1. Introduction................................ ................................ ................... 1-1
1.1 Study Development ................................ ................................ .......................... 1-1
1.2 Objectives of the Study................................ ................................ ..................... 1-1
1.3 Study Area................................ ................................ ................................ ........ 1-1
1.4 Structure of the Study ................................ ................................ ....................... 1-3
1.5 Study Organization ................................ ................................ ........................... 1-4
1.6 Technology Transfer ................................ ................................ ......................... 1-6
Table 3.2.1 Population and Population Density by Zone, 1998 ............................................... 3-7
Table 3.2.2 Number of Employed Persons on Workplace Basis, 1998 .................................... 3-10
Table 3.3.1 Environmental Impact by Surface Transport Sector in General ............................ 3-13
Table 3.3.2 Total Amount of NOx Emission from Road Transport by Type in EU................... 3-14
Table 3.3.3 Projection of CO2 Emission in Europe, 1990 ........................................................ 3-14
Table 3.3.4 Table Energy Consumption by Transport Sector in Europe, 1970-1990 ............... 3-16
Table 3.3.5 Energy Consumption and Emission by Different Passenger Transport in UK ...... 3-16
Table 3.3.6 Measures to Control the Environmental Impact in EU.......................................... 3-17
Table 3.3.7 Summary Urban Environmental Issues.................................................................. 3-19
Table 3.3.8 NO2 and PM Concentrations in Bucharest ............................................................ 3-20
Table 3.3.9 SO2 Concentration in Bucharest ............................................................................ 3-20
Table 3.3.10 Lead Concentration in Bucharest......................................................................... 3-20
Table 3.3.11 Air Quality Monitoring in Bucharest, 1995-1996................................................ 3-21
Table 3.3.12 Location of Supplemental Air Monitoring........................................................... 3-23
Table 3.3.13 Emission Amount in CEE Countries ................................................................... 3-28
Table 3.3.14 Waste Generation and Disposal Capacity in Bucharest ....................................... 3-29
Table 3.3.15 Roadside Noise Level in Bucharest ..................................................................... 3-30
Table 3.3.16 Green Area Distribution by Sector....................................................................... 3-30
Table 3.3.17 EIA Requirement for Transportation Projects ..................................................... 3-32
Table 3.3.18 Matrix of Environmental Regulations by Transport Mode in Romania .............. 3-34
Table 3.3.19 Area Charge System for Heavy Vehicle ............................................................... 3-35
Table 3.3.20 Summary of Air Monitoring System in Bucharest .............................................. 3-35
Table 3.3.21 Subject Substances for Air Quality Monitoring................................................... 3-35
Table 3.3.22 Frequency of Air Quality Monitoring .................................................................. 3-36
Table 3.3.23 Example of Vehicle Taxes on New Local and Imported Car ............................... 3-37
Table 3.3.24 Vehicle Inspection Period..................................................................................... 3-37
Table 3.3.25 Measures to Control the Environmental Impact
in Transport Sector, EU and Romania................................................................. 3-38
Table 11.2.1 Comparison of Future Traffic Volume and Capacity ........................................... 11-5
Table 11.2.2 Future Public Transport Demand and Capacity ................................................... 11-8
Table 11.2.3 Investment by RATB............................................................................................ 11-9
Table 11.2.4 Alternative Road Network Cases ......................................................................... 11-11
Table 11.2.5 Explanation of Four Alternatives ......................................................................... 11-22
Table 11.2.6 Future Transport Demand by Alternative............................................................. 11-22
Table 11.2.7 VOC Saving and Time Saving ............................................................................. 11-23
Table 11.2.8 Economic Costs of Alternatives........................................................................... 11-26
Table 11.2.9 Benefit from Each Alternative ............................................................................. 11-27
Table 11.2.10 Environmental Evaluation of Master Plan Alternative ...................................... 11-28
Table 11.2.11 Summary of Economic Evaluation .................................................................... 11-28
Table 11.3.1 Summary of Future Traffic Demand Crossing Ring and Radial Roads............... 11-33
Table 17.2.1 Necessary Number of Bus Berths – Gara de Nord .............................................. 17-5
Table 17.2.2 Future Railway Passengers at Gara de Nord........................................................ 17-5
Table 17.2.3 Number of Vehicles Parked in Gara de Nord Area .............................................. 17-7
Table 17.2.4 Long Distance Buses ........................................................................................... 17-7
Table 17.2.5 Necessary Number of Berths - Obor.................................................................... 17-15
Table 17.2.6 Number of Vehicles Parked in Obor Area ............................................................ 17-15
Table 17.2.7 Necessary Number of Berths - Sudului ............................................................... 17-21
Table 17.2.8 Number of Vehicles Parked in Sudului Area........................................................ 17-21
Table 17.2.9 Related Road Conditions ..................................................................................... 17-25
Table 17.2.10 (1) Traffic Volume Capacity Analysis at Pta.Sudului......................................... 17-32
Table 17.2.10 (2) Traffic Volume Capacity Analysis at Pta.Sudului......................................... 17-33
Table17.2.11 Comparative Analysis for Sudului Intersection .................................................. 17-41
Table 17.3.1 Piata Improvement Cost Estimation .................................................................... 17-42
Table 17.3.2 Intersection Improvement Cost............................................................................ 17-43
Table 17.4.1 Improvement Schedule of Piatas ......................................................................... 17-44
Table 17.5.1 Economic Analysis of Piata Improvement........................................................... 17-45
Table 17.5.2 Sensitivity Analysis for Piata Improvement Project ............................................ 17-46
Table 17.5.3 Capacity and Construction Cost of Parking Facilities ......................................... 17-46
Table 17.5.4 Result of Parking Development Project at Three Piatas ...................................... 17-46
Table 17.5.5 Environmental External Cost of Gara de Nord.................................................... 17-49
Table 17.5.6 Environmental External Cost of Piata Obor ........................................................ 17-49
Table 17.5.7 Environmental External Cost of Piata Sudului .................................................... 17-49
Table 17.5.8 Matrix Table of Environmental Impacts by Project Pahse -Gara de Nord........... 17-50
Table 17.5.9 Matrix Table of Environmental Impacts by Project Phase- Obor ........................ 17-51
Table 17.5.10 Matrix Table of Environmental Impacts by Project Phase- Sudului .................. 17-52
Table 19.2.1 Candidate Routes for Public Transport Corridor ................................................. 19-2
Table 19.2.2 Assumed Specification of New Type Tram.......................................................... 19-3
Table 19.2.3 Directions of the Development of New Type Tram ............................................. 19-3
Table 19.2.4 Comparison of Tram Route Alternatives at Piata Unirii ...................................... 19-5
Table 19.2.5 Comparison of Tram Route Alternatives for the Section
between Piata Unirii and Piata Latina ................................................................ 19-7
Table 19.2.6 Characteristics of Track Location ........................................................................ 19-9
Table 19.2.7 Standard Cross Section Plan ................................................................................ 19-11
Table 19.2.8 Route Data Relevant to the New Type Tram Route ............................................. 19-13
Table 19.2.9 Intersections on the Route ................................................................................... 19-14
Table 19.2.10 Types of Public Transport Control System ........................................................ 19-15
Table 19.2.11 Existing Power Substantions Related to the Route
between Colentina and Alexandria ................................................................... 19-15
Table 19.2.12 Estimated Charge Level of Power Supply for the New Type Tram
on the Route between Colentina and Alexandria ............................................. 19-16
Table 19.2.13 Operation Plan of New Type Tram .................................................................... 19-17
Table 19.3.1 Project Costs Estimation...................................................................................... 19-19
Table 19.4.1 Implementation Schedule .................................................................................... 19-20
Table 19.5.1 Economic Evaluation of New Type Tram Project................................................ 19-21
Table 19.5.2 Sensitivity Analysis for New Type Tram Project ................................................. 19-21
Table 19.5.3 Outline of New Type Tram .................................................................................. 19-22
Table 19.5.4 Environmental External Costs –New Tram.......................................................... 19-23
Table 19.5.5 Matrix Table of Environmental Impacts by Project Phase- New Tram................ 19-23
Figure 9.1.1 Working Process for Proposed Urban Development Pattern................................ 9-1
Figure 9.3.1 Uncontrolled Development Pattern ...................................................................... 9-3
Figure 9.3.2 Intensive Multi-centered Development Pattern.................................................... 9-3
Figure 9.3.3 Dispersed Multi-centered Development Pattern .................................................. 9-3
Figure 9.4.1 Location of Planned Centers ................................................................................ 9-7
Figure 9.5.1 Division of 8 Integrated Zones............................................................................. 9-10
Figure 14.3.1 Speed Related Emission Factors for Different Engine Types (EU) ................... 14-13
Figure 14.3.2 Emission Amount of Master Plan Option-1 ....................................................... 14-13
Figure 14.3.3 Emission Amount of Master Plan Option-2 ....................................................... 14-14
Figure 14.3.4 Impact Identification Flow by Phases ................................................................ 14-17
Figure 15.1.1 General Flow for the Determination of Implementation Schedule .................... 15-1
Figure 15.1.2 Implementation Schedule................................................................................... 15-3
Figure 15.2.1 Relation between Basic Strategies and Selected Projects
to be Further Studied. ......................................................................................... 15-4
Figure 15.4.1 Key Issues Regarding Customer Satisfaction..................................................... 15-15
Figure 15.4.2 Key Issues Regarding Productivity and Cost Recovery Ratio ........................... 15-17
Figure 18.2.1 Parking Zones in the Central Area of Bucharest ................................................ 18-2
Figure 18.2.2 Road Classification in Terms of Road Use ........................................................ 18-5
Figure 18.2.3 Location of the Parking Development Sites....................................................... 18-7
Figure 18.2.4 Layout Plan of Parking Academiei / Doamnei................................................... 18-8
Figure 18.2.5 Layout Plan of Piata Decebal Parking ............................................................... 18-9
Figure 18.2.6 Layout Plan of Parking Balcescu ....................................................................... 18-10
Figure 18.2.7 Parking Information System .............................................................................. 18-11
Figure 18.4.1 First Stage Parking Restriction Area .................................................................. 18-13
Figure 18.5.1 Comparison of Emission Amount (CO2 and NOx) –
Parking Facility Development .................................... 18-17
Figure 19.2.1 Candidate Routes for Public Transport Corridor ............................................... 19-2
Figure 19.2.2 Improvement of Running Conditions................................................................. 19-4
Figure 19.2.3 Alternatives for Piata Unirii Area....................................................................... 19-6
Figure 19.2.4 Proposed Route at Piata Unirii........................................................................... 19-7
Figure 19.2.5 Alternatives for the Section between Piata Unirii and Piata Latina ................... 19-8
Figure 19.2.6 Proposed Locations of Tram Track .................................................................... 19-10
Figure 19.2.7 Routes Relevant to the New Tram Route ........................................................... 19-12
Figure 19.2.8 Number of Existing Tram Operation at Peak Period.......................................... 19-12
Figure 19.2.9 Improvement of Tram Control System............................................................... 19-14
Figure 19.2.10 Power Supply System for New Type Tram ...................................................... 19-16
Figure 19.2.11 Transferring between Tram and Bus ................................................................ 19-18
Figure 19.2.12 The Level of New Type Tram........................................................................... 19-18
Figure 19.2.13 Improvement Plan of Platform (1) ................................................................... 19-18
Figure 19.2.14 Improvement Plan of Platform (2) ................................................................... 19-19
Figure 19.5.1 Estimation of Emission Amount (CO2 and NOx) – New Tram........................... 19-22
Figure 20.2.1 Types of Fare Collection and Ticketing Checking ............................................. 20-7
List of Terms and Abbreviations – English and Romanian
The background, objectives, Study area, etc. are described in this Chapter.
The preparatory study team headed by Dr. Hitoshi Ieda, was dispatched by JICA to Romania
and the Scope of Work for the Study was agreed in February of 1998. The full-scale site study
in Romania began in July 1998 and the Inception Report of the Study was submitted in
September 1998.
1-1
1.4 Structure of the Study
The structure of this Study is composed of three parts, that is, data collection and analysis of
the existing situation, formulation of the Master Plan, and the Study of priority projects.
In the first part, various traffic surveys, including the person trip survey, were conducted and
the existing traffic situation was analyzed based on the survey results, collected data, and
other information. In the second part the Master Plan was formulated to integrate the future
urban structure, road plan and public transport plan. In the last part, five projects selected
among the ones recommended in the Master Plan were studied in more detail.
Figure 1.4.1 and Figure 1.4.2 show the study sturucture and study schedule.
2 Socio-Economic
Conditions
18 Parking
9 Urban 13 Public System
Development Development in the
Pattern Transport Plan
5 Road Central Area
Facilities and
Road Traffic
20 Fare
15 Action Plan System
Improvement
7 Problems and
Issues
&TCHV
+PEGRVKQP 2TQITGUU +PVGTKO (KPCN
(KPCN
4GRQTV 4GRQTV 4GRQTV 4GRQTV
4GRQTV
1-3
The following reports were prepared and submitted to the Romanian side.
1) Inception Report
Thirty copies (30) in English at the beginning of September 1998 after the discussion on
the contents of the Inception Report prepared in Japan
2) Progress Report
Thirty (30) copies in English in the middle of February 1999 after the preliminary
formulation of the Master Plan
3) Interim Report
Thirty (30) copies in English at the beginnig of May 1999 after the selection of the
priority projects
4) Draft Final Report
Thirty (30) copies of main report in English and thirty (30) copies of summary report in
English at the end of December 1999 after finishing the Study
5) Final Report
Thirty (30) copies of main report in English and thirty (30) copies of summary report in
English at the end of March 2000 after modifying the report based on the comments from
the Romanian side
The members of the Study Team, JICA Advisory Committee, Romanian Counterpart Team,
Romanian Steering Committee, and related governmental officials are listed in the following
page.
1-4
1.6 Technology Transfer
During the Study period the members of the Study Team transferred various technologies
such as how to conduct the person trip survey, how to forecast the future traffic demand, how
to use the JICA STRADA, how to formulate the Master Plan, etc. These technologies were
deepened through the counterpart meetings, workshops, a seminar, and counterpart training in
Japan.
(1) Counterpart Meeting
The counterpart meetings were held almost once a week with the attendance of the members
of the Study Team and counterparts. The main topics were selected from the work items
studied during the last week. Especially the following topics were discussed in detail.
nHow to conduct the person trip survey
nResult of the person trip survey
nFuture socio-economic situation
nFuture traffic demand
nVehicle assignment on the road network
nFormulation of the Master Plan
nSelection of the priority projects
1-6
2. Socio-Economic Conditions
2. Socio-Economic Conditions
The GDP has been growing the revolution until 1996, however, the growth rate of the
GDP has been deteriorating since then. The population has been decreasing constantly at a
rate of –0.35% during the past 7 years. The population as of 1998 was 2,149 thousand
persons. The number of vehicles registered increased rapidly to 571 thousand vehicles, of
which passenger cars accounted for 75.2 % in 1998.
Comparing the GDP in Romania with that in the east European transition economies as shown
in Table 2.1.9, the scale of GDP is not so small; however, the per capita GDP—a more
appropriate measure of economic development—is substantially lower in Romania than all
other countries except Bulgaria.
2-1
* ' 3 F R Q V WD Q WS ULF H V
GDP
800
780
760
740
720
700
680
660
640
620
1992 1993 1994 1995 1996 1997
Table 2.1.2 shows GDP by category in 1996 and 1997 in current prices. Figure 2.1.2.shows
the GDP by category in 1997. Comparing each category of GDP in 1997 with that in 1996 in
constant prices, only the two categories of “Agriculture” and “Communications” barely
maintain the same production levels of the previous year. The production levels of other
categories were lower than those in the previous year, especially, “construction” which
showed a large decrease of 22% in 1997. Industrial activities also decreased, in spite of a
sector representing the major and the most important economic activities. It is expected that
the Romanian Government will take some measures to revitalize industrial activities.
2-2
*'3E\&DWHJRULHV
6%
3%
6% 20%
3%
7%
10%
6% 39%
According to the past trend of GDP by category from 1992 to 1996 (Table 2.1.3), the
production levels of the primary (“Agriculture”) and secondary (“Industry”) sectors remained
below those of 1990. On the other hand, for “Construction” and “Services” the production
levels in 1994 and 1995 respectively exceeded those in 1990. Only “Construction” barely
maintained its 1990 production level in 1997. GDP has also never exceeded the level of 1990.
Even in 1997, GDP was only 87.1% of that in 1990.
Looking at the composition of GDP in Table 2.1.4, the share of GDP represented by
“Agriculture” decreased steadily from 1993 to 1997. Other activities have fluctuated; however,
during 1995 to 1997 the GDP share for “Industry” increased and that for “Services” decreased.
As a result, the GDP shares in 1997 were 35.6% for “Industry”, followed by “Services” at
33.9% and “Agriculture” at 18.8%.
Generally, with economic development, the share of service activities is expected to increase;
however, the Romanian service activities remained stagnated. This situation demonstrates that
the present Romanian economic structure has not changed much from the centrally planned
economy.
2-3
Table 2.1.4 Structure of GDP by Categories
Items 1992 1993 1994 1995 1996 1997
Agriculture* 19.1 21.0 19.9 19.8 19.1 18.8
Industry 38.3 33.8 36.2 32.9 34.2 35.6
Construction 4.8 5.2 6.5 6.6 6.9 5.4
Services 40.6 36.9 33.7 36.0 35.3 33.9
Adjustment** -4.7 -4.2 -4.0 -3.0 -2.8 -1.7
Gross value added 98.1 92.7 92.3 92.3 92.7 92.0
Taxes on product 8.1 9.3 7.7 7.7 7.3 7.6
Customs duties 1.4 1.5 1.3 1.7 1.7 1.4
Subsidies on product -7.6 -3.5 -1.3 -1.7 -1.7 -1.0
Gross domestic product 100.0 100.0 100.0 100.0 100.0 100.0
Source : Romanian Statistical Yearbook 1997
Note: (Unit : %)
At this moment privatization in the industry sector is one of the most critical issues for the
Romanian economy; however, it is proceeding very slowly. By 1996 the economic activity of
the private sector accounted for only 52% of GDP, despite the fact that the agriculture and
service sectors had already privatized to levels of 91% and 70%, respectively, as shown in
Table 2.1.5. Also share of private sector in export and import production levels accounted for
only 51.4% and 48.3%, respectively. Nevertheless, by proceeding with further privatization,
the present low share will increase.
The current restructuring plan for “Régies Autonomes” (state owned enterprises) by the
national government is expected to accelerate privatization of these major loss-making
government corporations. At present the government desire to join EU depends on the
process of a rapid privatization, abolition of various regulations and decrease of foreign debt.
2-4
Table 2.1.6 Foreign Trade
Item 1991 1992 1993 1994 1995 1996 1997
Export (FOB) 4,266 4,363 4,892 6,151 7,910 8,084 8,431
(of which private sector) 679 1,201 1,364 2,481 3,259 4,156
(Share %) 16 28 28 40 41 51
Import (FOB) 5,372 5,784 6,020 6,562 9,487 10,555 10,411
(of which private sector) 864 1,898 1,636 2,573 4,306 5,096
(Share %) 16 33 27 39 45 48
Total -1,106 -1,421 -1,128 -411 -1,577 -2,471 -1,980
(of which private sector) -185 -697 -272 -92 -1,047 -940
(Share %) 17 49 24 22 66 38
Import (CIF) 5,793 6,260 6,522 7,109 10,278 11,435 11,280
Export (1990=100) 73.9 75.6 84.7 106.5 137.0 140.0 146.0
Import (1990=100) 58.4 62.9 65.5 71.4 103.2 114.9 113.3
Source:1991-1996 data Romanian Statistical Yearbook
Note: (Million US$)
The main export trade items are “Miscellaneous manufactured articles” and “Manufactured
goods”, which in 1997 accounted for 34.9 % and 25.6 %, respectively, followed by
“Machinery & transport equipment” at 14%. On the other hand, main import items are
“Machinery & transport equipment” and “Manufactured goods”, which in 1997 accounted for
26.5 % and 23.1 %, respectively, followed by “Mineral fuel & related materials” at 18.9 %.
The recent trend of exports and imports is shown in Table 2.1.7.
Table 2.1.8 shows major trading partners in 1997, and indicates that the EU is the largest
partner for exports and imports representing 71.3 % and 75.6%, respectively, of the total.
Among EU countries, Germany and Italy are currently Romania’s main trading partners. In
the past, the former Soviet Union was a main partner for gas, crude oil and raw material
imports; however, Russia’s importance as a trade market has decreased significantly in the
past several years.
2-5
Table 2.1.8 Foreign Trade by Groups of Region and Countries
Countries Export (FOB) Import (CIF)
Value (Million Share (%) Value (Million Share (%)
UD$) US$)
Total 8,431 100.0 11,280 100.0
Europe 6,010 71.3 8,530 75.6
(EU) 4,768 56.6 5,922 52.5
(Germany) 1,419 16.8 1,851 16.4
(Italy) 1,643 19.5 1,784 15.8
(France) 465 5.5 648 5.7
(Bulgaria) 57 0.7 56 0.5
(Poland) 102 1.2 90 0.8
(Russia) 250 3.0 1,356 12.0
Asia 1,466 17.4 1,584 14.0
(Turkey) 354 4.2 213 1.9
(India) 64 0.8 28 0.2
(Israel) 123 1.5 137 1.2
(Japan) 37 0.4 131 1.2
Africa 457 5.4 189 1.7
America 485 5.8 853 7.6
(U.S.A) 320 3.8 462 4.1
Oceania 13 0.2 124 1.1
Source : Foreign Trade Statistics
2-6
only 6.2% (133,305 persons) of the total. The total area of the Study Area is 61,681 ha, of
which 36,500 ha (61.6%) belongs to Ilfov. The population density of the Study Area in 1998
was 34.8 persons/ha; however, excluding the area of Ilfov, the population density reaches
80.1 persons/ha. Among sectors, Sector 2 had the highest density at 112.6 persons/ha,
followed by Sector 3 with 106.1 persons/ha. Population and population densities in 1998 are
summarized in Table 2.2.1. The map of six Sectors is shown in Figure 3.2.2.
P o p u la t io n b y S e c t o r
6% S e c to r 1
11%
19% S e c to r 2
18% S e c to r 3
S e c to r 4
S e c to r 5
13% S e c to r 6
18% I lf o v *
15%
Since the total population in Romania is about 22.7 million, the concentration of the
population in the Study area is about 10-11%. Comparing this ratio with that of capital cities
of the major European transition countries, Budapest (Hungary) is 20%, Warsaw (Poland) is
6%, and Sofia (Bulgaria) is 14%.
The population density in the Study area is almost the same as that in Vienna, Austria (38.6
persons/ha). In Vienna metro, tram, trolley bus and bus are used by the citizens as the public
transportation as in Bucharest, therefore, it is useful to observe the transport system of Vienna,
in order to improve the Bucharest transportation system for the tram track layout, ticketing
system, etc.
The average number of members per household was 2.8 persons in 1992 as shown in Table
2.2.2. The composition of working population, student and others in Bucharest was 45.9%,
18.4% and 35.7%, respectively. These composition rates did not differ significantly among
sectors.
2-7
Table 2.2.2 Population and Households in the 1992 Census
Sector Population Household Population Working population Student Others
per
household Persons % Persons % persons %
Sector 1 259,902 101,517 2.6 105,722 40.7 41,106 15.8 113,074 43.5
Sector 2 394,208 144,889 2.7 180,472 45.8 70,380 17.9 143,356 36.4
Sector 3 407,793 148,601 2.7 192,966 47.3 71,901 17.6 142,926 35.0
Sector 4 320,325 112,571 2.8 153,897 48.0 57,409 17.9 109,019 34.0
Sector 5 269,272 92,828 2.9 124,149 46.1 48,434 18.0 96,689 35.9
Sector 6 416,045 142,222 2.9 191,080 45.9 92,110 22.1 132,855 31.9
Bucharest 2,067,545 742,628 2.8 948,286 45.9 381,340 18.4 737,919 35.7
Ilfov* 127,776
Total 2,195,321
Source: Directia Generala De Statistica, Municipiului Bucuresti
Looking at the past trend of population, the total population of the Study Area has steadily
decreased from 2,195,321 persons in 1992 to 2,149,436 persons in 1998, by 45,885 persons as
shown in Table 2.2.3. The average annual population growth rate from 1992 to 1998 was –
0.35%. Within the Study Area, only Ilfov has experienced a relatively steady increase in
population with an average annual growth rate of 0.71%. These findings suggest that
population is dispersing from the central area of Bucharest to the suburban area. This can be
also understood from the fact that new shops, restaurants, entertainment centers, etc. are
locating in the city center and new houses have recently been constructed in the outskirts of
the city.
2-8
from the recent unfavorable economic situation, the actual number of unoccupied persons is
said to be much greater.
The number of pupils and students have increased and exceed the number of pensioners in
1998. In addition, the considerably high rate of “pensioner” of 471 thousands in 1998
characterizes the composition of population in Bucharest.
Table 2.2.5 indicates the industrial composition of the working population in residential areas.
In the industrial composition the share of working population of the primary industry
increased from 1.8% in 1992 to 3.7% in 1998, reflecting a slump of economic activities in the
secondary industry. The number of working population in the secondary industry drastically
decreased by 154 thousand persons from 1992 to 1998; on the other hand, in the tertiary
industry the working population increased from 443 thousand persons to 477 thousand
persons during the same period. As a result, the share of working population in the tertiary
industry increased from 46.5% in 1992 to 56.4% in 1998. On the other hand, the share of the
secondary industry decreased from 51.7% in 1992 to 40.0 % in 1998.
In the Study Area most factories are located near terminal metro stations in the suburban areas.
Before the December 1989 revolution, most workers commuted from their apartments in the
city to these factories using mainly metro; however, the recent slump of these factories
constitutes one of the reasons for the decreasing number of metro passengers.
2-9
2.2.3 Working Population in Residence Place and Working Population in Work Place
As shown in Table 2.2.6, the working populations both in residence places and in work places
have decreased from 1992 to 1998. The working population in work places in 1998 was 901.1
thousand persons, which is larger than that of the working population in residence places by
about 55 thousands, since some persons living in the surrounding area commute to the Study
area to work. The working population is concentrated highest in Sector 1, which accounted
for almost 26% of the total figure.
Table 2.2.6 Number of Working Population in Residence Place and Work Place
Working population in residence place Working population in work place
Sector 1992 1998 1992 1998
Population Share(%) Population Share(%) Population Share(%) Population Share(%)
Sector 1 100,894 10.1 86,506 10.2 264,391 26.5 230,222 25.5
Sector 2 172,024 18.1 132,370 15.6 192,285 19.3 175,691 19.5
Sector 3 183,103 19.2 160,920 19.0 189,400 19.0 168,816 18.7
Sector 4 146,099 15.3 149,003 17.6 99,988 10.0 84,882 9.4
Sector 5 116,761 12.3 114,226 13.5 92,296 9.2 96,598 10.7
Sector 6 182,920 19.2 150,527 17.8 123,066 12.3 109,781 12.2
Bucharest 901,801 94.7 793,551 93.8 961,426 96.3 865,990 96.1
Ilfov 50,128 5.3 52,627 6.2 36,642 3.7 35,085 3.9
Total 951,929 100.0 846,178 100.0 998,072 100.0 901,075 100.0
Source : BUCURESTI ANUAR STATISTIC 1996, Census Data in 1992 and Statistical Office
According to the information from the statistics department of the Bucharest Municipality, the
number of passenger cars registered in the Study Area was estimated at 411,449 vehicles,
therefore, the motorization rate was 191 vehicles per 1000 persons in the Study Area in 1998.
If excluding the office-owned passenger cars from 411,449 vehicles, the number of passenger
cars owned by households is estimated at 352,612 vehicles, since 85.7% of passenger cars are
registered by households.
Judging from 290 vehicles in Budapest and 431.1 vehicles in Vienna, more motorization is
expected to proceed in the Study Area in the near future.
2-10
Table 2.2.7 Number of Vehicles Registered in Bucharest and the Whole Ilfov
(Unit : Vehicles)
Type of 1995 1996 1997 1998 Growth rate
vehicle (%)
Passenger car 373,170 396,746 419,664 429,682 4.8
Bus 5,710 5,622 5,522 5,470 -1.4
Truck 65,207 68,896 71,736 73,989 4.3
Motorcycle 26,123 32,553 32,384 31,504 6.4
Others 28,183 29,566 30,512 30,808 3.0
Total 498,393 533,385 559,818 571,453 4.7
Source: DIRECTIA GENERALA DE STATISTICA, MUNICIPIULUI BUCURESTI
The state budget in Romania for 1999 is shown in the following. The income and expense are
planned to be 86,884.4 billion lei and 93,384.4 billion lei, respectively. As a special road fund,
2,000 billion lei is assigned, which occupies 2.1% of the total national expense. Loan
payments account for about 5 % of the total expense.
The budget of the Bucharest Municipality was 2,665 billion lei in 1998. About 54.3% of the
total income came from the central government as shown in Table 2.2.8. As for expenditures,
the Municipality spends about 218,434 million lei (8.2% of the total expense) for road
maintenance and street repairs. This amount is not sufficient to maintain the existing transport
infrastructure to an appropriate standard.
.
Table 2.2.8 Income and Expense of Bucharest Municipality
(unit: million lei)
Items 1995 1995 1997 1998
Income 637,946 939,559 2,103,567 2,665,559
Current income 122,780 210,556 479,619 666,295
Capital income 15,269 11,422 9,700 16,505
From tax 129,836 201,710 502,007 520,990
Subsidies 370,060 515,860 1,112,239 1,448,160
Loans 0 0 0 13,600
Expense 637,946 939,559 2,103,567 2,665,550
Public authority 4,270 5,390 11,598 23,820
Social & cultural 121,198 203,225 414,811 233,737
Housing 270,611 361,813 852,415 1,226,511
Transport &communication 240,120 365,519 821,88 1,106,300
Others 1,745 3,610 2,853 20,181
Source : Municipality
2-11
Table 2.2.9 shows the Bucharest Municipality’s budget and latest implementation amount for
road and street works in 1998. Road works (excluding the infrastructure works for
construction of dwellings) are financed by State budget, but street works are financed by the
Municipality. The continuing road works have already spent about 262,823 million lei,
however, only one-fifth of the budget was allocated. As for new works, road works take up
about 90,252 million lei, but the budget is only 1,100 million lei. This financial shortfall
should be covered by the Municipality. For the street modernization, there will be no problem
to implement the works.
In addition, the Municipality has an official duty to supervise RATB. For that duty, the
Municipality allocated 319,033 million lei in 1997.
The Study Area is located in one of the plains of less than 200 m in altitude, and its terrain is
flat and has no geographical hindrance to prevent the development of the city and the
expansion of the traffic network.
The Dambovita River crossing the city and several lakes in the north of the city demonstrates
that the surrounding areas are covered with river sediments. The fact that several earthquakes
have hit this region in the past shows that considerations for seismic activity are required in
the planning and construction of buildings and other structures.
The climate has four distinct seasons, and it is bitterly cold in winter. Bucharest has features
similar to cities in the northern region of the country.
2-12
2.3.2 Geographic Location of Bucharest
The geographical location of Bucharest is as follows;
East Longitude - 25q 27u 15u
North Latitude - 44q 14u 05u
Above the Sea
Lowest: 56.66 m
Highest: 96.63 m
The seismic micro zoning of Bucharest - presented in the map - indicates that the seismic
potential is different among zones.
- The zone of maximum intensity covers the area on the right side of Dambovita
(Militari District, Glina) and the micro zones on the left side of Dambovita, such as:
16 February District, Politehnica, Sala Palatului and the micro zones around Herastrau,
Floreasca and Tei Lakes.
- The zone of medium intensity (7-8 degrees) includes the meadows of Dambovita and
Colentina rivers.
- The zone of minimum intensity (7 degrees) encompasses the high fields in the
northern and southern parts of Bucharest.
(2) According to The Design Regulation for Constructing the Residential, Social-Cultural
and Industrial Building Against Earthquakes
(P-100-92), the calculation values of
Ks
and Tc
parameters for Bucharest, mentioned on the zoning maps are: Ks =
C = 2.20 and Tc = 1.5 seconds.
2-13
3. Existing Land Use and Environmental Condition
3. Existing Land Use and Environmental Condition
In the Study area, the urban area extends in all directions with a (maximum) radius of
10km. A considerable amount of agricultural land still remains within the municipal
boundary. Green and water areas occupy 35% of the total area. The gross population
density is 35 persons/ha.
For environmental aspects the present environmental conditions caused by urban transport
were examined and compared to other European countries’ experiences.
3.1 Present Institutional System for Urban Planning and Land Use Regulations
3.1.1 General
At present, the Law No. 50 of 1991 (concerning the authorization of construction and some
measures for house building) is the basic law that prescribes procedure and norms for building
and land use.
The Law No. 50 of 1991 stipulates in Art. 2 that “the building permit is issued on the basis of
respecting the documents of urban and territorial development approved in accordance with
the annex, which is an integral part of this law”. The annex shows documentation for urban
planning and territory arrangement with the organizations in charge of its assent and approval.
The Territory Arrangement Plan should be prepared from “at the national level” down to “at
the communal level”. The General Urban Plan (Plan Urbanistic General, PUG) should be
prepared from “at the municipal level” to “at the village level” and for resort areas. The Zonal
Urban Plan (Plan Urbanistic Zonal, PUZ) is prepared for the central part of each level of
administrative unit and for zones of special use or protection. The Detailed Urban Plan is a set
of documents required for every construction project in the urban area and classified into two
categories: national level and local level.
The Municipality of Bucharest is now preparing its Regional Territory Arrangement Plan
(Plan de Amenajare a Teritoriului-Zonal, PATZ) that covers the Bucharest Metropolitan Area
(BMA) including the peripheral communes, as well as PUG within the municipality boundary.
PATZ can be considered a master plan of BMA that shows the outline of development
including spatial use and socioeconomic development. PATZ has legal force on planning and
developing activities executed by administrative bodies, but has no binding power on a third
party. This lack of legal force on inhabitants is similar to SD (Schema Directeur) of France
3-1
and F Plan (Flachennutzungsplan) of Germany. SD (for a period of 10 – 30 years) is, in
principle, prepared by a group of communes, indicating the basic land use policies, and if
necessary, new urban areas and redevelopment areas, as well as protection areas, transport
system, water supply, sewerage and waste disposal. F Plan (for a period of 10 – 15 years) is
the land use master plan of the municipality, which shows the outline of land use for its
administrative territory, including agricultural lands, forests, recreation areas, conservation
areas and lands for social facilities, transport facilities and infrastructure.
PUG contains the strategy, priorities, regulations and restrictions of urban planning applied to
land use and building use within the urban areas and settlements, concerning the following:
(1) Demarcation of urbanization promotion area
(2) Division of use zones
(3) Size, structure and distribution of population and labor force
(4) Economic potential and distribution of activities
(5) Establishment of circulation system
(6) Establishment of use zoning with control indicators such as building height, building
coverage, floor area ratio and building prohibitions
(7) Locations of public use lands and public facilities
(8) Designation of historical zones and sites
(9) Designation of construction prohibition zones
(10) Designation of rehabilitation zones
(11) Development of urban utility network system
(12) Rehabilitation, protection and conservation of environment
PUG practically corresponds to POS (Plan d’Ocupation des Sols) of France. POS (for a
period of 5 – 10 years) is a detailed land use regulation plan of the commune, prepared under
the basic policies of SD, and the scales of maps are 1/2,000 to 1/10,000. This plan has legal
binding force on inhabitants.
Although the PUG is not yet enforced, some authorized PUZs and the road network plan
prepared by the Municipality have a controlling power on PUDs (development projects)
proposed by individuals and organizations. PUZ is a more detailed plan than PUG for a
designated urban area with the purpose of controlling shapes of buildings and land use based
on the local information. Where PUZ is enforced, development certificates and building
permits are issued by consulting the regulations of PUZ. And, if necessary, PUG can be
3-2
revised in conformity with a PUZ. The scale of maps is 1/1,000 to 1/2,000.
PUZ has the character of B Plan (Bebauungsplan) of Germany. B Plan (for a period of about 5
years) is a detailed urban plan determining building use classification, indicators for building
use limits like building coverage, location of building/building line, designation of lands for
public facilities like roads. The scale of maps is 1/500 to 1/2,500.
For the areas without authorized PUZ, only the road network plan has the controlling power.
There are some cases in which the development body makes a proposal of PUZ for the area
surrounding their own project site. It seems that the office of chief architect judges its
propriety on a case-by-case basis.
Nowadays the economic situation is stagnant and development demand is not large. However,
when business activity recovers in future, construction demand will expand rapidly. It is
feared that disorderly building activity and urban development will increase in areas where
PUZ is not yet prepared. Therefore, the preparation and enforcement of PUG should be as
soon as possible. And for the important areas where construction activity is expected to grow
in future, PUZ should be enforced even before PUG is completed.
(1) Urban Functional Macro Zone (prepared by the Atelierul de Urbanism “URBIS ‘90”)
(2) Frame Regulation Regarding Building Permit for Housing and Other Buildings in
Bucharest, Town Development in Perspective (prepared by URBANA, Urban Planning
Center)
3-3
Zones 2 (Cismigiu Park), 3 (Magheru Blvd. / The National Theatre), 25 (Sfantul Gheorghe
Church / The Historical Center / km 0) and 45 (The Parliament Palace) compose the present
city center of Bucharest. As common in European cities, commercial and service activities are
generally located on the ground floor, or in addition the first floor, of collective apartment
buildings except several office buildings and hotels in Bucharest. Therefore, in the city center
“Residential – collective dwellings in high apartment buildings” (colored orange in Figure
3.2.1) should be regarded as commercial area.
From the city center the urban area extends in all directions with a radius of maximum 10
kilometers. A considerable amount of agricultural land (colored pale yellow) is still left within
the municipal boundary. A large forest of Baneasa-Tunari is preserved to the north of the city
area. A series of lakes, with lakeside green areas, are located continuously from northwest to
southeast along the border of the urbanized area. In addition, there are many green and water
areas within the built up area. These areas in all occupy 35% of the city total. Considering the
municipal population of 2 million, Bucharest features a compact urban area with
comparatively rich green and water spaces.
According to Table 3.2.1, the total population of the Study Area is 2,149,436 and the gross
population density is 35 persons/ha. While the adjacent 13 communes have low densities of 3
to 7 persons/ha, the population of Bucharest Municipality is 2,016,131 and its gross
population density is 80 persons/ha.
Although some residential areas of Type A (other than the above-mentioned type in the city
center) are located adjacent to the center within the inner ring road, typical ones are mainly
constructed near the large-scale industrial zones called “Industrial Platform” located in the
east, west and south of the city. These apartment houses with 11-15 stories were intended to
accommodate the employees of the industrial platforms.
As shown in Table 3.2.1, net population densities of Zones with residential area of Type A
only vary from 181 persons/ha of Zone 70 (Cetatea) to 601 persons/ha of Zone 67 (Apusului).
Although Zone 51 (Rahova) and Zone 59 (Crangasi) include small portions of Type B, these
zones show high population densities of more than 1,000 persons/ha. Judging from the
population densities of other zones with a mixture of Types A and B, the population densities
of Type A can be considered between 500-1,000 persons/ha.
3-6
Table 3.2.1 Population and Population Density by Zone, 1998
3-7
Zone Midyear Zone area Residential area (ha) Population density
no. population (ha) Type A Type B Total Gross(p/ha) Net(p/ha)
57 24,858 667 40 87 127 37 196
Sector 5 269,746 3,225 340 598 938 84 288
58 18,931 217 22 46 68 87 278
59 38,916 67 28 8 36 581 1,081
60 20,410 291 40 1 41 70 498
61 46,558 334 81 5 86 139 541
62 10,879 398 32 8 40 27 272
63 12,169 623 2 116 118 20 103
64 10,909 128 48 0 48 85 227
65 35,316 138 61 2 63 256 561
66 36,390 126 64 0 64 289 569
67 55,336 179 92 0 92 309 601
68 57,853 227 83 1 84 255 689
69 47,210 233 73 5 78 203 605
70 8,700 881 48 0 48 10 181
Sector 6 399,577 3,842 674 192 866 104 461
Bucharest 2,016,131 25,181 2,967 3,168 6,135 80 329
71 10,581 2,770 4
72 27,097 3,620 7
73 21,942 7,240 3
74 24,564 9,680 3
75 17,569 6,460 3
76 7,078 1,900 4
77 7,375 1,510 5
78 17,099 3,320 5
Part of ilfov 133,305 36,500 4
Study area 2,149,436 61,681 35
Residential areas of Type B include those for higher income and for lower income. The
former is located mainly in the central part and, recently, in the northern part of the city, while
the latter in the northeastern and southwestern parts.
Old but well maintained detached houses built near the city center compose a high-class
residential area. Lands in the northern part with rich green and water spaces are generally
recognized as better areas for residential development and middle to higher income families
prefer to build their new houses there. Accordingly, the urbanization pressure is strong in the
northern direction even under the stagnant economic situation.
The northeastern Type B residential area in Zone 24 (Colentina) and the southwestern one in
Zone 54 (Ferentari) are typical lower income detached house areas. Roads in these areas are
scarcely paved except main streets and community service facilities such as daily shopping
facilities, schools and hospitals are insufficiently provided. Houses are not of high quality but
comparatively well maintained.
According to Table 3.2.1, net population densities of Zones including residential area of Type
B only vary from 111 persons/ha of Zone 53 (Prelungirea Ghencea) to 256 persons/ha of Zone
12 (Soseaua Chitila). The density of 599 persons/ha of Zone 43 (Progresul), which has
residential area of Type B only, appears to be too high and should be checked. Zone 13
(Bucurestii Noi), including Type A, shows the lowest density of 63 persons/ha. Generally, the
population density of Type B can be regarded as 50-250 persons/ha.
3-8
addition, many small-scale factories are scattered within the urban area as seen in Figure
3.2.1.
In the process of transition from a planned economy to a market oriented one, many of state
enterprises located in the industrial platform have lost their management staff and the number
of employed persons has decreased almost to half. Some factories have stopped production
activities and have no prospect to reopen. However, other industrial platforms such as Pipera
located in Zone 23 (Strandul Tei) have succeeded in introducing foreign investment,
maintained production and minimized the employment decrease.
