Item No.

Item Description Quantity Unit Rate ($)

SECTION 2 - GROUND INVESTIGATION

Trial Pits and Inspection Pits

Trial pit
3.02.01 maximum depth not 45 m3
exceeding 3.00m (provisional)

Extra over for excavation


in artificial hard material
3.02.02 maximum depth not 9 m3
exceeding 3.00m (provisional)

Trial Pits and Inspection Pits Affected by


Non-Tidal Open Water or Tidal Water

Trial pit
3.02.03 maximum depth not 45 m3
exceeding 3.00m (provisional)

Extra over for excavation


in artificial hard material
3.02.04 maximum depth not 9 m3
exceeding 3.00m (provisional)

Rigs

3.02.05 Moving rigs 8 nr

3.02.06 Standing time for rigs 8 hr

Drilling, Boring and Probing

Drill hole size N


vertically downwards
3.02.07 material other than 221 m
rock or artificial
hard material

3.02.08 rock 40 m

TOTAL OF SECTION 2 CARRIED TO SUMMARY

Item No. Item Description Quantity Unit Rate ($)

SECTION 5 - DRAINAGE AND DUCTS

Sewers, Drains, Piped Culverts, Ducts and


Trench Drains

PVC pipe
built in structures and the like
3.05.01 100 mm diameter 14 m

Drainage and Ducts in Structures

Ducts in structures
3.05.02 Primary Sedimentation Tanks --- item sum
No. 13-16

TOTAL OF SECTION 5 CARRIED TO SUMMARY

Item No. Item Description Quantity Unit Rate ($)

SECTION 6 - PIPEWORK

Pipes

DI pipe
in trench with Class B bed,
depth not exceeding 1.50m
3.06.01 DN200 432 m
in trench with Class B bed,
depth exceeding 1.50m but
not exceeding 2.50m
3.06.02 DN200 5 m

in trench with thrust block,


depth not exceeding 1.50m
3.06.03 DN200 30 m

built in structures and the like


3.06.04 DN200 8 m

Pipes Affected by Non-Tidal Open Water


or Tidal Water

DI pipe
in trench with Class B bed,
depth not exceeding 1.50m
3.06.05 DN200 9 m

in trench with Class B bed,


depth exceeding 1.50m but
not exceeding 2.50m
3.06.06 DN200 42 m

in trench with thrust block,


depth not exceeding 1.50m
3.06.07 DN200 2 m

CARRIED TO COLLECT

Item No. Item Description Quantity Unit Rate ($)

SECTION 6 - PIPEWORK (CONT'D)

Pipes Affected by Non-Tidal Open Water


or Tidal Water (Cont'd)

DI pipe
in trench with thrust block,
depth exceeding 1.50m but
not exceeding 2.50m
3.06.08 DN200 8 m

Valves and Pipe Fittings


Extra over for bend
DI double socket 11.25o bend
3.06.09 DN200 16 nr

DI double socket 45o bend


3.06.10 DN200 6 nr

DI double socket 90o bend


3.06.11 DN200 3 nr

DI double flange 45º bend


3.06.12 DN200 4 nr

DI double flange 90º bend


3.06.13 DN200 2 nr

Extra over for tee


DI tee, flange on double socket
3.06.14 DN200xdn200 1 nr

Extra over for detachable coupling


DI
3.06.15 DN200 2 nr

Extra over for puddle flange


DI
3.06.16 DN200 12 nr

CARRIED TO COLLECT

Item No. Item Description Quantity Unit Rate ($)

SECTION 6 - PIPEWORK (CONT'D)

Valves and Pipe Fittings (Cont'd)

Extra over for puddle flange


at an inclination to pipe alignment
DI
3.06.17 DN200 4 nr

Extra over for blank flange


DI
3.06.18 DN200 1 nr

Joints to New Pipes, Valves, and Fittings and


Connecitons to Existing Pipes, Valves and
Equipment

Joint
push-in joint for DI pipe
3.06.19 DN200 67 nr

flanged joint for DI pipe


3.06.20 DN200 12 nr

detachable coupling joint


for DI pipe
3.06.21 DN200 2 nr

Joints to New Pipes, Valves and Fittings and


Connections to Existing Pipes, Valves and
Equipment Affected by Non-Tidal Open
Water or Tidal Water

Joint
push-in joint for DI pipe
3.06.22 DN200 8 nr

CARRIED TO COLLECT

Item No. Item Description Quantity Unit Rate ($)

SECTION 6 - PIPEWORK (CONT'D)

Cutting Pipes

DI pipe
3.06.23 DN200 28 nr

Excavation in Rock and Artificial Hard


Material

Extra over for excavation in


3.06.24 artificial hard material, blasting 19 m3
not permitted.

