Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

Daily Drilling Fluids Report

EGYPTIAN MUD ENGINEERING & CHEMICALS COMPANY


Water Base

Operator General Petroleum Company"GPC" Rig Name ADM-88 Report No. 1


Operator (Rep's) Mahmoud Country Egypt Date 7/25/2019
Well Name & Number NWO - 3 Field / Location G.O.S / G.O.S Measure Depth / TVD, ft 580 / 580
Contractor ADS Water Depth / RKB, ft 208.00 / 313.00 Progress 10
Contractor (Rep's) Khalifa Spud Date 25.07.2019 Present Activity Drilling

STRING DATA CASING DATA HOLE VOLUMES MUD PIT VOLUME


OD ID Type Length OD ID Set @ MD bbl min stks Pit
Fluid Type Volume, bbl
5.000 4.276 Drill pipes 220.00 30.000 28.000 570.00 Surface Equipments 1.62 0 14 ID Status
5.000 3.000 HWDP 180.00 Drill String Capacity 6.86 1 59 S.Trap & Sett. Active Gel Mud 247.67
9.000 2.812 Drill colars 180.00 Drill String Displacement 17.01 1 146 Pit#1 Reserve Gel Mud 210.90
Annular Section 416.80 36 3564 Pit#2 Reserve Gel Mud 210.90
Total Hole With String 423.66 36 3622 Pit#3 Active Gel Mud 280.69
Total Hole Without String 440.68 38 3768 Slug Pit Reserve Gel Mud 0.00
Active Pits Volume 528.36 45 4517 Pit#4 Reserve Gel Mud 210.90
Total Circulation Volume 953.64 82 8153 Pit#5 Reserve Gel Mud 210.90
Circulation Volume at Bit 953.64 82 8153 Pit#6 Reserve Gel Mud 313.59
Pit#7 Reserve Gel Mud 528.95

MUD SPECS BIT DATA SOLIDS CONTROL EQUIPMENT CIRCULATION & PUMPS DATA
Fluid Type SPUD MUD Hole Size in 26.00 Device Make Size Hrs Pump Make NATIONAL DUPLEX NATIONAL DUPLEX
Parameters min max Bit Size in 26.00 Shaker-3 Fluid System 4*100 14 Pump Model NT. P-160 NT. P-160
Mud weight, lb/gal 8.80000 9.00000 Bit No. 1 Shaker-2 Fluid System 4*80 14 Liner, in 6.50 6.50
Funnel Viscosity, sec/Qrt 80 120 Bit Type Rock Bit Shaker-1 Fluid System 4*08 14 Stroke Length, in 12.00 12.00
PV, cP TFA in2 0.942 Mud Cleaner BRANDT 4*140 14 Efficiency, % 95.00 95.00
YP, lb/100ft2 40 50 Depth in ft 0.00 Desander SWACO 1*3 14 Pump Rate, stk/min 50 50
pH 9.00 10.00 W.O.B lbf 20 Desiliter SWACO 1*20 14 Pump Output, bbl 0.117 0.117
Ca++, mg/l 200 400 R.P.M 50 Pump Flow Rate, bbl/min 5.8 5.8
API Fluid Loss, ml/30min 100.0 170.0 R.O.P ft/h 10.00 Flow Rate, gal/min 491.3
MBT, ppb 30.00 35.00 Pump Pressure, psi 320.000