According to Table 3.2.2, which shows the number of employed persons by zone on a
workplace basis, 106,876 persons work in the city center (Zones 2, 3, 25 and 45). 84,371
persons (78.9% of the total) are engaged in the tertiary sector. The total land area of the city
center is 393 ha, of which 158 ha is regarded as “Workplace Area”, excluding “Green Area”,
“Rivers/Lakes”, “Vacant Lot”, “Cemetery” and “Agricultural Land”. While the average gross
employment density is 272 persons/ha (517 persons/ha in Zone 25), the average net
employment density on the workplace area reaches 676 persons/ha (1,060 persons/ha in Zone
25).
Within Zone 45 and the adjacent Zone 27 (Nerva Traian), widely spread vacant lots are left.
And along B-dul Unirii a series of apartment buildings remain half-completed, because the
recent stagnant economic situation has forced their construction to be suspended. In order to
utilize these vacant lots and half-finished apartment houses and to create a new city center, the
Municipality is studying a development project called “Bucharest 2000”.
Gara de Nord is an urban core formed in front of the railway terminal of Gara de Nord, where
national and international trains to and from Bucharest are daily arriving and departing.
According to Table 3.2.2, the total number of working persons in Zone 4 (Gara de Nord) is
22,544, of which 72.2% (16,288 persons) belong to the tertiary sector. The gross employment
density is 221 persons/ha and the net one is 347 persons/ha.
Obor is the present largest popular market place in Bucharest. It is located in Zone 21 (Obor)
but its boundary as a commercial/service center is hard to delimitate. The total of the tertiary
sector employment in the Zone is 14,269 persons (see Table 3.2.2). Most of them can be
assumed to work in the commercial area. In addition, the Industrial Platform-Obor (with a
comparatively good economic achievement) is located in the same Zone, with a secondary
sector employment of 17,286, which is larger than that of the tertiary sector. Accordingly,
Obor is an important employment center of commerce and industry.
3-9
Targ International located near Presei Libere is an exhibition complex where international
fairs and other international-scale events are sometimes held. It is located in Zone 10 (The
Exhibition Complex), which is a large zone with an area of 5.44 square kilometers is divided
into various land uses. The institutional area of 56 ha can be regarded as the present
international center zone. It is still low density and vast vacant lots are left adjacent to it. .
Other points and streets shown on the map are market places and commercial/service areas
with some characteristics of their own.
Generally speaking, the city center has a considerable scale of accumulation and appears to be
providing people with vivid commercial and service activities even under the present severe
economic conditions. However, the formation of hierarchical structure of sub centers and
incubation of service centers with specific functions seem to be insufficient in Bucharest.
3-10
Zone Employed persons on workplace basis Zone Workplace Employment Density
no. Primary Secondary Tertiary Total area (ha) area (ha)* Gross (p/ha) Net (p/ha)
42 756 5,562 9,691 16,009 350 219 46 73
43 438 1,740 2,051 4,228 313 196 14 22
44 338 13,633 3,784 17,755 1,077 376 16 47
Sector 4 3,029 39,991 41,862 84,882 3,405 1,418 25 60
45 554 3,054 19,161 22,769 176 59 129 386
46 145 3,979 9,801 13,926 164 74 85 188
47 0 2,868 2,686 5,554 112 63 50 88
48 140 5,627 5,105 10,872 209 133 52 82
49 0 4,208 2,245 6,453 138 92 47 70
50 375 7,672 4,736 12,783 162 120 79 107
51 481 3,537 5,278 9,296 92 55 101 169
52 0 418 1,432 1,850 226 113 8 16
53 89 551 1,520 2,161 386 175 6 12
54 112 1,019 3,211 4,342 528 234 8 19
55 0 203 974 1,177 166 78 7 15
56 246 1,055 1,592 2,893 199 108 15 27
57 145 1,022 1,355 2,523 667 212 4 12
Sector 5 2,287 35,214 59,097 96,598 3,225 1,516 30 64
58 479 3,665 5,534 9,679 217 111 45 87
59 327 1,951 4,900 7,178 67 36 107 199
60 242 13,796 8,412 22,451 291 208 77 108
61 116 5,627 7,375 13,118 334 188 39 70
62 100 1,093 1,688 2,881 398 58 7 50
63 0 1,476 1,584 3,060 623 146 5 21
64 0 334 546 880 128 51 7 17
65 574 3,767 5,371 9,712 138 109 70 89
66 227 984 2,133 3,344 126 71 27 47
67 242 3,467 5,791 9,501 179 92 53 103
68 142 3,631 3,559 7,333 227 168 32 44
69 232 1,018 2,878 4,129 233 107 18 39
70 627 10,357 5,532 16,517 881 309 19 53
Sector 6 3,308 51,167 55,306 109,781 3,842 1,654 29 66
Bucharest 27,043 344,023 494,924 865,990 25,181 10,867 34 80
71 85 1,793 5,377 7,255 2,770 3
72 802 979 2,668 4,449 3,620 1
73 188 1,459 991 2,638 7,240 0
74 1,375 4,191 1,911 7,477 9,680 1
75 1,053 2,113 2,693 5,859 6,460 1
76 211 1,228 432 1,870 1,900 1
77 605 689 616 1,910 1,510 1
78 1,035 1,254 1,338 3,627 3,320 1
Part of ilfov 5,354 13,706 16,025 35,085 36,500 1
Study área 32,397 357,729 510,949 901,075 61,681 15
* Workplace Area is the total from "Residential Area Type A" to "Special Land Area" in Table 3.2.1
3-11
forming simple patterns and insufficient interconnection among public transport
modes including metro.
In order to mitigate these impacts, their causes shall be identified and countermeasures shall
be taken. Table 3.3.1 shows environmental impacts caused by the transport sector in general.
Remarkable aspects of environmental impact from transport sector are from road transport,
especially vehicle emission at the operating stage, and some others such as water quality, soil
and topographical and natural condition in pre-construction and construction stages.
3-12
Table 3.3.1 Environmental Impact by Surface Transport Sector in General
Air Water Soil/ topography landscape/ nature
Road transport xCombustion of fossil xdraining oils, salts and xRoad construction> xconstruction materials
fuel > Emission of solvent>pollution of degradation of land and aggregate, road
Nox, CO, CO2, VOCs, surface and ground by land appropriation> construction>
SPM-air pollution, water emission of harmful decreasing landscape
health obstacle xNox, SO2 emission> substances by xinfrastructure> split of
xNox, VOCs> acidity transport>risk of community and
photochemical smog xRoad> impact on accident>soil disturbance for wild
xUtilization of fuels and water circulation contamination and animal activity
addictive >lead and health obstacle
VOC’s emission xfeet, oil, buttery, used
xroad transportþair tire left> industrial
pollution, /noise> waste issue
health obstacle
Rail transport xpower generation for xRailway line>change xdisturbance by traffic> xinefficiency by old
electric locomotive> of hydrological system risk of accident technology
emission for the air xrail facility>
xdiesel locomotive disturbance for wild
>emission for the air animal activity
xsteam locomotive (coal
fuel)>emission for the
air
Source: Environment in Europe 1997, EEA
From limited information from Central and Eastern Europe, however, increasing motorization
after the end of the cold war in 1989, is projected to increase emissions rapidly. In the case of
Poland, the total emission of NOx will be doubled by the year 2000 compared to the year
1989 level. One of the effective engine technologies, catalytic system has been introduced for
mitigation of harmful vehicle emissions. It is projected that after introduced emission controls
are introduced, 20% to 30% of total NOx emission will be reduced in all of Europe. For
reference purpose following table shows the total amount of NOx emission from road
transport by type in the year 1990 in EU countries. Gasoline passenger cars and heavy diesel
vehicles emit 56.2% and 33.6 % of the total NOx amount respectively.
3-13
Table 3.3.2 Total Amount of NOx Emission from Road Transport by Type in EU
Engine type Registered Share (%) NOx (1000 Share (%)
vehicle (in tones/year)
thousand)
Diesel engine: passenger car/ light vehicle 20,496 12.4% 414 7.2%
Diesel engine: heavy vehicle/ bus 3,780 2.3% 1,926 33.6%
Gasoline engine: passenger car/ light vehicle 115,241 69.9% 3,228 56.2%
Gasoline engine: <3.5 tones heavy vehicle/ bus 785 0.5% 77 1.3%
Other type of vehicle including motorcycle 24,529 14.9% 94 1.6%
Total 164,831 100.0% 5,739 100.0%
Source: Environment in Europe 1997, EEA Note: data shown is as of year 1990
In the case of EU (1990), road transport dominates at approximately 80% of total CO2
emission. In other words, 1/3 of total CO2 caused by transport is from freight transport and
45% is from passenger cars.
3-14
Particulate matters can remain in the air for considerable periods of time and contribute to
particulate smog. Particles are also damaging to health, particularly those particles fine
enough to remain within the lungs.
CO catalyst HC catalyst
60
8
CO disel HC disel
50 6
40
30
4
20 2
10
0
0
5 15 25 35 45 55 65 85
5
75
15
25
35
45
55
65
75
85
95
5
95 105 115 125
10
11
12
Vehicle Speed (km/h) T ravel Speed (km/h)
600
Emission Amount (g/km)
5 CO2 catalyst
500 CO2 disel
4
400
3
300
2
200
1
100
0
0
5
5
15
25
35
45
55
65
75
85
95
5
10
11
12
5
5
15
25
35
45
55
65
75
85
95
5
10
11
12
T ravel Speed (km/h)
T ravel Speed (km/h)
T SP disel
0.4
0.3
0.2
0.1
0
5
15
25
35
45
55
65
75
85
95
105
115
125
3-15
(3) Energy Consumption in Transport Sector
Transport has become a major consumer of non-renewable energy sources since the beginning
of 1970s. In EU, road transport accounts for over 80% of oil consumption of the transport
sector. The following table shows trends in energy consumption by transport in different parts
of Europe over the last 20 years. Energy consumption doubled between 1970 and 1990 in EU.
In Central Europe, the increase of total energy used in transportation is far more modest,
however, gasoline products for road transport increased 50% between 1970 and 1990.
In the total sector of energy consumption, the transport sector in EU shared 31.9% in 1990
while the transport sector in Central Europe held 12.8% in 1990, though after the end of the
cold war in Central Europe, energy consumption due to increasing vehicle ownership has
been accelerating rapidly.
Moreover, there have been improvements in road vehicle efficiency in Europe. During the
period 1970 to 1990, average fuel consumption of a new car in the EU decreased from 10
liters to 8.2 litters per 100 kilometers. Current technologies and weight reduction could have
reduced fuel consumption by more than a third, although such improvement in efficiency has
been written off by increases in vehicle ownership.
In Bucharest, the current share of total passenger trips depending on public transport is 75%.
Details of public transport sectors are subway (16%), tram (36.1%), trolley bus (11.8%) and
bus (36.1%). In this regard, only bus consumes fuel directly and emissions for the private car
ratio are less compared to other European cities,.
3-16
(4) Environmental Alleviation for Transportation in EU
Action to alleviate the environmental consequences for transport has been taken in EU
countries. A variety measures have been including technical and non-technical approaches.
The encroachment of transport on the environment and on the quality of life has been
significantly reduced. Further improvements are possible through advanced technology and
better maintenance. Mandatory emission standards combined with regular in-service controls
emerged as the universal strategy to combat air pollution from road transport.
A common problem for policy makers in Europe is how to respond to the twofold issues of
growing transport demand and how this demand can be allocated to different transport modes.
There is need to consider the more wide-ranging use of different strategies including
economic instruments as a way to curb growth in transport demand in order to meet the
environmental targets.
3-17
vision of the Union as it enters the 21st century.
In the environmental section on Romania shown in the box below, the EU recommended
priorities and intermediate objectives as follows:
Short Term:
Continue transposition of framework legislation
Establishment of detail approximation programs
Implementation strategy related to individual acts
Medium Term:
Development and monitoring and implementation control structure and capacities
Continuous planning and implementation of approximation programs related to
individual acts
Air and water sector were to be improved
Hence, EU has recognized that particular attention for Romanian environmental issues should
be given to administrative capacity and financing strategy.
Enlarging the European Union, Accession Partnership – Romania
4. Priorities and Intermediate Objectives
4.1 Short-term (1998)
Environment: continue transposition of framework legislation, establishment of detailed approximation
programmes and implementation strategies related to individual acts. Planning and commencement of
implementation of these programmes and strategies.
4.2 Medium-term
Environment: including the development of monitoring and implementation control structures and
capacities, continuous planning and implementation of approximation programmes related to
individual legal acts. A particular emphasis should be given to the air and water sectors.
Environmental protection requirements and the need for sustainable development must be integrated
into the definition and implementation of national sectoral policies.
Overall, Romania will have to place higher priority on environmental issues, significantly increase
related finance and develop its administrative and financing capacity. A considerable effort must be
made to develop adequate implementation and enforcement structures. Public awareness with regard
to the environment field must be stimulated.
Source: Enlarging the European Union, Accession Partnership – Romania, EU, 1997
3-18
(1) Environmental Issues in Bucharest
Current environmental issues are shown in Figure 3.3.2. The issues mainly consist of six
fields-air pollution, noise, soil contamination, and degradation of green area, waste disposal
and water quality. Related to transport among these are air pollution from vehicle emission,
noise from transport and industrial activities, soil contamination from lead contained in
gasoline and green areas occupied by parked cars.
2) CO2
CO2, 0.2 to 0.3 mg/m3 (std: 0.15) in 24hrs
transport and industrial activities
3) SO2
SO2, 0.02 mg/m3 (std;0.06 mg/m3 ) in central,
Industrial activities (thermal power
and 0.01 mg/m3 in fringe area plants, chemical factory, etc.)
2. Emission
NOx, 60% form transport,85kg/psn/year
automobile
CO2, 18% from transport, 4,686kg/psn/ year
industrial activities
3. Urban noise
Roadside, 60-75 dB(A)
Transport activities
Commercial and industrial activities
4. Soil
lead contamination (1.2µg/m3, std:0.7µg/m3)
Emission contained lead
contamination
Fuel sales share (leaded59%, unleaded7.2%,
disel 33.85)
5. Green area
12.2 sqm./habitant (std: 26sqm.)
Insufficient parking space in
degradation residential área
Solid wastes
3-19
responsible organizations in Bucharest called Bucharest Environmental Protection Agency
(EPA Bucharest), the Ministry of Water, Forest and Environment, had carried out an air
monitoring survey in 1997, and Romania Auto Register (RAR), Ministry of Transport has also
carried out air quality monitoring. In addition, the Study Team carried out supplemental air
quality monitoring in order to obtain current air quality conditions.
In summary, air quality in Bucharest shown in Table 3.3.8 is neither polluted by NO2 nor SO2
(24 hrs. value). PM and pb in PM concentration exceed the standards sometimes. Those
substances are higher in concentration in the central part of the city, which has higher traffic
volumes and congestion.
Concentration of SO2 in the central part is rather low, that is 1 3rd of the standard (annual) in
central part and 1 to 6th of standard in fringe area respectively according to EPA measurement.
JICA Study team’s measurement also shows lower concentration.(see Table 3.3.9.)
Regarding lead (pb) concentration in PM, it has a higher concentration level, 1.2 •g/m3 in 24
hrs, level than the standard (0.7•g/m3 the 24 hrs value) shown in Table 3.3.10. The highest
concentration is in the Acumulatrul area, which is the central part of the city.
3-20
1) Air Quality Monitoring by EPA Bucharest
According to EPA Bucharest’s information, NO2 concentration in EPA’s Laboratory
(University Area: central part of the City) does not exceed the standard level (0.1mg/m3 in 24
hours) that varies from 0.03 to 0.055 mg/m3 in Monthly Average. The Monthly Maximum
concentration, NO2 ranges form 0.06 to 0.13 mg/m3 in 24 hours value. There is a little
seasonal fluctuation so that it is rather lower from October to December, while it is rather
higher concentration from April to June.
Regarding PM concentration in the central part of the city the same NO2 sampling point,
concentration values range from 0.2 to 0.3 mg/m3 in 24 hours value which is nearly double
the concentration compared to the standard (0.15 mg/m3). There is also seasonal fluctuation
so it is rather lower in June and July.
In a comparison between Bucharest and other European cities, Bucharest is less polluted
especially NOx, SO2 and CO2. On the other hand, Bucharest is more polluted with particulate,
lead and VOC than other European cities.
3-21
NO2 Concentration 1995-1996 PM Bucharest 1995-96
450 400
350
300
319.9
300
256
NO2 (micro.g/m3)
250
PM (micro.g/m3)
250
237.6 211.5
200 197.5
200 208.4
169.9 167.9
176.3 181.5 178.4
150
150 127.8 133.4
115.2
113.3 116.8 100 102.9 106.3
99.4
100 105.2 96.5 96 97.9
78.9
65.6
50 55.7 51.7 55.7 56.3 50
0 0
Blv.Kogalniceanu
Blv.Balcescu
Colentina iesire
Militari iesire
Colentina zona Suveica
Blv.Kogalniceanu-
Baneasa Airpot
Blv.Balcescu
Blv.Kogalniceanu
Colentina iesire
Militari iesire
Blv.Kogalniceanu-
Bucrestii Noi-
Baneasa Airpot
LAROMET
Lic.Lazar
Lic.Lazar
Locations
Locations
The results is an average concentration within the monitoring period of November 17- 9, 1998,
exposure duration from 45 to 60 hours. The monitoring results are summarized as follows:
NO2: central part of the city shows higher concentration level. In comparison between Air
Quality Standard in 24 hours value and the results, the results show less than permissible level
(0.1 mg/m3).
NOx: central part of the city and along the arterial roads, especially northern part shows
higher concentration level. Vehicle emission contributes to this result due to a majority of
non-catalyst cars.
SO2: central part of the city, shows higher concentration level. It is doubtful about that the
fuel contains a higher S ratio the heating plant in the city. In comparison between Air Quality
Standard in 24 hours value and the results, the results show that it is less than the permissible
level (0.25 mg/m3).
3-22
Table 3.3.12 Location of Supplemental Air Monitoring
No. Sampling location No. Sampling location
1 Colentina / mihai bravu 11 B-dul. elisabeta / b-dul. magheru
2 Crangasi / splaiul independentei 12 B-dul. dacia / b-dul. magheru
3 Viilor cosbuc 13 Grivita / ion mihalache
4 Buc. – pitesti / valea cascadelor 14 Sos. berceni / ring road
5 Buc. –ploiesti / poligrfiei 15 Theodor pallady / nicolae grigorescu
6 Titulescu aviatorior 16 Brancoveanu / sos. magurele
7 n/a 17 Buc. - ploiesti / ring road
8 Basarabia / mihai bravu 18 Bucuresti – branesti / ring road
9 Giurgiului / oltenitei 19 Colentina / fundeni
10 Sos. alexandriei / sos. antiaeriana 20 Herastrau park
NO2 NOx
0.110 1.200
MPL
0.100 1.013 1.033
0.091
1.000
0.090 0.082 0.083
0.080
0.080 0.074 0.075
0.071
0.065 0.800 0.721 0.725
0.070 0.682
NOx (mg/m3)
NO2 (mg/m3)
SO2
0.050
0.045
0.045
0.038
0.040
0.035 0.032
0.030 0.029
0.029
SO2 (mg/m3)
0.030 0.028
0.026
0.025
0.010
0.004
0.005
0.000 0.000
0 .000
0.000
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
Sampling Locations
3-23
Location of Air Quality S ampling
NO2, NOx, S O2
Results of Air Quality S ampling
NOx unit: ppb
17 150
5 20
299
13 19 116
118
6 1 18
2 176
91
162
8
4 11 87
304
3
10 9 51
121
16 64
201
15
21.1 6
36
10
27 6 6
31.8
25.7 10 10 13 9
39.1
39.7
26
44.4 5 16
21
4 5
14.8 34.6
5 11
19.4
40.3
Study Area
Study Area 4
8.2
Figure 3.3.5 Location of Supplemental Air Quality Sampling, NOx, NO2 and SO2
3-24
Vehicle Condition in Bucharest 1995-1997
conformed
23.7%
non-conformed
76.3%
Moreover, for fuel sold in Bucharest in 1998, leaded gasoline, unleaded gasoline and diesel
oil shares are 59%, 7.2% and 33.8% respectively. For sold gasoline, leaded gasoline shares
89.1% while leaded gasoline is 0.9%. This large share of leaded sales is related to
non-conformed vehicle share.
Disel Oil
33.8%
Leaded
Gasoline
59.0%
Unleaded
Gasoline
7.2%
3-25
Growth of Vehicle Number 1995-1998
50.0%
40.0% 39.5%
30.0%
Growth Ratio (%) 95-96
20.0% 96-97
16.1%
97-98
10.0% 6.3% 8.8% 8.7%
6.6%
5.0% 6.8%
5.8% 1.8% 3.7% 5.4%
3.3%
2.4% 1.6% 1.5% 1.5%
0.0% 0.8%
-0.1% 0.3%
1.1% -2.1% -1.5% -0.3%
-0.7% -0.6%
-0.7%
-2.7%
Passenger Car
Microbus
Bus
Van
Special van
T ruck
T ractor
Motorcycle(large)
Motorcycle(small)
T railer
Semi T railer
-2.9% -1.7%
-3.2%
-7.5%
-10.0%
From the viewpoint of vehicle type share, passenger vehicle dominates 75% of total registered
vehicles in 1998 shown in Figure 3.3.9. So the volume and condition of passenger cars should
be considered as a major source of pollution in order to mitigate air pollution in Bucharest.
Registered Vehicle Share in Bucharest, 1998
Special van
1.21%
Van
11.71%
Bus
0.67%
Microbus
0.29%
Passenger Car
75.19%
3-26
CO2 Emission in EU12 Countries CO2 Emission in Romania
Other mobile
Waste treatment
and disposal Agriculture
sources and
Nature
Public power, machinery
1.4% 0.7% 6.2% Road transport
cogeneration and 3.9%
Other mobile 2.3% Public power,
district heating
sources and 25.6% cogeneration
machinery and district
2.9% heating
Road transport 34.5%
18.1%
Industrial
Extraction and combustion
distribution of 38.4%
fossil fuels
0.5% Commercial,
institutional and
residential
Production combustion Commercial,
processes Industrial 17.7% institutional
4.7% combustion and residential
22.3%
combustion
20.9%
Regarding NOx emissions, the road transport sector in EU12 antilates 50.9% of total NOx
emission while the road transport sector in Romania is 9.2% as shown in Figure 3.3.11, which
is 1 10th of the EU12.
In comparison between Bucharest’s CO2 emission share by sector shown in Figure 3.3.12, the
transport sector contributes 18% of the total emission amount. This is double the share
compared to national level, which is nearly the same as the EU12.
3-27
CO2 Emission Source in Bucharest
Others
14%
T ransport
18%
T hermal Power
68%
Moreover, only one substance in Romania, SO2, exceeds EU12 average in total amount, this is
139% of EU12 average shown in Table 3.3.13. The other substances, NMVOC, CO2 and NO2
are less than the EU12 average.
Furthermore, considering another aspect of CO2 and NOx, the annual CO2 emission per capita
in Bucharest and Romania are 4,686 kg/year and 7,538 kg/year respectively. This aspect is
lower than that of EU12. On the other hand, NO2 emission in Bucharest and Romania are 85
kg/year and 24 kg/year respectively.
3-28
CO2 Emission per capita
NO2 Emisiion Per Capita
18,000
15,294 90 85
16,000
80 75
14,000
70
12,000 10,712 10,749
kg/capita/year
60
9,207
kg/capita/year
10,000
7,538 50
8,000 37
5,965 37
40
6,000 4,686
30 24
4,000 19
20 16
2,000
10
0
0
Bucharest Romania EU12 Bulgaria Czech Hungary Poland
Bucharest Romania EU12 Bulgaria Czech Hungary Poland
Source:EPA and EEA
Bucharest’s data shows that it is more than three times the national one, for industrial and
road traffic centered activities.
For the transport sector, depots are required by regulation to treat their residual water before it
is discharge to of the sewage system. At present, depots have been carry out primary treatment
such as extracting oil from the residual water.
(5) Wastes
4,500 tons of daily waste are generated in Bucharest while daily disposal capacity is 100 tons,
so the remaining waste is dumped at a landfill site Ochiul Boului-Glin, which has quite a
limited capacity. In the transport sector, i.g., RATB depots have been trying to recycle solid
wastes.
(6) Noise
Noise monitoring of 35 streets in Bucharest was carried out under the INCERC study shown
in Table 3.3.15. 20 out of 35 streets were over 75 dB(A) caused by commercial, transport,
industrial, etc., activities. According to roadside noise standards, arterial road (category I) is
75-90 dB(A) so that the current condition is within the local standard level due to higher level
of standard.
3-29
Table 3.3.15 Roadside Noise Level in Bucharest
Sound level dB(A) Number of street exceeded
60-65 dB(A) 1
66-70 dB(A) 6
71-75 dB(A) 8
75-over dB(A) 20
Source: EPA Bucharest
Distribution of green area is shown in Table 3.3.16, Sector 2 has the largest green area and
Sector 1 has the largest green area per habitant, which is 18.0 sqm/habitant. Referring to
major cities in the world, Bucharests green area ratio is of medium level as shown in Figure
3.3.14.
Green Area/habitant Comparison
Tokyo 5.2
Paris 11.8
London 25.3
Bucharest 12.2
0 5 10 15 20 25 30 35
sqm./habitant
In addition, regarding road area ratio, Bucharest is 12.7% of total municipal area, which is
lower than that of Paris (20.0%), London (16.6%) and Tokyo (15.2%) shown in Figure 3.3.15.
3-30
Road Ratio Comparison
London 16.6
Paris 20.0
Washington DC 25.0
Bucharest 12.7
0 5 10 15 20 25 30
Road Ratio (%)
Chapter 2 give the regulations permitting procedures regarding environmental impacts caused
by economic and social activities. The subject project for EIA is shown in Appendix II.
Regarding transportation projects with activities that are subject to the procedure for EIA the
issuing of the environmental agreement and/or permit is shown on the following table.
3-31
Table 3.3.17 EIA Requirement for Transportation Projects
Category Subjects
Road traffic Highways
Main roads with busy traffic
Other main roads; all roads within protected area
Parking for stationing (lands or buildings) for more
than 300 cars
New public transportation lines
Rail traffic New rail roads lines
Other rail instruction, including doubling or
expending of existing lines
Water navigation Harbor installation for ships belonging to public
shipping companies
Industrial harbors with fixed loading and
unloading installations
Recreation harbors with more than 100 places for
mooring
Navigable routs
Air navigation Airport
Airdrome, with exception of heliports
Heliports in protected area
1) Environmental Agreement
The technical and legal act that establishes the conditions for implementation of a project or
an activity from the environmental impact point of view
2) Environmental Permit
The technical and legal act that establishes the conditions and operating parameters for
existing activities and for new ones, on the basis of the environmental agreement
The procedure for EIA consists of the preliminary stage, the main stage, the analysis and
validation stage. The environmental protection authority shall organize and decide on the
application of the stage of the procedure as shown in figure 3.3.16. The Environmental
Agreement and Permit is valid for a maximum five years.
3-32
Application of EIA Procedure that
Includes Project Description to
Environmental Protection
(EPA)
Identification of
Protection in the Project, and to judge
that EIA is necessary or not
Yes No
Yes No
To Issue Environmental
or Permit by EPA
Those standards are classified by environmental factors shown in Table 3.3.18 and amended
after 1989 in accordance with EU and other International Organization’s support, which cover
all environmental factors. Especially EU directives are taken in account for further progress to
become a member of the European Union.
An important aspect among environmental standards is that EURO2 (EU Directives 96/44),
which regulate emission from vehicles in order to mitigate emission level. This standard also
effects periodical vehicle inspection.
3-33
Table 3.3.18 Matrix of Environmental Regulations by Transport Mode in Romania
Vehicle Railway Ambient
Petrol Diesel
Trolley bus Metro Tram Railway
engine engine
1. Airquality
STAS
12574-87
1) Ambient air quality - - - - - -
STAS
9490/78
RNTR 1 RNTR 1
2) Emission - - - - -
EURO2 EURO2
* *
3) Fuel standard STAS STAS - - - - -
12574-87 12574-87
2. Noise
SR13342,
SR13342, SR13342, SR13342, SR13342, 1996
1) Ambient noise level - -
1996 1996 1996 1996 STAS
6926/15-76
2) Sound level
STAS
STAS 10009/88 STAS
- Ambient noise - - - -
10009/88 NTR 10009/88
2367/85
STAS
6156-86
-The noise upon the
- - - - - - 6161/1-89
buildings
6161/2-89
6161/4-89
- The noise in the urban
- - - - - - 6161/3-89
areas
3. Vibration
1) Vibrations upon the
- - - - - - SR 12025-2
buildings
2) Vibrations produced by STAS
- - - - - -
the traffic 12025/1-81
4. Area charge
1) Traffic flow Law 118/96 - - - -
5. Historical heritage
1) City plan - - - - - - GPU
Note: * “Technical Conditions for the Atmosphere Protection” (Annex 4) - MFWE
3-34
Table 3.3.19 Area Charge System for Heavy Vehicle
New charge
Old charge
(from Oct.1,1998)
One day permission 5,000 Lei 50,000 Lei
One month permission 25,000 Lei 500,000 Lei
Note: 1US$=9,000 Lei
In addition, the Municipality Police have a more comprehensive proposal according to the
regulation follows:
Schedule Regulation
7.00-10.00 Charge system
10.00-17.00 Prohibit to enter the zone
17.00-20.00 Charge system
Source: Municipality Police
5. Physical atmospherelaboratory (in afumati) No measurements, just estimating the pollution using the measurements
made by Romanian Auto Register
6. Municipality of bucharest - NOx, HC, NH3, CO, H2S, SO2, O3,
dust
7. Romanian auto register, ministry of CO, NOx, HC, particles from the CO from the atmosphere
transport vehicles CO, NOx, HC, particles from the
vehicles
3-35
Table 3.3.22 Frequency of Air Quality Monitoring
Subject substances
Stationary monitoring Mobile monitoring
1. Environmental protection agency - Continuously, during 2-4 day
(EPA) of bucharest, MFWE periods, between 1995-1997
2. Environmental engineering research No periodical measurements, but only some studies from time to
institute (ICIM), MFWE time; the most recent one – in 1995
3. Public health inspectorate (direction) 4-5 days/week; 24 h/day -
4. LACECA - -
5. Physical atmosphere laboratory (in No air monitoring
afumati)
6. Municipality of bucharest Once a week
7. Romanian auto register, ministry of Frequency imposed by RNTR 1 Permanently, if the
transport and HG 778/1995 (de cautat) meteorological conditions permit
the equipment to be used
VAT (22%)
15%
Fuel T ax
(25%)
17%
Oil Price
68%
3-36
Table 3.3.23 Example of Vehicle Taxes on New Local and Imported Car
Tax New car Imported car
1. Road tax 10% 5%
2. Import tax
1) Custom duty 18% (EU)
2) Custom commission 0.5%
3) Surcharge tax 4%
4) Excise 1% (1.4L normal)
0% (1.4L euro2)
3. Vehicle tax 72,000 Lei (1.4L)
4. Registration
1) Registration fee 8,300 Lei
2) Registration certificate 75,000 Lei
3) Number circuration 70,000 Lei
5.VAT 22%
Source: RAR
Providing stringent regulation for emission control, the EURO2 standard was applied in
January 1999, however, it takes time to upgrade existing registered locally made vehicles,
which do not conform to EURO2.
3-37
Table 3.3.25 Measures to Control the Environmental Impact
3-38
Others:
1. Regular in-service emission tests for vehicles; RNTR 1 – Romanian auto register – the technical periodic
inspections, according to the minister of transport order
353/1998
2. Time restrictions on transport movements (e.g. bans on Local authorities decide these restrictions locally. For
night and weekend driving for heavy vehicles); bucharest there are some decisions regarding the freight
heavy vehicles (HCLMB 18/1992, HCLMB 18/1993, DPG
67/1993)
3. Lowering and enforcement of speed limits for vehicles Decision of modifying and completing the decree no.
328/1966 (march, 1999)
4. Encouraging for smooth driving behavior; There are no legal regulations; there are only some measures
for punishing the contravention (road code)
5. Educational campaigns; There is no plan at a national level. Locally, the road police
and the NGOs have some actions from time to time
6. Car pooling; -
7. Staggered working hours; There is a contract signed with dalli parking company
8. Carrying through existing resolution (e.g. ECMT EU directives, i.g. EURO2
resolution on transport and environment (No.66) and power
and speed (No.91/5) and conventions (e.g. Sofia protocol in
NOx emission)
3-39
4. Person Trip Characteristics
4. Person Trip Characteristics
A person trip survey was conducted through home interviews on 90,272 persons. The
average trip production was 2.7 trips per day. For the composition of the trip purpose, “To
Work” trips account for the largest share of 24.7%. For the composition of the transport
mode, the share of public transport was 34.0% and that of private cars, 18.8%. Large trip
generation appears in traffic zones along the Inner Ring Road and Middle Ring Road, on
the other hand, large trip attraction concentrates on central zones. Concerning the trip
distribution, passenger cars and buses come from all directions, but metro users are from
the South and Southeast, and tram users from the North and Southeast.
During October through mid-December 1998, the surveyors visited selected households and
interviewed each family member on their travel behavior in one day. In the case that the
surveyors did not meet household members even after visiting the object households three
times, other households were visited according to the rules determined by the sampling
method. The survey result of the sampled households is indicated in Table 4.1.2.
4-1
Table 4.1.2 Outline of Sampled Households
Sector No. of No. of family No. of family No. of persons No. of car No. of non-car
households members members more interviewed ownership ownership
than 5 years old households* households*
Sector-1 5,014 12,296 11,967 11,686 1,852 3,156
Sector-2 7,133 18,521 17,921 17,321 2,614 4,509
Sector-3 7,331 19392 18,724 18,109 2,444 4,883
Sector-4 5,603 15,026 14,564 14,142 1,949 3,650
Sector-5 4,584 12,654 12,095 11,612 1,524 3,055
Sector-6 7,155 18,664 18,090 17,574 2,521 4,627
Bucharest 36,820 96,553 93,361 90,444 12,904 23,880
Ilfov * 1,176 4,050 3,875 3,758 386 783
Total 37,996 100,603 97,236 94,202 13,290 24,663
Note : * Excluding unknown data on car ownership
The number of actually surveyed households was 37,996 households (36,820 households in
the Bucharest municipal area and 117 in the Ilfov area), which was smaller than the targeted
number of 38,303 households by 1,483 households. The main reasons were as follows:
Most of the answers to the questions on the survey sheet were not completed;
Most of the family members refused to participate in the interview.
As a result, the effective sample rate was 4.8% in the Study Area (4.96 % in the Bucharest
municipal area and 3.0% in the Ilfov area) , since the estimated numbers of households in
1998 were 742,606 in the Bucharest municipal area and 39,113 households in the Ilfov area.
The number of interviewed persons was 94,207 persons, which is smaller than the number of
persons more than 5 years old by 3,034 persons. These persons could not be interviewed
because of the following reasons:
He or she was not in the house because of business trips outside the Study area, visit to
relatives or stay in the hospital;
He or she refused to participate in the interview.
4.1.2 Expansion
With the number of the above interviewed persons and the actual number of population in
1998, the expansion rate was determined by age and by sex. As a result, the expansion rate
was 22.6 for male and 21.6 for female as shown in Table 4.1.3.
4-2
Table 4.2.1 Households and Car Ownership by Income Level, 1998
Total Average
Income class No. of Rate of
No. of Accumulate income Accumulate income
(1,000 lei / owned cars ownership
households (%) (1,000 lei / (%) (1,000 lei /
month) (vehicles) (%)
month) month)
<500 13,833 38.5 2,561,200 3.1 185 2,167 15.7
500 - 1,000 7,097 58.3 4,993,050 9.2 704 2,375 33.5
1,000 – 1,500 5,025 72.3 6,118,400 16.6 1,218 2,411 48.0
1,500 – 2000 2,443 79.1 4,244,150 21.8 1,737 1,450 59.4
2,000 – 5,000 2,782 86.9 7,757,850 31.2 2,789 2,173 78.1
5,000 – 10,000 181 87.4 1,085,500 32.5 5,997 215 118.8
10,000 - 30,000 4,163 99.0 43,411,600 85.3 10,428 2,096 50.3
30,000+ 369 100.0 12,059,150 100.0 32,681 275 74.5
Total 35,893 82,230,900 2,291 13,162 36.7
5,621
145
2 Unit : 1,000
i
4-5
All M odes
W alk
B icycle
«É¸ÅÊÇÆÉËw¤Æ»¼ Truck
Taxi
M axi Taxi
C ar
R ail
B us
Trolley B us
Tram
M etro
ÀÊ˸ź¼wÂÄ
¤ ¼ ËÉÆ
« ɸ Ä
« ÉÆ Ãü Ð
ª¿¸É¼w|
ÌÊ
¸É
¦ Ë¿ ¼ ÉÊ
§ Ì ¹ ÃÀº
« Æ Ë¸ Ã
¦ ~º ÃÆ º Â
4-7
4.6.2 Transfer between Public Transport Modes
Table 4.6.2 shows the share of transfer between public transport modes. The transfer from bus
to bus indicates the highest share 33.1%, followed by transfer between bus and tram.
Passengers using metro and trolley bus do not transfer each other so much (only 1.6%). As a
result, transfer facilities between bus and bus or between bus and tram should be improved.
The improvement of transfer facilities is also necessary for big Piatas such as Obor, Sudului,
Unirii, etc., because many passengers concentrate in these areas.
There are many transfer patterns for one trip as shown in Table 4.6.3. Among these transfer
patterns, the “Bus to Bus” and “Tram to Tram” pattern account for a large share. More than
three times transfer pattern are very few, however, the patterns of “Tram-Tram-Tram”, “Tram-
Tram-Metro” and “Trolley-Tram-Tram” have a relatively large share.
Table 4.6.3 Transfer Pattern between Public Transport Mode
Pattern First mode Second mode Third mode Forth mode Share(%)
1 Bus Bus 26.3
2 Trolley bus Trolley bus 2.3
3 Tram Tram 21.1
4 Metro Metro 12.0
5 Bus Bus Bus 0.1
6 Trolley bus Trolley bus Trolley bus 0.1
7 Tram Tram Tram 1.1
8 Bus Trolley bus 0.7
9 Bus Tram 2.6
10 Bus Metro 0.6
11 Trolley bus Tram 12.0
12 Trolley bus Metro 4.3
13 Tram Metro 14.3
14 Bus Bus Trolley bus 0.0
15 Bus Bus Tram 0.1
16 Bus Bus Metro 0.0
17 Trolley bus Trolley bus Tram 0.3
18 Trolley bus Trolley bus Metro 0.0
19 Tram Tram Metro 0.8
20 Bus Bus Bus Trolley bus 0.0
21 Bus Bus Bus Metro 0.0
22 Bus Bus Bus Metro 0.0
23 Trolley bus Trolley bus Trolley bus Tram 0.0
24 Trolley bus Trolley bus Trolley bus Metro 0.0
25 Tram Tram Tram Metro 0.0
26 Bus Trolley bus Trolley bus 0.0
27 Bus Tram Tram 0.3
28 Trolley bus Tram Tram 0.9
4-16
4.7 Freight Movement
4.7.1 Statistics of Freight Transport
(1) Domestic Goods Transport by Mode
Table 4.7.1 describes the volume of goods carried by domestic transport in Romania, from 1991 to
1996. The total weight of goods carried decreased from 1,187 million tons in 1991,to 737 million tons
in 1993. Afterwards, it slightly increased to 796 million tons in 1996. According to this table, the role
of road transport is quite high and it has consistently maintained 80 percent of the total goods carried.
4-17
Table 4.7.3 Number of Trucks Counted at Cordon Line
Cordon Survey Total Number of Trucks Counted
location hour vehicles During 24 Rate During Rate
counted or night time
14 hr. (%) 12 hr. (%)
period period
Point-1 24h 25,211 1,674 6.6 355 21.2
Point-2 14h 2,287 315 13.8
Point-3 24h 21,548 2,523 11.7 736 29.2
Point-4 14h 6,418 824 12.8
Point-5 14h 3,793 5221 13.7
Point-6 14h 2,624 307 11.7
Point-7 14h 1,472 114 7.7
Point-8 24h 9,588 1,940 20.2 424 21.9
Point-9 14h 6,816 1,750 25.7
Point-10 14h 2,327 265 11.4
Point-11 24h 17,867 1,991 11.1 513 25.8
Point-12 14h 8,273 1,940 23.4
Point-13 14h 8,788 1,982 22.6
Point-1
25,211 (1,674)
Point-13
8,788 (1,982)
Point-2
2,287 (315)
Point-12
8,273 1,940) Point-3
21,548 (2,523)
Point-11 Point-4
17,867 (1,991) 6,418 (824)
Point-10
2,327 (265)
Point-9
6,816 (1,750)
Point-6
2,624 (307)
Number of Vehicles
Total (Trucks)
4-18
4.7.2 Freight Movement Survey
A small-scale yet comprehensive freight survey was conducted to better understand the
magnitude of truck trips generated by different types of companies, the utilization of trucks
for different commodity types, and the actual movement of trucks in and around Bucharest.
This survey involved a series of detailed interview questionnaires carried out on-site at 100
companies (80 in Bucharest Municipality and 20 outside of Bucharest but within Ilfov) in
November and December 1998.
- Agriculture
- Forestry
- Fishing
- Mining
- Processing Industry
- Electrical Energy, Thermal Energy, Gas, and Water
- Construction
- Wholesale and Retail, Including Motor Vehicle Maintenance and Repair
- Hotels and Restaurants
- Transport and Warehousing
- Post and Telecommunications
- Financial Services and Banking
- Real Estate
- Public Administration
- Education
- Medical/Health
- Other Community, social, and Personal Service Activities
- Activities of Persons Employed within Households
- Activities of External Organizations
Data provided on each company included (1) ownership type, (2) social capital, (3) annual
1997 revenues as reported by the Treasury Department, (4) number of vehicles, (5) number of
salaried employees, (6) number of contract (i.e., non-salaried) employees, (7) company
address, telephone number, and fax number, and (7) economic activity division code. There
are five company ownership categories/1) state-owned, (2) mixed or combination of state
and private, (3) private, (4) cooperative, and (5) other.
