggi genangan air hujan, = 5 cm 0.05 m
2. Mutu Bahan
1) Beton, fc' = 30 MPa Ec = 25742.96 MPa
2) Baja, fy = 350 MPa ES = 200000 MPa
3) BJair = 10 kN/m3
4) BJaspal = 22 kN/m3
5) BJbeton = 25 kN/m3
3. Pembebanan
1. Perencanaan tiang sandaran
Beban Mat
Pias Berat, (kN) Lengan Momen,
momen, (kN.m)
(m)
A1 0.871875 1.65 1.438594
Momen akibat beban mati, MD 0
Beban hidup
Momen akibat beban hidup, ML = 180 kg.m
= 1.8 kN.m
Momen perlu, MU = 2.88 kN.m
Beban hidup
ditinjau 1m tegak lurus
ML = 250 kg.m
= 2.5 kN.m
MU = 11.18771875 kN.m
Beban hidup
tas = 6 cm 0.06 m
tp = 20 cm 0.2 m
beban hidup 100%
a2 = 30 cm 0.3 m
b2 = 50 cm 0.5 m
AR, = 82 cm 0.82 m
= 62 cm 0.62 m
qL = 19.66955 ton/m2 196.695515 kN/m2
Momen perlu, MU
MU+ = 66.43619 kN.m
MU- = -41.6818 kN.m
Daerah Tumpuan
K = 1.802845 MPa
a = 12.47682 mm
As,u = 909.0254 mm2
As,min = 680 mm2
Jadi, As,u = 909.0254 mm2
s = 86.40002 mm
s <= 3.h = 600 mm
Jadi, s = 86.40002 mm D10-100mm As 785.3982
Asb = 181.8051 mm2
Asb = 400 mm2
Jadi Asb,u = 400 mm2
s = 70.68583 mm
s <= 3.h = 1000 mm
Jadi, s = 70.68583 mm D10-50mm As 565.4867
4. Perencanaan Gelagar Utama
1). Analisis pembebanan
Beban mat merata
Bagian Berat, (kN/m)
Plat lantai 9.25
Berat sendiri gelagar 12.375
lapis aspal 2.442
genangan air hujan 0.925
Trotoar dan tiang sandaran 5.924375
(beban mati, qD) 30.916375
Tulangan geser
Hitungan penulangan dirangkum dalam tabel di bawah
Gaya geser Jarak Jarak
perlu, Vc Vs Av,min Av Av,u antar begel
Titik VU begel, terpasang,
(kN) (N) (N) (mm2) (mm2) (mm2) (mm) (mm)
1=11 960.2984 482.6805 1117.8168295 428.57142857 2.718096 428.5714 527.7876 525
2=10 777.9608 482.6805 813.92082953 428.57142857 1.979139 428.5714 527.7876 525
3=9 576.1716 482.6805 477.6054962 428.57142857 1.161351 428.5714 527.7876 525
4=8 393.834 482.6805 173.7094962 428.57142857 0.422394 428.5714 527.7876 525
5=7 192.0436 482.6805 -162.60783713 428.57142857 -0.3954 428.5714 527.7876 525
6 9.706 482.6805 -466.50383713 428.57142857 -1.13436 428.5714 527.7876 525
Gaya geser
perlu, Ø.Vc Ø.Vc/2 Vs Vs,maks Av,u Av,u Av,u
Titik
VU
(N) (N) (N) (N) (mm2) (mm2) (mm2) (mm2)
1=11 960298.4 369250.6 184625.2927 788063.75279 1911415 1916.264 436.6131 450
2=10 777960.8 369250.6 184625.2927 544946.95279 1911415 1325.099 436.6131 450
3=9 576171.6 369250.6 184625.2927 275894.68612 1911415 670.8685 436.6131 450
4=8 393834 369250.6 184625.2927 32777.886123 1911415 79.70307 436.6131 450
5=7 192043.6 369250.6 184625.2927 -236275.9805 1911415 -574.531 436.6131 450
6 9706 369250.6 184625.2927 -479392.7805 1911415 -1165.7 436.6131 450
0.5.v 955707.4
terpasang,
0.029 0.0145
0.07925
Jarak Jarak
Av,u s s<=d/2 s<600 antar begel
begel, terpasang,
(mm2) (mm) (mm) (mm) (mm) (mm)
1916.264 118.0394 587.5 600 118.0394 100
1325.099 170.7002 587.5 600 170.7002 150
670.8685 337.1669 587.5 600 337.1669 325
450 502.6548 587.5 600 502.6548 500
450 502.6548 587.5 600 502.6548 500
450 502.6548 587.5 600 502.6548 500