MUD PROPERTIES MUD VOLUME ACCOUNTING MUD PRODUCTS CONSUMPTION


Sample Source Flow Line Additions, bbl Daily Cumm. Products Unit Size Used
Time 21:00:00 Initial Volume 0 0 Caustic Soda 25 kg Sax 54.00
Flow Line Temp., F 85.00 Mud Mixed 2684.79 2684.79 Soda Ash 25 kg Sax 54.00
Depth MD / TVD, ft 545.00/545.00 Water (dilution) 120 120 Bentonie (OCMA) 1 tn Big Bag 46.00
Mud Weight, lb/gal 8.90000 Diesel Added 0 0 DRILL WATER bbl 2,560.00
Mud Gradient, psi/ft 0.46 Chemicals 0 0 Sea Water bbl 120.00
Funnel Viscosity, sec/Qrt 85 Mud Recieved 0 0
600 / 300 / 200 RPM 57/46/41 Gain 0 0
100 / 6 / 3 RPM 35/15/13 Total Addition 2804.79 2804.79
Rheology Temp., F 120.00
PV / YP / LSYP, cP/lb/100ft2 11/35/11
Gel Str. 10s/10m/30m, lb/100ft2 15 / 24 /
API Fluid Loss, ml/30min (N/C)
HTHP, ml/30min/HTHP Temp., F /
Cake API / HTHP, 1/32nd in / Losses, bbl Daily Cumm.
Sand Content, Vol % 0.25 Shakers 35 35
Report Oil, Vol % 0.00 S.C.Eq. 50 50
Retort Water, Vol % 94.00 Formation 0 0
Retort Solids, Vol % 6.00 Dumped 80 80
Ph / Ph Temp., F 9.5/85 Trip 0 0
CEC Mud(MBT), ppb 35 Left in Hole 0 0
Alkalinity Mud (Pm), 0.9 Mud Returned 0 0 DAILY ADDITIONAL COST
Alkalinity Filtrate (Pf) / (Mf), 0.15/0.25 Oil in Cuttings 0 0
Chlorides, mg/l 1200 Other 0 0
Total Hardness, mg/l 780 Total Losses 165 165
Glycol, gal/bbl Final Volume 2639.79 2639.79
Glycol Cloud Point, F
ADDITIONAL PARAMETERS

Current Dilution Factor 8.500


SOLIDS ANALYSIS BIT HYDRAULICS MUD COST ANALYSIS
Dissolved Solids, Vol % 0.03 Rheology Model Power Law 26.00 Original Water Base Spud Mud 3,820.500
NaCl, % wt / ppb 0.2 / 0.69 AV / DP, ft/min
KCl, % wt / ppb / AV / DC, ft/min
Avg.Sp.Gr. Solids, 2.65 AV / Riser, ft/min
Corrected Solids, Vol % 4 Bit HHSI, hp/in2 0.115
LGS, Vol % 4.03 Bit Press. Loss, psi 210.045
Betonite, Vol % 3.75 Nozzels Vel., ft/sec 167.3
Betonite, ppb 34.84 ECD @ Bit, lb/gal 8.92908
Drilled Solids, Vol % 0.25 ECD @ Casing Shoe, lb/gal
Drilled Solids, ppb 2.29 Leak-Off Test
HGS (Wt.Material), Vol % n 0.31
HGS (Wt.Material), ppb k (lbf.sec^-n/100ft^2) 7.126
Aw 0.9967

Total Cost 3,820.500


RIG OPERATIONS TIME DISTRIBUTION MUD TREATMENT
Cont'd Drove 30 " C.P. to 565 mt, N/U & Install Diverter System, P/U & RIH with 26" Rotary Assy. to 96 P/U BHA 06:00 * Mud Engineers at Rig Site on 21/07/2019.
mt, Displaced with Gel Mud, Clean out 30" C.P. to 565 mt, Drl'd 26" Hole to 580 mt. RIH 03:00 * Check Mixing Pumps & All Related Lines, Solids Control Equipments.
Clean out CP. 12:00 * Dressed Shakers With New Screens (Sh#1 at 100 APi, Sh#2 at 80 API, Sh#3 at 80 API).
Drilling 02:00 * Dressed M.Cleaner with 4* 140 APi New Screens.
Circulation 01:00 * Mixed 2650 bbls Pre-Haydrated Gel.
* Dilute Active System with Sea Water.
Total 1.00:00:00
LITHOLOGY DATA
Age
Formation Drilled
Lithology
DEVIATION DATA
Inclination / Azimuth, de
MD / TVD, ft
Horisontal Displ., ft
Mohamed Atef District Egypt District Representative Yasser Abdel Rahman Daily Cost, $ Cummulative Cost, $
EMEC ENGINEER
Mohamed Magdy Warehouse ALEX. Free Zone Field Representative Hossam /Awad 3820.5 3820.5

General Petroleum Company"GPC", Egypt Page 1 of 1 July, 2019

You might also like