The 100 companies were then chosen with respect to company economic activity division,
company size in terms of annual revenue, company ownership type, vehicle fleet size, and
4-19
geographical location such that a broad representation of companies that generate truck trips
would be selected. Many economic activity divisions were not represented in the selection of
companies because these divisions do not contain companies that generate a significant
number of truck trips.
Typical economic sectors that were considered less important for the freight survey in
Bucharest and Ilfov include forestry, fishing, hotels and restaurants, financial services and
banking, education, and medical/health care. The most significant economic activity sectors
for truck trips are processing industry, construction, and transport and warehousing.
(2) Questionnaire
Five different sets of questionnaires were used for the freight survey: 1) business entity
questionnaire, 2) commodity inflow questionnaire, 3) commodity outflow questionnaire, 4)
truck operation questionnaire, and 5) fleet operation questionnaire for transport companies.
Pilot tests of the questionnaires were conducted at a few companies prior to finalization of the
survey sheets.
- number of employees, acreage/hectarage of site, and facility floor space of all offices
- relationship between commodity flow and business transactions
- address, type, and scale of the facilities for commodity flow located at the sites apart from
the place where the current business entity is located
- general information on main products inbound and outbound in terms of percentage of
total tonnage
- locations of main origins and destinations of freight traffic attracted to and generated from
the office and percentages of these in terms of total inflow and outflow tonnage
- general information on the frequency of commodity flow
- general information on main transport modes used for commodity flow
- number of vehicles owned and number of vehicles surveyed
4-20
who actually operated the trucks or managed their operations, included the following types of
information:
- type of truck and maximum loading capacity
- address, facility type, company ownership type, and economic activity type (industry
type) of the facility at arrival places
- arrival and departure times
- types off commodities loaded and unloaded and their tonnage
- trip purpose to the destination
No. of
Industrial sector answers (%)
Agriculture 1 1.0
Industry 45 45.9
Construction 15 15.3
Wholesales 4 4.1
Retail 7 7.1
Financial/Insurance 0 0.0
Transport/Comm. 12 12.2
Electricity/Water 1 1.0
Services 4 4.1
Public adm. 0 0.0
Others 9 9.2
Total 98 100.0
4-21
Table 4.7.5 Number of Trucks Owned by Surveyed Companies
Vehicle type No. of vehicles
Total 3,456
6TCPUUJKROGPV
6TWEM
2QKPV
6GTOKPCN
/CVGTKCN &GRQV
/CMGTU
2CTVU 9JQNGUCNG 4GVCKN
(CEVQT[
(CEVQT[
9CTGJQWUG
&KUVTKDWVKQP
%GPVGT
The typical flow diagrams of commodities by type of company activity obtained by the
survey are presented in the following pages.
The commodity flow for industrial companies is shown in figure 4.7.3. A truck leaves the
terminal first and carries commodities from a factory to the firm’s warehouse. This trip is
usually made by heavy trucks. On the other hand, light trucks transport the commodities from
the warehouse to retail companies or shops. The trucks makes a “going to and bank” trip, or a
round trip, between shops according to the amount and type of commodities which are being
4-22
carried. As shown in figure 4.7.4, trucks owned by a construction company have a travel
pattern very similar to those in an industrial company, although their trips are mostly “going
to and bank” trips. Long distance trips are covered by heavy trucks outside of the
Municipality of Bucharest, while light trucks cover inside of thee Municipality, as the
commodities are carried over a relatively short distance. The commodity flow for a wholesale
and retail company is displayed in figure 4.7.5, and that for a transport company is shown in
Figure 4.7.6. The commodity flow for a transport company is essentially a combination of the
trips which can be seen in the other type of companies.
5JQR
6TWEM
6GTOKPCN
5JQR
(CEVQT[
5JQR
9CTGJQWUG
5JQR
4-23
%QPUVTWEVKQP
(CEVQT[
5KVG
6TWEM
6GTOKPCN
%QPUVTWEVKQP
(CEVQT[
5KVG
+PFWUVTKCN %QPUVTWEVKQP
%QORCP[ 5KVG
9CTGJQWUG
+PFWUVTKCN %QPUVTWEVKQP
%QORCP[ 5KVG
9CTGJQWUG
(CEVQT[ 6TWEM
6GTOKPCN
9CTGJQWUG
5JQR
9CTGJQWUG 9CTGJQWUG
5JQR
4-24
(CEVQT[ 9CTGJQWUG
6TWEM
6GTOKPCN
5JQR 1VJGTU
(3) Others
1) Operational Efficiency
Table 4.7.6 and Table 4.7.7 describe the operational efficiency of trucks based on the answers
obtained from the freight survey. The average number of vehicle trips range from 2.25 in the
agriculture sector to 4.8.6 in wholesale. Although the average distance per vehicle trip is
almost 300km, the average efficiency is less than 50%, meaning that trucks are empty for half
on the round trip.
4-25
Table 4.7.7 Operational Efficiency of Trucks by Vehicle Type
Consistent with city regulations, there is no wholesale company in the central area. Almost
all major wholesale and other large markets are located along the radial trunk road outside of
the inner ring road, such as Sos. Colentina and B-dul Iuliu Maniu, and some of them are
located in the northern part of the Study Area, outside the outer ring road.
These locations avoid the attraction of trip made by heavy trucks into the central area and
ensure quick access to national roads connecting to adjacent countries. However, the
excessive concentration of wholesale and other large markets will generate and attract lots of
heavy trucks according to the economic growth, so that the severe traffic congestion might
occur without consideration of appropriate road plan and truck terminal plan.
In addition, at present the truck movement is basically allowed to pass within the central area
of the Study area for only night time. This regulation does not cause the traffic congestion by
loading or unloading on streets during day time in the central area. Therefore, this regulation
should be continued hereafter.
4-26
5. Road Facilities and Road Traffic
5. Road Facilities And Road Traffic
In this chapter, the existing conditions of road facilities and road traffic are analyzed. At
first the outline of the interregional road network, which is mainly located outside the
study area, is briefly summarized to clarify the traffic situation of Bucharest in Romania.
Secondly the road conditions in the study area are studied to grasp the present situation and
identify the existing problems.
5-1
The Figure 5.1.1 shows the major interregional road network in the vicinity of Bucharest.
These roads are a part of the international road network mentioned above, linking Bucharest
with the surrounding cities such as Ploiesti, Buzau, Calarasi, Giurgiu, Pitesti etc..
For the major interregional roads outside of Bucharest, the competent authority is the Ministry
of Transport. The actual design, construction, and maintenance of interregional roads is
managed by the National Road Administration, a subordinate organization of the Ministry of
Transport, in the corresponding district of the project.
Table 5.1.1 shows the length and width of the interregional roads. All the roads are paved and
generally well maintained. Most of them are 4-lane roads.
DN1A
DN1
DN7 DN2
Autostrada DN3
DN6
DN5
DN4
5-2
5.1.2 Future Development
With regard to the priority international corridors in Europe, the Pan European Motorway
Network Plan was proposed as elaborated by an order of the European Commission for
Transportation. The Plan includes the following network;
- Berlin/Nurenberg – Praha – Budapest – Bucharest – Constanta – Istanbul – Athens
- Helsinki – Moscow - Kiev – Odessa – Bucharest - Istanbul
In accordance with this Plan, a nationwide motorway development plan was identified and
prepared by the Government of Romania. Bucharest will be linked with major cities in the
neighboring countries by expressways.
Based on the national motorway network development plan, the Ministry of Transport is
promoting the development of the Autostrada projects. The present status of the projects in
the vicinity of Bucharest is summarized in the Table 5.1.2 and Figure 5.1.3.
In addition to the above projects, the following road projects are on-going.
a. Reinforcement of DN1 for the section near Ploiesti.
- improvement of the pavement etc.. (almost completed)
b Improvement of DN1A for the section Bucharest - Ploiesti
- improvement of vertical and horizontal alignment (F/S approved)
c. Improvement of DN3 for the section Bucharest - Lehliu
- improvement of shoulders, draining system etc.. (F/S approved)
5-3
Figure 5.1.3 Autostrada Projects in the Vicinity of Bucharest
5-4
Figure 5.1.4 Interregional Traffic Related to Bucharest (Truck OD)
5-5
Table 5.1.3 Commodity Types of Interregional Freight Traffic
Commodity Type Truck Type Average
Light Truck Medium Truck Heavy Truck Long Vehicle
(1.51-3.5t) (3.51-10t) (>10t) (w/trailer)
Fresh fruits, vegetables 7% 5% 2% 3% 5%
Refrigerated and frozen foods 11% 8% 3% 5% 7%
Other processed foods 18% 10% 6% 8% 11%
Beverages 10% 5% 3% 8% 6%
Other agricultural products 6% 6% 6% 7% 6%
Metal products 6% 9% 7% 4% 7%
Construction materials 9% 24% 48% 17% 24%
Machinery, equipment 6% 5% 4% 5% 5%
Fuels 1% 5% 3% 11% 4%
Chemicals, chemical products 9% 7% 5% 8% 7%
Misc. manufactured articles 12% 10% 7% 18% 11%
Other 5% 8% 5% 6% 6%
Total 100% 100% 100% 100% 100%
Note: The percentage shows the trip frequencies
5-6
Particularly in the winter season, congestion becomes heavier due to the slippery road surface
and the piles of snow along the roadside. These congested points are found particularly in the
N-S direction of the central area, where through traffic is usually mixed with local or district
traffic, since the interval or spacing of main roads is too large.
5-8
Based on the above classification, the standards for design elements such as maximum
gradient, visible distance, lane width etc. are set forth in the national standard (STAS
10144/3-81).
The cross sections of each category of roads in the urban area are shown as a design standard
in the STAS 10144/1-80. The typical cross sections for Category I and II are as depicted in
Figure.5.2.2. The width of each traffic lane is set up as 3.5 m for Category I and II, and 3.0 to
3.5m for Category III and IV .
¸Ë¼¾ÆÉÐw
¸Ë¼¾ÆÉÐw
According to the above table, the pavement ratio in terms of road length is 76% for the whole
city. The main roads are mostly paved with asphalt or concrete, while the minor local streets
in residential areas are not always paved even with stone.
5-9
Table 5.3.2 presents a comparison of road densities, (the road length per unit area) among a
number of major cities in the world. The road density of Bucharest seems to be at a low level
when compared to other European cities.
Taking the road area ratio (the road area per unit area), the indicator in Bucharest becomes
almost the same level as Vienna or Tokyo. This implies that the width of each road is
comparatively wide but that the density of the road network as a whole is not sufficient.
The road density data by Sector in Bucharest are also available. As shown in Table 5.3.3, the
road density of Sector 6 is extremely low, -less than half of the average for the whole city.
Even in the case that the area of urban use is taken instead of the total area, the same results
are obtained. Sector 6 is less developed in terms of the density of paved roads as well.
On the other hand, the districts with relatively high road densities are Sector 4 in terms of the
total road length and Sector 2 in terms of the paved road length.
Sector
Indicators 1 2 3 4 5 6 Total
Road Paved (km) 395 261 268 252 195 106 1477
Length Unpaved (km) 45 34 41 313 0 34 467
(km) Total (km) 440 295 309 565 195 140 1944
Area of Sector (km2) 68 30 33 32 28 37 228
Road Density (km/km2) 6.47 9.83 9.36 17.66 6.96 3.78 8.53
Paved Rd Density (km/km2) 5.81 8.70 8.12 7.88 6.96 2.86 6.48
Source : Municipality of Bucharest
5-10
5.3.2 Characteristics of Major Roads
(1) B-dul Magheru / Balcescu / Bratianu / Cantemir
This is the busiest street in Bucharest, connecting Pta.Victoriei, Pta.Romana and Pta.Unirii in
the N-S direction. Shops, hotels, theaters, etc., line both sides of the street. A university and
the city's largest shopping center are also located in the central area along this road. The
number of traffic lanes varies from 6 to 8 depending on the section.
5-11
(8) Splaiul Independentei
There is a river called Dambovita dividing the city into a north part and a south part. This
road is a pair of one way streets along both sides of the Dambovita. Each one-way street has 3
lanes.
The lane width is generally 3.5 m per lane in the case of trunk roads. The number of lanes is
generally more than 4 lanes for the arterial and semi-arterial roads, most of which are two-
way. The one-way system is applied to the following main roads; Calea Victoriei,
Sos.P.D.Kiseleff, B-dul Regina Elisabeta, etc. The number of lanes for the main roads is
shown in Figure.5.3.1.
Another point to be noted regarding the number of lanes is that they are not continuous over
the whole stretch of road. In the case of radial roads, the number of lanes normally does not
change or diminish with respect to the distance from the center, corresponding to the traffic
volume. Rather, the number of lanes changes irrespective of traffic intensity, sometimes
increasing and/or decreasing suddenly. This situation is not desirable from the viewpoint of
improving traffic flow.
5-12
Road, and the other seven are located either on the Inner Ring Road or in the city center. Most
of them are grade separated by having an underpass on the main road with the heavier traffic
volume.
- Unirii : underpass: B-dul Unirii / B-dul Cantemir
- Muncii : underpass: Mihai Bravu / Calarasi
- Obor : underpass: Mihai Bravu / Colentina
- Pta.Victoriei : underpass: Nicolae Titulescu / Victoriei
- Giulesti : interchange: Crangasi / Giulesti
- Lujerului : underpass: Iuliu Maniu / Lujerului
- Mircea Voda : underpass without access: Mircea Voda / Marasesti
1) Pta.Universitatii
In addition to the fact that various urban functions are concentrated near the intersection, two
major arterial roads cross at this point; therefore, traffic volumes on the two roads are heavy.
3) Mihalache / Turda
The road width is narrow for both roads. In addition to tram lines running on both roads, the
traffic volumes are considerably high. Although left turns are prohibited at the intersection,
traffic congestion is quite serious.
5-14
5.3.5 Road Maintenance
The maintenance work of the roads inside the Outer Ring Road is undertaken by the Street
Administration of the Municipality. The sectorial administration office, responsible for each
sector of Bucharest, is in charge of the actual maintenance work under the supervision of the
Street Administration. The Street Administration is responsible not only for road maintenance
but also for all the related facilities such as installation of traffic signs, signals, street lamps
and provision of parking spaces on the roadside etc.. Due to the shortage of financial
resources, road maintenance is not sufficiently carried out. Even for arterial roads, road
surfaces are heavily damaged and many holes and cracks can be found particularly on the
Inner Ring Road, and the main radial roads outside the Inner Ring Road mainly caused by
heavy vehicles. The lane markings and zebra crossings are not clear, -almost invisible, or
non- existent. Heavy vehicles are often overloaded, however, there is no system to check
overweight at present. The traffic police, who are regarded as the responsible organization,
check only the permit of the trucks required for entering the central area.
5-16
The Table 5.4.1 shows the comparison of the traffic inflows by direction between those at the
Outer Ring and the Inner Ring. In general, both the traffic inflows by direction do not seem to
be proportional. The following reasons can be pointed out.
1) The main portion of the traffic at the Inner Ring Road originates from the densely
populated area located between the two ring roads.
2) The Inner Ring Road is functioning for dispersing the traffic inflows from the outside
areas.
3) There are several sub-centers around the Inner Ring Road such as Pta.Obor, Presei Libre,
Pta.Victorie and Pta.Sudlui etc., absorbing some traffic inflow from the outside and
generating other traffic in different directions.
5-18
direction. This indicates that there are more work places located at the northern side of
the Dambovita than the southern side.
5-19
(2) Vehicle Composition
Vehicle composition of main roads differs by location, particularly between the roads inside
and the roads outside the Inner Ring Road. The reason is the traffic zone system for freight
vehicles, which restricts trucks from entering the area inside the Inner Ring Road without a
specific permit.
The Figure 5.4.4 shows the comparison of vehicle compositions at just inside the Inner Ring
Road and at the Outer Ring Road. Passenger cars make up about 95% of the total traffic
volume in the case of inside the Inner Ring, while they decrease to 84% in the case of the
Outer Ring Road.
For freight vehicles, on the other hand, the composition rate is only 2% in the case of inside
the Inner Ring, and occupies 14% at the Outer Ring.
|
|
5-21
Inner Ring Road Outer Ring Road
| | |
|
|
|
| |
5-23
high-demand spots scattered outside the central area, such as Obor, Gare de Nord and Drumul
Taberei. According to reports from the two companies, the total number of roadside parking
spaces is 675 and 391 respectively. By comparing these figures with those in Table 5.5.2, the
share of Dalli's parking spaces can be obtained. In Zone 1, Dalli's share is about one third of
the total.
Table 5.5.2 Parking Spaces Managed by Two Main Companies
Type of Other
Company Zone 1 Zone 2 Zone 3 Zone 4 Total
Facility Area
On Street 594 48 110 30 593 1,375
Dalli Off Street 343 286 65 45 344 1,083
Total 937 334 175 75 937 2,458
On Street - - - - 391 391
PS Off Street - - - - 278 278
Total - - - - 669 669
On Street 594 48 110 30 984 1,766
Total Off Street 343 286 65 45 622 1,361
Total 937 334 175 75 1,606 3,127
Source: Dalli and PS
Parking spaces managed by the two companies are normally charged on an hourly, daily or
monthly basis. Table 5.5.3 presents the operator interview results of off-street parking
facilities located in the control area. The largest parking facility in the table is the one located
underground below B-dul Bratianu and operated by a private company, Ciclop. The
occupancy rate is considerably high for all of the facilities, particularly since they are almost
full at capacity during the daytime. According to the report from the Municipality, the average
occupancy rate in October 1998 was 79.8 %. The past record shows an increasing tendency of
occupancy.
Table 5.5.3 Off-Street Parking Facilities
Parking Company Parking Occupancy Rate
Location
Capacity Name Charge Peak Hr. Off Peak Average
2300 lei/h
120%
Balcescu 55 Dalli 320,000 30-40% 80%
(11:30-14:00)
lei/month
Balcescu 60 Intercontinental Only Guests - - 60%
Balcescu 20 Theater - - - 50%
2300 lei/h
Independen 110%
70 Dalli 320,000 - 70%
tei /Peco (8:00-15:00)
lei/month
Calea
50 Hilton Hotel Only Guests - - 40%
Victoriei
180,000/m
Under-
(person) -
Ground of 1,300 Ciclop - 90%
200,000/m
Bratianu
(company)
20,000/day
Under- 150,000/m
Ground of 1,000 PS (person) - - 95%
Obor 200,000/m
(company)
Source: Study Team
The other on-street parking spaces are arranged by either the Road Administration or
Sectorial Administration Office.
The number of parking spaces arranged by the Road Administration is not available. Those
arranged by the Sectorial Administration Office are usually approved and registered by the
Office as for residential use.
5-26
The survey results include all types of roadside parking. Therefore, the difference between the
arranged parking spaces in Table 5.5.1 and the total on-street spaces of the private companies
in the corresponding areas is theoretically considered to be the spaces identified by either the
Road Administration or the Sectorial Administration Office. However, the number of actual
parked vehicles at the companies' spaces seems to exceed the "capacity" which is reported by
the company, sometimes nearly double. The reason may be that more than 50% of the
collected parking fees should be paid to the Municipality. Therefore, the parking spaces of the
Road Administration and Sectorial Office should be somewhat less than the difference stated
above.
The parking fee charged by the Sectorial Office is 5,000 lei per month as of Nov.1998. The
collected fee is exclusively spent for the management of the Sectorial Office. On the other
hand, the parking space identified by the Road Administration is not charged at present.
5-27
Synchronization is also possible for the above French-made signals. According to the Road
Administration, coordinated signal times were implemented along the Inner Ring Road for the
Stefan Cel Mare section (Dorobanti – Str. Polona); however, this measure was suspended
with the introduction of a one-way system.
The total number of intersections to be signalized is 400; therefore, signal installation is
required at the remaining 160 intersections. The installation of detectors is also required,
particularly to control incoming traffic to the center in the morning peak during weekdays,
and outgoing traffic on Sundays. However, these plans are now pending due to a shortage of
funds.
The Figure 5.6.1 shows the signalized intersections in Bucharest.
5-28
demonstrate that the northbound traffic volume is higher than the southbound traffic volume
at the center.
With regard to bus lanes, they have been introduced on only a short stretch of a few roads
because of the insufficient number of vehicle lanes. The main roads, with exclusive bus lanes,
are B-dul Regina Elisabeta and B-dul Dacia, where the one-way system has been adopted.
Only buses and trolley buses can use the lane, which is for the opposite direction of the
designated one way direction. (i.e., contraflow lane)
5-29
to make a rotary type traffic flow at some intersections, even in case that the intersection is
not a rotary type.
Accordingly, the intersections, where the left turn prohibitions are applied, would have the
following conditions.
- The traffic volume is considerably heavy for both the streets.
- The intersection is not a rotary type.
- The road width is too narrow to install a left-turn lane.
The major intersections with left turn prohibition are the intersection of B-dul Dacia with
Calea Victoriei, the intersection of B-dul Ion Mihalache with Str.Turda.
5-31
because of old controllers and lack of detectors. The shortage of parking facilities is also
reducing the possibility or effectiveness of the traffic management measures.
3) Traffic enforcement
The enforcement of traffic regulation by traffic police is not very strict in Bucharest. The
violation of traffic laws is frequent; e.g. driving of private cars on the exclusive bus lanes or
on one way streets in the opposite direction, and illegal parking. The fine for illegal parking
also seems to be very low, only 15,000 lei as of November 1998, which is lower than the
parking charge per day. Institutional arrangements for reducing illegal traffic activities should
be considered.
5-32
6. Public Transport
6. Public Transport
In this chapter, the existing conditions of public transport traffic, facilities, operation and
management are analyzed. At first the outline of the public transport system is briefly
summarized to clarify the public transport situation in Bucharest City and its Metropolitan
area. Then analyses were made by mode, namely, metro, tram, trolley bus, bus, maxi-taxi,
railway, air transport. Also inter-modal facilities and transferring system were analyzed
because of their importance for the public transport system as a whole. Existing conditions
of an institutional and administrative nature were also analyzed by mode. Finally based on
these analyses, the problems were identified.
Urban public transport in Romania is generally under the responsibility of local government.
Thus, in Bucharest the responsibility for the surface modes of public transport lies with the
Municipality, which has in turn devolved the responsibility to the principal public transport
operator, RATB. However, the Bucharest metro is the responsibility of an enterprise of the
Ministry of Transport called Metrorex.
Compared with other public transport modes, recently the decrease of metro passengers is
outstanding. Also the number of surface public transport passengers showed the tendency to
decrease, when statistical adjustment for exclusion of data discrepancy is taken into account.
In the first half of 1998, 388.7 million passenger journeys were estimated by RATB to have
been made by RATB services. This figure is based on ticket sales and therefore excludes fare
evaders, estimated by CIE Consult to be up to 25 percent. Holders of one-line season tickets
were estimated to make 50 journeys per month, holders of two line season tickets 100
journeys and holders of all line season tickets 150 journeys. Out of the total of 388.7 million
journeys, 159 million (or 41 percent) were estimated to have been made by holders of free
passes. Holders of full fare season tickets were estimated to have made 82 million journeys
(21 percent) and holders of half fare season tickets 75 million journeys (19 percent). The
remaining 73 million journeys (19 percent) were made by passengers holding single journey
tickets (Table 6.1.1).
6-1
Table 6.1.1 Passengers of Public Transport
1990 1991 1992 1993 1994 1995 1996 1997
Metro 1,000pass./year 246,825 244,356 207,496 172,040 172,605 164,418 152,900 151,295
1,000pass./day 676 669 568 471 473 450 419 415
100 99 84 70 70 67 62 61
Trams 1,000pass./year 236,100 267,200 345,800 281,900 264,900 244,500 340,600 316,400
1,000pass./day 647 732 947 772 726 670 933 867
100 113 146 119 112 104 144 134
Trolleys 1,000pass./year 53,300 73,700 99,600 111,400 88,300 78,700 110,900 103,000
1,000pass./day 146 202 273 305 242 216 304 282
100 138 187 209 166 148 208 193
Buses 1,000pass./year 147,000 226,500 299,900 289,600 275,700 252,000 340,600 316,400
1,000pass./day 403 621 822 793 755 690 933 867
100 154 204 197 188 171 232 215
Total 1,000pers./year 683,225 811,756 952,796 854,940 801,505 739,618 945,000 887,095
1,000pers./day 1,196 1,555 2,042 1,871 1,723 1,576 2,170 2,016
100 119 139 125 117 108 138 130
Source: Annual Report, Metrorex and RATB
Note: Number of passengers of RATB modes in 1996 and 1997 includes those passengers free of charge.
Number of passengers excludes fare evaders.
6.1.2 Network
Until the early 1970’s, the public transport system developed in a radial and concentric pattern
typical of many Central European cities. Primary radial and circumferential services were
provided by trams, supplemented by trolley buses. Buses provided feeder services,
intermediate connecting services and local services.
The primary network was largely oriented towards the city centre, with many through lines. In
addition, there was a circular line around the city centre served by both trams and buses.
In the early 1970’s, a number of circumstances resulted in a fundamental change in the pattern
of the public transport system. The demolition of a large part of the city centre and the
construction of a new government quarter resulted in the truncating of many services on the
periphery of the central area. The construction of industrial complexes around the periphery
of the city and of new residential areas between the city centre and the periphery resulted in a
reorientation of transport demand. The construction of a metro system resulted in the closure
of parallel tram and bus services.
The resulting network forms the basis of the services currently provided.
Existing routes of surface public transport are categorized into 7 route patterns.
Though the routes of trolley bus and bus reach the central district of Bucharest, no tram route
reaches the central district (Figure 6.1.1).
Detailed descriptions of the networks and characteristics of individual mass transit modes are
presented in subsequent sections of this chapter.
All modes suffer from poor inter-modal connection facilities, poor passenger facilities, lack of
passenger information, poor state of infrastructure, poor state of vehicles, lack of planning
tools.
6-2
Concerning transferring, in general the public transport modes are not well connected with
those supplied by other public transport service suppliers. Especially concerning the
transferring between metro and surface public transport modes, although the function is well
developed at Gara de Nord or Sudului, the role of the surface public transport modes is not
apparently recognized as a feeder service transport.
Regarding surface public transport, some fifteen RATB transfer terminals are located in
Bucharest and 6 autogaras for regional buses other than those served by RATB are located
within Bucharest. However the connection between the RATB terminals and autogara is not
well arranged, though generally bus or tram routes are provided to connect RATB terminals
and autogara.
Even in the case of the RATB network, there are some routes which force passengers to
transfer in spite of the possibility of delineating the direct access route to the central area. The
transferring facilities, passenger facilities and information facilities are generally poor.
Metro is playing the major role as a transport means for commuting, business and other
passengers in the Bucharest Metropolitan area because of its large transport capacity, rapidity,
punctuality and safety. The following is assumed to be the detailed role of the tram.
- Liner transport mode with moderate capacity between residential areas and work areas
- Transport mode to correspond to the transport demand within the business area
- Transport mode to connect with major regional transport facilities corresponding to the long
distance transport demand
Though tram is somewhat inferior to metro in terms of capacity, operating speed, punctuality
and safety, a historically dense network was established in Bucharest Metropolitan area, and it
is playing a significant role as a passenger transport mean for commuting, business and so on.
The expected role of the tram is assumed to be a public transport means to meet the demand
that is not large enough for mass public transport means. However the demarcation of the
function between metro and tram is not clearly identified and competition and duplication
with metro is emerging in Bucharest Metropolitan area. Presently, the tram is not fully
realizing its special functions compared with bus and trolley bus.
Trolley bus has disadvantages of relatively large energy consumption per transport capacity
unit compared with tram and of relatively large required cost for facilities despite little
difference from bus regarding transport capacity. However it is functioning to serve as
transport means for access to the center of the city and to serve as a feeder transport means
to connect with tram or bus in the peripheral area.
6-4
Following roles are taken care of by buses:
- Area servicing public transport mode to meet the demand for transport between areas
beyond the capacity of taxis.
- Transport mode together with rail transit to apply the feeder transport demand which is not
large enough for rail transit
On the other hand, it serves as a trunk public transport mode in areas where large public
transport demand exceeds the capacity of trams or where no rail transit is supplied in spite of
large transport demand.
From the results of this survey, the perception of public transport may be summarised as
follows. In general, there is a lack of information. Public transport is expensive and
uncomfortable. It is not convenient to change from one mode to another and the attitude of
staff is poor. Buses are generally preferred to trams, although neither mode is regarded as
providing a reliable service. The routes are not well adapted to demand. If available, metro is
the preferred mode, providing a fast service. The length of time between trains did not seem
to be a big issue. However, in general speed does not appear to be a concern, with no mode
regarded as slow. There would appear to be an indifferent opinion on the fact that there are
several different ticketing systems.
The highest number of occurrences of the response ‘don’t know’ was for statements referring
specifically to the characteristics of the metro. Such responses tended to be made by those
who did not use or did not have access to metro services.
The open question asked respondents whether they had any particular comments to make
about public transport in Bucharest. Among those responding to these questions, many
reiterated statements from the previous question e.g. that the waiting time for public transport
was too long and that a higher frequency was necessary. This was in fact the most frequent
response to the open question. Comments relating to other aspects of public transport which
arose frequently included the following:
x vehicles should run to a schedule (i.e. at fixed times, not fixed intervals)
x vehicles should be heated in winter
x vehicles should be cleaner
x the attitude and behaviour of ticket inspectors is bad
x old vehicles should be replaced
x services are overcrowded.
6.2 Metro
6.2.1 Network
After the preliminary study on the construction of metro from 1972 to 1975, the organization
for the metro was established in February, 1975 and design work and construction work were
started with Romanian-made equipment.
The metro was proposed with a background where the transport capacity was 600,000
6-5
Table 6.2.1 Specifications of Metro Rolling Stock
6.2.2 Cars
The cars used for Metro were completely manufactured by ASTRA Vagoane Arad in
Romania.
The average age of rolling stocks of Metrorex is about 10 years and the life expectancy is
assumed at 24 years. The rolling stocks are operated in double car units and trains are
principally composed of 3 double car units. The rolling stocks were made in mono-motor
bogie type with main motor power of 185 kW (750V DC) and 1,435 mm track gauge.
Passenger capacity is designed as 34 seats and 166 standees (Table 6.2.1). The number of
available rolling stocks amounts to 251 double car units in 1997. Out of these car units, 197
car units were usable and 180 car units were actually operated in 1997.
The number of trains operated on each line were 40 trains and 18 trains for M1 and M3 lines,
and M2 line respectively.
6.2.3 Infrastructure
The designed inner diameter of standard Metro tunnel is 5.7 m with a concrete thickness of 35
cm. This concrete was designed to bear the compressive strength of 500 kg per sq. cm. For
double tracks, a rectangular shape tunnel was adopted. The standard inner width and height of
this rectangular shape tunnel is 8.5m x 4.7m with concrete thickness of 0.8 to 1.0 m.
According to the Metrorex information, the tunnel is being electrolytically corroded.
The Metro rails are set at 7.8m to 19.6m below the surface and generally 12 m depth was
adopted.
There are 41 stations on the Metro routes and generally two entrances and one ticket office
are provided at each station. The length of the platforms is in the range of 135 to 175 m and
island platforms were adopted at 15 stations and opposite platforms were adopted at 25
6-7
stations. Granite and marble were used for walls, floors, poles at stations, and were seemingly
good in terms of quality, durability and environmental aspect. Escalators were equipped in the
case of over 5m difference between floor levels, however most of these escalator facilities are
currently dismantled. On the platform, speakers, clocks, emergency button, TV screens are
generally provided.
6.2.4 Performance
Following numbers of programmed trains are operated for each line in November 1998.
M1 line (Industriilor – Republica) 222 trains a day (both directions)
M2 line (IMGB – Pipera) 362 trains a day (both directions)
M3 line (Dristor 2 – Republica) 292 trains a day (both directions)
Other than above, 68 shuttle trains between Pantelimon and Republica are operated. Those
trains are operated at average headway of 4 to 5 minutes in peak periods (6 – 8 AM. and 3 – 5
PM.) and 8 to 10 minutes in off peak period. The schedule speed is 36 km./h.
6-8
The number of Metro passengers is decreasing since 1990. From 1990 to 1997 some 40 %
decrease in the number of passengers was observed. In 1997 the total number of yearly
passengers was 151.3 mil passengers per year, and this was translated into 450 thousand
passengers a day (Table 6.2.2). It was observed that the number of passengers is decreasing
not only by metro but also by other public transport means. It is said that the dissemination of
private vehicles and economic stagnation in 1990s are the main causes of this tendency.
Especially motorization is regarded as the primary factor of rapid decrease in captive riders.
The number of Metro stations with over 10 thousand passengers getting on amounts to 11 and
are located at central district on M2 and M3 line. Piata Unirii station was used by the largest
number of passengers and Universitatii station and Gara de Nord station followed in that
order (Table 6.2.3 and Figure 6.2.2).
A Metro passenger survey to get detailed information on the metro passenger traffic at peak
periods was conducted on weekday by the JICA Study Team with assistance of METROREX.
A Representative train was chosen in each direction of each line. The survey results showed
that high passenger density was observed between Piata Romana and Eroii Revolutiei of M2
line with over 1,000 passengers on board in total of both directions. And the section between
Eroilor and Politehnica also showed over 1,000 passengers on board Presently, the number of
passengers in suburban areas near terminals is low. The section between Obor and Dristor of
M2 line which is located on the inner ring road had a relatively low number of passengers
showing less than 500 (Figure 6.2.3).
Table 6.2.2 Metro Passengers
1990 1991 1992 1993 1994 1995 1996 1997
Total (1,000 246,825 244,356 207,496 172,040 172,605 164,418 152,900 151,295
passengers/year)
(1,000 676 669 568 471 473 450 419 415
passengers/day)
Index (1990=1000) 100 99 84 70 70 67 62 61
Source: Metrorex
6-9
Table 6.2.3 Metro Passengers by Station
6-11
Table 6.2.4 Energy Consumption by Metrorex
1994 1995 1996 1997
Total consumption 153,616 147,300 152,276 151,591
Train traction 95,144 102,270 91,861 97,084
Source: Metrorex
(3) Subsidy
At present a high proportion of Metrorex’s finance is subsidized by the Central Government.
In 1997 Metrorex’s financial accounts showed that the revenue received from passengers was
just over one third of its estimated costs. However this rate improved slightly compared with
the one in 1996 because of frequent revision of tariffs (Table 6.2.7).
For capital expenditure, Metrorex also received additional finance for capital expenditure for
renewal and desired extension of network and vehicle fleet.
6-12
Table 6.2.6 Accumulated Mileage, Cost and Income per Car-Unit km
1994 1995 1996 1997
Accumulated mileage (mil. car-unit km.) 18,365 18,903 18,280 19,019
Metro Passengers (mil. passengers) 182,l960 174,282 168,745 151,295
Revenue 1) (mil.lei) 16,646 29,396 43,732 107,814
Expenditure (mil.lei) 60,980 87,289 122.,596 282,028
Revenue per car-unit km. (lei/car-unit km.) 906 1,555 2,392 5,669
Revenue per passenger (lei/passenger) 91 169 259 713
Cost per car-unit km. (lei/car-unit km.) 3,320 4,618 6,707 14,829
Cost per passenger (lei/passenger) 333 501 727 1,864
Source: Metrorex
Note: 1) Subsidies are not excluded.
Expenditure
Personnel expenditure 356 1,387 4,536 13,313 31,791 44,889 64,141 143,163
Expenditure for material 362 1,053 4,408 14,280 28,514 41,177 56,839 133,153
Others 6 120 85 818 675 1,224 1,616 5,712
Total 725 2,560 9,029 28,411 60,980 87,289 122,595 282,028
Source: Metrorex
The projects officially announced at present as most important investments in "The Most
Important Future Investments" are the following.
6-13
3. Construction of the section between Nicolae Grigorescu and Linia de Centura
This line is planned with length of 3.9 km and 4 stations between Nicolae Grigorescu and
Linia de Centura to connect with the existing M3 line.
6-14
6.3 Tram
6.3.1 Network
Since the opening of the metro, the tramway is intended to provide a complementary network
of services in densely trafficked medium and long distance corridors. However, it does not
provide access to or across the city center. Instead, radial lines link up with an incomplete
circumference line at some distance from the central area. To a large extent, this results from
the destruction of a large area of the city center since the mid 1970s for the new government
district, prior to which tram routes did cross the central area.
A schematic representation of the tram network in 1970 and 1998 is shown in Figure 6.3.1.
This is based on a conceptual plan of the tram network drawn up by CIE Consult.
1970 1998
Inner tram ring Tram lines
City City
Centre Centre
Industrial areas
Source: after CIE Consult / Regional Consulting (1998) Pre-Investment Study for Bucharest Urban Transport,
Draft Final Report, Fig C.1.
Figure 6.3.1 Schematic Representation of the Tram Network in 1970 and 1998
The figure shows the 1970 network as consisting of an inner ring route and radial routes, some of
which crossed the city centre. In the 1998 network, a reduced number of radial lines is shown and they
no longer cross the city centre. The inner ring is shown as being no longer continuous, with lines
coming in from outer urban areas, traversing a section of the ring and then turning outwards again
along another radial line. The essential role of the routes is shown to be to link together residential and
industrial areas.
While the concept provides some broad indications of the form of the tram network, it only
really applies to the south-west quadrant of the city.
Figure 6.3.2 shows a less conceptual plan of the network, while still retaining a schematic
representation of the lines. The objective of this diagram is to provide an understanding of the
basic pattern of tram services.
6-17
A key feature of the network is the semi-circular routes along the inner ring line. These are
shown in red in the figure. Two sets of routes run radial from southern outer-urban locations
to the inner ring, then split towards the east and the west, traversing the inner ring from the
south of the city to the Gara de Nord. There is no direct service provided between the north
and west sectors of the ring. Some of the routes leave the inner ring in the north to provide
radial links to outer-urban areas.
These routes are supplemented by a number of radial routes. In the southern sector of the city,
there are radial routes that run through from south east to south-west. They are shown in
yellow in the figure. Some of these routes from the east branch to the inner ring in the south.
In the south-west quadrant of the city, there are pairs of radial lines from suburban locations
linked together by short sections of the inner ring. They are shown in blue. There are also
radial lines from outer-urban locations to the city centre, to the Gara de Nord and to the inner
ring.
In the north west quadrant there are radial lines from outer-urban locations to the Gara de
Nord and city center, shown in gray. There is also an outer ring in this quadrant.
In the north east quadrant, there are radial lines from outer-urban locations to the city centre.
They are shown in green. Some of these are linked together in the centre. There are also links
from outer-urban locations to the Gara de Nord via the inner ring.
The actual route network is shown in Figure 6.3.3. In the first half of 1998, the total length of
tram route in service was 305.6 km, excluding lines in depots. It should be noted that the
services differ slightly during the summer period compared with winter. The service is also
reduced by about a third at weekends. The summer network of 1998 was made up of 36 routes.
The current winter weekday network is made up of 38 routes, details of which are shown in
Table 6.3.1.
There are 555 permanent tram stops at which passengers board and alight. The average
distance between stops is 0.55 km.
The numbers of units on each route are shown in Table 6.3.1. Figure 6.3.4 shows the
maximum number of units on each section of the tram network in the peak period.
The routes are operated from eight depots, as identified in Table 6.3.1. The location of these
depots is shown in Figure 6.3.5.
The only priority measures that exist for trams are the segregated rights of way that occur
along several routes. The locations of these segregated rights of way are shown in Figure
6.3.6. There are other sections of road where the carriageway is generally wide enough for
trams to be effectively segregated, even though there is no physical barrier. A greater respect
for the right of way of trams appears to be achieved when there is one traffic lane for trams
and at least two traffic lanes for other vehicles.
Even when other vehicles are not allowed to use lanes reserved for trams, they often do so.
Vehicles are frequently observed travelling along the tram lane to bypass queuing traffic at
traffic lights, including driving through the tram stop. This latter action is specifically
prohibited and is particularly dangerous to waiting tram passengers.
