COSTING SUMMARY - VMM

Basic amount
Sr.
Description Area (without CPOH & Amount
No.
Tax)
1 Base Build excluding. Mezzanine Err:504 Err:504
2 Mezzanine (Process + AHU) Err:504 Err:504
3 Development works Err:504 Err:504
Total Err:504 Err:504
COSTING DETAILS - VMM

Sr.
Activity Unit Area Rate
No.
A Boundary Wall and Road Works
1 Boundary Wall Rmt
2 saucer drain Rmt
3 Kerb Rmt
4 Kerb Stone Painting Rmt
5 Crash barrier Rmt
6 Concrete Road Sqft
7 Truck Paver Parking Sqft
8 Pathway Paver Sqft
9 Covered Pathway Rmt
10 Covered Parking for Bike and Car (U/G) Sqft
11 Road Marking on total Land Area Acre
12 Green Area with landscape on total land area Sqft
13 Garden Hydrant ( irrigation ) on total land area Sqft
B Plumbing , STP and UG Tanks
1 Storm (Drainage) & Sewerage Cost Acre
2 Rain Water harvesting. Acre
3 STP Lac Sqft
4 WTP plant Lac Sqft
5 Equilation tank Lac Sqft
6 Fire water Tank KLD
7 Raw/Clear Water Supply KLD
8 Pump Room Mechanical Works Sqft
9 Service Croosing on land area Acre
10 Water supply network/Plumbing Lac Sqft
11 Toilets inside warehouse Sqft
C FC- Civil , PEB and Allied Works
1 Main Structure ( PEB ) Sqft
2 MS Canopy 8 mtr canopy Sqft
3 Inside flooring FM2 Sqft
4 FC. Civil Works Sqft
5 External Staircase ( G + 3 ) Each
6 External Staircase Railing ( G + 3 ) Each
7 External Small Staircase ( G +1 ) Each
8 External Small Staircase Railing Each
9 External Small Staircase ( G ) Each
10 External Small Staircase Railing Each
11 Dock leveller Each
12 Sectional Door ( 4000 X 5000) Each
13 Sectional Door ( 2400 X 3000) Each
14 Dock Edge No
15 Additional dock door and dock edge or cafeteria no
16 Bus Shelter Each
17 Fire Doors Each
18 Roof Lifeline Sqft
COSTING DETAILS - VMM

Sr.
Activity Unit Area Rate
No.
D Process Mezzanine
1 MS structural Steel Procss Mezzanine Sqft
2 Mezzanine Process flooring Sqft
3 Mezzanine Civil Works for process Mezzanine Sqft
4 Mezzanine Staircase Each
5 Mezzanine Staircase Railing Each
E AHU Mezzanine
1 MS structural Steel AHU Mezzanine Sqft
2 Mezzanine AHU flooring Sqft
3 Mezzanine Civil Works for AHU Mezzanine Sqft
COSTING DETAILS - VMM

Sr.
Activity Unit Area Rate
No.
F Fire System
1 Roof Sqft
2 Process Mezzanine Sqft
3 External Hydrant ( Boundary Wall ) Rmt
4 Internal Hydrant ( Main Header Roof ) Sqft
G Electrical.
1 Transformer KVA
2 Lighting Protection System Sqft
3 Light Pole on every 20 meter Each
4 Hign side installation Sqft
5 Equipotential Earthing Sqft
6 Wall Light Sqft
7 Utility incomers Sqft
H Other works
1 HT Room ( Civil Work ) Sqft
2 LT Room ( Civil Work ) Sqft
3 Meter Room civil Works Sqft
4 Driver Room Sqft
5 Guard room Civil Works Sqft
6 Sliding Gate Each
7 DG foundation incl. Stack Sqft
8 Chilller Foundation Sqft
9 Transformer Foundation Sqft
10 Cattle Trap LS
11 Dock Platform civil work Sqft
12 Sliding Railing For Dock Platform RMT
13 Structural works for Dock Leveller Each
14 Façade Work at Entrance LS
15 Cement concrete floor around the warehouse Sqft
I Total
GST @ 18% Total

Err:504 Err:504
Err:504 Err:504
Err:504 Err:504
Err:504 Err:504
Amount with 18%
Amount
GST
Amount with 18%
Amount
GST
Amount with 18%
Amount
GST

- -