Download as pdf or txt
Download as pdf or txt
You are on page 1of 62

Road Construction

Stabilisasi Tanah untuk Perkerasaan Jalan


PT. CAHAYA INTI SOLUSINDO
PT. CPP
• PLANTATION
PT. CIS Replanting / PT. SIL
Trading Road Construction Heavy Equipment
• ROAD DEVELOPMENT Estate By Design • OFF SHORE
(PT. AAD) (PT. CIS) Dept
(PT. CPP & PT CBR)
ROTEC Aplications
ROTEC Soil Stabilizer can be applied to various road construction needs :

Residential Air Strip Mining


Pedestrian Service Road Plantation
Jogging Tracks Parking Area Factory Access
Golf cart Path Inspection Road and many More

ROTEC Made in Indonesia


Parking Area
Golf Carth path

AirStrip

Jogging Track Mining


Plantation

Residential Factory Access Pipeline Inspection Road


Common Pavement Problems
Dusty Road Poor Road Condition
Crack Pumping Road

Soil Cement Pavement


Additives to stabilize and solidifies soil (stabilization & solidification)
by means of Physics-Chemistry.
Form : Powder composed of inorganic minerals.

ROTEC is developed and tested for tropical climates.


Normal Soil Condition Role of ROTEC
ROTEC
Soil
soil decomposes
water in the soil

Soil particles
Soil particles soil are coated with
ROTEC

Soil blends
Soil particles
soil coated with
perfectly with
cement
water

ROTEC fill the cavities of soil


Water coated soil particles -
particles, Soil blends to cement
Soil can not bond with Cement
perfectly.
Pavement Layer (Rigid & Flexible Pavement)
Road Construction Comparison
Conventional Road Construction ROTEC Construction
* Optional
Hotmix 5cm Hotmix 3cm
Base
20cm ROTEC 20cm

SubBase • Faster to Construct


30cm • Cost-efficient
• CBR up to 100% (Strong)
• Water Resistant
• LPB CBR 20%, LPA CBR 50%
• Longer time to construct
• High cost

ROTEC proven superior in terms of quality, cost and time.


PAVEMENT COMPARISSON
Load Distribution on Pavement
Analisa perhitungan Stabilisasi dengan metode Plaxis
PAVEMENT SURFACE OPTION
ROTEC CONCRETE ASPALT PAVING BLOCK
ROTEC PAVEMENT LAYERS
COMPOSITION

Soil Cement ROTEC Water


Comparisson Sand-Gravel & ROTEC
Sand – gravel Bond ROTEC
Sand – Gravel Bond
ROTEC Application
Water Resistant After Flood
Implementation Method
Initial Striping
Cut and Fill
Form & Improve
Mixing Cement & Soil
Rotec Sprinkling & Compacting
Finished Road
Finished Road
PROJECTS REFERENCE
PT GSM - Riau
Cut & Field + Forming
Compacting
Rotec Aplication process
Finished Road
Transportation
PT GPTR
CBR Testing
PKS PAJ - Jambi
Main entrance
PT PAJ
Work Progress
After Rotec application
Engine Room Access
Pilot Project at Papah, Sabah - Malaysia
Papah, sabah – Malaysia (3bln)
Papah, sabah – Malaysia (15bln)
Recent Project
PT MJA
Lokasi : Desa Random dan Senipah Kabupaten Passer.
Kalimantan Timur
Year of Construction 2011
PT MNS – 15 September 2016

Construction year 2011


Construction year 2011
Pavement Surface (15 September 2016)

Construction year 2011


PT. Cahaya Inti Solusindo
Komp. Sentra Niaga Terpadu E2/18
Pantai Indah Kapuk.
Jakarta 14470. INDONESIA

Tel : +62 21 56982874


Fax: + 62 21 56982875

You might also like