6-18
20,31
20,31
20,31 555
45
45
45
45
45 15
15
33
24
24
24
24
15
15
15
15 3
333
14
14
14
14
14
14
14
18
18
18
16,36
16,36
16,36
18
18
17
18
42
42
21
42
42
42 333
66666
3333 41
41 17
17
32 4
32
32
32
32
32 44
44
44 41 21
21
21
21
2,11,44
2,11,44
2,11,44 9
999
99
2,11,44
2,11,44
2,11,44 18
18
18
18
18
25
25
25
25
25
25 25
25
25
25
25
25
25 18
36
36
11111
36
36
36
36
21
21
21
21
21
21
36
36
36
36
36
36
36 21
21
21
21
21
21
21
25
25
25
25
25
25
9999 26
26
26
26
26
26
26 28 9
999
99
21
21
21
21
21 47
47 9 28
28
28
28 28
28 20
20
20
21 47
47
47 28 28 20
28
28
28 20
20
12 47 46,52
46,52
61
61
61 46,52 35
35
35
35
35
35 12
12
12
12
12
12
61
61
61 25
25
6
6134 25
25
25
34 25 9
999
99 13 13
13
13
13
13
13 3
33
33
33 52
31,4534
999 31,45
31,45
31,45
31,45 24
24
24
24 35
35
35
35
35
35 12
52
52
26
26 9
9 9
99 12
12
12
12 27
27
27
27
27
27
12 2736 15
15
15
25
25 26
26
26
26 9
9
99 9
99
9 36
363615
15
15 24 24
24
24
24
24
25
25
25
25 22
22
22
22 14 31
31
31
31 16 24 18
18
18
47
47
47
47
47
47 20
20 14
14 16
16
16 18
18
18
18
35
35
35 20
42
42 35
35
35
35 99
9 5
5 55
5
42 37
37
37 18
18 9 5 55
5
35
37 41
41
41
41 18
41
41 18
18
18 24
24
24
24
24
24
88888 35
35 44 19
19
19
19
19
19 5,14,46
5,14,46
5,14,46
5,14,46
3544
35
35 14
14
22
22
22 44
44 14
14
14 32
22
22
22
22 32
32 13
13
1313
13
13 13
13
13
13
13
13
13
35
35
35 14
14
14
14
14 21
21
32
32
32 13
26
26
26 14 21
21
21 16
16 16.36
16.36
16.36
47,48
26
26
26 41
41
41
41 22
22
22 16
16
16 16.36
22
22
22
22 3232
32
32 24
24
24
24
24
36
36 24
47,48
47,48
47,48 36
36
36
36
11
11
11
11
11 34
34
34
34
34
34
34 34
34
34
34
34
34
34 23,50
23,50
23,50
23,50
23,50
41
41 46
46
46
46
46 26
26
26 11 27
27
41 46 26
26
26 27
13
13
13
13
13
13
56
56
56
56
56
56 5555
55
6666 17
17
17
17
17
17
40
40
40
40 66
6666
22
22
22
22
22
22
22
55
55
55
5151
51
5151
51 49
49
49
49
49
49 27
27
27
2727
27
27 30
30
30 38
38
18
18
18
18
18
18
40
40
40
32,37
32,37 38 40
40
40
32,37 50
47
47 50
50
50 15,19,27,38
15,19,27,38
47 18
18 15,19,27,38
22222 47
47
47 18
18
18 18
18
18
18
18
18 19
19
19
19
15,30
15,30
15,30 777 13 13
13
13
65
65
65
65
65
65 35
35
35
35
35
35
35
8,18,23,58
8,18,23,58
8,18,23,58
18
18
18
18
18
18
1,9,11,34
1,9,11,34
1,9,11,34
47
47
47
47
47
47
7,12,17
7,12,17
7,12,17
7,12,17
29
7,12,17
29
29
29
2
222
22
29
29
29
29
29
Figure 6.3.3 Tram Route Network
6-20
Table 6.3.1 Tram Routes October, 1998
1-way Route Average Frequency Capacity
length Vehicle No. of time speed max min (max
Route From To Depot (km) type vehicles (mins) (km/h) (veh/hr) (veh/hr) places/hr)
1 Cartier Colentina Giurgiului Colentina 12.2 V3A-93 6 55 13.3 3.2 2.1 998
2 Depoul RATB Alexandria Cartier 16 Februarie Alexandria 12.5 V3A 9 49 15.2 5.3 3.4 1588
5 Sos. Bucuresti Granitul SA Colentina 15.9 V3A-93 21 68 14.0 9.0 4.9 2844
6 Gara de Nord Bd. Expozitiei Buc. Noi 5.9 EP/V3A 4 25 14.2 4.4 3.3 1467
7 CFR Progresul (suspended)* Sura Mare Giurgiului 4.1 V3A (14)* 17 14.5 22.1 15.0
8 Zetarilor Depoul RATB Militari Militari 15.0 T4R 18 55 16.3 9.5 6.3 2842
9 ROMPRIM SA (suspended)* Gara Basarab 8.5 V2A (12)* 37 13.8 9.2 4.5
11 CFR Progresul Cartier 16 Februarie Alexandria 16.4 V3A 9 62 15.8 4.2 0.9 1266
12 CFR Progresul Gara Basarab Alexandria 12.2 V3A 34 50 14.6 19.6 12.5 5885
14 Granitul SA Piata Sf. Gheorghe Colentina 8.0 V3A-93 12 38 12.6 9.1 5.2 2880
15 Depoul RATB Alexandria Complex RATB Titan Alexandria 17.6 V3A 20 60 17.6 9.7 6.3 2903
16 Platforma Industriala Pipera Republica SA Victoria 14.1 EP/V3A+V3A-93 27 58 14.6 13.5 8.9 4385
17 CFR Progresul Bd. Lacul Tei Giurgiului 14.7 V3A 13 60 14.7 6.3 3.4 1902
18 Piata Rahova CFR Progresul Giurgiului 7.9 V3A 6 33 14.4 5.2 3.4 1565
19 Complex RATB Titan Giurgiului Titan 13.1 V3A 16 47 16.7 9.8 6.1 2939
20 Laromet SA Mezes Buc. Noi 8.7 EP/V3A 12 37 14.1 9.5 6.2 3126
21 Cartier Colentina Piata Sf. Gheorghe Colentina 7.6 V3A-93 21 33 13.7 18.3 11.6 5770
23 Zetarilor FAUR - Poarta 4 Alexandria 13.8 V3A 9 55 15.1 4.7 2.6 1333
24 Cartier Damaroaia Gara de Nord Buc. Noi 7.4 EP/V3A 4 31 14.3 3.4 2.7 1238
27 Complex RATB Titan Baba Novac Titan 8.2 V3A 3 30 16.4 2.9 1.9 871
29 CFR Progresul CFR Centura Jilava Giurgiului 2.7 V3A 1 10 16.2 2.5 0.0 750
30 Depoul RATB Alexandria Ilioara Alexandria 10.8 V2A/2S+V3A/2S 9 41 15.7 5.9 3.9 1503
31 Gara de Nord LAROMET Victoria 8.0 EP/V3A 6 34 14.0 5.1 3.3 1697
32 Depoul RATB Alexandria Piata Unirii Alexandria 5.7 V3A 16 21 16.1 21.8 13.6 6545
34 Giurgiului Gara de Nord Dudesti 14.5 V3A+VTF/VTM 36 59 14.7 18.0 13.3 4725
35 Depoul RATB Militari Calea Plevnei Militari 12.6 T4R 16 48 15.8 9.8 6.7 2939
36 Republica SA Platforma Industriala Pipera Colentina 13.0 V3A-93 9 47 16.5 5.5 3.5 1741
37 Depoul RATB Alexandria Calea Plevnei Alexandra 10.5 V3A 6 46 13.7 3.9 1.2 1161
38 Complex RATB Titan P-ta Titan Titan 3.6 EP/V3A 9 13 16.6 18.0 11.3 5940
41 Piata Presei Libere Cartier T. Vladimirescu Victoria 9.4 EPV3A+V3A-93 30 38 14.8 22.5 14.3 7236
42 Depoul RATB Militari Bd. Expozitiei Militari 13.3 T4R 5 53 15.1 2.7 1.1 839
44 Cartier 16 Februarie Calea Plevnei Buc. Noi 7.1 EP/V3A 12 29 14.6 12.0 8.0 3960
45 Mezes Gara de Nord Buc. Noi 7.4 EP/V3A 14 30 14.8 13.6 8.4 4471
46 Granitul SA Gara de Nord Victoria 11.0 V3A 11 46 14.3 7.0 5.0 2106
47 CET Vest Militari Calea 13 Septembrie Militari 8.4 T4R 2 55 9.2 2.0 0.0 600
48 CET Vest Militari Calea 13 Septembrie Militari 8.4 T4R 2 55 9.2 2.0 0.0 600
50 FAUR - Poarta 4 Giurgiului Dudesti 8.9 VTF/VTM 9 35 15.2 7.3 4.8 1642
52 Baicului Gara de Nord Victoria 7.4 4 34 13.1 3.3 2.5 1100
373.4 441.0 1540.0 14.5 95357
Source: RATB data NB Routes suspended
6-21
15
15
15
15 3333
14
14
14
14 18
18
18
18
18
18
18
32
32 4444 3333
32
32
25
25
25
25 9999 18
18
18
18
Legend
Legend
36
36
36
36 25
25
25
25
21
21
21
21
36
36
36
36
21
21
21
21 1 - 15 vehicles/hour
25
25
25
25
999 26 26
26
26
2626 28
28 99999 16 - 30 vehicles/hour
21
21
21
21 50 999
50
50
50
50
50
50 28
28
28
28 28 20
28
28
28 20 9
20
20
42
42
42 28
28
28 32
32
32
32
32
3232 35
35
35
25
25
25
42
42 28
17
17
17
17
17
17
17
999999
13
13
13
13
13
13
13
35
35
35 12 12
12
12
12
12
12 333333
3
31 - 45 vehicles/hour
25 26
26
26 35
35
35
26
26
2626 999999 3512 12
12
18
18
18
18
18
27
12 27
27
27 15
27
27 15
15
15
15
15 24 46 - 60 vehicles/hour
22
22
22 18 9999 31 31
31
31
31
31
31 16 24
24
24
24
24
47
47
47 22
22
22 16
16
16 18
18
18
18
18
18
18
47 35
35
35 9999
35 555555 60 + vehicles/hour
24
24
24
24
24
22
22
22
22
41
4141
41
4141 18 18
18
18
18
18 24
19
19
19
14
14 1313 13
13
13 19
19
19
19
14
14 32
32
32 13
1313
13 13
13
13
13
26
26
26
26 41
41
41 32
4444 41 22
22
22
22 24
24
24
24 12
12
12
36
36
36 34
34
34
34 34
34
34 12
36 555 11
11
11 34
46
46
46
46 26 5
26
26
26 11
13
13
13
13 40
40
40
40
56
56
56
56 6666 22
22
22
22
17
17
17
17 6666
55
55
55
55
55
55
55
51
51
51
51 18
18
18
18
49
49
49
49 27
27
27
27 40
40
40
40
47
47
47
47 65
65
65
65
18
18
18 13
13
13
13
18
63
63
63
63
35
35
35
35
47
47
47
47
2222222
6-22
Bucurestii Noi
Colentina
Victoriei
Militari
Dudesti
Alexandria Titan
Progresu
6-23
Table 6.3.2 Tram Fleet Characteristics, November 1998
V3A V3A-2S EP/V3A V2A V2A-2S V3A-93
Year of first manufacture 1972 1972 1976 1981 1985 1994
Country of manufacture Romania Romania Romania Romania Romania Romania
Type Double Double Motor unit Articulated Articulated Double
articulated articulated + trailer articulated
Number of bogies 4 4 2+2 3 3 4
Number of doors 4 4 each side 3+3 3 3 each side 5
Number of seats 42 42 20 + 20 = 40 32 28 33
Maximum standing places 258 258 145 + 145 = 184 172 267
290
Maximum capacity 300 300 165 + 165 = 216 200 300
330
Maximum speed (km/h) 70 70 70 65 65 55
Total vehicles in fleet 181 6 117 41 8 140
Av. no. motor units in 142 5 80 31 8 120
service
6.3.2 Vehicles
In November 1998 there were on average 519 tram units in daily service, out of a total fleet of
670 units. The characteristics of the fleet are shown in Table 6.3.2. The type of tram used on
each route is shown in Table 6.3.1.
6-24
However, the platform is generally rather narrow (about 1.5m) and may not be sufficient
when large numbers of passengers are boarding or alighting. The platform also tends to be
rather low, at about 20 cm. Since the trams in use have very high floors, this makes boarding
and alighting difficult, especially for the old, infirm or passengers with children or shopping.
The platforms generally have no protection in the form of guard-rails to protect them from
other traffic. Some centrally located stops do not have pedestrian crossings or traffic signals
adjacent to them so that passenger must cross in front of other traffic unaided.
When no platform is provided, passengers must wait at the side of the road until a tram arrives,
then cross the area of the road used by other traffic. Although other traffic is legally obliged to
stop behind a stationary tram at a tram stop, the potential danger is increased. Furthermore,
the lack of platform increases the inconvenience of boarding and alighting for the old and
infirm.
Whatever the type of stop, the other facilities provided tend to be very basic or non-existent.
There is usually a sign indicating the stop and the tram routes which pass, but there is often no
further information about the routes such as route plans, timetables etc.. Few stops have
protection from the weather. Integration with other modes is often poor, with long distances to
bus stops or metro stations.
The conditions inside older vehicles are often very poor, with uncomfortable seating,
inefficient heating, poor lighting and a generally run-down atmosphere.
Source: RATB
A person caught without a valid ticket is fined a penalty of 75000 Lei. About 11000 persons
per month are caught and fined. This represents less than one person fined per controller per
day. However, evidence from surveys conducted by CIE Consult suggests that the incidence
of fare evasion may be 25 percent or more. There is an indication that either the productivity
of the controllers is very low, or that there is widespread collusion between passengers and
controllers.
If a person is caught without a valid ticket, he is obliged to pay the fine on the spot to the
controller or within 48 hours at one of several RATB offices. If the person fails to pay the
penalty, a civil charge may be brought against the offender for 150000 Lei. However, the
procedure is rather cumbersome and is not often pursued.
6-25
6.3.5 Operating Costs
Indicative costs have been taken from information provided by RATB supplemented by data
in “The Activity of RATB - Statistical data on the first half of 1998”. The data shows that the
cost per vehicle kilometre is 8525 Lei and per passenger place kilometre is 44 Lei. A
summary of the costs is shown in Table 6.3.4. It should be noted that the cost allocated to
energy is based on a theoretical division between trams and trolley buses and cannot actually
be measured.
Total costs per depot and costs per tram kilometre for the first half of 1998 are shown in Table
6.3.5.
Table 6.3.5 Costs per Depot and Costs per Tram Kilometer, First Half 1998
Depot Cost (Lei million) Kilometres Cost per km Vehicle type kms per type
(Lei)
Buc. Noi 12,578.519 1,492,839 8425.91 EP/V3A 1,492,839
Victoria 17,368.780 1,971,519 8809.85 V3A 362,492
V3A-93 20,911
EP/V3A 1,588,116
Dudesti 14,406.364 1,556,745 9254.16 V3A 895,678
VTF/VTM 661,067
Alexandria 28,246.478 3,104,924 9097.32 V2A 1,222,519
V3A 844,724
V3A-93 1,037,681
Colentina 20,215.213 2,207,549 9157.32 V3A 49,980
V3A-93 2,157,569
Militari 22,227.693 3,177,280 6995.83 T4R 3,177,280
Giurgiului 12,408.642 1,593,407 7787.49 V3A 1,593,407
Titan 13,364.157 1,620,137 8248.79 V3A 1,620,137
Administration* 1,765.792
TOTAL 142,581.638 16,724,400 8525.37
Source: RATB
* The administration cost is for all trams and trolley buses in all depots and head office costs.
A more detailed breakdown of costs has been provided by RATB for the Colentina tram depot.
This is shown in Table 6.3.6.
6-26
Table 6.3.6 Operating Costs of Trams at Colentina Depot, October 1998
Cost (million Lei) % of total
I Materials 811.131 25.6
- raw materials 188.971
- fuel 6.657
- electricity, water 605.086
- inventory items 9.339
- consumable items 1.078
VI Exceptional charges 0
Kilometres 375147
Cost per kilometre 8451.88
Source: RATB
The operating costs by type of tram and by depot were derived from information provided by
RATB (see section 6.3.5 above). For the purposes of this analysis, costs of administration
were excluded.
Multiplying the cost per tram kilometre derived the costs per route by the route length.
Revenues on each route were estimated by multiplying the average revenue per passenger by
the total number of passengers using each route.
The average revenue per passenger was estimated on the basis of the number of RATB
passengers and revenues. RATB estimate that in the first half of 1998, there were 388.7
million passengers. This number was based on the number of individual tickets and season
tickets sold, and on the number of free passes issued. It is assumed that 50 trips per month are
made by holders of single line season tickets, 100 trips by holders of two line season tickets
and 150 trips by holders of all line season tickets.
However, it is known that there is a certain level of fare evasion. CIE Consult estimate that
this may be as high as 25 percent (Fig. F.60). If this is so, then the total number of passengers
becomes 518.
6-27
The total revenue in the first half of 1998 was 513686.6 million Lei. However, this includes a
subsidy of 368599.7 million Lei. The revenue from ticket sales was, therefore, 145086.9
million Lei. Thus, the average revenue per RATB passenger was 280 lei.
The number of passengers boarding on each tram route was calculated from the tram
passenger loading survey. For each route and each direction, this was multiplied by the
number of trams per hour and the average fare per passenger to give an estimate of the
revenue per route in each direction in the peak hour.
The analysis of the above costs and revenues shows that the total estimated operating costs in
the peak hour are 56.784 million Lei, while the revenues are 39.607 million Lei. Thus, a
deficit of 17.2 million Lei is incurred per hour and revenues cover 70 percent of the operating
costs. Furthermore, it has been suggested by RATB that the level of fare evasion of 25 percent
may be too high. In this case, the revenue per passenger would be higher and revenues would
cover a greater percentage of operating costs. In fact, if fare evasion was non-existent (or
eradicated), revenues would cover 95 percent of operating costs.
(RATB assumes that 50 trips per month are made by 1 line season ticket holders, 100 trips by
2 line holders and 150 by all line holders. Check in the person trip survey whether this is
reasonable. If the number of trips is less, the revenue per trip should be increased.)
The above analysis has been validated against data for the whole of the first half of 1998.
During this period, the total revenue of RATB was 145087 million Lei (as explained above).
The number of passenger journeys made by tram was 167.1 million out of a total of 388.7
million, i.e. 43 percent (RATB Table 9.1). The estimated revenue for trams was, therefore, 43
percent of 145087 million Lei i.e. 62387 million Lei.
The calculated revenue per peak hour is 39.312 million Lei (albeit for the month of
November). If it is assumed that the daily profile of tram use is similar to the daily profile of
metro use, then the peak hour represents about 10 percent of the total number of passengers
carried during the day. If it is assumed that the passenger volumes at weekends are 66 percent
of the volumes on weekdays, then the total revenue for a six-month period in 1998 may be
estimated to be 65352 million Lei. This figure is remarkably close to the estimated revenue
derived from RATB data in the preceding paragraph.
Routes 2, 5, 12, 18, 19, 41, 45, 47 and 52 would appear to cover their operating costs in the
peak direction. Route 21 would appear to cover its operating costs in both directions (Figure
6.3.7).
It may be argued that revenues should include the amount received in subsidy to cover free or
half price passes. This is about 30 percent of the total subsidy i.e. 110580 million Lei. If this
is added to the total revenue from fares, the revenue per passenger becomes 493 Lei. In this
case revenues for the whole tram network become 1.08 times the operating cost.
6-28
6.4 Trolley Bus
6.4.1 Trolley Bus Network
Trolley buses are intended to provide a feeder network of short distance services. However,
they also provide a high-density service across the city center along an east - west axis and to
the Gara de Nord. The pattern of these services is typically from the inner suburbs, across the
city center to a point on the far side of the center, or simply across the city center. Trolley
buses have recently been used to replace tram services at the extremes of certain tram routes
within the inner ring road because vibrations were damaging old buildings. The current trolley
bus routes are shown in Figure 6.4.1.
The routes are operated from four depots, as identified in Tables 6.4.1 and 6.4.2. The location
of these depots is shown in Figure 6.4.1.
Prior to the mid-1970s, trolley bus routes also ran north-south, connecting the suburbs to the
centre via what is now Bd. Gh. Magheru. All that remains of these routes is the feeder
services to Piata Sudului and Clabucet. The pattern of the east-west routes was very similar to
that of today.
Two roads have sections which are bus only in one direction; on Bd. Dacia (150 m) and Bd.
Regina Elisabeta (1050 m). A section of Str. Iancu Cavaler de Flondor is trolley bus only in
both directions. However, this is not respected by drivers of other vehicles. These are the only
special facilities that exist for trolley buses.
Poor road conditions have an adverse effect on trolley bus speed, passenger comfort and
operating costs. Specific problems for trolley buses are that bad road surface conditions may
cause the contact to jump off the overhead cable.
6-30
Figure 6.4.1 Trolley Bus Route Network and Depots
6-31
Table 6.4.1 Trolley Bus Routes, June 1998
1-way Route Average Frequency Capacity
Vehicle No. of
Route From To Depot length time speed max min (max
type vehicles
(km) (mins) (km/h) (veh/hr) (veh/hr) places/hr)
61 Master SA Pta. Rosetti Bujoreni 9.8 SAURER 9 38 15.5 7.0 2.3 764
62 Gara de Nord Liceul Ind. Auto Bujoreni 9.3 DAC 117E 12 31 18.0 11.3 3.6 1226
66 Spitalul Fundeni Vasile Parvan V. Luminoasa 7.8 Astra 415T 21 34 13.8 17.8 11.5 2893
69 Valea Argesului Baicului Bujoreni 12.4 DAC 117E 18 55 13.5 9.5 5.6 1544
70 Bd. Basarabia Vasile Parvan V. Luminoasa 8.9 ASTRA 415T 11 38 14.1 8.4 5.2 936
71 Valea Argesului Gara de Nord Bujoreni 7.8 DAC 117E 9 33 14.2 7.9 5.2 1294
73 Turnu Magurele Piata Sudului Berceni 2.0 DAC 117E 5 10 12.0 11.5 8.3 1881
74 Bd. Alexandru Obregia Piata Sudului Berceni 2.2 DAC 117E 6 12 11.0 12.0 8.0 1956
76 Piata Resita Piata Sudului Berceni 2.8 DAC 117E 14 13 12.9 27.1 16.9 4417
79 Bd. Basarabia Gara de Nord V. Luminoasa 9.7 ASTRA 415T 14 48 12.1 8.6 4.2 960
85 Baicului Gara de Nord V. Luminoasa 7.6 ASTRA 415T 11 34 13.4 9.3 6.6 1270
86 Stadionul Lia Manoliu Gara de Nord V. Luminoasa 7.0 DAC 117E 9 37 11.4 7.1 4.6 1158
87 Dridu Carpati Buc. Noi 2.1 DAC 117E 6 11 11.5 15.0 9.2 2445
90 Valea Ialomitei Stadionul Lia Manoliu V. Luminoasa 12.7 ASTRA 415T 9 57 13.4 4.5 1.5 734
91 Valea Ialomitei Piata Rosetti Bujoreni 8.2 DAC 117E 9 40 12.3 6.6 4.4 1073
92 Barajul Dunarii Vasile Parvan V. Luminoasa 8.6 ASTRA 415T 9 38 13.6 6.8 4.4 766
93 Valea Ialomitei Gara de Nord Bujoreni 7.4 DAC 117E 9 31 14.3 8.4 5.6 1375
96 Tacerii Gara de Nord Bujoreni 6.5 SAURER 9 26 15.0 10.2 6.9 1661
97 Strandul Straulesti Carpati Buc. Noi 4.2 DAC 117E 10 18 14.0 15.8 10.2 2574
137.0 200 604 13.6 30927
6-32
6.4.2 Vehicles
In November 1998 there were 249 trolley buses allocated to routes, out of a total fleet of 288
units. The characteristics of the fleet are shown in Table 6.4.3.
The types of vehicle are described in the following paragraphs. It should be noted that the
total passenger capacities quoted are as specified by RATB. However, the capacity in terms of
standing passengers is somewhat subjective, depending on what is regarded as an acceptable
crush-loading capacity. In general, RATB use a crush-loading capacity of 8.5 persons per
square metre.
The DAC 117E (and EA) is the old standard trolley bus of RATB. There are 111 of these
buses in the fleet, accounting for some 39 percent of the total. It is an articulated bus dating
from 1980 (and 1989 for the EA), with three axles and four doors. It was manufactured in
Romania. The vehicle has 34 seats and a total capacity of 162 passengers.
The Astra - Ikarus 415T is the new standard trolley bus of RATB and accounts for some 35
percent of the fleet. It is a rigid bus with two axles and three doors dating from 1997. The
body is manufactured by Ikarus in Hungary and the engine by Astra in Arad, Romania. The
vehicle has 26 seats and a total capacity of 100 passengers. There are 100 Astras in the fleet.
The price of a new Astra is of the order of USD 400,000 (including VAT at 22 percent).
The DAC 217E and 317E are more recent variants of the DAC 117E. There are thirty-eight
217s in the fleet and one 317. The 217s date from 1990, has 39 seats and a total capacity of
156 passengers. The 317 dates from 1993, has 38 seats and a total capacity of 155 passengers.
The DAC 212ECS is a rigid bus with two axles and three doors dating from 1989. The bus
was manufactured in Romania and there are 4 in the fleet. They have 24 seats and a total
capacity of 100 passengers.
The DAC 312E is a more recent variant dating from 1995. There are 2 of these vehicles in the
fleet. They have 22 seats and a total capacity of 95 passengers.
The ROCAR 412 dates from 1998 and the ROCAR 512 from 1997. There is one 412 in the
fleet and nine 512s. Each has 20 seats and a total capacity of 105 passengers. The price for a
new ROCAR is USD 220,000 (including VAT at 22 percent).
The rest of the trolley bus fleet is made up of 22 Saurers. They were manufactured in
Switzerland as diesel powered buses dating from 1968. They were used in Switzerland for 20
years, then imported to Romania. They were used initially in Bucharest as diesel powered
buses, then later modified as trolley buses. They have 30 seats and a total capacity of 104
passengers.
There is also one double articulated trolley bus with four axles in the fleet, operating on route
69. However, no reference is made to this in the inventory of vehicles.
As with the trams, the condition of vehicles is closely related to their age. Some of the oldest
trolley buses are in very poor condition. Conversely, the Astra trolley buses are in very good
condition, and are maintained so through the maintenance checks carried out each time the
vehicle returns to the depot.
6-33
Table 6.4.3 Trolley Bus Fleet Characteristics, November 1998
DAC 117E / EA Astra Ikarus 415T DAC 217E DAC 317E DAC 212ECS
Year of first manufacture 1980 / 1989 1997 1990 1993 1989
Country of manufacture Romania Hungary/Romania Romania Romania Romania
Type Articulated Rigid Articulated Articulated Rigid
Number of axles 3 2 3 3 2
Number of doors 4 3 4 4 3
Number of seats 34 26 39 38 24
Maximum standing places 128 74 117 117 76
Maximum capacity 162 100 156 155 100
Maximum speed (km/h) 52.5 60 60 60 60
Total vehicles in fleet 111 100 38 1 4
Av.no.vehicles in service 100 94 26 1 4
However, it should be noted that the Municipality is currently (January 1999) installing bus
shelters with lighting and seats at many city centre bus and trolley bus stops. They incorporate
panels for advertising to offset the cost, and may be considered to be of an appropriate design.
At major stops, route information panels are also being installed. If these facilities are
maintained in good repair and cleaned regularly, they will go a long way towards providing
the minimum necessary passenger facilities.
Nevertheless, a general attitude of disregard for passengers and other pedestrians has been
shown during the implementation phase. For several weeks before the shelters themselves
were installed, support posts were left protruding approximately 20 cm from the pavement,
providing a hazard to passengers and other pedestrians, particularly at night. Since the
installation of the shelters, the trenches to the electricity supply have so far only been
temporarily refilled, presenting a further hazard.
6-34
kilometre is 7384 Lei and per passenger place kilometre is 84 Lei. A summary of the costs is shown in
Table 6.4.4. It should be noted that the cost allocated to energy is based on a theoretical division
between trams and trolley buses and cannot actually be measured.
Total costs per depot and costs per trolley bus kilometre for the first half of 1998 are shown in
Table 6.4.5.
Table 6.4.5 Costs per Depot and Costs per Trolley Bus Kilometer, First Half 1998
Depot Cost (Lei million) Kilometres Cost per km (Lei) Vehicle type kms per type
V. Luminoasa 22,437.586 2,704,770 8295.56 DAC 112E 12,696
DAC 117E 80,081
DAC 117EA 1,412,387
DAC 212ECS 119,757
DAC 217E 232,978
DAC 312E 36,598
512E 118,546
ASTRA 691,727
Buc. Noi 3,875,618 504,978 7674.82 DAC 117E 504,978
Berceni 5,574,423 613,973 9079.26 DAC 117E 893,605
SAURER 20,368
Bujoreni 16,577,578 2,732,034 6045.89 DAC112E 125,627
DAC 117E 1,255,767
DAC 217E 770,385
SAURER 580,255
TOTAL 48,405,205 6,555,755 7383.62
Source: RATB
A more detailed breakdown of costs has been provided by RATB for the V. Luminoasa trolley
bus depot. This is shown in Table 6.4.6.
The operating costs by depot were derived from information provided by RATB. For the
purposes of this analysis, costs of administration were excluded.
6-35
Table 6.4.6 Operating Costs of Trolley Buses at V. Luminoasa Depot, October 1998
Cost (million Lei) % of total
I Materials 598.887 14.6
- raw materials 82.737
- fuel 10.640
- electricity, water 480.960
- stocks 23.229
- consumables 1.321
VI Exceptional charges 0
Kilometres 481766
Cost per kilometre 8539.25
Source: RATB
Multiplying the cost per trolley bus kilometre derived the costs per route by the route length.
Revenues on each route were estimated by multiplying the average revenue per passenger by
the total number of passengers using each route.
The average revenue per passenger was estimated on the basis of the number of RATB
passengers and revenues. RATB estimate that in the first half of 1998, there were 388.7
million passengers. This number was based on the number of individual tickets and season
tickets sold, and on the number of free passes issued. It is assumed that 50 trips per month are
made by holders of single line season tickets, 100 trips by holders of two line season tickets
and 150 trips by holders of all line season tickets.
However, it is known that there is a certain level of fare evasion. CIE Consult estimate that
this may be as high as 25 percent (Fig. F.60). If this is so, then the total number of passengers
becomes 518.
The total revenue in the first half of 1998 was 513686.6 million Lei. However, this includes a
subsidy of 368599.7 million Lei. The revenue from ticket sales was, therefore, 145086.9
million Lei. Thus, the average revenue per RATB passenger was 280 lei.
The number of passengers boarding on each trolley bus route was calculated from the trolley
bus passenger loading survey. For each route and each direction, this was multiplied by the
number of trolley buses per hour and the average fare per passenger to give an estimate of the
revenue per route in each direction in the peak hour.
6-36
The analysis of the above costs and revenues shows that the total estimated operating costs in
the peak hour are 19.1 million Lei, while the revenues are 11.0 million Lei. Thus, a deficit of
8.1 million Lei is incurred per hour and revenues cover 58 percent of the operating costs. It
has been suggested by RATB that the level of fare evasion of 25 percent may be too high. In
this case, the revenue per passenger would be higher and revenues would cover a greater
percentage of operating costs.
(RATB assumes that 50 trips per month are made by 1 line season ticket holders, 100 trips by
2 line holders and 150 by all line holders. Check in the person trip survey whether this is
reasonable. If the number of trips is less, the revenue per trip should be increased.)
The above analysis has been validated against data for the whole of the first half of 1998.
During this period, the total revenue of RATB was 145087 million Lei (as explained above).
The number of passenger journeys made by trolley bus was 54.5 million out of a total of
388.7 million, ie. 14 percent (RATB Table 9.1). The estimated revenue for trolley buses was,
therefore, 14 percent of 145087 million Lei ie. 20312 million Lei.
The calculated revenue per peak hour is 11.0 million Lei (albeit for the month of November).
If it is assumed that the daily profile of trolley bus use is similar to the daily profile of metro
use, then the peak hour represents about 10 percent of the total number of passengers carried
during the day. If it is assumed that the passenger volumes at weekends are 66 percent of the
volumes on weekdays, then the total revenue for a six-month period in 1998 may be estimated
to be 18176 million Lei. This figure is close to the estimated revenue derived from RATB data
in the preceding paragraph.
Only routes 61, 62 and 66 would appear to cover their operating costs in the peak direction
(Figure 6.4.2).
6-37
6.5 Bus
6.5.1 RATB Bus
Hereafter representative meaning will be given to long distance bus including regional bus
other than RATB bus, international bus and inter-city buses. RATB is also providing services
to the nearby cities, towns, villages and communes from Bucharest. Those buses are to be
called RATB regional bus.
(1) Network
The bus network in the Bucharest Metropolitan area and its surroundings are composed of
RATB (Regia Autonoma de Transport Bucuresti) buses, regional buses, international buses
and maxi taxis. Other than international buses those buses are designed to accommodate to
the regional services, local services, and feeder services.
In 1998 the 122 RATB bus routes are served in Bucharest and its surrounding area with total
length of some 1,400 km.
The network is densely established in the urbanized area with some exceptions, for instance in
the eastern part of the inner ring road or in the area near Bucharest Basarab station. In those
areas the access to the bus route is beyond walking distance.
RATB bus network is largely in a radial pattern from the city center to the peripheral areas in
the Bucharest Municipality, and some routes reach to the Communas beyond the city
boundary. Each route is basically in a linear shape, and circular pattern routes are not adopted
(Figure 6.5.1 and 6.5.2). The route length mostly ranges from 3 km to 20 km averaging 11.4
km (one way). The average number of buses operated on the route varies 7 (summer season)
to 8 (winter season) (Table 6.5.1).
6-39
Table 6.5.1 Bus Routes and Number of Operated Buses in 1998
Line no
Route Length
No. of Buses Headway Schedule
(one Depot
Route (operated) (min.) Speed
direction)
(km) summer winter V1 V2 V3 (km./h)
1 100 Republica - CFR Bucuresti Sud 4.7 8 9 Titan 4 5 6 17.7
2 101 Doamna Ghica - FAUR 10.1 20 21 Floreasca 3 4 7 16.8
3 102 Bd. Basarabia - Giurgiului 12.1 30 32 Titan 2 4 7 19.1
4 104 Vatra Luminoasa - P-ta Operei 8.1 21 24 Pipera 3 3 5 14.8
5 105 P-ta Presei- Valea Oltutui 14.7 19 20 Militari 4 6 7 19.4
6 110 Gara de Nord - CFR Pipera 11.5 4 4 Pipera 20 20 26 18.2
7 112 Sos.Chitilei - CFR Pipera 14.5 5 6 Floreasca 17 20 27 17.3
8 116 Timpuri - Progresul 8.9 9 12 Alexandria 5 6 11 16.2
9 117 P-ta Unirii - Cart . Salaj 7.4 13 15 Alexandria 3 4 6 18.5
10 122 Universitate - Ghencea 8.1 6 6 Militari 10 12 15 16.8
11 123 Gara Basarab - CET Sud 9.3 13 15 Ferentari 4 6 6 15.9
12 125 REMAT - Metalurgiei 8.4 3 3 Ferentari 20 20 0 20
13 126 Lahovary - Cart. Ghencea 8.2 5 6 Militari 10 13 17 16.9
14 131 Aero Baneasa - P-ta Romana 8.2 14 15 Nordului 3 4 6 18.1
15 133 Gara Basarab - Timpuri Noi 11.4 15 18 Nordului 4 6 8 16.3
16 135 CET Sud - CFR Pipera 13.7 21 21 Pipera 4 5 10 17.1
17 136 Pod Izvor - Militari 8.3 7 8 Militari 7 9 11 17.7
18 137 MASTER SA - Universitate 8.4 0 12 Militari 7 8 10 16.8
19 139 Zetarilor - P-ta Leul 7.4 22 30 Ferentari 3 2 5 17.1
20 141 IMGB Vulcan - Zetarilor 10.8 7 11 Ferentari 7 8 14 19.6
21 143 Baicului - Bucur Obor 4.6 5 6 Titan 6 8 9 16.1
22 144 Danubiana - sos. Viilor 10.1 6 6 Titan 11 13 17 18.3
23 146 Granitul - Com. Pantelimon 3.1 3 3 Titan 10 10 30 18.3
24 147 Granitul - Ferma Pantelimon 4.2 1 1 Titan 30 30 50 19.2
25 150 Militari - Comuna Chitila 15.2 2 2 Alexandria 60 60 60 22.8
26 152 Chiajna - Lujerului 7.6 6 6 Alexandria 8 10 12 18.9
27 153 Voluntari - Republica 10.6 7 7 Titan 10 13 15 18.2
28 154 GLINCARN - Piata Sudului 9 4 6 Ferentari 10 10 15 19.3
29 155 Pod Afumati - Inst. Oncologic 8.2 8 8 Floreasca 7 8 9 18.2
30 163 Magazile CFR - Giulesti Sarbi 4.1 2 2 Alexandria 15 15 15 18.8
31 164 Mezes - Chitila 7.5 8 9 Alexandria 5 6 9 20.5
32 167 CINESCOPE - Baneasa SA 8.8 2 2 Floreasca 30 30 60 21.1
33 168 Lahovary - Valea Argesului 10 18 21 Floreasca 3 4 5 17.7
34 171 Jilava - Progresul 7.7 3 3 Ferentari 14 14 14 23
35 173 Viilor - Valea Argesului 8.8 9 10 Alexandria 6 8 13 17
36 178 Apusului - Sala Palatului 9.6 21 23 Militari 2 3 5 19.1
37 180 P-ta Operei - CET Vest 9.7 6 7 Militari 8 10 26 20.8
38 181 I.N.M.B. - Camil Ressu 3.8 2 2 Titan 15 15 30 16.1
39 182 Inst. Oncologic - Gara Basarab 12.7 14 16 Nordului 5 7 9 17.7
40 200 Dobroiesti - Republica 4.5 1 1 Titan 30 30 60 20.5
41 201 Bucur Obor - Pipera 5.1 2 2 Floreasca 18 18 39 17.6
42 203 Dumitrana - Cart. T. 14.7 2 2 Alexandria 45 45 90 22.1
Vladimirescu
43 204 CFR Centura – Cart. T. 15.2 2 2 Alexandria 46 46 92 21.2
Vladimirescu
44 205 BIOTERRA – Gara de Nord 9.2 7 8 Nordului 7 9 12 17.3
45 206 Ghencea - IFA Magurele 10 3 3 Alexandria 18 20 28 23.1
46 214 Darasti – Ghencea 15.6 2 2 Alexandria 45 45 90 23.4
47 220 P-ta Rahova – IMGB Vulcan 10.7 7 9 Ferentari 12 12 18 18.9
48 221 Ghencea - CET Vest 6.1 2 2 Alexandria 20 20 23 19.3
49 226 13 Septembrie - Foisor 7.8 14 15 Alexandria 5 6 8 16
50 232 P-ta Unirii - Alex. Obregia 9.3 8 11 Ferentari 8 7 10 18
51 233 Aurel Vlaicu - Baneasa SA 8.6 1 1 Floreasca 60 60 0 20.6
52 241 Metalurgiei - IMGB Vulcan 3.5 4 4 Ferentari 6 6 15 21
53 242 Metalurgiei - P-ta de Gros 2 1 1 Ferentari 15 15 0 20
54 244 Danubiana - P-ta Sudului 7.5 4 6 Ferentari 8 10 10 18.8
55 246 RATB Titan - Granitul 7.5 5 5 Titan 9 13 26 20.5
56 252 Lujerului - Com. Rosu 7.6 1 1 Alexandria 51 51 50 22.7
57 253 Spitalul Fundeni - FAUR 8.7 7 8 Titan 8 10 12 18.6
58 254 GLINCARN - RATB Titan 4.9 1 1 Titan 60 60 0 18.2
59 261 Vatra Noua - P-ta Presei 5.2 3 3 Floreasca 20 20 30 21.6
60 268 Universitate - Valea Argesului 9.1 7 7 Militari 9 11 12 18.1
61 275 PECO Jilava - Timpuri Noi 10.4 3 3 Ferentari 24 24 36 17.7
6-40
Line no
Route Length
No. of Buses Headway Schedule
(one Depot
Route (operated) (min.) Speed
direction)
(km) summer winter V1 V2 V3 (km./h)
62 282 Gara de Nord - Doamna Ghica 11.1 18 20 Pipera 4 5 6 15.9
63 300 Clabucet - N. Balcescu 6.2 20 21 Pipera 2 3 5 18.5
64 301 Baneasa SA - P-ta Romana 12 13 12 Pipera 6 6 11 19.5
65 302 Sos. Magurele - SOMIC 6.1 1 1 Alexandria 34 40 60 24.5
66 303 Varteju - Ghencea 13.5 6 6 Alexandria 11 14 17 23.9
67 304 Laromet - P-ta Presei 14.5 6 6 Floreasca 15 18 45 20.2
68 305 Gara de Nord - Valea Oltului 9.6 4 4 Militari 16 23 66 18
69 311 P-ta Rosetti - FAUR 9.8 24 26 Titan 2 3 4 18.9
70 312 P-ta Unirii - Metalurgiei 7 10 12 Ferentari 4 5 6 19.1
71 313 Bd. Corneliu Coposu - 8.4 14 15 Ferentari 4 5 6 19.3
Metalurgiei
72 323 Timpuri Noi - Zetarilor 6.2 7 9 Ferentari 6 7 9 16.9
73 330 Barajul Dunarii - P-ta Presei 12.3 2 23 Pipera 3 4 5 18
74 331 Damaroaia - Lahovary 8.1 22 22 Nordului 2 3 5 17.4
75 335 Aeroport Baneasa - Barajul 14.7 14 15 Pipera 6 8 14 18.6
Dunarii
76 336 P-ta Rosetti -Apusului 8.5 24 25 Militari 2 3 5 17.3
77 346 Granitul - Neferal 5.4 5 6 Titan 6 7 7 22.9
78 368 Laovary - Valea Oltului 10.5 27 30 Floreasca 2 3 6 17.5
79 385 Drumul Sarii - P-ta Unirii 7 14 15 Militari 3 4 7 16.8
80 401 Branesti - Granitul 12.9 3 4 Titan 30 30 45 18.4
81 407 Mihailesti - Tacerii 17.5 6 6 Alexandria 13 13 20 29.2
82 408 Domnesti - Ghencea 13 4 4 Ferentari 17 17 35 26
83 409 Afumati - Inst. Oncologic 13.7 3 3 Titan 26 26 83 24.2
84 410 Balaceanca - Granitul 14.8 3 4 Titan 22 22 45 23.3
85 412 Petrachioaia - Inst. Oncologic 20.7 1 1 Titan 101 117 117 29.6
86 415 Fierbinti Targ - Inst. Oncologic 42.9 1 2 Floreasca 100 100 200 28.6
87 416 Moara Vlasiei - Inst. Oncologic 28.9 2 2 Floreasca 70 70 140 26.7
88 417 Stefanesti - Inst. Oncologic 13.2 2 2 Floreasca 40 40 40 22.6
89 418 Berceni - P-ta Sudului 13 4 4 Ferentari 15 17 32 26.9
90 419 Vidra - P-ta Sudului 15.4 3 3 Ferentari 28 46 42 24.3
91 421 Zurbaua - Lujerului 15.2 6 6 Alexandria 15 18 28 20.3
92 428 Teghes - Ghencea 16 1 1 Ferentari 131 131 131 10.1
93 429 Granitul - Belciugatele 21 1 1 Titan 100 110 110 24
94 430 Islaz - Granitul 18 1 1
95 432 Sindrilita - Inst. Oncologic 17.7 1 1 Titan 92 92 92 26.6
96 438 Clinceni - Ghencea 14 1 1 Alexandria 70 70 70 25.5
97 439 Clinceni - Alexandria 10.5 1 1 Alexandria 60 60 60 25.2
98 444 Saftica - P-ta Presei 18.3 2 2 Floreasca 60 60 0 20
99 445 Tunari - Aurel Vlaicu 9.6 2 2 Floreasca 30 30 60 19.9
100 448 Sitaru - P-ta Presei 40.5 4 4 Floreasca 45 45 90 28.6
101 449 Corbeanca - P-ta Presei 14 12 12 Nordului 6 7 10 22.1
102 450 Spit. Balotesti - P-ta Presei 23 5 5 Floreasca 25 31 31 25.1
103 451 Moara Vlasiei - P-ta Presei 30.5 5 5 Floreasca 29 30 50 26.1
104 452 Caldarusani - P-ta Presei 35.5 1 1 Floreasca 0 0 0 0
105 454 Ganeasa - Inst. Oncologic 17.2 1 1 Titan 104 104 104 22.9
106 456 Olteni - Ghencea 9.3 1 1 Alexandria 60 60 60 22.3
107 458 Ciorogarla - Lujerului 16.9 4 4 Alexandria 25 25 31 21.1
108 459 Tangnau - Granitul 17.5 4 4 Titan 22 22 45 27.6
109 460 Buftea - Laromet 11.8 12 12 Alexandria 5 6 10 23.6
110 466 Glina - RATB Titan 5.7 2 2 Titan 30 30 60 21.2
111 471 Copaceni - Progresul 12 2 2 Ferentari 32 32 32 25.7
112 472 Progresul - Adunati Copaceni 15.3 3 3 Ferentari 25 25 26 25.5
113 473 Progresul - Vidra 18 3 3 Ferentari 30 30 45 27
114 475 Tunari - Baneasa SA 6.5 2 2 Floreasca 30 30 0 13.8
115 601 Rosetti - Crangasi 6.5 3 4 Militari 30 30 0 15.6
116 605 Gara Basarab - Grivita 5.5 5 6 Nordului 5 7 12 20.6
117 618 Zetarilor - sos. Giurgiului 1.8 Ferentari 10 10 0 13.5
118 781 P-ta Resita - P-ta Romana 10 9 11 Metalurgiei 6 8 0 19.4
119 782 P-ta Rosetti - Granitul 6.5 4 4 Metalurgiei 13 17 0 19.5
120 783 P-ta Unirii - Aero Otopeni 18 8 8 Pipera 12 14 12 27
121 784 Platf. Metalurgiei - P-ta Romana 9.3 7 7 Metalurgiei 8 12 0 16.4
122 785 Bucur Obor - MASTER SA 11.5 7 8 Metalurgiei 12 20 0 16.4
Total 1,391.40 839 953 2,645 2,817 3,533 2,421.50
Average 11.4 7 8 22 23 29 19.8
Source: RATB
Note: Operation program is for weekdays.