Large Displacement Expansion Pipe Joints

Supply and install large displacement


expansion pipe joint
3.06.25 DN200 3 nr
CARRIED TO COLLECT
COLLECTION

Page BQ3/3
Page BQ3/4
Page BQ3/5
Page BQ3/6
TOTAL OF SECTION 6 CARRIED TO SUMMARY

Item No. Item Description Quantity Unit Rate ($)

SECTION 7 - EARTHWORKS

Excavation

Excavation for structures


material other than rock or
artificial hard material
3.07.01 maximum depth not 398 m3
exceeding 3.00m

3.07.02 maximum depth 355 m3


exceeding 3.00m but
not exceeding 6.00m

Excavation for foundations


material other than rock or
artificial hard material
3.07.03 maximum depth 144 m3
exceeding 3.00m but
not exceeding 6.00m

Excavation Affected by Non-Tidal


Open Water or Tidal Water

Excavation for structures


material other than rock or
artificial hard material
3.07.04 maximum depth not 151 m3
exceeding 3.00m
3.07.05 maximum depth 34 m3
exceeding 3.00m but
not exceeding 6.00m

CARRIED TO COLLECT

Item No. Item Description Quantity Unit Rate ($)

SECTION 7 - EARTH WORKS (CONT'D)

Excavation Affected by Non-Tidal


Open Water or Tidal Water (Cont'd)

Excavation for foundations


material other than rock or
artificial hard material
3.07.06 maximum depth 101 m3
exceeding 3.00m but
not exceeding 6.00m

Deposition of Fill Material

Deposition
general fill material
3.07.07 above structures 589 m3

3.07.08 above foundations 20 m3

Disposal of Material

Disposal of material
3.07.09 in tips provided by the Employer 574 m3

Imported Fill Material

Imported general fill material


3.07.10 above structures 2194 m3

Compaction of Fill Material

Compaction
general fill material
3.07.11 above structures 2783 m3

3.07.12 above foundations 20 m3

CARRIED TO COLLECT

Item No. Item Description Quantity Unit Rate ($)

SECTION 7 - EARTH WORKS (CONT'D)

Soft Spots and Other Voids Affected by


Non-Tidal Open Water or Tidal Water

Excavation of soft spots


3.07.13 below structures (provisional) 20 m3

Filling of soft spots and other voids


below structures
3.07.14 general fill material 20 m3
(provisional)
Completion of Formation

Completion of formation
3.07.15 surface of excavation in material 831 m2
other than rock or artifical hard
material

3.07.16 surface of general fill material 2622 m2

Completion of Formation Affected by


Non-Tidal Open Water or Tidal Water

Completion of formation
3.07.17 surface of excavation in material 147 m2
other than rock or artifical hard
material

CARRIED TO COLLECT
COLLECTION

Page BQ3/7
Page BQ3/8
Page BQ3/9
TOTAL OF SECTION 7 CARRIED TO SUMMARY

Item No. Item Description Quantity Unit Rate ($)

SECTION 9 – PILING

Piling Plant

Moving piling plant


preliminary piling
3.09.01 bored piles 2 nr

3.09.02 minipiles 2 nr

main piling
3.09.03 bored piles 46 nr

3.09.04 minipiles 58 nr

Cast-in-Situ Concrete Piles Affected by


Non-Tidal Open Water or Tidal Water

800mm diameter vertical bored pile shaft,


blasting not permitted, compressed air
not permitted
preliminary piling
3.09.05 exceeding 25.00m but 56 m
not exceeding 30.00m
in length

main piling
3.09.06 exceeding 20.00m but 100 m
not exceeding 25.00m
in length

3.09.07 exceeding 25.00m but 1066 m


not exceeding 30.00m
in length

3.09.08 exceeding 30.00m but 100 m


not exceeding 35.00m
in length

CARRIED TO COLLECT

Item No. Item Description Quantity Unit Rate ($)


SECTION 9 – PILING (CONT'D)

