Description of Work Drawing: Off Take
Description of Work Drawing: Off Take
Description of Work Drawing: Off Take
+13.754
+13.084
+13.754
+13.084
+13.854
+13.154 +13.154
+12.494
Hauling earthfill material from Borrow Area to Embankment with hauling distance
20 - 25 km
SEGMENT-1 14.58 m3
Potongan I - I L = 3.00 m
Area = 4.86 m2
Volume = area x L1
= 4.86 x 3.00
= 14.58 m3
SEGMENT-2 10.05 m3
Potongan I - I L = 20.50 m
Area = 0.49 m2
Volume = area x L1
= 0.49 x 20.50
= 10.05 m3
SEGMENT-3 10.05 m3
Potongan I - I L = 20.50 m
Area = 0.49 m2
Volume = area x L1
= 0.49 x 20.50
= 10.05 m3
SEGMENT-4 10.05 m3
Potongan I - I L = 20.50 m
Area = 0.49 m2
Volume = area x L1
= 0.49 x 20.50
= 10.05 m3
SEGMENT-3 0.00 m3
Potongan Ts2-Ts2 L = m
SEGMENT-4 0.00 m3
Potongan Ts4-Ts4 L = m
Area J = 1.39 m2
Volume = area x L
= 1.39 x 0.00
= 0.00 m3
SEGMENT-6 0.00 m3
Potongan Ts4-Ts4 L = m
Area J = 1.09 m2
Volume = area x L
= 1.09 x 0.00
= 0.00 m3