6-41
(2) Fleets
The inventory number of RATB buses is 1,281 in 1998 and out of those buses 1,232 buses are
in operation. A double-axle diesel-engine bus with three doors is typical among RATB buses.
Over 60 % of the buses are Romanian-made represented by ROCAR buses, and other buses
were made in Spain, Hungary, Holland, Greece and France (Table 6.5.2). According to the
data from the RATB, new buses are purchased every year and average vehicle age of RATB
buses is 6 to 8 years old. This figure makes quite a contrast to the ages of regional buses
operated by private companies, which can not afford to purchase new fleets. When operated
mileage has reached 500,000km, the buses are sent to the URAC for general overhaul and
renovation.
ROMAN IKARUS DAF ROCAR ROCAR ROCAR ROCAR SAVIEM DAC IK-4 UD112
112 UDM 260-50 SB 220 UL70 U412-230 U412-220 U412-260 117
Body size (mm) 11,210(l) 110,000(l) 11,690(l) 12,000(l) 120,000(l) 120,000(l) 120,000(l) 120,000(l)
2,500(w) 2,500(w) 2,500(w) 2,500(w) 2,500(w) 2,500(w) 2,500(w) 2,200(w)
3,080(h) 3,040(h) 3,020(h) 2,960(h) 3075(h) 3,075(h) 3,075(h) 2,700(h)
Cabin space (sq.m) 9.6 10.6 8.7 10.0 10.0 10.0 9.3 4.0
Maximum capacity (pers.) 8.5 113 112 104 109 109 109 104 76
pers./sq.m
No. of doors 3 3 3 3 3 3 3 3
Engine capacity (cc) 10,344 10,350 8,661 6,871 6,871 6,871 6,871 7,258
Fuel type diesel diesel diesel diesel diesel diesel diesel diesel
HP metric 192 192 217 230 230 220 260 156 272
Fuel consumption (l/km) 35,0 30,5 30,0 33,5 33,5 30,0 30,0 24,0
Tare weight (kg) 9,180 9,000 10,670 10,700 10,950 10,730 9,630 9,000 7,200
ESA - - - - - - - - - - -
No. of axles 2 2 2 2 2 2 2 2 3
Source: RATB
6-44
(3) Infrastructure
- Ticketing office
Three types of ticketing facility are provided for RATB transport. The first is called cabs,
located at the end of routes with RATB staffs to check the operation schedule and also to sell
the tickets and passes. There are 88 cabs in the RATB service area and 62 cabs are used for
buses. The others are called ticket sales boxes and fare card offices. 180 ticket boxes, 40
magnetic card offices and 63 seasonal ticket offices were distributed mainly along the RATB
routes in the RATB servicing area in 1998. Tickets are not basically available on the RATB
bus.
- Depot
There are 8 depots for RATB buses. Each depot has its own routes and buses to administer.
Therefore depots are considered as basic units of operations. The scale of depots is relatively
large having over 100 buses. These depots are exclusively used for buses and not used for
trams and trolleys (Table 6.5.3).
- Stops
There are 1476 bus stops in the RATB servicing area. Mostly these stops are not equipped
with shelters. Out of these stops, only 252 common stops for bus and trolley have shelters and
are used for advertisements.
- Traffic controll system
ATS (automatic transport assistance system) has been partly introduced since 1984 to adjust
the interval of bus service on the route. This system is composed of radio-controlled
transponder, remitter, and computers. The location of bus is detected by transponder and
displayed on the screen at the control center. And the command for the bus operation
adjustment is transmitted to the bus by radio. This ATS was only applied for the 11 bus routes
that belong to the Militari Depot and 6 trolley routes that belong to the Bujoreni Depot. This
system is monitored and operated at the central controll center. At the control center 33 staff
are engaged in the monitoring and operational work in three shifts.
Floreasca Ferentari Nordului Alexandria Militari Titan Pipera Berceni 2 ETA Total
Inventory number 182 213 131 177 151 186 171 70 1281
Available number 176 194 131 167 151 173 171 69 1232
ROMAN 112 UDM 102 146 119 1 146 514
IKARUS 260-50 42 48 48 27 165
DAF SB 220 65 171 236
ROCAR UL70 5 5
ROCAR U412-230 15 15
ROCAR U412-220 20 20
ROCAR U412-260 32 65 110 207
SAVIEM 69 69
DAC 117 0
IK-4 1 1
UD112 0
Planned number for 136 148 112 128 132 124 148 30 958
operation
Engaged number in 145 153 114 132 132 142 149 51 1018
operation
Engaged number on route 136 149 112 130 132 126 148 30 963
Source: RATB
6-45
(4) Performance
RATB buses are operated quite frequently on the trunk routes. Average headway of buses on
these routes at peak period is less than 5 minutes.
According to the official data on the number of passengers, an increase in the number of
passengers from 1995 to 1996 is observed. However this increase is mainly due to the change
of the definition of passengers in the statistical data, namely, after 1995 legally granted free
ride passengers on RATB are included in the number of passengers in the statistical data.
Therefore it can be pointed out that the number of passengers of RATB bus has been
decreasing after 1992. RATB statistics from ticket sales indicate that 316 million passengers
were transported by RATB bus in 1997. This is translated into 867 thousands passengers per
day. In addition, approximately 5% of passengers who were considered as free riding children
till 5 years of age and illegal fare dodgers need to be counted as actual RATB bus passengers
(Table 6.5.4).
Regarding fare evasion the small survey results in the "Pre-investment Study for Bucharest Urban
Transport,” CIE CONSULT funded by EU Phare, 1998 revealed that about 25% to 30% of the
passengers evaded fares.
In this study, a passenger survey was conducted in November 1998 with the help of RATB.
This survey was designed to get more clear information on passengers getting on and off the
RATB buses in peak periods by each route. This survey revealed that the bus use by route
varies considerably and there are considerable RATB bus routes on which passengers are
scarce (Figure 6.5.3). The routes less than 5 passengers per km are mainly located in the outer
area of central districts and relatively low population density areas serving industrial areas.
On the contrary high passenger density RATB bus routes are the routes going to the central
area of Bucharest.
6-46
Table 6.5.4 Passengers of Public Surface Transport
6-48
The revenue, excluding subsidies, per passengers, showed that these were about 26 % of cost
in 1997 and much improvement was not observed in recent years (Table 6.5.7).
- Revenues and expenditures
Though the number of passengers of RATB bus is decreasing, the revenues are remarkably
increasing at current prices, and total expenditures in the bus sector are also increasing.
Consequently the financial condition of RATB bus operation is still suffering a large deficit.
Compared with tram and trolley, the financial condition of bus operation is seemingly inferior
to that of tram (Table 6.5.8 and 6.5.9).
Season tickets
One week ticket (valid for all routes in urban area) 28,000
15 days ticket (valid for all routes in urban area) 58,000
One month ticket (valid for one route in urban area) 38,000 19,000
One month ticket (valid for two routes in urban area) 60,000 30,000
One month ticket (valid for all routes in urban area) 85,000 42,000
One month ticket (valid for one route in suburban area) 40,000 20,000
One month ticket (valid for two routes in urban and suburban area) 70,000 35,000
One month ticket (valid for all routes in urban and suburban area) 90,000 45,000
One month ticket for the employees of the business entities (not nominal) 230,000
(valid for all routes in urban and suburban area)
One month ticket 140,000 70,000
(valid for all routes including long distance routes in urban and suburban
area)
Source: RATB
Note: One month tickets are not available on special routes, express routes)
6-49
Table 6.5.7 Accumulated Mileage, Cost and Income per Veh.-km
Bus passengers 1) (mil .passenge 147 227 300 290 276 252 341 316
rs)
Revenue 2) (mil.lei) 378 440 1,214 4,888 17,600 28,886 44,408 90,497
Expenditure (mil.lei) 837 2,251 7,151 22,716 59,281 103,277 167,191 342,626
Revenue per (a) (lei/veh.-km.) 8 10 22 89 288 435 674 1,333
veh.-km.
Revenue per (b) (lei/passenger) 3 2 4 17 64 115 130 286
passenger
Cost per veh.-km. (c) (lei/veh.-km.) 19 49 132 415 969 1,555 2,537 5,046
Cost per passenger (d) (lei/passenger) 6 10 24 78 215 410 491 1,083
(b)/(d) 0.45 0.2 0.17 0.22 0.3 0.28 0.27 0.26
Source: RATB
Note: 1) Number of passengers in 1996 and 1997 includes those passengers free of charge.
2) Subsidies are not included.
Total expenditure 705 1,897 6,024 19,137 49,942 87,006 144,851 282,609 201,688
Revenue 375 436 1,205 4,854 17,478 28,685 44,099 88,999 65,144
Subsidies 421 1,670 5,476 16,388 38,130 67,837 113,572 227,900 158,498
Trolley
Total expenditure 289 778 2,472 7,854 20,496 35,706 56,117 118,501 82,901
Revenue 122 141 391 1,573 5,663 9,294 14,289 28,975 21,209
Subsidies 137 544 1,783 5,336 12,414 22,086 36,977 74,200 51,604
Balance -31 -93 -299 -945 -2,418 -4,326 -4,851 -15,326 -10,088
Bus
Total expenditure 837 2,251 7,151 22,716 59,281 103,277 167,191 342,626 239,379
Revenue 378 440 1,214 4,888 17,600 28,886 44,408 90,497 65,663
Subsidies 421 1,670 5,476 16,388 38,130 67,837 113,572 227,900 158,498
Balance -38 -142 -461 -1,439 -3,551 -6,555 -9,211 -24,228 -15,218
RATB Total
Total expenditure 1,831 4,926 15,647 49,707 129,718 225,990 368,159 743,736 523,968
Revenue 874 1,017 2,810 11,315 40,742 66,865 102,796 208,471 152,016
Subsidies 980 3,883 12,735 38,113 88,674 157,760 264,122 530,000 368,600
Source: RATB
6-50
Table 6.5.9 RATB Investment Achievement
(mil.lei)
1990 1991 1992 1993 1994 1995 1996 1997
Total Investment 255 1,891 2,305 20,783 54,504 75,811 120,101 340,287
Transport means 139 1,684 2,003 19,633 53,709 72,481 111,633 301,098
- trolleys (veh,) 38 42 12 11 2 2 2 54
- tb, SAURER 18 4
- modern. t.w. 5 30 44 31
Source: RATB
(6) Plan
In 1997 RATB has published a report, “Ground public transport development strategy until
year 2000 and, in the future, until 2010”.
The announced main objective of RATB for the horizon of the next ten years in this report is
to satisfy the public transport demand of approximately 3 million trips/day with a crowding
rate of 6 passengers/sq.m.
To this end the following measures have been announced:
a) Improving the transport network
- the public transport network will consist mainly of a tram network, metro and, additionally,
a network of busses and trolley buses;
- the main network, which satisfies most of the transport demand, will extend only to large
residential areas;
- a secondary network will be considered on those routes where it is necessary.
b) Modernization of repairing facilities
- modernization of tram tracks;
- building of depot with 100 places capacity for trams;
- modernization of the trolleys contact network;
- building of 2 depots having a capacity of 150 places each.
c) reconfiguration of the vehicle fleet
- modernization of V3A vehicles;
- low floor tram launching;
- purchasing 300 trolleys;
- purchasing of 200-300 buses;
d) Modernization of the maintenance and repair technologies
- modernization and refurbishing the maintenance and repair facilities in all the depots;
- modernization of Repair Plant;
e) Traffic management improvement
- expansion of automated real time monitoring system for public transport vehicles;
- facilities for public transport means such as priority lighting, exclusive lanes, traffic
priorities;
- improving the passenger information system
6-51
RATB is a partner in two European projects, CAPTURE and DANTE undertaken as part of
the European Union DGVII Road Transport Research Program. In both projects RATB is the
only partner from the former communist countries and has an important disseminating role
within Central and Eastern European countries. RATB is performing the research work with
full support of the Bucharest Municipality.
The results of the research are periodically reported to the general coordinator of the project
(Transport and Travel Research Ltd.). The conclusions will be disseminated to other European
cities.
a) CAPTURE Project
This project is assessing the strategies and existing restrictions regarding the implementation
of physical measures designed to effect a modal shift from cars to public transport. The
CAPTURE evaluation is based on impact analysis and traffic, social, attitudinal indicators
before and after the implementation of the physical measures in 11 European cities (Brescia,
Bucharest, Copenhagen, Manchester, London, Madrid, Mytilini, Orvieto, Rome, Tampere,
Vitoria).
Taking into account the necessity of traffic improvement in Bucharest and considering the
increase of the motorization and urban pollution rates, RATB suggested the implementation of
some physical measures proved to be needed and feasible. The coordination process of the
implementation and financing these measures are performed by the Municipality, which has
the competency and the authority to collaborate with institutes, governmental bodies and
agencies involved in transport field.
For Bucharest, the measures are referring to traffic reorganization within "Unirii" square (an
area of 0.8 sq.km.), introducing an exclusive lane for public transport on "Unirii" Blvd. (a
corridor of 4.2 km), introducing a trolley bus line on "Iuliu Maniu" Blvd. and improving
inter-modal transfer between underground and surface public transport.
Before the implementation of the above mentioned physical measures, a set of measurements
were performed in order to measure the pollution and noise levels, the public transport
performances and to assess public opinion. The before survey was accomplished by RATB
and PROED SA.
Out of those projects, the rearrangement of the public transport at Piata Unirii is in progress
and partly implemented. The exclusive lane for Unirii Avenue between Mircea Blvd. and
Piata Unirii (direction Piata Unirii) was completed. The construction of round-about with
parking spaces was completed.
b) DANTE Project
DANTE is an eighteen months project with the aim of assessing strategies to avoid the need
to travel. The experiments will be conducted in seven European cities (Bristol, Brescia,
Enschede, Aalborg, Lesvos, Zurich and Bucharest) and two interurban corridors (Bristol-Bath,
Brescia, Verona).
The project will focus on six types of strategy, to be used individually or in combination:
switching strategies (modal, time and location switching) and substitution strategies (use of
technology to replace a trip, linking activities through multipurpose trips, and trip
modification).
The research program for Bucharest (together with CURS as subcontractor of RATB)
comprise: the causality, motivations and tendencies of changing the modal split as a result of
the change in the business activity of the industrial areas, increase of the semi-circle trips,
increase of the traffic demand due to the commercial, residential, industrial and leisure areas
development, correlation between public transport strategy and parking management.
6-52
Out of six autogaras, SC Autotrans Calatori Filaret SA manages four autogaras and Autogara
Rahova and Autogara Militari are managed by different private companies, respectively.
SC Autotrans Calatori Filaret SA administers about 185 routes, and Autogara Militari
administers 29 routes. Autogara Rahova serves the southern part of the region, to the Danube
and Autogara Militari serves the northwest part of the region.
Buses are usually operated from 6 a.m. to 9 p.m. The frequency of bus operation on each
route is quite low due to the sparse transport demand.
Though the extension of routes into the central district of the city is preferable for the
passengers, bus operators are not positive about making the extension for fear of a strong
competitor, RATB, with respect to the fare and waiting time.
The terminals for the long distance buses other than RATB and autogaras are in direct liaison
with the Bucharest Municipality.
Source: RATB
(2) Fleets
The buses put in use for regional bus service based on autogaras are old and obsolescent large
buses and have many disadvantages in terms of comfort compared to RATB buses. On an
average, the buses are put out of service “put out of service” after 500.000 km which
represents a wear level of 80%.
6-54
On some routes the actual transport demand is not large enough to meet the transport capacity
of large buses. The bus companies are planning to replace large buses with microbuses with
15, 20 or 25 seats to permit many departures on a given route and at different time from the
same place. However budgetary constraints prevent them from realization of this idea.
(3) Infrastructure
There are 6 autogaras: Filaret, Obor, Grivita, Aeroport Baneasa, Militari, Rahova in
Bucharest.
As stated these autogaras are situated outside of the centre of the city with their own areas of
service due to the former strategy of regional bus service.
The areas of autogara are in general large enough for the function of terminals. The area of
Autogara Militari is 22,000 sq.m. The Autogara Filaret has more than enough space for
cleaning and maintaining buses and parking. However, the buildings and facilities have not
been modernized as yet. The bus berths are generally not well equipped with shelters.
Though the busses usually run from 6 a.m. to 9 p.m. the public relations, ticket selling are a
24-hour operation at Autogara Filaret.
Opinion on the relocation of autogara differs by the respondents at each autogara. For the
increase of the regional bus passengers, the relocation of autogara to the transport nodal
points was protested, and on the other hand, negative opinion on the relocation of autogara to
the center of the city was protested because of the creation of more serious congestion
problems.
(4) Performance
No accurate data is available regarding the number of passengers due to lack of statistical
integration of transport performance of each bus company and partly, the accurate reporting of
the number of the passengers by the driver.
At the autogaras under the administration of the SC Autotrans Calatori Filaret SA, 10,000
passengers/day was roughly estimated, and 500 passengers/day at Autogara Militari. These
numbers of passengers are reported to be on the decrease every year.
The following reasons for the decrease of transported passengers were pointed out by the
personnel concerned in the regional bus companies.
- leveling of living standard
- decrease of commuters due to the rise of unemployment
- abolition of restrictions on weekend vehicle use
- change in former monopolistic transport market
- piracy of the transport companies without license (it was estimated 20-30 % of total
regional bus transport demand was encroached by transport companies without
license.)
- increase of the number of cars due to relaxation of the car purchase formalities
And it was stressed that private cars and private microbuses are recognized as strong
competitors to the regional buses. The increase of transport demand for regional bus was not
expected as long as the unemployment rate is still increasing in Bucharest. The following
ways for improving the situation were mentioned.
- replacement of autogara to inside the city (close to Gara de Nord station)
- comfort improvement (better vehicles)
- governmental or municipal subsidies
6-55
(5) Fares, Revenues and Expenditures
The fares depend on the distance determined by the bus companies. Each bus company can
set their own tariffs. In the case of the SC Autotrans Calatori Filaret SA, 140 lei/km for an
ordinary ride is adopted and it is gradually decreased according to the route length. For
charter rides, 4,850 lei/Km is adopted. The tickets are sold at each autogara, and on the bus
for passengers who take regional buses on the road. Bus companies for fear of losing
customers, are not thinking of raising fares.
6-56
6.6.2 Fleets
The transport capacity of the microbuses for maxi taxis varies from 9 to 22 seats and the fleet
characteristics are the following:
a) 9 seat microbus:
length = 4,350 (mm)
width = 1,690 (mm)
height = 1,950 (mm)
power = 62 (kW)
b) 22 seat microbus:
length = 6,500 (mm)
width = 2,100 (mm)
height = 2,510 (mm)
power = 77.3 (kW)
Romanian made microbus, TV 35 and TM 35M have become superannuated. In recent years
imported second hand microbuses without air-conditioning were generally put to in use for
transport business by maxi taxi companies. Two hundred and three microbuses are operated in
the maxi taxi business today.
6.6.3 Infrastructure
There are no facilities regarding the operating system such as central operating system, bus
location system, etc.
Regarding road use, there are no exclusive lanes or special parking permission. The taxi stops
are checked and approved by the Technical Traffic Committee of the Municipality of
Bucharest. The locations of taxi stops are generally different from those of RATB. However
the maxi taxis are operated more flexibly, in fact, usually passengers can take and get off the
maxi taxi anywhere along the route.
As for the parking, ALLEGRO maxi-taxi SA Company has its own depot at 4, Chitila-Triaj
St., Sector 6 and park their cars in this depot. All the other companies have approval for their
parking lots from the Technical and Traffic Safety Committee of Bucharest Municipality,
based on the contracts signed between the vehicle owner and other private companies that can
offer parking spaces.
6.6.4 Activities
The number of passengers using maxi taxi is compiled in each private maxi taxi company and
no statistical data is available at present.
6.6.5 Fares
The fare system is based on tickets sold by the maxi i.e. taxi driver. The price for one ticket
varies from 2,000 to 3,000 lei/trip and is established by each maxi taxi company. No seasonal
ticket is available for maxi taxi at present.
6.7 Taxi
6.7.1 Vehicles
All vehicles used for taxi business are required to have at least 2 doors on the right hand side
and sufficient power for transporting 5 persons in compliance with the stipulated standard in
the contract condition of HCGMB No.57/1993.
At present the most commonly used vehicle for taxi business is DACIA 1310, which has the
following technical characteristics:
L =4,388(mm)
6-58
W =1,616 (mm)
H = 1,435 (mm)
P= 46 (kW)
The number of vehicles belonging to each company and private person varies from 1 to 450
vehicles. In the case of companies with their own fleets, SC GETAX SA has the lowest
number of vehicles with 25 and SC CRISTAXI SRL has the largest number of vehicles with
131. In the case of companies with rented fleets, generally the number of vehicles is small.
75% of such companies manage vehicles in the range of between 1 and 5. The number of
individual owner-drivers, who own and drive cars amounts to a considerable number (Table
6.7.1).
From the data provided by the Transport Licenses Service under Bucharest Municipality,
8,004 vehicles are legally operated in the taxi business market.
Regarding the number of passengers transported by taxis, no accurate data or information is
available.
6.7.2 Infrastructure
In order to carry out this activity in as effective and convenient a way as possible, the Street
Administration in Bucharest Municipality has arranged taxi stations at the places where a
large passenger flow is observed.
The setting up of taxi stations is implemented by the initiative of Bucharest Municipality or
by the passengers' or transport operator's requests. These stations should have the approval of
the Technical Traffic Committee of the Bucharest Municipality.
Within the Bucharest Municipality area, 75 taxi stations with a capacity of 1,800 taxis have
been arranged.
6.7.3 Fares
Distance related charging system is basically applied.
The charge of each route is measured by a taxi meter mounted on each vehicle that provides
the passenger transport service. The meters are checked and approved by the Bureau
responsible for inspection and checking the accuracy of meters, that issues a metrological
6-59
report to prove the result of official inspection with a validity of 1 year from the date of the
inspection. Determination of the tariffs depends on each business entity, varying from 2,500
lei/km to 10,000 lei/km. Other than distance related charge, users are charged between 1,000
to 5,000 lei irrespective of the distance as the basic fare.
Different tariffs for day/night or working day/holiday are permitted for each business entity,
and the charging meters are set to program for 1 to 8 types of tariffs.
6.7.4 Others
Supervision and observation of the activities for passenger transport by taxis are imposed on
the Bucharest Municipality, and Transport License Bureau belonging to the Public Transport
and Traffic Safety Department in collaboration with the officers and non-commissioned
officers of the Traffic Police Office, Protection Office and Financial Guard. They make
periodic checks on the road in order to apprehend and punish those who break the lows for
carrying out this activity
6.8 Railway
6.8.1 Network
The railways in Romania were designed to meet the demand for international, national and
regional traffic.
The greater Bucharest area has a dense rail network comprising a ring railway and several
radial railway lines. Four railway terminals, Gara de Nord, Bucharest Obor, Titan Sud and
Bucharest Progresul are established in the Bucharest Metropolitan area, and those railway
terminals are located at some distance from the central district of Bucharest as is often seen in
other European cities. Most of the trains to and from Bucharest start from or arrive at Gara de
Nord, the railway station nearest to the central district of Bucharest (Figure 6.8.1).
In the study area the number of railway stations amounts to 25 and the stations on the ring
railway are exclusively used for freight transport.
Though the railway network in Bucharest municipality is densely developed, connections
with other rail transit modes are not well arranged with the exception of Gara de Nord. At
Obor station, passengers transferring to metro are forced to walk a considerable distance.
6-60
6.8.2 Infrastructure
The railways in Bucharest Metropolitan area are electrified with the exception of the ring
railway and the railway to the south. The voltage used is 25 kV AC (50 Hz).
Gauge size of track is 1,435 mm. This gauge size is also used by Metro in Bucharest.
6.8.3 Performance
The number of trains arrowing to and departing from Gara de Nord (Bucharest Nord)
amounted to 215 trains a day in 1998. Compared with Gara de Nord, other terminal stations in
the Bucharest municipality are less used for passenger trains. The number of trains to and
from Bucharest Obor, Titan Sud and Bucharest Progresul are 19 trains a day, 7 trains a day
and 11 trains a day respectively. Basically distance related fares are adopted for railway
passengers (Table 6.8.1).
As designed, the usage of railway stations in the Bucharest Metropolitan area is generally low
except from the four terminal stations. The number of railway passengers boarding and
alighting at Gara de Nord amounted to some 56.3 thousand passengers a day in 1998. At other
terminal stations the number of passengers is small. The number of passengers boarding and
alighting at the Bucharest Obor, Titan Sud and Bucharest Progresul stations are some 4.1
thousand a day, 1.3 thousand a day and 3.0 thousand a day respectively. At other stations in
the Bucharest Metropolitan area, only a small number of railway passengers ranging from 4 to
321 passengers a day utilize the railway (Table 6.8.2).
6-62
The JICA Study Team, in cooperation with to Ministry of Transport, conducted a railway
passenger survey in December 1998. In this survey all the trains crossing the Study Area
boundary were surveyed to get information on the number of passengers coming to and
learning the Study Area by train. The survey was conducted on a weekday for about two
weeks. The result showed that about 75 thousand passengers cross the boundary of the Study
Area (Table 6.8.3).
6.8.4 Plan
A proposed railway improvement plan related to the Bucharest metropolitan area is shown in
the series of reports prepared by ISPCF (Railway Studies and Projects Institute).
In the report “Study for Integrated Circulation in Bucharest Municipality and its Metropolitan
Area”, ISPCF, 1997, modernization, systematization and integration of the railway into the
European railway network, and the future role of the railway for commuting in Bucharest
Municipality was pursued.
Main proposed projects in this report are as follows (Figure 6.8.2):
x Construction of railway between Bucharest Progresul and Gara de Nord. This new line is
proposed to improve the linkage between Gara de Nord and Giurgiu in the south and to
improve the international railway network. A partial underground line near Gara de Nord
was proposed.
x Construction of new central station “Bucharest Panduri” between Bucharest Progresul and
Gara de Nord. This new station is proposed to be an underground station. This station can
provide shorter linkage to 1st May line, better access to the city center and is expected to
share the role of Gara de Nord if necessary.
x Electrification and modernization of the railway line between Gara de Nord and Giurgiu.
This project is proposed to modernize the line that has not been electrified as yet.
x Modernization and systematization of existing Gara de Nord, Bucharest Obor, and
Bucharest Progresul stations. These projects are proposed to modernize the existing
stations but also to rearrange the roles of existing stations, that is, to solve the capacity
problem of Gara de Nord in future and to expand the role of other terminal stations.
x Construction of a new railway line between Panduri and 1st May line This line is expected
to shorten the distance to Craiova by over 6 km and serve the regional and urban transport
demand in future.
x Construction of a new railway line between Bucharest Pipera and Caciulati line. This line
is expected to shorten the distance to Galati and Iasi by over 10 km and serve the regional
and urban transport demand in future with the new construction of Bucharest Pipera
station.
6-63
6.9 Airport
There are two airports Otopeni international airport and Baneasa domestic airport in the north
of the study area.
5,000
4,500
4,000
pas s engers pe
3,500
3,000
2,500
2,000
1,500
1,000
500
0
1994 1995 1996 1997 1998
6-65
6.10 Intermodal Facilities
6.10.1 Transferring Facilities
PT survey results revealed that major transferring points are distributed in Bucharest
Municipality area. It was notied that there was no typical concentration of transfer points to
the city center but a dispersed pattern corresponding to the existing terminals.
1,600
1,400
1,200
1,000 T ram
800 T rolley
600 Bus
400
200
0
1993 1994 1995 1996 1997
Figure 6.10.1 Number of Tram, Trolley, Bus and Bus Stops, (RATB, 1998)
The tram islands are narrow (1.2 ~ 1.5 m wide, 32 m ~ 60 m length, 0.2 m high) and have no
conspicuous signs. There is no shelter even at plaza and end points. There are stops without
sign posts.
Standard of location of bus / trolley bus stop is given as follows: (Figure 6.10.2)
Average distance between stops: 500 m (150 m ~ 2000 m)
After crossing or intersection
Distance between sign post and pedestrian crossing:
- 20 m for low frequency
- 30 m for higher frequency
- more than 30 m for very high frequency
6-66
32~60 m
Bus
Tram
Trolley Bus
(2) Sign
The sign board is a rectangular steel board standing alone on a steel pole or attached to
electricity pole etc. The width is 53 cm and the height is variable according to the number of
routes indicated, but the standard is 32.5 cm for 1 route, with the name of the stop in the
center and the number of lines below. The older type sign board is 53 cm wide and 23 cm
high with the name of the stop in the center, logo of RATB in pentagon shape at the top and
number of lines near the bottom, which makes little impression.
Information on the starting and ending time and the operation interval is shown on an A4 size
plate attached to the sign board only at major stops.
Recently RATB is replacing the old signs with a new colorful and elongated design with
information on the route number, origin / destination and advertisement. Time schedule can be
attached however the existing ones do not have schedules. All bus stops should have clear
sign bearing the name, line number, route information (major stops), time schedule and
contact points (telephone number).
Other than the above, some maxi-taxis are operated as regional buses (ex.: Filaret – Vama
Giurgiu, Pacii – Bolintin Vale).
6-67
(4) Ticket Box
The ticket box is important for passenger service as tickets are not sold in the cars and cash is
not accepted except at the ticket box.
There are several types of ticket box. One is column shaped with plane selling window.
Another is rectangular attached to the shelter. Another sells magnetic cards for express bus.
Larger box offices sell seasonal passes or commuter tickets.
1) Piata Unirii
Transfer between tram, bus and metro is not convenient because the plaza is too large and
underground pedestrian network has not been completed. Parking space is not sufficient.
There are many kiosks along the sidewalk, which shows the potential for commercial
development. There is no entrance to metro at the stop of Tram Line 32 or the southwest
corner. The usage of the plaza is not satisfactory. The public underground passage connects
northwest - southeast along Metro Line 1, and east – northeast of Line 2. Line 1 and 2 are
connected only inside the barriers and no public way is connecting. The bus stops are
located on the north, west, southwest, southeast and east. The transfer is inconvenient in terms
of distance and crossing roads. Transfer between Metro Line 1 and 2 is not convenient with
long walking distance and difference of levels. There is a plan to construct a so-called
People’s Cathedral or Orthodox Cathedral in Piata Unirii, which was generally approved,
however the decision is not firm and there are objections to the plan. The large central
fountain is not accessible surrounded by roadways and the plaza does not have good
environment for people.
2) Universitate
It is good that the four corners of the Universitate intersection are connected by underground
passage leading to the metro, where small shops are located.
3) Piata Romana
The entrance of the metro is only on the east side of B-dul Magheru and there is no entrance
on Piata Romana. The escalator goes directly from the platform to the surface only in the
north-bound direction. The width of platform is very narrow. The columns are located too
near to the edge of the platform.
6-69
4) Piata Victoriei
The entrances of the metro are located only on B-dul Lascar Catargiu for both Line 1 and 2.
The transfer between Line 1 and south-bound Line 2 is convenient, but the north-bound
platform is not directly connected to Line 1. Although the tram runs along the underpass, there
is neither a stop under the plaza nor a connection.
5) Obor
The concourse and the entrances of metro are located at both ends of the platform. The
entrances are located in the traffic islands and the underpass runs both sides of the metro
station. The underground parking is located on the outer sides of the underpass. There is no
direct connection between the metro station, underground shopping arcade and underground
parking. There is no underground pedestrian network crossing the metro or underpass. The
existing 2-tier underground parking is located on both sides of the underpass each with
capacity of 500 cars (total 1,000 cars). The trams along the ring road run on a side road and
the island makes the width narrow. The municipality has a plan to improve the intersection,
widening the B-dul Mihai Bravo and expanding the lanes.
6) Gara de Nord
Gara de Nord area is expected to become the urban core in future. It is a vital issue to foster
the Gara de Nord area as an urban core to develop the transferring function among various
public transport modes.
In this study, rearrangement of bus routes comprising mainly RATB bus routes, by providing
bus terminal and improvement of bus information system are proposed to enhance the
convenience of bus passengers.
The regional buses and international buses arriving at and leaving the Autogaras which are
respect to sporadically located in the built up area of Bucharest are not well arranged with
other public transport modes. The Gara de Nord area is supposed to function as a terminal for
those buses in consideration of the role to be shared with other multi-modal points.
In addition the bus terminal need not necessarily be located just adjacent to the railway station
and there seem to exist candidate sites in the area if redevelopment is realized based on the
PUZ.
However maximum utilization of the limited space will be pursued for the construction of bus
terminal at Gara de Nord area because of the characteristics of the existing land use of that
area.
Generally space for the buses to adjust to scheduled operation is required for bus terminals.
Therefore it is necessary to examine the effectiveness of the information system for bus
operation and bus route arrangement to set the termini at places other than Gara de Nord.
Based on those examination required space for bus terminal shall be determined.
There is no proper loading / unloading space and taxi pool. The trolley bus stop and taxis
conflict with each other. Parking space is not sufficient. Parking along B-dul Dinicu Golescu
on the east disturbs traffic clearing only tram way. The concourse of the metro is located in
the center of the metro line and Calea Grivitei. The entrances lead to the railway station and
the opposite side of the road. Connection to the trolley bus stop and B-dul Dinicu Golescu is
not convenient. The Municipality has a plan to construct underground parking under the Piata
Gara de Nord and parking on the roof of the new station building to be reconstructed.
6-70
7) Eroilor
The entrances of metro are located at both ends of the platform, facing B-dul Eroilor and Str.
SF. Elefterie. Signs for Line 1 or 3 in the west-bound direction are not clear.
8) Dristor
The transfer between Line 1 and 2 is no problem, only that the width of the passage is narrow.
The transfer to the tram and bus is not convenient.
9) Armata Poporului
The entrances of metro are located at both ends of the platform, but the entrances are located
only on the south side of B-dul Iuliu Maniu.
(1) Financing
As operators of urban public transport in Bucharest, RATB and Metrorex have been allowed
to operate each traffic mode with blanket subsidy paid by the Municipality and the Ministry of
Transport respectively. Not only operating loss but also travel concessions are paid to them.
Investment capital is also provided to them. More precisely, the subsidy fund for RATB does
not solely consist of taxes collected by the Municipality itself (real estate tax, taxi/maxi-taxi
tax, etc.): the fund depends heavily on the Ministry's support, since local income tax is levied
by the government. As for investment capital for RATB, the Municipality receives around
30 % of local income tax collected by the government, though the ratio fluctuates every year.
The following figure shows financial flow for RATB and Metrorex.
6-71
0HWURUH[
,QFRPHWD[
Central Operation cost
General Government's
general account
tax
Capital expenditure
payer Real estate tax
Income tax
Taxi tax, etc.. in collected by
Bucharest central
government in 5$7%
Bucharest
&DSLWDOH[SHQGLWXUH
Public 3DVVHQJHUIDUH
transport user
Metro
Total expenditure 725 2,560 9,029 28,411 60,980 87,289 122,595 282,028 403,243
Revenue 469 495 1,841 5,229 16,646 29,396 43,732 107,814 157,852
Subsidies 192 2,055 6,427 20,684 42,103 51,500 73,225 160,613 245,391
Balance -64 -10 -762 -2,499 -2,232 -6,394 -5,638 -13,601 0
Tram
Total expenditure 705 1,897 6,024 19,137 49,942 87,006 144,851 282,609 445,191
Revenue 375 436 1,205 4,854 17,478 28,685 44,099 88,999 -
Subsidies 421 1,670 5,476 16,388 38,130 67,837 113,572 227,900 -
Balance 91 209 657 2,105 5,666 9,516 12,821 34,289 -
Trolley
Total expenditure 289 778 2,472 7,854 20,496 35,706 56,117 118,501 186,229
Revenue 122 141 391 1,573 5,663 9,294 14,289 28,975 -
Subsidies 137 544 1,783 5,336 12,414 22,086 36,977 74,200 -
Balance -31 -93 -299 -945 -2,418 -4,326 -4,851 -15,326 -
Bus
Total expenditure 837 2,251 7,151 22,716 59,281 103,277 167,191 342,626 512,625
Revenue 378 440 1,214 4,888 17,600 28,886 44,408 90,497 -
Subsidies 421 1,670 5,476 16,388 38,130 67,837 113,572 227,900 -
Balance -38 -142 -461 -1,439 -3,551 -6,555 -9,211 -24,228 -
RATB total
Total expenditure 1,831 4,926 15,647 49,707 129,718 225,990 368,159 743,736 1,144,045
Revenue 874 1,017 2,810 11,315 40,742 66,865 102,796 208,471 314,430
Subsidies 980 3,883 12,735 38,113 88,674 157,760 264,122 530,000 802,618
Balance 23 -26 -103 -279 -303 -1,365 -1,241 -5,265 26,997
Source: Metrorex and RATB
6-72
(2) Subsidy
As noted previously, operating losses brought about by the two organizations are repaid on an
annual basis. According to the Government Decision 179/1993 a subsidy of 60 % can be
provided for Bucharest Municipality.
The Ministry of Transport subsidized Metrorex for the deficit of 60% of managerial
expenditures and for 100% of the investment cost. RATB receives about 70% of managerial
expenditure as subvention and also receives a subvention for all investment expenditures.
However the new law 189/14 named "The law of local public finances" was introduced in
January 1999 and budgets are set in advance each year to determine the amount of subsidy
which will be paid, but there are no direct adverse impacts on both organizations for
exceeding their budgets. This fact means that both organizations have not been exposed to
fiscal constraint. Actually a private bus operating company has once tried to get into the
market, but it had to abandon the attempt because RATB could offer lower fares based on
subsidy assistance. Under such circumstances, incentives for cost awareness has not been
rooted well and user satisfaction has been given much lower priority in both organizations.
6.11.2 Metrorex
Many Romanian state-owned companies are now in the process of privatization. In the case of
Metrorex, the Government Ordinance No.482 issued on July 17,1999 proclaims that it should
be transformed from a “regie autonomie” into a commercial company, with the majority of
shares is held by the state. Based on the Ordinance, Metrorex became a commercial company
as of August 1. Though privatized, it performs activities of public importance and works
under the jurisdiction of the Ministry of Transport.
According to Article 5 of the Ordinance, Metrorex has to accept present regulations for setting
passenger fares. On the other hand, Metrorex is allowed to receive state budget transfers that
can cover the difference between its revenues from transport activities and the total
expenditure. The discount of passenger fares for certain categories of people stipulated in the
law will be compensated (Article 6). The amounts of investment for infrastructure are
financed from the state budget or from the loans guaranteed and paid from state budget
(Article 7). Though the financial sources of its activities are clearly described in the
Ordinance, it goes without saying that further efforts are needed to improve the profitability of
its operation.
As for its investment, Metrorex has been financed 6.8 million USD by European Bank for
Reconstruction and Development (EBRD) to construct a new line and to purchase new rolling
stocks. Metrorex will be able to avoid employing a large number of maintenance staff by
introducing new rolling stocks (Table 6.11.2).
The income statements of Metrorex as of 1997 and 1998 are displayed in Table 6.11.3 The
latest organizational chart is shown in Figure 6.11.2.
6-73
Dispatcher Center-PSI
Ambulance
Department
Department of Rolling Stock
Director of Operation
Depot of Line II and Traffic Operation
Working Environment
of
Financial Relations
Section
Trade-unions
Electromechanics
Department of Installations
Section
Department of Forecasting,
Planning, Statistics and Tariffs
External
Electromagnetics
Department of Management, staff
Employment, and relationships to
Department of Patrimony,
Cadaster, Building Survey
Section of Trucks.
6-74
General Director
Station Management,
General Shareholders’ Meeting
Administration Council
Special Buildings
Technical Office
Audito
U.R.M.R.M.