Cast-in-Situ Concrete Piles Affected by


Non-Tidal Open Water or Tidal Water
(Cont'd)

800mm diameter vertical bored empty bore,


blasting not permitted, compressed air
not permitted
3.09.09 preliminary piling 2 m

3.09.10 main piling 22 m

Extra over for grade 43A mild steel


permanent lining 10mm thick
preliminary piling
3.09.11 800mm diameter 52 m
vertical bored pile

main piling
3.09.12 800mm diameter 1202 m
vertical bored pile

Extra over for breaking out obstructions


preliminary piling
3.09.13 800mm diameter 2 m³
vertical bored pile
main piling
3.09.14 800mm diameter 46 m³
vertical bored pile

Extra over for toeing-in 800mm diameter


vertical bored pile to bedrock
preliminary piling
3.09.15 exceeding 0.50m 2 nr
but not exceeding
1.00m in depth

main piling
3.09.16 exceeding 0.50m 30 nr
but not exceeding
1.00m in depth
CARRIED TO COLLECT

Item No. Item Description Quantity Unit Rate ($)

SECTION 9 – PILING (CONT'D)

Cast-in-Situ Concrete Piles Affected by


Non-Tidal Open Water or Tidal Water
(Cont'd)

Extra over for toeing-in 800mm diameter


vertical bored pile to bedrock
main piling
3.09.17 exceeding 1.00m 16 nr
but not exceeding
1.50m in depth

Minipiles Affected by Non-Tidal Open Water


or Tidal Water

219mm diameter vertical minipile pile shaft,


blasting not permitted, compressed air not
permitted
3.09.18 preliminary piling 32 m

3.09.19 main piling 1487 m

219mm diameter raking minipile pile shaft,


blasting not permitted, compressed air not
permitted
3.09.20 preliminary piling 33 m

3.09.21 main piling 394 m

219mm diameter vertical minipile empty bore,


blasting not permitted, compressed air not
permitted
3.09.22 preliminary piling 1 m

3.09.23 main piling 21 m

CARRIED TO COLLECT

Item No. Item Description Quantity Unit Rate ($)

SECTION 9 – PILING (CONT'D)

Minipiles Affected by Non-Tidal Open Water


or Tidal Water (Cont'd)

219mm diameter raking minipile empty bore,


blasting not permitted, compressed air not
permitted
3.09.24 preliminary piling 1 m
3.09.25 main piling 23 m

Permanent casings, Grade 43A mild steel


preliminary piling
3.09.26 219mm diameter 27 m
vertical minipile

3.09.27 219mm diameter 28 m


raking minipile

main piling
3.09.28 219mm diameter 1257 m
vertical minipile

3.09.29 219mm diameter 334 m


raking minipile

Extra over for breaking out obstructions


preliminary piling
3.09.30 219mm diameter 1 m³
vertical minipile

3.09.31 219mm diameter 1 m³


raking minipile

main piling
3.09.32 219mm diameter 46 m³
vertical minipile

3.09.33 219mm diameter 12 m³


raking minipile

CARRIED TO COLLECT

Item No. Item Description Quantity Unit Rate ($)

SECTION 9 – PILING (CONT'D)

Minipiles Affected by Non-Tidal Open Water


or Tidal Water (Cont'd)

Extra over for toeing-in 219mm diameter


vertical minipile to bedrock
3.09.34 preliminary piling 1 nr

3.09.35 main piling 46 nr

Extra over for toeing-in 219mm diameter


raking minipile to bedrock
3.09.36 preliminary piling 1 nr
3.09.37 main piling 12 nr

Pile heads
preliminary piling
3.09.38 219mm diameter 1 nr
vertical minipile

219mm diameter 1 nr
raking minipile

main piling
3.09.39 219mm diameter 46 nr
vertical minipile

219mm diameter 12 nr
raking minipile

CARRIED TO COLLECT

Item No. Item Description Quantity Unit Rate ($)

SECTION 9 – PILING (CONT'D)

Reinforcement for Cast-in-Situ Concrete


Piles Affected by Non-Tidal Open Water
or Tidal Water

High yield steel bar reinforcement


bars not exceeding 12.00m in
length
3.09.40 bar diameter not 9 t
exceeding 16mm

3.09.41 bar diameter 79 t


exceeding 16mm

Reinforcement for Minipiles Affected by


Non-Tidal Open Water or Tidal Water

High yield steel bar reinforcement


bars not exceeding 12.00m in
length
3.09.42 bar diameter not 120 t
exceeding 50mm