Director
Supply Office
of
Relations, Protocol
Information
Programs, Investment,
Control
Development Office
Figure 6.11.2 Organization Chart of Metrorex (as of August 1999)
Technical
Civil Protection, and Fire Safety
Investments Supervising
Department of Financial
Offi
Department of Judicial Affairs
Department of
i
Department of Accounting
Director of
Department of Price
Negotiations
Healthcare and Work
Table 6.11.3 Metrorex's Operating Income / Costs for 1997 and 1998
1997 1998
Lei(million) US$(million) Lei(million) US$(million)
Income 256,383 31.99 403,243 36.72
- Transportation 100,275 12.51 149,877 13.65
- Subsidy 148,569 18.54 245,391 22.34
- Others 7,539 0.94 7,975 0.73
6.11.3 RATB
(1) Institutional Arrangement
Urban public transport service is covered in the Local Public Administration Law No.
69/1993. Surface transport modes with the exception of regional and international buses have
been devolved to RATB. Within the Bucharest Municipality the responsibility for public
transport falls under the Public Transport and Communication Department, headed by the one
of the Deputy Mayors, and a specific Public Transport Section has been established for this
purpose. RATB can propose alteration of operation that the section must ratify. Traffic
Management Committee assists in this process.
Monitoring of public transport service and co-ordination between the various bodies charged
with the planning are achieved at four levels:
- Commission for Integrated Transport
- General Council Municipality Transport Commission
- Public Transport Department of Bucharest Municipality
- Traffic Committee
Commission for Integrated Transport that is chaired by the Vice-General Mayor makes
recommendations to the General Council of Municipality. RATB can propose all items to the
Traffic Committee.
In 1998 approximately half of the RATB operational staff, namely 4,026 staff out of over
8,242 staff were engaged in the bus operation sector. Though from 1990 to 1995 the number
of staff in the bus operation sector continuously increased, no large change in number of staff
was observed after 1995 (Table 6.11.5).
6-75
Table 6.11.4 Comparison of Public Transport Operation, 1995 (Metro)
Source: 1997 edition of the UITP Book of Urban Transport Statistics, *Imidas 97
* The data of Metrorex (Bucharest) are as of 1998
6-76
Table 6.11.5 Operational Personnel of the Department
RATB
Total 6,609 7,041 7,371 7,612 7,929 8,127 8,068 8,083 8,242
Driver 2,722 2,966 3,162 3,355 3,728 3,992 4,016 4,060 4,236
Mechanics, Electrician, 1,736 1,762 1,821 1,878 1,912 1,900 1,893 1,854 2,333
Revision man
Engineer, Economist, 177 169 178 176 177 183 184 194 99
Technician
Other 1,974 2,144 2,210 2,203 2,112 2,052 1,975 1,975 1,574
Tram
Total 2,370 2,488 2,549 2,622 2,704 2,804 2,819 2,810 2,906
Driver 774 851 904 987 1,057 1,141 1,169 1,175 1,178
Mechanics, Electrician, 761 763 780 825 835 837 866 876 1,090
Revision man
Engineer, Economist, 87 78 79 80 81 85 83 90 36
Technician
Other 748 796 786 730 731 741 701 669 602
Trolley bus
Total 1,150 1,226 1,256 1,291 1,332 1,381 1,389 1,384 1,310
Driver 449 483 470 495 508 562 585 590 590
Mechanics, Electrician, 323 338 342 348 351 363 357 333 417
Revision man
Engineer, Economist, 41 35 36 34 35 35 36 41 23
Technician
Other 337 370 408 414 438 421 411 420 280
Bus
Total 3,089 3,327 3,566 3,699 3,893 3,942 3,860 3,889 4,026
Driver 1,499 1,632 1,788 1,873 2,163 2,289 2,262 2,295 2,468
Mechanics, Electrician, 652 661 699 705 726 700 670 645 826
Revision man
Engineer, Economist, 49 56 63 62 61 63 65 63 40
Technician
Other 889 978 1,016 1,059 943 890 863 886 692
Source: RATB
Note: Data are those at 31 Dec. of each year.
Early in 1999 RATB was re-organised to cope with the changes in the socio–economic and
political condition (Figure 6.11.3).
RATB also suffers from low productivity due to the redundancy of the institutional frame and
insufficient technological supporting system.
RATB has already launched a reorganizing program in order to improve the activity of
6-77
coordination and management of the restructuring. When the reorganization is completed, the
system will become simpler and depots will be linked directly to division chiefs at
headquarters.
Main contents of the program are the following:
- the separation Section Auto Ciclop” from RATB, resulting the decrease of 537 RATB staffs
- the setting up of the Consulting department at the level of a “service”
- the setting up of the environmental department within the technical direction
- the re-organizing of the patrimony administration
- the setting up of the position deputy civil protection inspector
- the abolition of the section designing workshops and workshop terminals and depots
Other than the abolishing 537 staff resulting from the separate in of CICLOP, 420 positions
were eliminated from the organization chart in 1998.
6-78
Repair Factories
f URAC
Processing Center
Department of
Quality Checking
Director, Department of
Department of
Section of
Operating
O
Operation Movement
Section of Traffic Control
ti
Reorganization
Department of Consulting and
Department of Organization-
Working Group of
Infrastructure
Plan-Development
Standardization
Department of
Section
Operating
D
Techniques and Mechanical-Power
Director,
Department of
t
of
Mechanics Energy
t
Department of
Department
Power, Maintenance,
Operating Section of
Lines and Buildings
Electronics and
Office of Environment
Working Group of
of
General Director
Equipment
Administration
6-79
ion site
Construct
Director, Department of
Council
C
Department of Supply
Department of Marketing
i lS i
Department of
Printing House
Commercial Service
Department of
of
Director, Department
Department of Judicial
Department of Internal
Fi
i C t l
Department of Payment
S
Department of Asset
t i t
Management
Section of
Buildings
Department of Personnel
Resources and Social Assistance
Director, Department of Human
Welfare Facilities
The Department is divided into four sections: network planning, operations analysis, survey
section and projects.
The network section is responsible for producing the details of routes to be operated and
frequencies of service.
The operations section produces analyses of operations. The section receives technical
information from depots such as damage to vehicles, number of vehicles used, number of trips
made etc. The section may make technical proposals and recommendations
The survey section is responsible for carrying out simple passenger counts at stops or in
vehicles. It also produces tables of frequencies for each route and each vehicle.
The projects section is responsible for studying particular proposals for route changes.
The Departmental Chief or General Manager must ultimately approve all decisions.
The routes and schedules are provided to the tram depots which are then responsible for
operating the specified services.
Each depot has a chief, an assistant chief, a traffic manager and a maintenance manager.
The traffic manager is responsible for allocating drivers to vehicles and vehicles to routes. In
general, two drivers are permanently allocated to each vehicle, although there are certain
exceptions. The drivers alternate between early, late, split and reserve shifts
The general operational procedure is set out below.
A driver is required to report to the dispatcher 15 minutes before he is due to leave the depot.
This allows the dispatcher time to allocate a reserve driver if necessary. There is usually one
dispatcher on duty at a time, although this may be increased to two at particular times and
certain locations.
The driver is handed a dispatch sheet and goes to his allocated vehicle. The dispatch sheet
includes the name and code of the driver, the number plate and code of the vehicle, the code
of the route and the scheduled time of departure. On exiting the depot, the gate man signs the
dispatch form and records the time.
The vehicle is then driwen to the start of its allocated route if this is not the depot itself, and a
route dispatcher records the departure time of the vehicle from the start of the route. At the
end of the route, the route dispatcher records the arrival time and the procedure is repeated for
each trip. A route dispatcher may be responsible for recording the arrivals and departures of
several lines if these share a common terminus. The driver himself may record any incidents
along the route on the dispatch form, including traffic congestion that delays the vehicle, and
accidents.
On completion of the working period, the driver returns the vehicle to the depot. The gate man notes
the time of arrival, vehicle code, driver code and route, and notes any technical problems reported by
the driver. A mechanic makes a visual inspection of the vehicle.
The vehicle is taken by the driver to be washed, cleaned inside and checked in the workshop.
If the vehicle requires no maintenance, it is taken to the parking area. Otherwise, it is left in
the workshop. The traffic manager or maintenance manager is informed of any problems. The
driver leaves the vehicle and returns the dispatch sheet to the dispatcher.
In certain situations a driver may be changed at the route terminus or mid-way along a route,
rather than at the depot.
The assistant chief heads the technical service in the depot. The service is responsible for the
preparation of the maintenance programme and for traffic analysis on the basis of the dispatch
forms. A traffic analysis is made for each route, including the number of trips made,
percentage of scheduled trips operated, timekeeping and any incidents encountered.
6-80
Table 6.11.6 RATB's Assets Balance Sheet for 1997 and 1998
1997 1998
Lei (million) US$ (million) Lei (million) US$ (million)
Current assets 217,004.8 27.1 323,513.8 29.5
(Inventories) (118,901.1) (14.8) (112,358.8) (10.2)
(Accounts receivable) (80,674.0) (10.1) (196,537.2) (17.9)
(Cash and bank account) (3,611.5) ( 0.5) ( 12,568.5) ( 1.2)
(Others) (13,818.2) ( 1.7) ( 2,049.3) ( 0.2)
Account for regulation 9,447.1 1.2 2,829.3 0.3
Fixed assets 670,948.4 83.7 1,444,664.2 131.5
Totalassets 897,400.3 112.0 1,771,007.3 161.3
Table 6.11.7 RATB's Liabilities and Equities Balance Sheet for 1997 and 1998
1997 1998
Lei (million) US$ (million) Lei (million) US$ (million)
Accounts payable and loans 26,642.1 3.3 87,634.2 8.0
Others 41,169.1 5.2 65,127.5 5.9
Total liabilities 67,811.2 8.5 152,761.7 13.9
Account for regulation 16,130.7 2.0 15,428.9 1.4
Capital 806,748.4 100.7 1,602,816.7 146.0
Reserves 6,710.0 0.8 0 0
Total equity 813,458.4 101.5 1,602,816.7 146.0
Total 897,400.3 112.0 1,771,007.3 161.3
Table 6.11.8 RATB's Operating Incomes / Costs for 1997 and 1998
1997 1998
Lei (million) US$ (million) Lei (million) US$ (million)
Public transport 742,807 92.7 1,141,103 103.9
(Revenue from main activities) (208,471) (26.0) (314,430) (28.6)
(Subsidy) (530,000) (66.1) (802,618) (73.1)
(Others) ( 4,336) ( 0.6) ( 24,055) ( 2.2)
Investment Income 113,595 14.2 155,831 14.2
Total Incomes 856,802 106.9 1,296,934 118.1
Comparison of the levels of operational efficiency in each public transport mode in Bucharest with
those of other European cities revealed that the performance of trolley, and tram in Bucharest leaves
much to be desired.
6-81
Table 6.11.9 Comparison of Public Transport Operation, 1995 (Tram/LRT)
Service provider RATB GSP Helsinki City Azienda Stadtwerke AS Oslo Wiener
Transport
Transport Transporti Munchen Sporveier Linien
Organization type City owned City owned City owned City owned City owned City owned
Population (million)* 2.06 1.09 0.5 1.31 1.3 0.47 1.59
Total staff (persons) 5,022 1,540 588 2,045 1,144 356 4,251
Total route length (km) 400 118 75 203 65 128 181
Single passenger trips per day (million) 0.486 0.38 0.183 0.578 0.235 0.101 •|
Average single trip distance (km) 4.4 6.9 2.1 3.3 2.8 2.8 3.5
Annual single passenger trips (million) 177.4 153 51.6 179 72.9 31.5 217.2
Annual passenger distance (million km) 780.36 1,270.00 109.1 588 203.4 86.6 754.33
Annual vehicle distance (million km) 33.0 8.3 5.2 23.1 11.7 5 44.4
Staff / km 12.6 13.1 7.8 10.1 17.6 2.8 23.5
Staff / 1000 passenger trips 10.3 4.1 3.2 3.5 4.9 3.5
Annual passenger distance / staff (thousand) 155.4 824.7 185.5 287.5 177.8 243.3 177.4
Annual vehicle distance / staff (thousand) 6.6 5.4 8.8 11.3 10.2 14 10.4
Source: 1997 edition of the UITP Book of Urban Transport Statistics, *Imidas 97 (1997)
*The data of RATB (Bucharest) are as of 1998
*Administrative staffs of RATB are allocated to each mode based on the ratio of number of drivers in each mode
*The data of “single passenger trips per day” and “arrival single passenger trips” in RATB Annual Report (1998) are modified by JICA Study Team
*”Average single trip distance” is calculated by JICA Study Team
6-82
Table 6.11.10 Urban Public Transport Statistics, 1995 (Trolley)
Bucharest Belgrade Geneva Milan Riga
Service provider RATB GSP TPG Azienda Riga Tram-
Transporti Trolley Bus
Organization type City owned City owned Private City owned
Population (million)* 2.06 1.09 0.18 1.31 0.89
Total staff (persons) 2.509 988 307 580 1,574
Total route length (km) 138 62 31 40 364
Single passenger trips per day (million) 0.291 0.243 0.111 0.154 0.31
Average single trip distance (km) 4.4 5.1 1.9 2.6 4.1
Annual single passenger trips (million) 106.2 78.4 36 47 98.7
Annual passenger distance (million km) 467.3 478.2 68 124 404.6
Annual vehicle distance (million km) 12.9 6.1 3.3 4.57 18.082
Staff / km 18.2 15.9 9.9 14.5 4.3
Staff / 1000 passenger trips 8.6 4.1 2.8 3.8 5.1
Annual passenger distance / staff (thousand) 186.2 484 221.5 213.8 257.1
Annual vehicle distance / staff (thousand) 5.1 6.2 10.7 7.9 11.5
Source: 1997 edition of the UITP Book of Urban Transport Statistics, *Imidas 1997
*The data of RATB (Bucharest) are as of 1998
*Administrarive staffs of RATBare allocated to each mode based on the ratio of number of drivers in each mode
*”Average single trip distance” is calculated by JICA Study Team
6-83
Table 6.11.11 Urban Public Transport Statistics, 1995 (Bus)
Service provider RATB GSP Helsinki City Centrewest Azienda Stadtwerke AS Oslo
Transport London Buses
City London Transporti Munchen Sporveier
Transport Buses
Organization type City owned City owned City owned Private City owned City owned
Population (million)* 2.06 1.09 0.5 6.9 1.31 1.3 0.47
Total staff (persons) 10,444 6,006 850 1,587 4,180 1,637 830
Total route length (km) 1,414 1,227 433 811 1,056 444 904
Single passenger trips per day (million) 1.3 1.904 0.255 0.288 0.972 0.517 0.11
Average single trip distance (km) 3.8 7.7 4.2 2.2 3.7 2.9 3.5
Annual single passenger trips (million) 474.45 619.7 70.7 96.56 301 160.4 34.5
Annual passenger distance (million km) 1,802.89 3,860.70 294.9 339.89 1,117.00 458.4 121
Annual vehicle distance (million km) 66.4 62.3 18.8 28.63 52.3 31.1 9.89
Staff / km 7.4 4.9 2 2 4 3.7 0.9
Staff / 1000 passenger trips 8.0 3.2 3.3 5.5 4.3 3.2 7.5
Annual passenger distance / staff (thousand) 172.6 642.8 346.9 214.2 267.2 280 145.8
Annual vehicle distance / staff (thousand) 6.4 10.4 22.1 18 12.5 19 11.9
Source: 1997 edition of the UITP Book of Urban Transport Statistics, *Imidas 1997
*The data of RATB are as of 1998
*Administrative staffs of RATB are allocated to each mode based on the ratio of numbers of drivers in each mode
*The data of “single passenger trip per day” and “annual single passenger trips” in RATB Annual Report (1998) are modified by JICA Study Team
*Average single trip distance” is calculated by JICA Study Team
6-84
6.11.4 CFRs
The privatization of railway operation was required because of the background of huge
deficits in recent years, which amounted to 900 bil. lei in 1996 and 600 bil. lei in 1997. The
former Romanian Railway National Society (SNCFR) did not receive any governmental
subsidies.
In 1998 the railway operation was in the process of privatization in Romania by the
announcement of series of a decrees and orders, which include;
- Emergency order No.12/1998
- Governmental Decree No. 581/1998 regarding the setting up of the National Company for
Railways, CFR SA
- Governmental Decree No. 584/1998 regarding the setting up of the National Society for
Railway Passenger Traffic, CFR Calatori
- Governmental Decree No. 582/1998 regarding the setting up of the National Society for
Railway Freight Traffic, CFR Marfa SA
- Governmental Decree No.95/1998 regarding the setting up of the public institutions under
the Ministry of Transport
- Governmental Decree No.626/1998 regarding the Romanian Railway Authority.
Emergency Order No.12/1998 stipulated the principal direction of reorganizing the SNCFR. It
also stipulates that the public railway transport will be organized to provide the unified,
balanced, functional system according to conditions concerning the compatibility and
inter-operability with the European rail transport system. SNCFR has been reorganized as 5
private companies.
Stepwise privatization of the CFR National Company capital is expected.
6.11.5 Others
(1) Regional Bus
Private companies operate long distance regional buses. Several or more bus companies are
commonly using the same autogara and the companies, which administer the autogara also
provide regional bus service. Those bus companies also provide chartered buses for schools,
asylums, and tourism for groups of passengers at weekends.
There were two major organizations RATB and ITA (Road Transport Enterprise) that carried
out the public bus transport in Bucharest before 1989.
Autogaras belonged to the former ITA, which had more than 2,000 buses. After 1991, 4
autogara: Filaret, Obor, Grivita, Aeroport Baneasa were managed by SC Autotrans Calatori
Filaret SA. Militari and Rahova came under respective independent management, because the
law allowed the independence of such companies and they thought that they could manage
better by being independent.
The companies that administer autogara are privatized. However the composition of the
shareholders of companies differs from one to another. The large majority of the capital is
owned by individual shareholders in the case of the Autogara Militari.
Those autogara companies own their own fleets and operate the regional bus service.
SC Autotrans Calatori Filaret SA owns 120 buses and partly operates by itself and partly lease
the buses to other bus companies for regional bus service with license under the contract. The
Autogara Militari operates 28 buses by itself.
The companies managing the autogaras are also selling the tickets for regional buses served
by other companies and they are receiving commission fees of 10% of the ticket price
(Militari).
The charge for using the autogara depends on the contract between the Bus Company and the
company administering autogara. In the case of the Autogara Militari bus companies are
6-85
charged 150.000 lei/month/bus.
Before 1997 the charge for operating regional busses without license was 3.000 lei.
The number of staff and busses belonging to each company are as follows;
a) SC Autotrans Calatori Filaret SA
- 210 staff (administration 20, exploitation 20, maintenance 50, driver 120)
- 120 buses
b) Autogara Rahova
- 13 staff
- 46 buses
c) Autogara Militari
- 100 staff (driver 30, other department 17)
- 37 buses (28 buses in operation now)
The RRA, the Romanian Road Authority (the former Department of Road Transport) of
Ministry of Transport only supervises implementation and observance of the law.
To obtain an approval for a new route, bus companies should send the files including the
operation hours, days, and route etc. to the Road Office of Ministry of Transport. If there is no
other route identical with the proposed one, the Road Office gives approval after obtaining
agreement of branch offices of Road Office located in the region where the new route will
pass.
For international routes, approval has to be obtained from the Central Road Office, Ministry
of Transport and the applicant has to obtain approval from the countries along the
international route and find a corresponding transport company in the destination country.
In order to avoid a fraud, Autogara Militari leases the vehicles to the drivers that have to pay a
certain amount of money monthly.
Though the potential of autogara is high, all of the autogaras are not fully functioning to the
extent of their potential because of relatively small transport demand. A bus can cover,
during one month, 2.000 km. This value could be doubled, but it is limited by the poor
conditions of the roads reducing the operating speed. At Autogara Militari they are covering,
with the whole fleet, 75.000 km.
6-86
vehicles;
- the documents on the drivers;
- the documents of the person in charge of the passenger transport activity management.
In order to create a company in the maxi taxi business it is necessary for the appropriate
documentation to be handed to the Romanian Chamber of Commerce and Industry.
Until now 35 commercial companies and 10 private owners are already registered in the maxi
taxi business. Their document are kept in the Transport Licenses Issuing Division.
Almost all of the companies obtained their fleets under a leasing contract, and their depots
keep such fleets ranging from 1 to 41 (the GRILL IMPEX SRL has 41 microbuses). There is
only one exception, ALLEGRO maxi taxi SA, which separated from RATB after 1989, owns
98 microbuses.
The Municipality of Bucharest carries out periodical inspections in order to check whether the
maxi taxi operators are following the regulations stipulated in HCGMB No. 163/1998 or not
and also to stop the operation by anyone without a maxi taxi business permission, with the
help of the Traffic Police belonging to Bucharest Police.
(3) Taxi
In Bucharest Municipality area, the passenger transport service by taxi can only be performed
based on transport and execution license issued by Transport Licenses Services under the
Public Transport and Traffic Safety Department belonging to Bucharest Municipality.
6-87
(4) Inconvenient Transferring
In general, transferring between transport modes supplied by different organization is
inconvenient in terms of route coordination. It is especially it is evident in the case of
transferring from metro to surface public transport, and between public transport by RATB
and other surface public transport.
No alleviation measures have been taken for the transfer of passengers between metro and
surface public transport in the existing fare system. These circumstances lead to lowering the
convenience of transferring, and to a decrease of public transport passengers, and unrestricted
use of public transport means.
In addition, transferring facilities are generally poor.
6-88
(5) Lack of Financing Resource
Public transport service requires large amounts of investment funds for the improvement of
infrastructure and facilities. For such items like the purchase of new rolling stocks or
rehabilitation of tracks Metrorex and RATB are forced to depend on funds financed by the
international organization or the fund provided by the governmental organization in charge of
administration. However such funds are sometimes insufficient and not always available.
Although the beneficiary pay principle is not only a matter of passengers but also applicable
to other beneficiaries including land users near the public transport, no clear legal frame work
has been established.
The lack of institutional and legal frame works for fund procurement is a problem.
(6) Lack of Institutional Arrangement for the Integrated Public Transport System
Well coordination of the transport master plan and land use master plan is not well geared
because of the timing of the process. For the integrated public transport system, the
institutional frame work for coordinating public transport service suppliers and integrating
public transport, is lacking.
a) Metro
- There is a route having its terminus in an industrial estate and which doesn't cover the nearly
residential area which has a large transport demand
- The interval of stations is rather long (1.463km on average) which detracts from the
availability of the metro
- Due to the lack of funds modernization of rolling stocks has been delayed.
- Due to the lack of funds, abandonment project plans and suspension of construction work
has occurred.
b) Tram
- There are some routes which pass through idle industrial land and do not correspond to the
transport demand.
- The connection of tram routes in the central area is lacking.
-Old tram cars and deteriorated tram tracks lower the operating speed and comfort of
passengers.
- Due to the lack of funds, the purchase of new rolling stocks for the modernization has been
delayed.
- Common use of road space by traffic lights disturb effective tram operation.
- Deterioration of infrastructure is proceeding due to it’s insufficient maintenance work.
- Insufficient power supply system curbs the modernization of operation.
- Chain operation with less than one-minute interval is made in some sections at peak periods.
- Total cost per passenger-km is high due to high fleet cost.
c) Trolley bus
- Operating speed is low except for trolley exclusive lane.
- Incomplete trolley routes to access the central area exist in the peripheral area.
- Operation cost is high in terms of place-km and revenue cost ratio is low compared with
other public transport modes due to unprofitable routes.
6-89
d) Bus
- Duplication of bus routes by RATB bus and other bus routes to/from autogara.
- Passenger facilities are poor.
- The roles of RATB bus, Maxi Taxi and other long distance busses are not well demarcated.
e) Maxi taxi
- The role as an area service public transport is not well performed.
f) Taxi
- Taxi meter is not always used and users are then compelled to negotiate the fare.
- The vehicles are usually old.
6-90
7. Problems and Issues
7. Problems and Issues
In this chapter, the problems identified in the previous chapters were further analyzed from
the viewpoints of urban structure, socio-economic structure, and transport demand supply
structure to clarify the causal relationship. Then based on the clarified problem structure,
the issues to be solved were identified for the project proposals in the following chapters.
These issues were stated in three sectors comprising road, public transport, and
institutional, operation and management.
In addition, the road network system lacks continuity in terms of road width and functions.
The typical features of discontinuity can be recognized at the T-shape intersections, an end of
arterial roads, missing links, etc. For example, the most serious road discontinuity is found on
the road section of Inner Ring Road at the northwest part of Bucharest, which is divided by
the railway, creating a severe traffic bottleneck. Another discontinuity is created by the
gigantic Piata Unirii and continuous buildings along the B-dul Unirii in the central area,
resulting in a long traffic barrier for the North-South direction. The discontinuity of network
is also pointed out by sidewalks. It is caused by the disorderly car parking.
Another transport network problems come from poor maintenance works. Inadequacy of road
maintenance works leads to the deterioration of road surface and causes many holes and
7-1
cracks even on the arterial roads such as Stefan Cel Mare and Mihai Bravu, which decreases
the road network capacity. On the other hand, inadequacy of tram track maintenance makes
tram speed lower, which decreases the number of passengers. As a result, poor maintenance
works make the transport network system much more inefficient.
7-2
financial situation, sufficient maintenance has not been done. As a result, the service provided
by RATB and METROREX gradually has been deteriorating.
On streets and roads car parking is a serious traffic management problem, which reduces the
traffic capacity and obstacles for both the vehicles and pedestrians. This problem is resulting
from the facts that sufficient parking facilities have not been developed and that the adequate
regulation has not been established.
The one-way system has been adopted to increase the traffic capacity, however, it has caused
other problems; vehicles are forced to make a long detour and mostly reach to the congested
intersections due to the network structure problem stated above.
Traffic signal system also has deficiencies; the signal phase is always set at a fixed pattern,
therefore, it cannot adjust to the changes in traffic pattern during the day. There are some
major intersections where a traffic signal has not been installed, result in a traffic disorder
7-3
chronically. The synchronization of traffic signals among intersections has been interrupted
due to the introduction of one way system.
7-4
comfortable rolling stocks, integration of public transport network to absorb latent public
transport demand using private cars at this moment.
Lack of market research partly due to the institutional framework and partly due to the lack of
planning tools, and lack of statistical data disturbs the realization of coordinated and planned
public transport service. The public transport routes and network are generally established
without traffic demand forecast. Therefore the network is following the existing transport
demand and it is hardly formed to induce the future urban structure.
7-5
8. Socio-Economic Development Scenarios
8 Socio-Economic Development Scenarios
Based on the 2.7% of the average future economic growth, the population in 2015 was
projected to be 2,261 thousand persons from 2,149 thousand in 1998. The motorization
rate was also projected at 259 vehicles per 1,000 persons in 2015 from 191 vehicles per
1,000 persons in 1998.
Within the first six years of post-Communist rule, the inflation rate fell dramatically, down
from 300% at the end of 1993 to 28 % in 1995. GDP grew by 1.3% in 1993, 3.9% in 1994
and 6.9% 1995. However, after that, the Romanian economy has shrunk drastically, mainly
reflecting the implementation of restrictive monetary and fiscal policy by the IMF and the
World Bank as well as the world-wide economic slump, etc. At this moment, no one knows
the future economic performance not only of Romania but also other transition countries.
Judging from Romania’s existing economic composition, industry and agriculture have
contracted in real terms and the share of services is growing but it still lags behind that of
other transition economies. The growth rate in 1997 was –6.6% and the CNP (COMISIA
NATIONALA DE PROGNOZA)made a preliminary estimate –5.5 % for the 1998 growth
rate. In addition, CNP also predicted negative growth rate of –2.0% in 1999, however,
economic growth is expected to improve to a positive growth rate of 1.0 % in 2000.
Judging from the lack of proper management and maintenance, the remaining price controls
and regulations, world-wide economic slump, etc., the Romanian economy is consider likely
to continue to decline over the next several years. On the other hand, inflow of foreign
investment, elimination of various regulations, acceleration of privatization programs,
recovery of world economy, etc. have the possibility to rapidly improve the Romanian
economy. Therefore, considering these circumstances, the following five scenarios are
considered likely for the future performance of the Romanian economy.
8-1
Scenario 3 Conservative Growth Pattern
According to “Transition Report 1996”, the past average growth rate of Eastern Europe and
the Baltics from 1992 to 1997 is estimated to be about 3.0%, therefore, this growth rate is
assumed to continue up to 2015.
8-2
As for the economy of the Study Area, no reliable data is available both for the existing
situation and for forecasting the future economic framework. Considering that the number of
population and the economic activities are concentrate relatively highly on the Study Area,
the Study Area plays an important role as a locomotive for national economic activities. For
example, the population and employment in Bucharest occupies 9% and 14.3%, respectively,
and some industrial products account for more than 50 % of the national market share. The
average industrial production, including agricultural products, has a share of 12.5% for the
whole national market. Therefore, it is reasonable that the future economic growth of the
Study Area is assumed to follow the above-mentioned national economic growth pattern, that
is Scenario 4.
Table 8.2.2 Population in Major Eastern European Countries and their Capital Cities
Country name 1992 1993 1994 1995 1996
Poland 37,879 38,495 38,549 38,588
Warsaw 1,654 1,654 1654 1643 1643
Hungary 10,374 10,294 10,261 10,205
Budapest 2,017 2,012 2,002 1,963 1,918
Bulgaria 8,948 8,472 8,470 8,433 8,402
Sophia 1,141 1,141 1,141 1,113 1,116
Romania 22,789 22,755 22,730 22,680 22,607
Bucharest 2,195 2,198 2,193 2,187 2,170
Source: World Bank Population Yearbook, Romanian Statistical Yearbook Bucharest Statistics
In the cities of the eastern European countries, the population growth is different from the
level of the completion of countries’ economic transition. As shown in Table 8.2.3, the
8-4
population growth in the capital cities in the major eastern European countries seems to
parallel with the national economic growth rate.
Table 8.2.3 Growth Rates of Economy and Population in Eastern European Cities
Name of city Bucharest Prague Warsaw Budapest
Growth rate of national economy -1.4% -2.6 2.4 -1.0
Growth rate of population -0.7 -1.7 0.7 0.0
Note: Growth rate from 1990 to 1995
Currently the population of Bucharest has been decreasing, but if the national economy
recovers in the future, the population also will begin to increase, because job opportunities
will increase due to the economic growth as explained above. Therefore, the population in the
Study area will increase keeping pace with the growth of employment necessary for the
above- mentioned economic growth. However, the much higher growth rate of around 0.7 %
like Warsaw will not be achieved, judging from the following facts:
a) Romania has one of the lowest birth rates (lower than Japan) in the world, according to
“World Development Report”,
b) The large scale migration from rural areas to the capital city will not occur because
agriculture continues to be active in the areas even hereafter,
c) The population of the whole country will also been decrease in the future according to the
population forecast by the World Bank (from 22,545 thousands in 1998 to 21,900 thousands
in 2015).
Considering the above, the future population is projected based on consideration of the
growth of the number of active population by the above-mentioned economic growth pattern,
decrease of unoccupied population, past trend of the number of pupils and students, and the
ratio of active population to total population. As a result the future population was projected
at 2,128 thousand persons in 2003, 2,158 thousand persons in 2008, and 2,261 thousand in
2015. The population in 2015 grows 1.05 times compared with that of 1998. Therefore, The
average growth rate from 1998 to 2015 results in 3 % per annum. Considering the past
population growth in eastern European countries, this growth rate should be reasonable.
However, since the population growth keeps pace with the economic growth, the growth rate
of each period is 0.02 % between 1998 and 2003, 0.08 % between 2003 and 2008, and 0.72 %
between 2008 and 2015. Table 8.2.4 shows the future population projection.
8-5
8.3 Projection of Working Population
The future working population in residential place and work places is projected with the
economic growth pattern as mentioned above. The former is shown in Table 8.3.1 and the
latter is shown in Table 8.3.2. The both total growth rates are assumed to be same, however,
the growth rate of each industry was determined, considering the growth rate of past three
years. In 2015 the number of working population in residential and place in work places
reach 1,063 thousand persons and 1,132 thousand persons, respectively. Looking at the
working population by industry, the tertiary sector was projected to account 60.0% and 61.8%
in 2015. On the other hand, the secondary industry will decrease to 37.6% and 35.9%.
Table 8.3.1 Future Number of Working Population in Residential Place
Year 1998 2003 2008 2015
Industry Persons % Persons % Persons % Persons %
Primary 30,908 3.7 30,142 3.5 26,392 2.8 25,270 2.4
Secondary 338,213 40.0 349,570 40.1 370,801 40.0 399,645 37.6
Tertiary 477,058 56.4 492,884 56.5 530,837 57.2 637,713 60.0
Total 846,178 100.0 872,596 100.0 928,030 100.0 1,062,628 100.0
Projection by Study Team
8-6
9. Urban Development Pattern
9. Urban Development Pattern
The urban development pattern was examined for three alternative development
patterns. The intensive multi-centered development pattern was selected. Based on this
development pattern, the future population and working population were allocated in each
traffic zone. More population was assigned to the zones outside the central area rather than
in the central area.
9.1 General
In this chapter, a proposed urban development pattern is presented. The working process is as
shown in Figure 9.1.1.
Basic Policy and Objectives
for Urban Development
Selection of
Intensive Multi-centered
Development Pattern
Characteristics of the
Distribution of Population/
Employment in the Proposed
Development Pattern
9-1
For the projection of future traffic demand, future population and employment are distributed
to each traffic zone based on the proposed urban development pattern.
9-2
9.3.1 Characteristics of Three Urban Development Pattern
(1) Problems of Uncontrolled Development Patter
Characteristics of this development pattern are described in Table 9.3.1 comparing with the
two controlled development patterns. In this development pattern, PUG will not be prepared
and various urban problems will occur. Main problems are as follows:
- Land use regulations will not be sufficiently enforced.
- Public inducement or guidance of urban development will not be implemented.
- As a result, residential areas will expand in a disorderly fashion and green areas and
agricultural lands will disappear. The work place will be mainly concentrated in the present
city center.
- Long distance “To work” trips (and “To home” trips) will increase and traffic congestion
will be accelerated.
Table 9.3.1 shows anticipated facts and problems of uncontrolled development pattern for
various aspects and corresponding planning objectives of the two controlled development
patterns.
9-4
Table 9.3.1 Problems of Uncontrolled Development and Correspondin Planning
9-5
The reasons are as follows:
Figure 9.4.1 shows location of the planned centers. Almost all proposed centers are located
within the outer ring road, except some freight-related ones located at the intersections of
radial trunk roads with the outer ring road.
9-6
x New development of Type B (low-rise houses) residential areas amounts to 373 ha in all.
Projects are located in Zones 14 (Baneasa Airport), 22 (Pantelimon), 44 (IP-IMGB), 52
(Rahova), 53 (Prelungirea), 54 (Ferentari), 55 (Rahova), 56 (Ferentari) and 63 (Giulesti) on
the fringe of the urban área
9-8
90 persons to 1,000 population (72 persons to 1,000 population in typical residential zones
on average in 1998). Zonal employment in the citywide type activity is determined by
applying assumed employment densities. Higher employment densities are applied to
zones where sub centers are planned.
Tables 9.5.1 and 9.5.2 show the planned population and employment by integrated zone.
From these tables the following is pointed out:
x Most of the increase in population will be accommodated within Bucharest and the
population of the city center will also increase. If uncontrolled, a greater, increase in
population will occur in the adjacent Ilfov, and population of Bucharest Center will
continue to decrease.
x As for the distribution of employment, working population in the secondary sector will
decrease in the center and increase on the fringe caused by revitalization of the industrial
platforms. Working population in the tertiary sector will be distributed according to
development of sub centers. As a result, distribution of employment will be leveled as a
whole.
x As most of the population and employment will be concentrated within the boundary of
Bucharest Municipality and distributed comparatively level, traffic generation and
attraction will be mainly limited within the outer ring road and shorter trips to and from
centers and residential areas are dispersed within the city.
9-9
10. Future Transport Demand
10. Future Transport Demand
The future traffic demand was forecast by the four step method. The total trip production
was estimated to reach about 1.2 times from 5,760 thousand trips in 1998 to 7,051
thousand trips in 2015. About 52% of these trips were made by public transport modes in
2015.
10.1 Method
The future traffic demand is forecast by the four step method ; First Step : projection of trip
generation and trip attraction by zone, Second Step : projection of distribution, Third Step :
modal split, Fourth Step : traffic assignment.
In the Study area four public transport modes (Metro, Tram, Trolley Bus and Bus) are
operating. Therefore, a device was made for the above Third and Fourth Steps to obtain a
more accurate traffic assignment volume for the public transport modes. In this device, the
modal split and the traffic assignment were performed on the four layer network structure
(marked “*” in Figure 10.1.1) which is composed of four networks of each public transport
mode in addition to the road network. In the modal split stage, private mode trips select the
shortest route on the road network and public transport mode trips select the shortest route on
the above complete network using public transport. The total OD table was split into the
public and the private with time and cost calculated based on the above shortest route (Trips
by “Walk”, “Bicycle” and “Motorcycle” are excluded). In the next assignment step, the trip
volume of each public transport mode was estimated under the multi-layer networks (marked
“**” in Figure 10.1.1, which are composed of public transport service routes, so that this
multi-layer networks are composed of more than 200 layers. The outline of the above
procedures is shown in Figure 10.1.1.
Future socio-economic
Urban & Transport Plan
conditions
Gravity Model
Multi-layer Network**
Traffic Assignment
10-1
10.2 Projection of Future Trip Production
10.2.1 Forecast of Car Ownership Rate
In the analysis of the person trip survey results, the average number of trips differs
considerably between the household members belonging to the car-owning households (3.3
trips per day) and those belonging to non-car owning-households (2.4 trips per day). Since the
number of passenger cars registered in the Study area is expected to increase in the future, a
model, which can reflect this difference, was examined. As a result, firstly the following
model was adopted for projecting the future car ownership rate, based on the relationship
between car ownership rate and average household income level. The future income level was
assumed to increase at the same growth rate as that of GDP presented in Chapter 8.
Ratei = ai + bi • ln (Income)
Where, Rate : Car ownership rate
Income : Average income level
i: Category of the number of cars owned by households
a, b: parameters
The estimated parameters show a good fit statistically as indicated by the correlation
coefficient in Table 10.2.1.
Table 10.2.1 Estimated Parameters
No. of cars owned A b Correlation coefficient
One car owned 0.06842 0.03642 0.8872
Two cars owned -0.06495 0.01748 0.8677
More than three cars owned -0.00771 0.00262 0.9680
Non car ownership 0.89058 -0.03586 0.9023
Since the number of passenger cars registered in the Study area was 352,612 vehicles in 1998,
the future number of vehicles registered privately was forecast to increase by 1.42 times
(501,086 vehicles) in 2015. If including vehicles owned by offices (16.1% of the total
passenger cars is owned by offices), the total number of vehicles becomes 584,698 vehicles.
The population and households in 2015 are estimated at 2,260,910 persons and 858,109
households, respectively, therefore, the number of passenger cars per 1000 persons and per
household are 221.6 vehicles and 0.58 vehicles except the office owned vehicle, respectively.
If including office owned vehicles, the above figures become 258.6 vehicles and 0.68 vehicles,
respectively. This motorization rate does not amount to that in most west European cities,
however, it becomes close to that in east European cities.
10-2
(2) Trip Production
From the trip production rate by purpose and by car ownership obtained by the person trip
survey, the future trip production was projected. The future trip production by car owners was
estimated at 5,307,631 trips from 2,891,660 trips in 1998 and that of non car ownership was
also estimated at 1,743,602 trips from 2,868,826 trips in 1998. As a result, the total trips was
estimated to reach about 1.22 times of the present total trip production (5,760,486 trips) as
shown in the following Table 10.2.3.
In 2015 about 75% of the future trips will be made by persons belonging to car owning
households. According to the result of the person trip survey, these persons make about 40%
of their trips by cars. If this situation continues in the future, about 35 % of the total trips will
be made by cars (about 28% in 1998).
Gi = ai + bi • X1 + ci • X2 + ci • X3 + ···················
Aj= aj + bi • X1 + cj • X2 + cj • X3 + ···················
The explanatory variables such as X1, X2, X3, etc. are shown in Table 10.3.1. The estimated
parameters are shown in Table 10.3.1. These modes show the statistically good fitness except
for “Business” and “Other” purpose trips, since the number of these trips is not so many and
scattered randomly among OD pairs .