CARRIED TO COLLECT
COLLECTION

Page BQ3/10
Page BQ3/11
Page BQ3/12
Page BQ3/13
Page BQ3/14
Page BQ3/15
TOTAL OF SECTION 9 CARRIED TO SUMMARY

Item No. Item Description Quantity Unit Rate ($)

SECTION 10 - FORMWORK

Formwork

Formwork to give Class F1 finish


3.10.01 exceeding 300mm wide, at any 3 m2
inclination more than 5o up to and
including 85o to the horizontal

3.10.02 exceeding 300mm wide, at any 49 m2


inclination more than 85o up to
and including 90o to the horizontal

Formwork to give Class F2 finish


3.10.03 exceeding 300mm wide, horizontal 130 m2
or at any inclination up to and
including 5o to the horizontal

3.10.04 exceeding 300mm wide, at any 2421 m2


inclination more than 85º up to
and including 90º to the horizontal

3.10.05 not exceeding 300mm 52 m2


wide at any inclination
3.10.06 curved, girth and width exceeding 7 m2
300mm, at any inclination

Formwork to give Class F3 finish


3.10.07 exceeding 300mm wide, at any 184 m2
inclination more than 85º up to
and including 90º to the
horizontal

3.10.08 not exceeding 300mm wide at 47 m2


any inclination

Formwork to give Class F4 finish


3.10.09 exceeding 300mm wide, at any 553 m2
inclination up to and including
5º to the horizontal

CARRIED TO COLLECT

Item No. Item Description Quantity Unit Rate ($)

SECTION 10 - FORMWORK (CONT'D)

Formwork (Cont'd)

Formwork to give Class F4 finish


3.10.10 exceeding 300mm wide, at any 604 m2
inclination more than 5º up to
and including 85º to the horizontal

3.10.11 exceeding 300mm wide, at any 4401 m2


inclination more than 85º up to
and including 90º to the horizontal

3.10.12 not exceeding 300mm wide at 281 m2


any inclination

3.10.13 Curved, girth and width exceeding 150 m2


300mm at any inclination

3.10.14 Curved, girth or width not 1 m2


exceeding 300mm, at any
inclination

Formwork to give Class F4 finish, as part


of the permanent work
3.10.15 exceeding 300mm wide, horizontal 66 m2
or at any inclination up to and
including 5o to the horizontal

Formwork Affected by Non-Tidal


Open Water or Tidal Water

Formwork to give Class F1 finish


3.10.16 exceeding 300mm wide, at any 5 m2
inclination more than 5o up to and
including 85o to the horizontal

3.10.17 exceeding 300mm wide, at any 15 m2


inclination more than 85o up to
and including 90o to the horizontal

CARRIED TO COLLECT

Item No. Item Description Quantity Unit Rate ($)

SECTION 10 - FORMWORK (CONT'D)

Formwork Affected by Non-Tidal


Open Water or Tidal Water (Cont'd)

Formwork to give Class F2 finish


3.10.18 exceeding 300mm wide, at any 146 m2
inclination more than 85º up to
and including 90º to the horizontal

Formwork to give Class F3 finish


3.10.19 exceeding 300mm wide, at any 2 m2
inclination more than 85º up to
and including 90º to the horizontal

Formwork to give Class F4 finish


3.10.20 exceeding 300mm wide, at any 24 m2
inclination more than 5º up to
and including 85º to the horizontal

3.10.21 exceeding 300mm wide, at any 8 m2


inclination more than 85º up to
and including 90º to the horizontal

Formwork to give Class F4 finish, as a part


of the permanent work
3.10.22 exceeding 300mm wide, horizontal 43 m2
or at any inclination up to and
including 5º to the horizontal

3.10.23 exceeding 300mm wide, at any 2 m2


inclination more than 5º up to
and including 85º to the horizontal

3.10.24 not exceeding 300mm wide at 3 m2


any inclination
CARRIED TO COLLECT
COLLECTION

Page BQ3/16
Page BQ3/17
Page BQ3/18
TOTAL OF SECTION 10 CARRIED TO SUMMARY

Item No. Item Description Quantity Unit Rate ($)

SECTION 11 - STEEL REINFORCEMENT

Reinforcement

High yield steel bar reinforcement


bars not exceeding 12.00m in
length
3.11.01 bar diameter not 1094 t
exceeding 40mm
TOTAL OF SECTION 11 CARRIED TO SUMMARY

Item No. Item Description Quantity Unit Rate ($)

SECTION 12 - CONCRETE

In-Situ Concrete

Concrete Grade 20/20


3.12.01 ordinary Portland cement 19 m3

Concrete Grade 40/20


3.12.02 PFA and CSF concrete 3567 m3

3.12.03 PFA concrete 459 m3

Blinding concrete Grade 10/20


3.12.04 PFA concrete 283 m3

In-Situ Concrete Affected by Non-


Tidal Open Water or Tidal Water

Concrete Grade 20/20


3.12.05 ordinary Portland cement 4 m3

Concrete Grade 40/20


3.12.06 PFA and CSF concrete 116 m3

Precast Concrete

Precast Concrete Deflector


3.12.07 2050x250x150 as drawing 42 nr
DDN/276DS/1036

Formation of Channels in Slabs and Walls

Forming U-channel
3.12.08 200mm wide 34 m

Forming scum channel


3.12.09 225mm wide 44 m

Forming effluent channel


3.12.10 800mm wide 58 m

CARRIED TO COLLECT

Item No. Item Description Quantity Unit Rate ($)


SECTION 12 - CONCRETE (CONT'D)

Protective Coating for Concrete

3.12.11 Anticorrosion concrete coating system 6363 m2

CARRIED TO COLLECT
COLLECTION

Pages BQ3/20
Pages BQ3/21
TOTAL OF SECTION 12 CARRIED TO SUMMARY

Item No. Item Description Quantity Unit Rate ($)

SECTION 16 - BEARINGS
AND MOVEMENT JOINTS

Movement Joints Formed In-Situ


Non-absorbent compressible joint filler
3.16.01 20mm thick 126 m2

Polyurethane-based joint sealent


3.16.02 20x20mm 283 m

PVC centre-bulb waterstop


3.16.03 250mm wide 98 m

PVC rearguard waterstop


3.16.04 250mm wide 163 m

Stainless steel dowel


3.16.05 25mm diameter x 600mm long 724 nr
with dowel sleeve 400mm long
with 25mm compressible joint
filler in end

3.16.06 Plastic sliding membrane 2 m2

TOTAL OF SECTION 16 CARRIED TO SUMMARY

Item No. Item Description Quantity Unit Rate ($)

SECTION 23 - FINISHINGS

Finishes - Internal

Ceramic tiles with backing, 25mm overall


thickness
to walls and columns
3.23.01 100 x 100 x 5 mm thick 83 m2

Glazed ceramic tiles with screed, 40mm


overall thickness
to floors
3.23.02 100 x 100 x 9 mm think 354 m2

Ceramic coved base tiles with backing,


25mm overall thickness
to walls and columns
3.23.03 100 x 100 x 9 mm thick 33 m2

Gypsum plaster
to soffits and beams
3.23.04 15mm thick 40 m2

3.23.05 to walls and columns


15mm thick 47 m2

Painting one coat of alkali resistant primer


3.23.06 to soffits and beams 40 m2

3.23.07 to walls and columns 47 m2

Painting two coats semigloss plastic emulsion


paint
3.23.08 to soffits and beams 40 m2

3.23.09 to walls and columns 47 m2

Finishes - External

Texture spray coating system


3.23.10 to soffits and beams 641 m2

TOTAL OF SECTION 23 CARRIED TO SUMMARY

Item No. Item Description Quantity Unit Rate ($)

SECTION 25 - TESTING

Pile Testing

Load test bored pile


to twice the vertical working load
specified in the Contract
3.25.01 preliminary piling 1 nr

to twice the horizontal working


load specified in the Contract
3.25.02 preliminary piling 1 nr

Load test minipile


to twice the vertical working load
specified in the Contract
3.25.03 preliminary piling 1 nr

to twice the raking working load


specified in the Contract
3.25.04 preliminary piling 1 nr

Sonic test bored pile


3.25.05 preliminary piling 56 m

3.25.06 main piling 1266 m

Core test 100mm diameter


bored pile
3.25.07 preliminary piling 28 m

3.25.08 main piling 280 m

Integrity test
bored pile
3.25.09 preliminary piling 1 nr

3.25.10 main piling 5 nr

CARRIED TO COLLECT

Item No. Item Description Quantity Unit Rate ($)