10-3
Table 10.3.1 Parameters of Trip Generation and Attraction Model
Trip purpose Model Correlation
coefficient
Car owner
To work Gi = 299.4492 + 0.00466 • Pop +0.690425 • Wh2 + 2.403444 • Wh3 0.9862
Aj = 67.79855 + 1.10194 • Ww2 + 2.19022 • Wwt 0.9936
To study Gi = 51.87528 + 0.04313 • Pop + 0.428540 • Sch 0.9797
Aj =-315.3819 + 0.57745 • Pop 0.9739
To shop Gi = 231.7637 + 0.07269 • Pop + 0.170525 • Wh3 0.9472
Aj =-416.8745 + 0.02915 • Pop+ 0.442277 • Wht 0.8381
For private Gi = 292.7327 + 0.22196 • Pop + 0.075363 • Sch + 0.021696 • Wht 0.9105
Aj = 60.11770 + 0.06696 • Pop+ 0.263668 • Wht 0.8809
For business Gi =-282.0203 + 0.06981• Pop + 0.153524 • Wwt + 0.001086 • Ww3 0.9521
Aj =108.65840 + 0.09090 • Wwt+ 0.119861 • Wh3 0.7405
Other Gi =-71.12247 + 0.02781 • Pop + 0.003484 • Scs 0.007325 • 0.8317
Aj = 10.34192 + 0.00838 • Pop+ 0.013483 • Sch +0.019835 • Wwt 0.7491
To home Gi =-1405.804 + 0.1052 0• Pop + 0.406453 • Scs + 2.413089 • Wwt 0.9726
Aj =-321.3052 + 0.56871• Pop + 0.179924 • Scs + 1.850684 • Wht 0.9855
Non car
Gi = 300.0183 + 0.02813 • Pop +1.319518 • Wht 0.9834
owner Aj = 279.7697 + 1.13592 • Wwt + 0.26305 • Ww3 0.9791
To work Gi = 137,8090 + 0.00780 • Pop + 0.435218 • Sch 0.9799
Aj =-144.5660 + 0.49413 • Scs 0.9673
To study Gi = 0.142835 + 0.06393 • Scs 0.8766
Aj =-645.3203 + 0.08019 • Pop+ 0.392882 • Wh3 0.7761
To shop Gi = 224.7026 + 0.20636 • Pop 0.9245
Aj =-581.6173 + 0.07711 • Pop+ 0.144684 • Scs + 0.196713 • Wht 0.9069
For private Gi =-127.5487 + 0.01914 • Wwt + 0.211872 • Ww3 0.8557
Aj =-211.9950 + 0.04850 • Wwt+ 0.123339 • Wh3 0.8823
For business Gi =-138.3391 + 0.02939 • Pop + 0.002178 • Sch 0.8675
Aj =-124.1603 + 0.02106 • Pop+ 0.036664 • Wwt 0.9119
Other Gi =-960.8963 + 0.23992 • Pop + 0.203797 • Scs + 1.742608 • Wwt 0.9403
Aj = 1121.593 + 0.67284 • Sch + 0.483661 • Wh2 + 3.596772 • Wh3 0.9709
To home
Where, Pop : Population
Wh2 : Number of workers of secondary industry in residence place
Wh3 : Number of workers of tertiary industry in residence place
Wht : Number of total workers in residence place
Ww2 : Number of workers of secondary industry in work place
Ww3 : Number of workers of tertiary industry in work place
Wwt : Number of total workers in work place
Sch : Number of students and pupils in residence place
Sch : Number of students and pupils in work place
Note : Variables used in “Caw owner” represent persons belonging to the car owned households and those used in “ Non car
owner” represent persons belonging to the non car owned households.
10-4
10.4.2 Inter-Zonal Distribution Model
The gravity type model was adopted to forecast the inter-zonal trip distribution. The model
and parameter are indicated in Table 10.4.1. Using future trip generation, trip attraction and
OD distance, the future trip distribution was estimated as shown in Table 10.4.2 and 10.4.1.
(Car owner)
To work -3.023115 0.4918121 0.4717053 -0.3732137 0.8810
To school -0.171864 0.3643706 0.3094105 -0.3723804 0.7389
To shop 0.7894210 0.2575826 0.3554094 -0.5705703 0.7324
For private -.0484770 0.3230427 0.3068116 -0.2791359 0.6725
For business 1.3834460 0.2805181 0.2060866 -0.0087466 0.5716
Other 2.2472680 0.1808911 0.1984748 -0.1941417 0.6190
To home -5.077220 0.5732604 0.6049877 -0.6169508 0.8484
10-6
10.5 Modal Split
10.5.1 Model Building
(1) Modal Split Model for “Walk” Trips Including Motorcycle and Bicycle
The above OD table by trip purpose was split into transport mode. Before performing the
modal split, the volumes of trips by trucks and rail were projected by the uniform rate of the
future economic growth rate, since the number of these trips is very small (almost 1% of the
total trips) . Excluding these trips, firstly “Walk”, “bicycle”, and “motorcycle” trips were split
by the following model:
The estimated parameters are shown in Table 10.5.1. The correlation coefficient shows more
than 0.800, which is considered to be passable, statistically.
Table 10.5.1 Parameters for Modal Split Model for “Walk” Trips
Type A b Correlation coefficient
Car ownership 1.456464 0.070917 0.8482
Non car ownership 0.68159 0.126744 0.8117
(2) Modal Split Model for Private Car and Public Transport Mode
This model was examined basically by introducing two explanatory variables, that is, the time
difference and the cost difference between private car and public transport, considering
persons choose a more convenient mode when they take trips. However, the model with these
two variables did not show a good statistical fit. The reason was considered to be that the cost
of public transport is not so different depending on the travel distance, on the other hand, the
cost of private car becomes higher as the trip length becomes longer. Then the model was
reconstructed by introducing dummy variables by discriminating trips by trip length as shown
in the model below. With this model, parameters are estimated as shown in Table 10.5.2.
10-8
Table 10.5.2 Estimated Parameters for Modal Split Model between
Private Car and Public Transport Mode
D1 D2 D3 b c R
Car Owner 0.11924 0.13781 0.08869 0.01258 0.05242 0.7681
Non Car Owner 1.16713 1.18458 1.18961 0.08323 0.19996 0.7239
From the above parameters, the time value was estimated 24,996 lei/hour for persons
belonging to the car owning household and 14,414 lei/hour for persons belonging to the non
car owning household. Comparing this value with the person trip survey results, the former
was 20,671 lei/hour and the latter was 13,137 lei/hour. Therefore, the estimated parameters
are considered reasonable. Incidentally in the income approach method by per capita GDP,
the time value was estimated at 936 lei/hour (GDP in 1998 is 370,645 billion, total population
is 22,490 thousand persons, and 1760 working hours per year). If the population is limited
only to the working population, the time value is estimated at 23,716 lei/hour.
Table 10.5.3 Future Demand for Public Transport and Private Car
(Unit:Trips)
Existing Do Nothing Case
Transport Mode
No. of Trips Share No. of Trips Share
Public Transport 2,976,670 51.6% 3,021,944 42.9%
Passenger Car 1,642,543 28.5% 2,492,400 35.3%
Truck 237,114 4.1% 329,399 4.7%
Others 909,273 15.8% 1,207,491 17.1%
Total 5,765,600 100.0% 7,051,234 100.0%
With this future OD table, the future road traffic volume was forecast by assigning this OD
traffic volume to the existing road and public transport network. Figure 10.5.1 shows the
existing traffic volume and the traffic volume of “Do Nothing Case”. Compared with the
former volume and the latter volume, major trunk roads such as B-dul Nicolae Balcescu, B-
dul gh. Mageru, B-dul Lascar Catargiu, Sos. Colentina, B-dul Eroilor, B-dul Iuliu Maniu,
Dorobanti, etc will become heavily congested in the future. Therefore, the following issues
are pointed out:
a) If the Municipality does not take any measures regarding transport in the future, the
number of private car trips will drastically increase and the number of public transport
users will remain at the existing level.
b) The increment of private car use will increase the road traffic congestion.
c) The decrease of public transport users makes the financial position worse and the
established public transport infrastructure will become idle.
d) Some measures to decrease private car users and increase public transport users is desired
in the near future.
10-9
11. Transport Master Plan Formulation
11. Transport Master Plan Formulation
In this chapter the process of forming the transport master plan is described. First, the
planning policy for the master plan was established, then transport network pattern
alternatives were examined, and the alternative combined with the Ring Road
Reinforcement Pattern and the Multi-modal Axis Pattern was selected. The urban
transport master plan was formulated based on this alternative.
11-1
- Improvement of the quality of public transit services
Strategy 6: To promote inter-modal use of multiple transport modes
- Promotion of the park and transit-ride
Strategy 7: To establish a hierarchical structure of public transport modes
- Improvement of metro lines expected to have a large volume of users
- Improvement of tram lines expected to have a medium volume of users
- Endowment of metro and tram with the same high ranking
Strategy 8: To prioritize the use of roads by the type of user
- Giving first priority to pedestrians and cyclists, second to public transit, third to
freight transport, and last to private cars
- Introduction of related required measures such as bus lanes, truck routes and
truck time, and prioritized signal control
Strategy 9: To establish and improve the performance of the road network
- Construction of ring roads, missing links, and grade-separation at important
intersections
- Improvement of the control system of traffic signals
Strategy 10: To introduce a Traffic Management System
- Restraint of the inflow of cars to the city
- Introduction of parking management policies in the city center
Strategy 11: To improve the financing position of public transport entities
- Introduction of an ear-marked fuel tax, PFI and BOT scheme
- Examination of integrated operation and management of public transport modes
- Establishment of a revenue system based on the beneficiary pays principle
- Reconsideration of subsidy policy
- Decrease in fare evasion rate
Strategy 12: To improvement the institutional system
- Improvement of the institutional arrangements for an integrated public transport
system
- Institutional improvement for the integration of transport plans and land use
plans
11-2
The intensive multi-centered development pattern was proposed as the future urban structure.
Many kinds of centers should be developed to influence the direction of the urban structure.
In order to nurture the centers, appropriate transport network development is essential. Radial
trunk and circular transport are both necessary for major centers and sub-commercial centers.
With regard to the road network outside of the Inner Ring Road, there are no links required at
present. Only the improvement of some intersections will be necessary. When considering the
future changes in terms of total demand and the traffic pattern, the necessity of some other
road development arises. One such development is a ring road (Middle Ring Road) situated
between the Inner Ring Road and the Outer Ring Road. This ring aims to bring into the new
development poles and simultaneously substitute some functions of the Inner Ring Road. The
other roads to be considered are the radials connecting the central area with the dense
residential zones located outside the Inner Ring Road. Taking the growth of car ownership
into account, the widening of existing radial roads might be required. However, in case a
11-3
public transport system is planned to be developed in the corresponding corridor, it might be
strategically better not to widen those roads in order to better promote public transport usage.
2) Metro
Metro is expected to serve as the main public transport means in the future trips for work,
study and business in the urban transport system because of its high transport capacity,
operating speed, punctuality and high safety.
3) Tram
Although tram is inferior to metro in terms of transport capacity, operating speed, punctuality,
and safety, it is superior to diesel bus regarding transport capacity and environmental impacts
(i.e., emission) and superior to metro regarding construction cost. Therefore, tram is assumed
to be utilized as a trunk public transport means and well coordinated with general road traffic.
This is particularly relevant to the Bucharest Metropolitan Area since its historically dense
tram network enables immediate utilization of these assets for the formation of a public
transport network. Tram is assumed to be used as trunk public transport mode for person trips
for work, to study and or business together with metro.
4) Trolley Bus
Trolley bus has the disadvantages of a relatively large amount of energy consumption per unit
of transport capacity compared with tram and a large investment cost for infrastructure
without any discernable difference in transport capacity compared to the of bus. However,
because of the environmentally favorable conditions of low noise and no local air pollution,
trolley bus routes for access to the business area and for transport within the business area
utilizing existing infrastructure are assumed
5) Bus
Bus is assumed to take care of i) the public transport demand above that utilizes individual
transport modes (e. g. taxi) and ii) the public transport demand requiring feeder service to rail
public transit.
11-4
corresponding road capacity by setting several screen lines illustrated with green lines in
Figure 11.2.1. The comparison table is summarized in Table 11.2.1. As a result, the screens
where the traffic demand exceeds the road capacity are as follows.
a) The screens IR-N1, MRN1, MR-N2: indicating that the network capacity from the center
toward the north falls into shortage.
b) The screens IR-W2, IR-S1: indicating that the network from the west to the center at the
entrance point becomes insufficient.
c) The screens CA-N1, CA-E1, CA-S1, CA-W1: indicating that the capacities for all the
directions around the central area will be insufficient.
d) The screens S-NE1, S-NE2, S-NE3 : indicating that the capacity along the Inner Ring at the
northeast will not be sufficient.
e) The screens OR-N1, OR-W1, OR-S1: indicating that the capacity of the suburban roads for
the north, south and west becomes insufficient.
11-5
DVRXWKZHVWQRUWKHDVWSXEOLFWUDQVSRUWFRUULGRU'UXPXO7DEHUHL&ROHQWLQD
b) circular direction of northeast quadrant in the area between inner ring road and outer ring
road.
The public transport volume and capacity analysis was made for links and corridors based on
the result of traffic assignment of future transport demand (planned) on the existing network.
This analysis showed that the following directions of the public transport network should be
improved.
Formerly 8.5 passengers per sq.m on board was applied as a maximum passenger density of
the public transport means for planning in the Bucharest Metropolitan Area. However 6
passengers per sq.m. is adopted now to provide more comfortable public transport service in
the "Ground Public Transport Strategy until 2000 and 2010" (May, 1998, Bucharest Public
Transport Administration). In this study this standard was also applied for the estimate of the
transport capacity of public transport modes.
11-8
11.2.4 Constraints for Planning
(1) Possible Investment Frame in Transport Sector
1) Road Sector
The total amount of the national budget for 1999 was 93,384 bil. lei including 2,000 bil. lei
for the Special Road Fund.
The budget of Bucharest Municipality for 1998 was 2,666,5 bil. lei and the share for the road
sector was 218.4 bil. lei, (15.5 mil USD) less than 10 % of the budget. This amount seems
rather low for the new road sector projects. Provided that new institutional frame work
introduced, the elastic budget constraint was considered for the formation of alternatives.
11-9
preservation zone (central historical zone) was proposed.
Other than the above, parks and open space (green areas) are also considered as providing
urban values. Those zonings were taken into account in the process of formulating
alternatives.
11-10
Table 11.2.4 Alternative Road Network Cases
Alternative
Development Concept Development of Roads and Intersections Remarks
Pattern
-Completion of Inner and Outer Ring Roads.
-Establishment of Central Circulation Road
-Improvement of the connection roads
between
Development is made Inner Ring Road and the Central Circulation Assuming the following:
for: Road -Although public transport
(1)Radial And -improving the -Construction of Middle Ring Road oriented policy is taken, the
Ring existing problems -Construction of North-South road in the traffic demand of private
Formation -meeting the future central area vehicles will increase in both
Pattern traffic demand growth -Autostrada Access Roads (widening of major directions for radial and ring
for both radial and radial roads in the suburban area in axis.
circular directions correspondence to the traffic demand)
-Grade separation of major intersections along
Inner Ring Road
-Grade separation and widening of problem
intersections
Assuming the following:
-Public Transport
development in radial axis
(A drastic public transport
improvement is expected in
-Missing link of Inner and Outer Ring Roads terms of travel time, network
Development is made -Establishment of Central Circulation Road frequency etc.)
mainly for : -Construction of Middle Ring Road -Excessive parking
(2) Ring Road
Reinforcemen
-improving the -Grade separation of major intersections along facilities will not be
existing problems Inner Ring Road prepared in the central
t Pattern
-meeting the future -Grade separation and widening of problem area.
traffic demand in intersections -The traffic demand of
circular direction private vehicles for the
center will not increase
significantly owing to the
public transport in radial
axis.
11-11
(2) Public Transport
Alternatives are made for the establishment of the public transport master plan network from
the following view points :
- The structure of the public transport network is basically defined by the concept of how the
trunk public transport network and service level will be provided by metro and tram which
can form the trunk public transport.
- Feeder transport will be provided in the peripheral areas of Bucharest because the built-up
area of Bucharest is only about 6 to 7 km in radius, and the future urban structure is also
assumed to be densely inhabited and compact.
- For improving the profitability of metro, which requires a high investment cost, measures to
expand service areas, such as construction of new metro stations or improvement of feeder
transport modes by surface transport, should be considered.
- Abolition and integration of routes should be the primary direction of network in the
sections where metro and tram co-exist or are expected to co-exist in the future. However,
the supply of plural or overlapping public transport modes also should be considered based
on the future transport demand and for shaping the urban structure.
- Tram routes should be segregated from automobile traffic. However in case expansion of the
number of vehicle lanes is limited because of the existing building conditions along the road,
alternative roads should be considered to secure sufficient road capacity for vehicles.
- As a soft strategic plan for improving reliance on public transport by providing a more
convenient transferring system, introduction of a common ticketing system based on a zonal
system shall be considered.
- Regarding the regional bus network, dispersed bus terminals through the integration and
relocation of existing bus terminals will be arranged. Regarding the city bus network,
transfer functions at major transport nodal points such as Gara de Nord will be intensified to
improve passenger convenience when transferring.
- Existing plans which were already prepared by responsible organizations were respected in
the planning process and projects for which budgets are already secured were adopted as the
initial condition for planning.
Metro
- The following 6 new routes were proposed based on future public transport demand and the
proposed future urban structure:
nM4 (Gara de Nord – Laromet)
nM5 (Drumul Taberei – Str. Traian)
nM6 (Str.Traian – Colentina)
11-13
nMR4 (Nicolae Grigorescu – Linia de Centura) (4.8 km, 4 stations)
nMR1 (Aviatorilor - Baneasa) (alternative route)
nM4 (Eroii Revolutiei – Gara Progresul) (4.774 km)
- Taking account of the present situation, that is, the long distance between metro stations (1.5
km on average) which prevents metro from attracting more passengers, 8 new stations will
be constructed on the M3 line and other lines near the central district.
Tram
- Abolishment of tram routes which are located on the same routes as metro.
n(Laromet - Clabucet)
n(Cartier Damaroaia – Bd. Bucurestii Noi)
n(Complex Titan – Piata Titan)
n(C.F.R. Centura Jilava – Sura Mare)
n(Pasaj Colentina – Str. V. Lscar)
n(Piata Victoriei – Bd. Tineretului) (Inner Ring Road)
- Tram route will be relocated from Sos. Progresului to Sos. Panduri and extended to Intr.
Rotativei.
- Construction of new tram routes to re-link existing tram routes in the central district.
nPiata Unirii area
nStr. V. Parvan
nStr. Traian
nStr. Grozavesti – Gara de Nord area
- New tram routes connecting to metro stations will be provided to cope with the transport
demand around the proposed middle ring road.
n(Depoul Alexandria – C.F.R. Progresul)
n(C.F.R. Progresul – Piata Sudului)
n(Faur Poarta 4 – Bd. Basarabia)
n(Intr. Rotativei – Bd. Armata Poporului)
Trolley Bus
- Because of their favorable effect on the environmental conditions, existing trolley bus routes
that access the central district will be preserved and a circular route in the central district
will be formulated by utilizing existing infrastructure.
- Trolley bus routes located independently in the peripheral area with low passenger transport
demand will be abolished.
n(Strand Straulesti - Clabucet)
n(Complex Pajura – Bd. Bucurestii Noi)
n(V. Ialomitei – Str. Sibiu)
- New north-south trolley route will be introduced in the area where no metro service is
available.
n(Piata Sudului – Blvd. Aerogarii)
11-14
middle capacity rail transit public transport system.
- Rehabilitation and construction of new tramway will perform improvement in the service
level of tram operations, as well as introduction of segregated tracks and high performance
trains.
Metro
- The following 2 new routes were proposed based on the future public transport demand and
the proposed future urban structure.
nM4 (Gara de Nord – Laromet)
nM5 (Drumul Taberei – Piata Universitatii) (The construction project of the section
of M5 line was already approved by the Romanian Government).
Tram
- Tram route will be relocated from Sos. Progresului to Sos. Panduri and extended to Intr.
Rotativei.
- New north - south tram routes will be introduced in the area where no metro service is
available.
nStr. Servanescu - Piata Unirii
- Construction of new tram routes to re-link existing tram routes in the central district.
nPiata Unirii
nStr. V. Parvan
nStr. Traian
nCalea Mosilor - Str. Nerva Traian
nStr. Grozavesti – Gara de Nord area
- New tram routes connecting to metro stations will be provided to cope with the transport
demand around the proposed middle ring road.
n(Drumul Taberei - Depoul Alexandria – C.F.R. Progresul)
n(C.F.R. Progresul – Sos. Oltenitei)
n(Faur Poatra 4 – Bd. Basarabia)
Trolley Bus
- Because of their favorable effect on environmental conditions, existing trolley bus routes
that access the central district will be preserved and circular route in the central district will
be formulated by utilizing existing infrastructure.
n(Piata Sudului – Piata Unirii)
- Trolley bus routes located independently in the peripheral area with low passenger transport
demand will be abolished.
n(Strand Straulesti - Clabucet)
n(Complex Pajura – Bd. Bucurestii Noi)
n(V. Ialomitei – Str. Sibiu)
- New north - south trolley route will be introduced in the area where no metro service is
available.
n(Piata Sudului – Piata. Unirii)
The public transport network alternatives are illustrated in Figures 11.2.5 through 11.2.10.
11-15
11.2.6 Selection of Alternatives
(1) Combination of Alternatives
As mentioned above, two road investment plans and two public transport improvement plans
were identified as shown 11.2.11.
5DSLG7UDQVLW$[LV3DWWHUQ
Public transport net work road network Existing public Rapid transit axis Multi-modal
transport network pattern axis pattern
Existing road network No nothing case —
Radial and ring formation pattern Alternative 1 Alternative 2
Ring road reinforcement pattern Alternative 3 Alternative 4
11-22
Comparing each Alternative with the Do Nothing Case, the numbers of the trips by the public
transport modes increases, on the other hand, the number of trips by private vehicle cars
decreases. Among the four Alternatives, the highest rate of public transport was shown by
Alternative 2 and the next was by Alternative 4.
Figure 11.2.11(1) to Figure 11.2.11(4) show the road traffic volume for the above four
Alternatives. Under these four Alternatives, the road traffic volume and pattern do not show a
large difference, however, comparing these figures of the Existing Case with the Do Nothing
Case, the roads from north to south, the inner ring road, the road to north-east show a decrease
of traffic volume. On these roads, the traffic congestion to decreases below almost 1.0.
VOC saving and time saving are shown in Table 11.2.7. Among the four Alternatives,
Alternative 4 shows the most VOC saving, and Alternative1 together with Alternative 3 shows
the most Time saving.
11-23
(3) Economic Cost Estimation
The Project cost was estimated as shown in Table 11.2.8. Alternative 1 requires the highest
cost (2,598.7 million-dollar), on the other hand Alternative 4 requires the least cost (1,587.7
dollars). In order to evaluate the project package from the viewpoint of the national economy,
it is necessary to convert the project costs from financial costs to economic costs. Since the
economic evaluation in this Section is performed approximately, the cost of each project
package is converted into economic cost by just subtracting value-added tax included in each
project cost, from the financial cost. The tax rate is set at 22% uniformly since the
value-added tax is 22% in Romania.
(4) Calculation of Benefit
1) VOC Saving Benefit and Time Saving Benefit
Benefits from each project package mainly consist of Vehicle Operating Cost Saving Benefit
(VOC Saving) and Time Saving Benefit (Time Saving). These benefits were calculated by the
following equation:
Time Value
Data was obtained from the results of the Person Trip Survey.
- Metro Users : 15,498 Lei/h
- Trolley Bus Users : 12,094 Lei/h
- Tram Users : 15,498 Lei/h
- Bus Users : 13,325 Lei/h
- Private car Users : 20,671 Lei/h
- Truck users : 17,806 Lei/h
11-26
Operating Cost
Data was obtained from the official statistics published by RATB and METROREX.
- Metro : 459 Lei/km
- Trolley Bus : 304 Lei/km
- Tram : 297 Lei/km
- Bus : 516 Lei/km
Table 11.2.9 shows the estimated benefit for each alternative. Alternative 3 generates the
highest benefit of 8,623 million lei.
11-27
Table 11.2.10 Environmental Evaluation of Master Plan Alternative
Alt.1 Alt.2 Alt.3 Alt.4
CO2 (t/day) Nox (kg/day) CO2(t/day) NOx (kg/day) CO2(t/day) NOx (kg/day) CO2(t/day) NOx (kg/day)
Public 34 139 25 108 34 140 27 109
Private 1,304 2,243 1,305 2,244 1,271 2,185 1,275 2,192
Freight 516 2,104 514 2,096 521 2,124 520 2,119
Total 1,855 4,486 1,845 4,448 1,827 4,450 1,822 4,421
A comparison study was conducted on the basis of the above-mentioned evaluation items.
The criteria for the evaluation are: IRR is more than 12%, B/C is over 1.0 and NPV is positive.
As shown in Table 11.2.11, Alternative 4 was evaluated the most viable Alternative, since
every indicator shows the highest economic evaluation. The integrated evaluation of the
Master Plan is explained in Chapter 14 in more details.
11-28
11.3 Transport Master Plan
11.3.1 Formulation of Transport Master Plan Network
The selected alternative (the combination of the ring road reinforcement pattern and the
multi-modal axis pattern) was understood to satisfy the panning principles set in this Study. It
was necessary to examine further and modify individual networks and projects for the
detailed formulation of the Master Plan.
The urban transport master plan was formulated according to principles outlined below.
a) To Reinforce the Skeleton Transport Network in Accordance with the Form of the Future
Urban Structure.
nThe ring roads such as the central circulation road, inner ring road, middle ring road and
outer ring road will be completed. Metro line M4 (1 May - Laromet), part of line M5
(Drumul Taberei – Universitate - Str. Traian) and line M6 (Str. Traian - Obor) will be
constructed as the main public transport radial axes.
nThe tram network will be improved as radial axes of public transport together with metro.
Tram routes will form two circumferential routes (the inner ring and the middle ring).
Cross center linkage of tram will be improved.
nA new type of tram will be introduced on the radial and ring trunk roads that do not have
Metro lines as additional axes of public transport.
11-29
11.3.2 Transport Demand on Master Plan Network
(1) Modal Share
According to the calculation of transport demand using the Master Plan Network, the public
transport share is estimated at 66.8 % (of the total of public and private transport modes). This
figure is essentially the same as the existing public transport share of 67.6%, and it is much
higher than the 45.2% share in the Do-Nothing case. These results demonstrate that the
Master Plan Network is able to bring about reduced dependence on private car use and serve
as a model to realize the goals of a public transport priority policy.
Table 11.3.1 Summary of Future Traffic Demand Crossing Ring and Radial Roads
Item Central area Inner ring road Middle ring road Outer ring road Radial road
Existing
Capacity(pcu) 821,600 1,146,800 1,469,200 579,000 1,421,800
Volume(pcu) 599,039 660,981 839,094 319,881 953,994
V/C ratio 0.73 0.58 0.57 0.55 0.67
Public transport(pax) 708,047 979,966 875,906 85,145 1,170,785
Do nothing
Capacity(pcu) 821,600 1,146,800 1,469,200 566,000 1,421,800
Volume(pcu) 973,005 1,207,907 1,430,475 488,386 1,536,007
V/C ratio 1.18 1.05 0.97 0.86 1.08
Public transport (pax) 637,949 883,235 797,144 86,259 1,054,573
Master plan
Capacity(pcu) 818,800 1,155,600 1,501,200 616,000 1,335,800
Volume(pcu) 616,865 733,237 964,124 440,709 1,155,247
V/C ratio 0.75 0.63 0.64 0.72 0.86
Public transport(pax) 709,252 1,043,475 1,074,758 124,171 1,137,487
The future traffic assignments on the Master Plan road network and the Master Plan public
transport network are shown in Figure 11.3.4 and Figure 11.3.5, respectively.
11-33
12. Road Sector Plan
12. Road Sector Plan
The road sector plan, which is a part of the Master plan stated in the previous chapter is
described in this chapter. Firstly the road transport policy for Bucharest is explained, then,
road network development plan, traffic management plan, and other related facilities plan
are proposed based on the road transport policy.
12.1 Road Transport Policy
When preparing the master plan in Bucharest, it is important to pay attention to the following
suggestions extracted from past experience in other European cities.
In Bucharest, the vehicle ownership is still comparatively low, however, the present tendency
seems to be following the same lines as other major European cities, namely the increase of
car traffic is not limited and continues to grow owing to changes in the car market conditions
which are brought about by the progress of the market economy. This may contribute to
increasing the personal mobility of the car users, but on the other hand, will lead to decreasing
the importance of public transport in Bucharest, which is not sustainable in the long term in
the sense of managing increased traffic demand and maintaining environmental quality. As a
12-1
result, Bucharest, also, has a high potential to face the same problems as other cities
mentioned above.
As already shown in the previous chapter, the result of the traffic forecast in the “Do Nothing
case” shows that traffic demand exceeds the capacity at many screen lines. Particularly, in the
central area, there will be a shortage of road capacity for all directions.
As a consequence, it is highly important to establish a well balanced package plan comprising
not only road development but public transport development as well as traffic restriction
measures.
The further reinforcement of public transport is a pre-requisite for guaranteeing the transport
capability and at the same time for a reduction in environmental pollution from vehicles.
In the road sector, therefore, the master plan will be developed from the following viewpoints.
(1) Firstly, a well arranged road network is required for handling the essential private traffic
and keeping through traffic away from the densely populated area. This is not intended to
simply increase the capacity to match the traffic demand, but essentially for formulating
the skeletal network which is incomplete at present. Otherwise it is obviously difficult to
provide space for developing public transport and introduce traffic restriction measures
supporting public transport priority policy.
(2) Secondly, various traffic management measures are required to realize a more effective
use of the limited road space in order to create a smoother traffic flow, increase the
traffic safety and improve the urban environment. Traffic management measures include
the improvements of intersections, parking restrictions, traffic signals and the application
of intelligent transport systems etc.
(3) Application of restriction measures for private vehicles will be definitely necessary for
avoiding foreseeable further congestion and environmental deterioration. As the traffic
restriction measures, in general, limit the vehicle use in certain areas or at certain times,
they should be accompanied by the provision of alternative transport means by developing
public transport or diversion roads.
Among the various traffic restriction measures, parking restrictions should be considered
at first, since vehicle parking in the central area has already become one of the main
problems in Bucharest and there are many successful results in other European cities.
Pricing strategy on parking in the central area is also worthwhile to discourage vehicle use
and long stay parking. If it is found to be insufficient to achieve the objectives, other
measures such as an increase in fuel tax, road pricing etc. should be additionally examined.
(4)Parking restriction in the central area is closely related to how to use the limited road space,
which should be more attractive for non car users, particularly for public transport users
and pedestrians. The conditions for pedestrians, which are continuously deteriorating due
to the growing demand for space for vehicular traffic, should be drastically improved.
12-2
12.2.2 Road Projects
The major projects given in the Master-plan road network are as follows.
12-5
As the Central Circulation Roads, the following roads are considered; Traian/ B-dul Dacia/
Mircea Vulcanescu/ Berzei/ Petriceicu Hasdeu/ Calea Septembrie/ B-dul Libertatii/ Mitropolit
Nifon/ B-dul Marasesti.
- Traian
The road width is mostly narrow at present. Widening to a 4 lane road and the improvement
of alignment at the connection point with B-dul Dacia will be required.
- B-dul Dacia
The road has 4 lane width, -then further widening will not be necessary if some traffic
management is applied such as parking restriction at road side or improvement of one way
system etc..
- Mircea Vulcanescu
The carriage-way width is only about 10 m, thus a widening work is required for about 500
Meters in length.
- Berzei
This is also a narrow street with tram lines at the center. Widening for about 1 km is required.
- Petriceicu Hasdeu
The width should be widened to accommodate 4 lanes. The road is proposed to be extended to
Calea 13 Septembrie crossing through the land site of Parliament House by constructing a
new road.
- Mitropolit Nifon/ B-dul Maraseti
This is a road with 2 lane width linking between P-ta. Cosbuc and P-ta. Libertatii. Hence, it is
proposed to be widened to a 4 lane road.
Since the P-ta.Cosbuc is a multi-leg intersection with large traffic volume, some improvement
of the intersection will be required. It is proposed to restrict the traffic inflow from the minor
crossing roads other than Mitropolit Nifon and B-dul George Cosbuc by changing them to one
way streets.
(3) Connection Roads between Central Circulation Road and Inner Ring Roads
The purpose of the connection roads is to reinforce the bypass function of the central
circulation roads by strongly connecting with the Inner Ring Road. They are also expected to
act as main radial roads at the same time.
As for the connection between Central Circulation Road and Inner Ring Road, the following
roads should be improved to 4 lane roads.
- Mircea Vulcanescu
This is a connecting road between B-dul Dacia and Cotoroceni. The Constantin Noica, which
is the section flanked by the Cotroceni and Milcea Vulcanescu, is wide enough to
accommodate a 4 lane carriageway, thus the widening of Mircea Vucanescu to 4 lanes will be
effective for realizing a smooth flow from Iuliu Maniu to Dacia.
- Berzei
Berzei should be widened to 4 lanes for the section connecting Calea Grivitei, which is an
arterial road towards Bucarest Noi.
- Extension of Hasdeu
Hasdeu should be extended as a 4 lane road up to the Intersection Cosbuc/ Tudor
Vladimirescu by using the carriageway of the existing street Uranus. This extension will be
not only a connection between, the Central Circulation Road and Inner Ring Road but also an
alternative traffic route in the N-S direction. Widening and improvement of alignment will be
required.
- Extension of Marasesti
Marasesti is a 4 lane road and is a part of the Central Circulation Road. This road should be
extended from P-ta Libertatii to the Inner Ring Road at the southwest. A candidate route is
12-6
along Constantin, which is a 4 lane road facing the Pepsi Cola Co.. The road Istrati linking
Pta Cosbuc and Constantin is now under construction. Hence improvement work is required
only at P-ta. Libertatii in order to secure smooth traffic flow from Marasesti to Istrati.
Another route is along Fabrica de Chibrituri, which is a parallel road to Constantin. This road
is proposed to be upgraded and extended to the intersection Ferentari/ Salaj.
1) Existing Condition
There are some road sections to be used as a part of the Middle Ring Road. They are as
follows;
- North-western part of the Ring : Brasof/ Virtutii/ Crangasi/ Turda/ Alex Averescu/ C-tin
Prezan (about 8 km in total length)
- Eastern part of the Ring : Chisinau/ Nicolae Grigorescu (about 5 km in total length)
- South part of the Ring : Luica/ Turnu Magrele (about 3.5 km in total length)
These roads have more than a 4 lane carriageway, therefore, widening will not be required.
2) Proposed Plan
The Middle Ring Road will be completed as a 4-lane arterial road by constructing missing
road sections connecting the existing sections above. The new sections to be constructed are
as follows;
- Northeast section: between Str. Barbu Vacarescu and B-dul Chisinau (5.48km)
- Southeast section: between B-dul Pallady and Sos.Vitan Barzesti (3.45km)
- Southwest section: between Sos Giurgiului and Str.Brasof (6.91km)
To accommodate the traffic demand in 2015, a 4 lane carriage-way will be sufficient.
12-7
width , but the land is reserved.
The Str. Compozitorilor is proposed to be extended to the Inner Ring Road by improving the
existing road space. The length to be widened is 1.26km. The planned width is 4 lanes.
(7) Access Roads to Autostrada
As the access road to Autostrada, the following two roads are proposed to be developed. As
for the other Autostrada, access roads are not necessary for the target year 2015, judging from
the future traffic demand. The traffic inflow from the other Autostrada will be dispersed by
connecting with either the Ring Expressway or the Outer Ring Road.
- Construction of an access road to Autostrada for Brasof with 4 lanes.
- Construction of an access road to Autostrada for Constanta with 4 lanes.
The road projects are summarized in Table 12.2.1 and Figure 12.2.3.
12-8
Table 12.2.2 Proposed Road Projects
Total Existing Planned No. Widening New Construction
No. Project Length No. of of Length Length (km)
(km) Lanes Lanes (km)
Inner Ring Road 0.48 0 4 0 0.48
1
(Basarab Passage)
Inner Ring Road 3.53 0 4 0 1.02
2 (West part) 2 4 0.39 0
Inner Ring Road 3.18 0 6 0 0.24
3
(Southwest part) 4 6 1.17 0
Inner Ring Road 2.90 0 6 0 2.90
4
(South part)
Widening of 1.90 2 4 1.90 0
5
Str.Traian
Widening of Mircea 1.27 2 4 1.27 0
6 Vulcanescu
Widening of 1.46 2 4 1.46 0
7
Str.Berzei
8 Extension of Hasdew 0.60 0 4 0 0.60
Widening of 1.80 2 4 1.80 0
9 Marasesti /
Mitropolit Nifon
Repavement / 4.63 0 6 0 2.95
10 Widening of Calea 2 4 0.69 0
Grivitei
Extension of 2.01 0 4 0 1.05
11 Marasesti 2 4 0.96 0
Extension of 1.26 0 4 0 0.36
12
Compozitorilor 2 4 0.90 0
Middle Ring Road 5.48 0 4 0 2.56
13
(Northeast) 2 4 2.37 0
Middle Ring Road 3.45 0 4 0 1.83
14
(Southeast) 2 4 1.62 0
Middle Ring Road 6.91 0 4 0 6.49
15
(Southwest) 2 4 0.42 0
Brasof Autostrada 9.62 0 4 0 9.62
16
Access road
Constanta Autostrada 5.00 0 4 0 5.00
17
Access road
Outer Ring Road 0.70 0 2 0 0.70
Missing link
18
Widening & 74.29 2 2 74.29 0
Rehabilitation
12-9
16
13
10
1
6
7
2
5
12 8
9
3
11
17
18 4 14
15
12-10
- For this purpose, each road should be reviewed whether or not the roadside can be used as a
parking space. At the same time, off-street parking facilities are also to be developed.
- For encouraging the public transport use, the traffic demand into the central area is managed
by restraining the total number of parking spaces. Other restriction measures such as demand
control during peak hours may be difficult to apply, judging from the situation in other
European cities. The increase of public transport will be rather realized by improving the
public transport system itself to become more attractive to users.
- At present there are several one-way roads where a bus lane is installed in the opposite
direction. However, the expansion of the bus lanes will not be appropriate. The reasons are
that the road width is not sufficiently wide to allot a lane exclusively for buses and that the
bus and trolley bus are defined as a feeder service, which does not need such high speeds as
the trunk line services.
12-11
mass media so as to prepare people’s minds for the prevention of illegal parking. It is
desirable to set up a special section for parking regulations in the Traffic Police.
ü
ü
ü
ü
ü
ü
ü
ü
3DUNLQJ5HVWULFWLRQ$UHD
3DUNLQJ)DFLOLWLHV
ü 3XEOLF7UDQVSRUW
12-13
parking at not-arranged space to the total on-street parking is found to be approximately 50%.
If this ratio is applied, the on-street parking at not-arranged space is calculated as about
14,000 veh/day. In case of work and home trips, most of the vehicles require the parking
spaces continuously for the day time, however, in case of other purpose trips, the vehicles
may not need the parking spaces for many hours.
According to the Person trip survey, the average parking duration is 2 to 3 hours for such
purposes. Tentatively assuming that the turnover ratio is 5 for the trips other than work and
home, the number of existing parking demand in the central area is calculated to be about
10,000.
In the future, the total number of trip ends by private vehicles in the central area is estimated
to increase as much as 17% in the trend case, namely an increase of about 53,000 vehicle trips.
Accordingly, the parking demand in the central area is also expected to increase by the same
growth rate.
As far as the public transport oriented policy is pursued, vehicle usage should be restrained
and public transport use encouraged in the central area. Therefore, it is not desirable to
excessively develop parking facilities. On the other hand, the vehicles restricted to park in the
central area should be left in legal parking spaces at least in the short term because of the
reasons stated above.
As a consequence, it is proposed to develop parking facilities to meet the existing demand and
not to expand them any more to meet the future demand growth.
Accordingly the following parking facilities are proposed to be developed in the central area.
a. Off-street parking facilities such as parking building, underground spaces :
approximate total capacity of 5000 vehicles
The candidate sites are the underground of P-ta.Unirii, Bdul Balcescu, and the interrupted
construction sites of numerous buildings , where parking buildings can be developed.
b. On-street parking spaces arranged by the Street Administration Office :
approximate total capacity of 5000 vehicles
The candidate sites are mainly roadside or deadend spaces of minor streets in the central
area.
The roadside spaces of some broad streets with low traffic, such as B-dul Natiunil Unite,
B-dul Libertatii etc. are also considered as candidate sites.
All the parking should be charged irrespective of on-street or off-street. A tariff system should
be established so as to discourage long stay parking like commuters, but not to levy
excessively high charge on residents, by introducing special permits.
For outside the central area, parking facilities are proposed to be developed at the adjacent
areas of terminals and the fringe areas of the parking restricted area for encouraging “park and
ride”.
The former are those at metro or tram stations at the peripheral area of urbanized areas such
as Lalomet, Pipera and the terminal station of M4 line etc. The latter are those at the fringe
area of the central district, from where frequent public transport services to the city center are
provided.
12-14
(1) Razoare/Drumul Taberei
The traffic from Drumul Taberei into the intersection is very heavy, on the other hand the
number of tramcars from/to Timisoara to/from Progresrui is extremely high. As a result, the
intersection is congested throughout the daytime. According to CPU (Urban Planning Center) ,
a new metro line is planned to be constructed between Pta.Universitati and Drumul Taberei.
The route is already decided to use Regina Elizabeta- Kogalniceanu- Eroilor- Dr.Bagdasar-
Razoare- Drumul Taberei. Hence, CPU has an intersection improvement plan that heavy
traffic will be drained directly from Drumul Taberei to Eroilor by constructing an underpass
together with the new metro line. It can be an effective solution for the congestion.
Accordingly the plan will be included in the master plan. The only the problem anticipated
will be congestion at the entrance point to the underpass on Dr. Bagdasar. Sufficient width
with adequate length should be secured, otherwise, serious weaving problems can be
expected.
(2) Mihalache/Turda
Because of the narrow width for both the roads, Mihalache and Turda , the traffic congestion
is quite serious. As the road Turda constitutes a part of the Middle Ring Road, Turda should
be widened to construct an underpass for the through traffic prior to the completion of the
Middle Ring.
(4) Pta.Obor
The traffic disorder is mainly caused by the crossing movement between the vehicle traffic to
the underpass and the tram lines. According to the CPU, the Municipality has determined a
plan to relocate the tram lines to the center of the underpass at the ground level. This plan is
also incorporated in the Master Plan.
(6) Muncii
The problem is similar to Pta.Obor, therefore, the Municipality will take the same
countermeasure as Pta. Obor as stated above. This will be also included in the Master plan.
12-15
12.3.4 Traffic Signal Improvement Plan
(1) Improvement of Signal Phase
As stated in Chapter 5, the signal phases are set at a fixed pattern at each intersection.
They are generally adjusted to maximize the capacity for the peak hour traffic. However, the
phases at some intersections are not appropriately adjusted for such traffic because of the
changes in traffic flow pattern. Since the traffic signal system at present is not capable of
adjusting to the hourly traffic variation, it is proposed that the readjustment should be made
for the peak hour traffic first, then be improved to be able to cope with the hourly variation at
the second stage since some new controllers or detectors might be required for some
intersections.
As the improvement does not require large investment, it can be started immediately. The
candidate intersections are the congested ones pointed out in the previous section.
(2) Installation of Traffic Signals
There are 240 signalized intersections at present in Bucharest. The Municipality of Bucharest
has a plan to additionally install traffic signals at more than 200 intersections. Among them,
68 intersections are given higher priority with implementation aimed by the year 2000.