SECTION 25 - TESTING
(CONT'D)

Testing Water Retaining Structure And


Air Tight Structures

Testing water retaining structures


3.25.11 primary sedimentation tanks no. 13 --- item sum
to 16 from the inlet chamber to
outlet chamber

Pressure Testing Pipe Joints, Pipelines and


Fittings

Pressure testing pipeline


3.25.12 200mm diameter 2 nr
CARRIED TO COLLECT
COLLECTION

Page BQ3/24
Page BQ3/25
TOTAL OF SECTION 25 CARRIED TO SUMMARY

Item No. Item Description Quantity Unit Rate ($)

SECTION 26 - MISCELLANEOUS

Doors, Windows, Louvres and


Roller Shutters

Doors
3.26.01 type D1 2 nr

3.26.02 type D8 1 nr

Louvres
3.26.03 type L16 1 nr

Vertical folding doors


3.26.04 type FD8 1 nr

3.26.05 type FD9 1 nr

Sundry Metalwork

Flooring
3.26.06 aluminium chequer plate cover 20 m2

3.26.07 Aluminium alloy weir plate 116 m

Work for Electrical and Mechanical


Installations

3.26.08 Earthpits / lightning pits 3 nr

Fiberglass Reinforced Plastic (FRP)


Catladders / Staircases

FRP catladder as
drawing DDN/276DS/1158
3.26.09 Type A, 1600mm high 2 nr

3.26.10 Type E, 5800mm high 1 nr

CARRIED TO COLLECT

Item No. Item Description Quantity Unit Rate ($)

SECTION 26 - MISCELLANEOUS
(CONT'D)

Fiberglass Reinforced Plastic (FRP)


Handrailing

3.26.11 FRP handrailing 583 m

3.26.12 FRP curved handrailing 3 m

Fiberglass Reinforced Plastic (FRP)


Grating

FRP grating
3.26.13 open mesh 225 m2

3.26.14 covered 160 m2


CARRIED TO COLLECT
COLLECTION

Page BQ3/26
Page BQ3/27
TOTAL OF SECTION 26 CARRIED TO SUMMARY

Description Amount ($)

BILL NO. 3

SECTION 2 OF WORKS

SUMMARY

Page No. Summaries brought forwards from

BQ 3/1 Section 2 - Ground Investigation

BQ 3/2 Section 5 - Drainage and Ducts

BQ 3/6 Section 6 - Pipeline

BQ 3/9 Section 7 - Earthworks

BQ 3/15 Section 9 - Piling

BQ 3/18 Section 10 - Formwork

BQ 3/19 Section 11 - Steel Reinforcement

BQ 3/21 Section 12 - Concrete

BQ 3/22 Section 16 - Bearing and Movement Joints

BQ 3/23 Section 23 - Finishings

BQ 3/25 Section 25 - Testing

BQ 3/27 Section 26 - Miscellaneous


Total of Bill No. 3 Carried to Grand Summary
Amount ($)

Amount ($)
Amount ($)
CARRIED TO COLLECTION

Amount ($)
CARRIED TO COLLECTION

Amount ($)
CARRIED TO COLLECTION

Amount ($)
CARRIED TO COLLECTION

Amount ($)
CARRIED TO COLLECTION

Amount ($)
CARRIED TO COLLECTION

Amount ($)

CARRIED TO COLLECTION
Amount ($)

CARRIED TO COLLECTION

Amount ($)
CARRIED TO COLLECTION

Amount ($)
CARRIED TO COLLECTION

Amount ($)
CARRIED TO COLLECTION

Amount ($)
CARRIED TO COLLECTION

Amount ($)
CARRIED TO COLLECTION

Amount ($)
CARRIED TO COLLECTION

Amount ($)
CARRIED TO COLLECTION

Amount ($)
CARRIED TO COLLECTION

Amount ($)
Amount ($)

CARRIED TO COLLECTION

Amount ($)
CARRIED TO COLLECTION

Amount ($)
Amount ($)
Amount ($)
CARRIED TO COLLECTION

Amount ($)
CARRIED TO COLLECTION

Amount ($)
CARRIED TO COLLECTION

Amount ($)
CARRIED TO COLLECTION

Amount ($)