There is no definite criteria for whether a signal should be installed or not. As an empirical
data, traffic signals should be installed when the traffic inflow into the intersection exceeds
650 vehicles/hr. in urban areas and 1000 vehicles/hr in suburban areas. However, it is difficult
to use traffic volume uniformly as a criterion, though it is easy to obtain. For example, the
degree of congestion may differ due to the frequency of pedestrian crossings, even when
traffic volume is the same.
Other empirical data in the USA indicate that a signal will be necessary when the average
queue becomes four vehicles or more during the peak hour. However, if there is a big
difference in traffic volume between the two crossing roads, this empirical data will not be
applicable. The necessity of signal installation , therefore, should be examined one by one by
referring to the above criteria.
In Budapest, there isn’t a sufficient number of traffic signals exclusively for pedestrains.
Accordingly, their installation is proposed for areas where frequent pedestrian crossing is
expected, such as central area, commercial zones etc..
12-17
traffic management, electronic toll collection system, assistance for safe driving, support for
emergency vehicle operations etc..
Among others, the study team recommends the adoption of the following components for
Bucharest city; -public transport supporting system and information services for drivers.
In order to realize the above systems, the following facilities and equipment are required.
12-19
a. Facilities for Data Collection
The information on the road traffic is collected through the following facilities.
- Vehicle detectors to be installed at road side
- CCTV camera for traffic control to be installed at road side
- Telephone lines at road side
Sensor
Tram
12-20
12.4 Other Road Related Facilities
12.4.1 Street Environment Improvement in the Central Area
The central area is the busiest area in the city, since various urban facilities are concentrated
there such as government offices, banks, hotels, commercial facilities etc.. Accordingly, the
traffic densities for both vehicles and pedestrians are also high. However, the street
environmental condition is not attractive when compared to other major cities in Europe;
-space for pedestrians as well as green zones are not sufficiently provided, most roadsides are
occupied by parked vehicles, the historical buildings are not well maintained. In addition,
people are always disturbed by dust, noise and emission gases from the incessant vehicle
traffic. In order to improve these environmental conditions, the following package program is
proposed in the central area. The development concept is illustrated in Figure 12.4.1.
a. Establishment of a pedestrian network
b. Improvement of the urban landscape
c. Development of urban greenery, street amenities
(1) Pedestrian Network
The pedestrian network is not complete even in the central area. There are intersections with
no clear pedestrian crossing. Some parked cars disturb pedestrians. Facilities in consideration
of the mobility of the handicapped have not been prepared.
As the most important factor of the program, the pedestrian network in the central area
including the historical core should be strengthened. The network covers the area surrounded
by B-dul Magheru, B-dul Dacia, Carea Victoriei, Stirbei Voda, Schitul Mageanu, and Splaiul
Independenti. Numbers of shops and hotels and cultural facilities, together with buildings of
exceptional architecture are located in this area. On the arterial streets, not only should
parking on the sidewalk be eliminated, but the sidewalk itself should be widened by
restricting car parking at the roadside. For this purpose, parking facilities should be developed
off-street. At the same time, the vehicular traffic should be restricted on the connection streets
between the arterial streets to create a safe and comfortable pedestrian environment.
There is a pedestrian mall on Lipscani street, where the street is reserved only for pedestrians
with block pavement and illumination in the historical zone. This mall should be extended to
Calea Victoriei to establish a pedestrian network. For this reason, Calea Victoriei should be
also improved by expanding the pedestrian space on both sides of the street. The pedestrian
network will link all the places of interest in the central area such as the Uniri area, Lipscani
mall, Pta.Universitati, museums, hotels, restaurants and shops along B-dul Magheru, Calea
Victoriei, and Cismigiu park.
12-21
Figure 12.4.2 Pedestrian Priority Street Plan
12.4.2 Truck Terminal - Distribution Center
There are no public or collective truck terminals in Bucharest. Each company or organization
has its own truck terminal individually. Such large truck terminals are located on or around
the outer ring road. Some of them are located in the urbanized area. The scale varies from
small size to hundreds of heavy trucks.
Conceptually the present condition whereby freight is carried into the built-up area piecemeal
can be improved by establishing a public distribution center located at the area adjacent to
industrial zones near the intersection of the truk national roads and the outer ring road.
Figure 12.4.3 and Figure 12.4.4 show a conceptual plan for introducing such a distribution
center.
The distribution center aims to enable more effective truck movement and reduce the
transport cost by enabling the common use of trucks. Several distribution centers are proposed
to be established along the Outer Ring Road. The main functions of the distribution centers
are as follows:
- Unloading/loading of the freight from/to the long haul trucks at the center
- Classification of the freight by destination
- Storage of the freight at the warehouse at the center
- Loading/unloading of the freight to/from short haul destinations
12-23
7UXFN
Figure 12.4.3 Flow of Commodities - Location of Truck Terminal : Present and Plan
Office
Storage
Railway,Trailer,
Unloading Transshipment
Large Truck Loading Small Truck
Truck Terminal
Office
Storage
Railway,Trailer,
Unloading Manufacturing Loading Small Truck
Large Truck
12-24
12.5 Road Project List
The projects for the development of roads and related facilities are summarized in Table
12.5.1. The projects are composed of roads and intersections, development of parking
facilities and restricting parking, traffic management improvement including traffic signals,
street environment improvement and freight terminals.
Table 12.5.1 Project List for Roads and Related Facilities
No. Project Name Contents
Road R1 Inner Ring Road (Basarab) Construction
Projects R2 Inner Ring Road (west) Construction & Widening
R3 Inner Ring Road (southwest) Construction & Widening
R4 Inner Ring Road (south) Construction
R5 Str.Traian Widening
R6 Mircea Vulcanescu Widening
R7 Str.Berzei Widening
R8 Extension of Hasdew Construction
R9 Marasesti / Mitropolit Nifon Widening
R10 Carea Grivitei Construction & Widening
R11 Extension of Marasesti Construction & Widening
R12 Extension of Compozitorilor Construction & Widening
R13 Middle Ring Road (northeast) Construction & Widening
R14 Middle Ring Road (southeast) Construction & Widening
R15 Middle Ring Road (southwest) Construction & Widening
R16 Brasof Express Access Construction
R17 Constanta Express Access Construction
R18 Outer Ring Road Widening & rehabilitation
Inter-sectio CR1 Razoare Improvement Underpass
n Projects CR2 Obor Improvement Widening & Tram relocation
CR3 Munci Improvement Widening & Tram relocation
CR4 Sudului Improvement Grade separation
CR5 Pieptanari Improvement Signal etc.
CR6 Mihalache / Turda Grade separation
CR7 Mihai Bravu / Ferdinand Grade separation
CR8 Mihai Bravu / Iancului Grade separation
Traffic RP1 Parking Restriction Central Area
Manage-ment RP1 Parking Facilities (central area) Off-street & On-street
Projects RP2 Parking Facilities (Obor) Off-street
RP3 Parking Facilities (Gara de Nord ) Off-street
TM1 New Signal Installation 200 intersections
TM2 Signal Improvement Synchronization&Detectors
Signals for left turn &
Pedestrians
TM3 Traffic Control Center Related to signal control & ITS
TM4 Intelligent Transport Systems(ITS) Public transport priority etc.
Other RO1 Street Environment Improvement Pedestrian ways etc.
Projects RO2 Freight Terminal Development 2 terminals
12-25
13. Public Transport Plan
13. Public Transport Plan
The public transport plan, which is a part of the Master Plan stated in the former chapter is
described in this chapter. Firstly the public transport policy for Bucharest is explained, then
metro development plan, tram development plan, other surface public transport
development plans, other related facilities plans, and operational and management plan
were proposed, based on the public transport policy.
13-1
(3) Improvement of Public Transport Attractiveness
The attractiveness of public transport needs to be improved by soft and hard measures to
absorb future increase of transport demand by private vehicles. Lack of the sufficient funding
resource disturbed the sufficient maintenance work for infrastructure, purchase of new rolling
stocks, etc. and lowered the attractiveness of public transport modes in Bucharest. There are
several measure types to enhance the attractiveness of the public transport modes.
2) Improvement of Comfort
The comfort of the public transport is not only a matter of rolling stock or car, but also matters
of passenger facilities and conditions of infrastructure. Those should be improved.
3) Improvement of Accessibility
Accessibility will be improved by combination of trunk public transport network formation,
supplementary public transport network formation and feeder servicing transport
improvement as stated earlier. Realization of public transport network formation should be
pursued. For this purpose missing links of public transport network should be constructed.
Transit mall is to restrict the accessibility by vehicle and to improve the accessibility by public
transport instead to the area where traffic congestion and parking problem emerge.
The para-transit public transport is significant for feeder service, however, the size of the
transporter should be carefully chosen from the economic and environmental aspects.
13-2
b) Transport infrastructure improvement measures
- Construction of cross-center linkages
- Establishment of trolley routes to the center of the city
- Construction of tram lines in circular direction (along Inner and Middle Ring
Road)
13-3
coordinated planning and implementation, and rationalization of management.
At the same time fare system should be revised to increase the revenues from passengers
because of the large number of free riders.
1) Funding resources for construction
Due to the large amount of required fund for construction and usually insufficient fare level
for recovering construction cost, it is necessary to seek the funding resources outside of public
transport management body. Currently no domestic loan for the transport projects with
favorable condition is used due to the lack of institutional scheme.
- Revision of beneficiary pay principle including indirect benefit beneficiaries and
free riders
- Improvement of institutional frame for domestic loan including two step loaning
- Flexible utilization of taxes such as vehicle relevant taxes
2) Funding resource for management
Public transport management by Metroex, RATB and other private companies are usually
operated in deficit. Though it is rather difficult to seize wholly the benefits, public transport
service other than civil minimum service should be managed without any subsidy in principle.
- Revision of beneficiary pay principle including indirect benefit beneficiaries and
free riders
- Revision of fare system
13-4
13.1.3 Arrangement of Public Transport Measures with Road Sector
(1) Consistency of the Contents of Both Plans
For the consistency of the contents of the public transport plan and road sector plan, i)
Embedding the plans and projects of public transport in the road sector planning at early
stage; and
1) Gearing the implementation of the public transport plans and projects with implementation
program of the plans and projects in road sector
should be taken account of.
In detail followings are the issues to be consistent.
a. Arrangement of transit mall with restriction of general traffic on the road
b. Introduction of Public Transport Priority System (PTPS) and introduction of
integrated traffic control system including road traffic control system
c. Establishment of segregated tracks and securing road capacity by introducing
transportation demand management measures
d. Construction of cross-center linkages by public transport modes and securing road
capacity in north-south direction
e. Improvement of transferring facilities including multi-modal transferring
terminals and reconstruction of roads
f. Construction schedule of new tram line and construction schedule of road (ex.
Basarab Overpass and Middle Ring Road)
g. Piata improvement schedule and rearrangement schedule of tram routes caused by
the road construction (Basarab Overpass)
Metro is assumed to take care of i) the transport demand between business district and
residential area as a liner type mass rapid public transport mean, ii) the transport demand
within the business district, iii) the transport demand to connect to the facilities for long
distance trips, and iv) the role to induce the future urban structure by reason of its large
13-5
influence on the formation of urban district. Out of those transport demand it is preferable
that metro serves the transport demand within the business district an area servicing public
transport means.
- accommodation to the mass transport demand between residential areas and business
district in a radial direction
- service supply within the business district without necessity of feeder transport means by
suitable distribution of stations
- connection with the transport facilities for long distance trips
- service supply between business district and urban cores
- service supply to the large public transport demand without rail transit service
- expansion of catchment area by construction of new stations and intensification of
coordination with other public transport modes
13.2.2 Projects
(1) Construction of M4 Line (1 May - LAROMET) (PM4-2)
1) Background
This line is expected to provide better access to the center of the city and industrial and
residential area in the northeastern part of Bucharest. This line was suspended after 1989
because of the shortage of the fund. However the budget has been secured by the European
st
Investment Bank and Romanian Government for the 1 section of this line (between Gara de
Nord and 1 May) and construction works were restarted. The construction of the second
section of this line is expected to enhance the efficiency of the total M4 line to expand the
catchment area.
2) Outline
"1 May - Laromet" segment has a total length of 3.1 km and 2 stations (Fig. 13.2.1).
The remaining construction works are following.
13-6
(2) Construction of M5 Line (Drumul Taberei - Str. Traian) (PM5-4, PM5-5, PM5-6)
1) Background
This line provides the link between one of the most densely inhabited areas in Bucharest
(nearly 300,000 inhabitants are living) with the downtown and existing metro network.
Currently only surface transport is provided and the expansion of public transport capacity is
required. The Romanian Government as a transport project has officially approved the section
between Drumul Taberei and Universitatii. Some geo-technical study and route study was
already made.
2) Outline
"Drumul Taberei - Str.Eroilor" segment has a total length of 5.6 km and 10 stations.
No construction work was initiated as yet. The depth of the tunnel is 8 to 20 m below the
surface level. The construction work will require more than 5 years.
" Str.Eroilor - Universitate" segments has a total length of 2.3 km with 3 stations.
This line is expected to be extended to Str. Traian as southwest-northeast public transport axis
and connected to propose M6 line between Colentina and Str. Traian.
"Universitate - Str. Traian" segments has a total length of 1.5 km with 3 stations.
2) Outline
The length of the line is 4.7 km with 4 stations.
The remaining construction works are following:
13-8
2) Outline
18 EMUs will be modernized from DC drive to AC drive asynchronous motors acted on by
IGBT inverters, using the existing bodies.
2) Outline
Assuming the average number of trains per station required number of trains is estimated at
19 trains for M4 and M5 lines. The project of 108 rolling stocks purchase for M2 line is
underway. In June 1999 loan contract between Romanian Government and EIB for the 50% of
the project cost was signed. The Romanian Government will fund the rest of 50% of the
project cost. The loan period is scheduled from 1999 to 2003. In this project introduction of
new rolling stocks is planned. The prototype will be made within 20 months and delivery of
new rolling stocks is scheduled in October 2002. Other than above purchasing rolling stocks
for M4 and M5 lines will be necessary.
13.3.2 Projects
(1) Construction of Cross-center Linkages (PTM-1, 2, 3, 4, 16)
1) Background
Existing tram routes are terminated near the center of the Bucharest and no cross-center routes
13-9
are provided. Therefore the passengers who want across the central area of the Bucharest by
tram are currently forced to change their train.
ÞÕOutline
This project provides the linkages crossing the central district of Bucharest. Three linkages, at
Piata Unirii, Str. V. Parvan, Str. Traian will be constructed. At Piata Unirii the new linkage
includes a stop at the entrance to Piata Unirii metro station. The new linkages at Str. V. Parvan
and Str. Traian will take the north-south transport demand in the west side and east side of
Piata Unirii respectively (Fig. 13.3.1 and 13.3.2).
Section Length
1 Bd. Regina Maria - Calea Mosilor (Piata Unirii) 0.72 km
2 Str. V. Parvan - Sos. Panduri 2.00 km
3 Bd. O. Goga - Calea Calarasilor (Str. Traian) 1.05 km
4 Bd. Vasile Milea - Sos. Cotroceni 0.8 km
5 Gara de Nord area 0.5 km
(2) Construction of New Tram Route along Middle Ring Road (PTM-6, 7, 8, 9, 11)
1) Background
The insufficient linkages with metro in the area near the proposed Middle Ring road hinder
the wholly efficient use of existing metro. This project will provide public transport service in
the area where relatively densely populated and no mass transit service are provided except
buses and trolleys.
2) Outline
New tram routes to connect to the metro line in the areas near proposed Middle Ring road will
be constructed. The routes will be located in the southeast and east part of Bucharest.
Section Length
1) Bd. Basarabia - Faur Poarta 4 (Bd. 1 Dec. 1918) 1.42 km
2) Depoul Alexandria - Prelungirea Ferentari 3.60 km
3) Bd. Ghencea - Depoul Alexandria 2.39 km
4) Str. Luica - Sos. Oltenitei (Str. Turnu Magurele) 3.92 km
13-10
2) Outline
This route will be delineated between Piata Unirii and Baneasa Airport along Calea Dorobanti
and Calea Victoriei. The route will be basically constructed as a segregated track. The route
length is 9.0 km transit mall will be introduced for Calea Victoriei. The objective of the transit
mall is to enhance the attractiveness of the city that should be pursued together with the
applying to the public transport demand by public transport plan in the central district as one
of the European Capital cities. Bd. Calea Victoriei on which so many high grade commercial
facilities and historical buildings are located will be served for transit mall (Fig. 13.3.3).
2) Outline
The same gauge width as existing tram will be adopted for this new tram system so that
staged improvement from ordinary tram to new tram will be possible. Supposed transport
capacity is 1,500-18,000 pax./h. direction and expected operating speed is 25-30 km/h with
500 to 1,000 station intervals. Basically the track will be constructed as segregated lane on the
road where possible. Following steps will compose the project:
a. identification of the possible routes for the new category tram based on the PT survey
b. feasibility study on the selected routes
c. detailed design of the project
d. tendering
e. construction work
Following routes are considered candidate route for new category tram system (Fig. 13.3.4)
Pasajul Colentina – Jilava 15.6 km
Granitul – Depoul Alexandria 13.2 km
Baneasa – Piata Unirii 9.3 km
Sudului - Gara de Nord 10.1 km
Pasajul Colentina – Depoul Alexandria 13.2 km
Depoul Alexandria – Sos. Oltenitei 9.6 km
Piata Presei Libere – Depoul Alexandriei 9.4 km
The feasibility study on the improvement of tram route 41 was already carried out in 1998. As
reference the summarized outline of the results is shown below.
13-13
stage I General study including definition of feasibility study, feasibility study of pilot line
41
stage II study for the definition of the light rail vehicle LRV
stage III tender documents, detailed design, building of the LRV including the test of
homologation.
The LRT system comprises segregated on concrete or wooden sleepers, 55 cm high platforms,
signaling systems at crossings with priority for light rail traffic and power traction system.
The LRT will be operated at 6 min. interval with 5700 passenger capacity per hour.
Assumed specifications of the LRT are following:
- length 37 m
- width 2.65 m
- capacity 310 passengers
- max. speed 70 km/h
- voltage DC750V
- current max.800A
- power 550 kw
- tare weight 51 t
13-16
Electric feeding network in use has following characteristics:
- simple elastic suspension and concrete pillars on sidewalk
- elastic suspension on consoles and reinforced concrete pillars on street center
- longitudinal chain network with compensation
- longitudinal chain network without compensation
44% of the network is out of the life span for normal function, which causes frequent
damages, hard maintenance and repairing efforts.
Based on these conditions "Tram Infrastructure Modernization in South-West Area of
Bucharest -Feasibility Study - ", March 1999 was carried out by RATB. Fifty percent of the
budget for the project was already secured by European Investment Bank.
2) Outline
The project aim the improvement of the tram infrastructure to enhance the operating speed of
tram, improve the reliability of operation, and diminish the hindrances to general traffic.
Following criteria for selecting the sections to be rehabilitated are adopted.
- infrastructure condition
- operating data
- other transport modes in the area
- function of the area
- capacity to implement the works
- budgetary capacity
40.5 km of the track will be replaced by segregated track to improve the operation speed of
tram. Sina 49B rail will be laid on the reinforced concrete sleepers and compacted ballast
track bed. RI59 or RI60 rail will be used for other street tracks.
- passenger facilities
All tram stations will be rehabilitated to improve accessibility, safety, and
information for passengers.
- switches and crossings
Out of 202 switches and 93 crossings in the south-west area of Bucharest, 40 switches will
be provided point machines and heating devices for good operation. RI59 rail type will be
used for all switches.
- electric power supply substations
For the improvement of capacity, spare loading, and safety, 6 new substations will be
constructed, 3 existing substations will be upgraded.
13-17
(7) Rehabilitation of Tram Infrastructure (2) (PTMR-2)
1) Background
This project is to cover other than southwest area to improve the tram operation.
2) Outline
The project aims the improvement of the tram infrastructure to enhance the operating speed of
tram, improve the reliability of operation, and diminish the hindrances to general traffic.
Segregated lane will be positively introduced in the area where possible for the future
introduction of new trams (Fig. 13.3.5).
The following criteria for section to be rehabilitated are adopted.
- infrastructure condition
- operating data
- other transport modes in the area
- function of the area
- capacity to implement the works
- budgetary capacity
The contents of the project are followings.
- track
Track will be replaced by segregated track to improve the operation speed of tram. Sina
49B rail will be laid on the reinforced concrete sleepers and compacted ballast track bed.
RI59 or RI60 rail will be used for other street tracks.
- passenger facilities
All tram stations will be rehabilitated to improve accessibility, safety and information for
passengers.
- switches and crossings
Switches will be provided point machines and heating devices for good operation. RI59
rail type will be used for all switches.
- electrical power supply substations
For the improvement of capacity, spare loading, and safety, new substations will be
constructed and existing substations will be upgraded.
- DC cable network
Aluminum DC cables will be changed to decrease maintenance cost and energy losses.
- AC cable network
A part of medium voltage cable network will be replaced to apply 20 kV instead of 10 kV
Further this project is supposed to be timely implemented with Public Transportation
Priority System (PTPS), the one of the new ITS technologies.
2) Outline
The total length of proposed route amounts to 31.4 km. Assuming the average distance
between stops is 500 m, the necessary new stops will be 65. Assuming the average number of
tramcars per station is 0.5, required number of trains is calculated as 65.
13-19
13.4 Other Surface Public Transport Plan
13.4.1 Development Direction
(1) Trolley Bus
Trolley bus has the disadvantage of relatively large amount of energy consumption per
transport capacity compared with tram and disadvantage of large investment cost for
infrastructure without any discerning difference in transport capacity of bus. However because
of environmentally favorable condition of low noise and no air pollution, trolley bus routes for
the access to the business area and transportation within the business area utilizing existing
infrastructure stocks are assumed.
- establishment of circular route to apply the transport demand within central district
- maintaining of access routes by utilizing existing infrastructure stock
- abolishment of unprofitable routes located in the peripheral area
(2) Bus
Buses should take care of the public transport demand which is not served by rail public
transit as feeder public transport to the rail public transit.
The following should be provided ;
- improvement of accessibility to the metro stations and tram stations as feeder transport
- service supply to the area where no rail transit service is provided
- service supply as regional transport
- service supply between major intermodal points for long distance bus, urban transport bus.
13.4.2 Projects
(1) Construction of Trolley Bus Route to Central Area (PTL-1)
1) Background
The environmental effect by the trolley buses is relatively superior to other surface transport
modes concerning noise, vibration, and air pollution. The existing trolley bus network is at
favorable location to access the center of the city. However some trolley routes are located
independently to serve as feeder transport mode to other surface transport modes. New route
alignment to access the center of the city by utilizing existing asset of power supply network
and secure the isolated low profitable routes is preferable.
2) Outline
The new line is to be constructed between Piata Sudului and Piata Unirii with the length of
4.67 km connecting to the existing trolley routes 73, 74, and 76.
13-20
Transport means with relatively small impact on the environment with respect to pollution and
noise is desirable. Introduction of electricity bus or minibus or utilization of existing trolley
route is preferable.
2) Outline
The section between Gral Magheru and Bd. Elisabeta (1.8 km) on the Calea Victoriei and
missing link near Gara de Nord will be served for trolley bus network for the establishment of
circulation route. In case of mini bus or electricity bus the route delineation will be similar to
trolley bus circulation route passing the Calea Victoriei via the Gara de Nord area.
These route are considered to be the alternative public transport means for tram route on the
Calea Victoriei which is expected to be served as transit mall (Figure 13.4.1).
Multi-modal facility is assumed to serve the transferring among bus, long distance bus, and
taxi, metro. Connection with rail and tram is also considered if location allows. As pointed out
existing bus terminals of RATB and long distance bus are located in the peripheral area of the
Bucharest. The facilities of most existing bus terminals become decayed and the transfer is not
convenient. This multi-modal facility provides more convenient transfer for passengers near
the center of Bucharest. It will be possible for public transport passengers more easily to
choose the transport mode to their destination at this multi-modal facilities and the
rectification of public transport routes are also expected. The concept of multi-model transfer
is shown in Figure 13.5.1 and 13.5.2, and the destination is shown in Figure 13.5.1.
Feeder service inter-modal point is assumed to apply the public transport demand between
residential areas and business district by rail transit and feeder bus.
Figure 13.5.1. shows schematic location of inter-modal facilities and its related bus services
13-22
13.5.2 Projects
(1) Improvement of Multi-modal Facilities
The important locations for multi-modal facility, which will include a regional or long
distance bus terminal, are described in Table 13.5.1.
Among them, Gara de Nord, Obor and Sudului haave been selected as the most important and
feasible for urgent improvement.
Table 13.5.1 Characteristics of Major Multi-modal Facility
- Connection metro, tram metro metro, tram metro, tram metro, tram
with public (trolley) trolley trolley trolley
transport railway railway
- Parking facilities to be to be to be to be to be
constructed constructed constructed constructed constructed
- Commercial Unirii Dep. Store - Buzesti Market Market Obor Market
Facilities
- Future Urban central district central district urban core urban core urban core
Structure
- Site acquisition Relocation of
railway facilities
will be required.
Coordination with CFR
2) Obor (PTR-2)
Multi-modal transferring facilities will be developed.
There is possibility that the tram should run in the center and over the metro, which will
improve the transfer among RATB and the side roads of Blvd. Mihai Bravu will be widened.
Underground pedestrian network should be formed using the basement 1 level parking,
however it will require lowering the existing underpass with excavation, of which work
magnitude would be large.
Considering large parking demand, underground parking under Sos. Colentina and/or Plaza in
front of Halele Centrale Obor.
13-25
(2) Improvement of Inter-modal Facilities
Inter-modal points are located on the cross point of rail transit (metro and tram) and the
proposed middle ring road. The locations are selected utilizing existing Autogaras and RATB
bus terminals.
The important transferring points are the followings:
- Str. Doamna Ghica
- Complex Titan (to be moved to the metro station)
- CFR Progresul
- Auto Gara Rahova (Depoul Alexandria)
- Cart. T. Vladimirescu
- Lujerului
- B-dul N. Grigorescu
- Piata Charles de Gaulle
Other than above major transfer points also exist at the nodal point of public surface transport
modes.
Shop
Concourse Concourse
Concourse Concourse
Pr esent Improvement
(For example : Pacii)
Figure 13.5.4 Improvement of Metro Concourse and Pedestrian Network
13-26
The development schemes of plazas connecting to metro station are following (Table 13.5.2).
13-27
Table 13.5.2 Improvement Scheme of Plaza (Metro Station)
Completion of Improvement
Use of part of Underground
underground of surface Underground
Place existing shopping Taxi stand Remarks
pedestrian pedestrian parking
building arcade
network network
13-28
(3) Passenger Facility Improvement (PTR-6)
1) Tram Stop / Island
The width of the island is too narrow to cope with the passengers in peak hours. The freezing
and snow covered island is rather dangerous. It would be better to widen the island providing
with a shelter for passengers. The typical section is shown below. Clear sign with information
of Line Number, destination, and time schedule should be attached.
6TCO
5JGNVGT
RTQRQUGF
O
However a wide island will decrease the number of lanes of roadway, which would cause
traffic jam. The connection to pedestrian crossing is not satisfactory in many cases.
In order to improve the convenience and safety for the passengers, modification of the design
will be necessary.
2) Bus Stop
The major points to be improved are as follows:
- The information is not clear and insufficient. The replacement to the new signs should be
expedited, in which time schedule or operation interval, contact points (telephone number
etc.) should be attached. The new type shelter should have the indication of number of lines
stopped, as only advertisement is displayed in the existing ones and the number of lines are
indicated in the previous type.
- Illumination should be provided at dark stops.
- Shelters should be provided as much as possible in such a severe winter climate.
- RATB network map should be displayed in busy areas.
- Pedestrian network should be completed for traffic of pedestrians connecting stops,
sidewalk, and pedestrian crossing.
13-29
13.6 Operating Projects
13.6.1 Development Direction Operation and Maintenance
The existing institutional and operational problems have been considered in some detail in
preceding chapters. They may be summarised as follows:
After the regime of the market oriented economy, competitiveness and privatisation is
promoted in transport service market. Those changes are observed in the transport service
market in terms of expansion and diversification of the market. Those changes are
conceptually expressed as the transition from the non-competitive service supply with grace
subsidies to the autonomous and privatised service supply in the broader market in Bucharest
Metropolitan area. The problem in transport sector is in a sense ascribed to the lack of new
scheme for the transport market due to the remainder of the former socio-economic scheme.
Those specific scheme and more common scheme of the transport problems are combined
together resulting in the present transport problems in Bucharest Metropolitan area.
The objective of the operation and management plan is to address these problems.
The direction of operation and management plan of public transport focused on the
institutional arrangement and legal frame, and competition and privatization in the transport
market.
13.6.2 Projects
(1) Introduction of Common Ticketing System (POM-1)
1) Background
Common ticketing system is designed so that public transport passengers can utilize the
several public transport modes by only one common ticket after the integration of fare and
ticketing system of each public transport mode within city or metropolitan area. This system
is commonly observed in European large cities.
The basic scheme of the system is following:
a) participation of pubic transport service suppliers including metro, bus etc. to the new fare
ticketing system
b) adoption of common fare system such as flat fare system or zoning fare system
c) pooling of revenues from ticket sales
d) distribution of revenue according to the certain rule consented
13-30
b) decrease in the operating cost by simplification of ticket checking system
For the introduction of common ticketing system in Bucharest Metropolitan area decrease of
number of fare evaders and information on accurate number of public transport passengers of
each public transport mode will be essential. In case of zoning fare system information on
origin zone and destination zone will be also necessary.
The support by new advanced technology will be helpful for collecting the information on
public transport passengers' movement.
Although Metrorex has adopted the magnetic card, which allow only to collect the
information on origin station of metro passengers. The ticketing system of RATB depends on
the manual ticket selling and checking system with some inspectors. Existing ticketing system
adopted RATB has following drawbacks.
- No sufficient statistical data concerning the origin and destination of passengers.
- High rate of fare evasion is not controlled.
- Attractive and flexible charging system can not be implemented.
- Due to the lack of statistical data on the passenger travel demand no useful exploitation of
network, and integrated operation among public transport modes are allowed.
RATB is now promoting to introduce automatic ticketing system called "SINTAX 2000".
2) Outline
For the improvement of the transparency of the operation new cost accounting system will be
essential. This system reveals the real cost of the operation of each route or depot, with the
help of devices. The information of real number of passengers, the consumption energy,
operating time, and other relevant information are immediately collected and analyzed.
2) Outline
Training courses for the staffs of public transport service supplier and responsible
governmental agencies will be performed on the site or at school. The lecturers are supposed
those from private companies and public transport operators with successive performances in
the countries .
13-31
Table 13.6.1 Project List (Public Transport)
13-32
14. Evaluation of Transport Master Plan
14. Evaluation of Transport Master Plan
The Master Plan was evaluated from the viewpoint of the economy, finance and
environment. The economic analysis shows the Master Plan is feasible, but the
procurement of the project cost is a little difficult. No environmental problems will occur
even after the Master Plan projects are implemented.
Since the above costs are financial costs, for performing the economic evaluation, these costs
should be converted into the economic cost from the viewpoint of the national economy. The
converted economic cost is indicated in Table 14.1.4.
14-1
from the Master Plan projects was estimated at 15,584.5 million lei per day as shown in Table
14.1.2.
Table 14.1.4 shows the economic cost and EIRR of major project groups. All project groups
show higher value of IRR than 12.0%, therefore, every project recommended in the Master
Plan can be judged to be viable. The public transport project group indicates better value of
IRR (19.2%) than that of the road project group (16.5%) in spite of the lager amount of
investment, which suggests the importance of the improvement for the public transport
system.
14-2
14.1.4 Sensitivity Analysis
The sensitivity analysis was done for the following four cases to examine the economic
viability depending on the change of the project cost and project benefit; (1) Decrease of
project benefit, (2) Increase of project cost, (3) Decrease of the value of leu, (4) Decrease of
the number of trips.
For the above four cases, each value is assumed to change at the rate of 5%, 10%, and 20%
up to 2015 in the direction of deteriorating the values of economic indicators. For the
sensitivity analysis of the foreign exchange rate deterioration, the foreign portions of road-
related-project cost and public transport project cost are assumed to be 20% and 50%,
respectively. The result is indicated in Table 14.1.5, which shows the Master Plan is feasible
for the factor variations of 5% - 20%.
14-3
Table 14.1.6 Saving of Fuel Consumption for Vehicles
Item Private car Truck Bus Total
A. Existing Running km (1,000 km) 8,660 2,440 233 11,333
B. Do nothing km (1,000 km) 16,177 3,800 260 20,237
C. Master Plan km (1,000 km) 14,297 3,427 217 17,941
D. Type of fuel Gasoline Diesel Diesel
E.. Running distance per litter (km/l) 7 3.5 3.5
F. Existing fuel consumption (1,000 l) 1,237 697 66 2,001
G. Do nothing fuel consumption (1,000 l) 2,311 1,086 74 3,471
H. M/P fuel consumption (1,000 l) 2,042 979 62 3,083
I. Saved fuel per day (1,000 l) 269 107 12 387
J. I/G 0.217 0.153 0.184 0.194
K. Saved fuel per year (kl) 98,023 38,940 4,453 141,417
This huge amount of investment in public works increases the GDP through the demand
generation effect, and, will increase the welfare of citizens. With the past five years’ data of
GDP and public investment for infrastructure, the following relationship was estimated by
regression analysis:
From the above equation, it is understood that one leu investment for social infrastructure
makes GDP increase 2.63 lei, as a result, 36,538 billion lei investment will totally push up the
GDP by 96,094.8 billion lei until 2015. Since the GDP in 1998 is 370,645 billion lei, this
increment (equivalent to 25.9% of 1998 GDP) cannot be said to be small. Therefore, this GDP
boost will become one of the factors to develop the Romanian economy.
14-4
Table 14.2.1 Fund Procurement Candidate
Ministry of Foreign
Project Municipality Third Sector BOT RATB METROREX Private
Transport Loan
Road Project
Road Improvement
Inner Ring Road ó ó
Middle Ring Road ó
Outer Ring Road ó
Radial Road ó
Street Improvement ó
Intersection Improvement
Razoare ó ó
Others ó
Parking ó ó ó ó
Traffic Control ó ó
Street Environment ó
Freight Terminal ó
Public Transport Project
Metro Related ó ó
Tram Related ó ó ó ó ó
Trolley Related ó ó ó ó
Piata Improvement ó
Ticketing System ó ó ó ó
The borrowing of 1,030.1 million dollars is quite large. However, the foreign loan is the
amount that it is sufficiently possible for Romania to borrow and reimburse by the following
reasons:
a) Debt service ratio is lower than the so-called risk level of 30%
At present, as shown in Table 2.1.9, the debt service ratio in Romania is only 12.1%, not
bad compared with other Eastern European countries. If the amount of 1,030.1 million
dollars is borrowed at the interest rate of 12% on the conditions that the grace period is 5
years while the repayment period is 10 years, the total repayment amount including
interests reaches about 3,200 million dollars. Assumed that the present export level will
14-5
remain in the future years, the debt service ratio will deteriorate only 4 points, which does
not exceed the risk level of 30%.
b) Ratio of cumulative foreign debt to GDP is not bad, compared with other East European
countries.
As shown in Table 2.1.9, the ratio of cumulative debt to GDP is calculated to be 24%.
Even if Romania borrows 1,030.1 million dollars, this ratio will increase only 3 points in
the future years, which is not bad compared with other East European countries (Bulgaria
110%, Hungary 62.9%, Poland 31.4%, Czecho 37.1%, Slovakia 42.1% and Slovenia
24.3%).
c) 10 % of the total borrowings can be appropriated to the transport-related projects.
Table 14.2.3 shows the share of borrowings for transport-related projects to the total
borrowings. As seen from this Table, it is possible to appropriate about 10% of the total
borrowings to the transport-related projects in 2000. According to Comisia Nationala de
Pronoza, Romania plans to borrow 2,287 millions dollars. If Romania continues to borrow
foreign loans of about 2,500 million dollars per year hereafter, about 250 million dollars
(10% of 2,287 million dollars) will be used for the transport-related projects. The estimated
yearly borrowings for transport related projects are lower than 250 million dollars as
shown in Table 14.2.4. Thus, it is expected that the borrowing of 1,030.1 million dollars is
possible.
14-6
Table 14.2.4 Estimated Necessary Transport Related Borrowings
Year 2001 2002 2003 2004 2005 2006 2007 2008
Borrowings (US$Mil.) 72.5 82.9 105.9 128.1 137.9 53.2 57.2 76.3
Accumulated (US$Mil.) 72.5 155.4 261.3 389.4 527.3 580.4 637.7 714.0
Year 2009 2010 2011 2012 2013 2014 2015
Borrowings(US$Mil. 53.2 57.2 80.0 84.7 0.0 0.0 0.0
Accumulated (US$Mil.) 767.1 824.4 904.4 989.1 989.1 989.1 989.1
Note 1:Borrowing of loan which project cost is high or construction period is long is divided into 2 to 3 terms.
Note 2: One year or two years are set to projects necessary for the detailed study.
Among projects in the Master Plan, there are some projects expected to profit like surface
parking construction. These projects should be entrusted to the private sector as much as
possible. According to the experience in developed countries, these projects seem to be
operated successfully by the private sector. Although future uncertainty and imperfection of
the legal establishment remains, it is recommended to positively entrust these projects to the
private sector through the BOT method or the third sector method. This project is limited to
parking construction projects listed in Table 14.2.5 in the Master Plan projects, of which total
cost reaches to 128.0 million dollars.
The number of paid passengers was forecast to rise from 887,147 thousand passengers in
1998 to 1,103,030 thousand passengers in 2015. In addition, after the introduction of new
ticketing system, about 25% of fare evasion for RATB and 6% of fare evasion for Metro are
assumed to decrease to a reasonable level of 5%. Therefore, until 2015 the increase of revenue
from the increment of passengers and decrease of fare evasion was calculated, which reaches
287,487 million dollars as shown in Table 14.2.6. This revenue increment should be assigned
for the proposed projects.
14-7
Table 14.2.6 Revenue Increment through Passenger Increment
and Fare Evasion Decrease
Year Metro Tram Trolley Bus Bus RATB Total Total Revenue Revenue
(1,000 (1,000 (1,000 (1,000 (1,000 (1,000 (million Increase
passengers) passengers) passengers) passengers) passengers) passengers) dollars) (million
dollars)
2003 174,005 309,699 114,081 364,338 788,118 962,123 74,910 5,838
2004 179,622 320,515 118,537 374,284 813,335 992,957 77,311 8,238
2005 185,421 331,709 123,167 384,500 839,376 1,024,797 79,790 10,717
2006 191,407 343,293 127,977 394,996 866,267 1,057,674 82,350 13,277
2007 197,586 355,282 132,976 405,778 894,037 1,091,623 84,993 15,920
2008 203,965 367,690 138,170 416,855 922,716 1,126,681 87,722 18,650
2009 210,550 380,532 143,567 428,234 952,333 1,162,882 90,541 21,469
2010 217,347 393,821 149,175 439,923 982,920 1,200,267 93,452 24,379
2011 224,364 407,575 155,002 451,932 1,014,509 1,238,872 96,458 27,385
2912 231,607 421,810 161,056 464,268 1,047,134 1,278,741 99,562 30,489
2013 239,084 436,541 167,347 476,941 1,080,829 1,319,913 102,767 33,695
2014 246,802 451,787 173,883 489,961 1,115,630 1,362,433 106,078 37,005
2015 254,770 467,565 180,675 503,335 1,151,575 1,406,345 109,497 40,424
Total 287,487
Therefore, it is recommended not to levy heavy taxes on car ownership (in order not to
deprive citizens of the pleasure to drive for recreation during summer vacation or weekends),
but to levy tax on car usage for the purpose of improving the urban transport facilities and
avoiding senseless car usage. Currently, 25% of fuel tax is imposed on the oil price. However,
it is recommended to surcharge more 10 – 15 % tax on the oil price to allocate to project fund,
which could make available 124.5 million dollars until 2015 as shown in Table 14.2.7.
14-8
(5) Use of Bucharest Municipality’ Budget
The Bucharest Municipality now allocates about 13.3% of the total revenue to the
infrastructure improvement such as road, street, etc. The Municipality continues to allocate
this money for the same purpose hereafter, however, it requires much more contribution to
implement projects proposed in the Master Plan. Therefore, it is recommended that the
Municipality increases the contribution from the existing 13.3% to the level of 15% (actually
speaking, not so high) and allocates half of this contribution to the Master Plan projects. From
this source, it is expected to generate 233.8 million dollars up to 2015, as shown in Table
14.2.8.
Table 14.2.8 Assignment by the Bucharest Municipality
Budget Road Related Availability Availability
Year
(million lei) (million lei) (million lei) (million dollars)
2003 2,942,983 441,447 220,724 14.1
2004 3,001,842 450,276 225,138 14.3
2005 3,061,879 459,282 229,641 14.6
2006 3,123,117 468,467 234,234 14.9
2007 3,185,579 477,837 238,918 15.2
2008 3,249,291 487,394 243,697 15.5
2009 3,314,276 497,141 248,571 15.8
2010 3,380,562 507,084 253,542 16.2
2011 3,448,173 517,226 258,613 16.5
2012 3,517,137 527,570 263,785 16.8
2013 3,587,479 538,122 269,061 17.1
2014 3,659,229 548,884 274,442 17.5
2015 3,732,414 559,862 279,931 17.8
3,668,846 206.6
14-9
(7) Introduction of City Planning Tax
Through the implementation of the Master Plan projects, the urban transport environment will
be considerably improved in the Study area. Especially, in the central area, traffic congestion,
emission gas, noise, etc. will significantly decrease compared with the “Do Nothing” case.
Currently, 3 million lei is imposed on 65 m2 (average size) of property on average. Aiming at
improving the living conditions of citizens, it is recommended to introduce a city planning tax
of 0.5 million lei on the property owner. If this property tax is imposed on property within the
inner ring road (residents and owners within the inner ring road are expected to receive a
significantly large benefit from the Master Plan projects), 49.2 million dollars will be
obtained, which is indicated in Table 14.2.10.
Even including the above foreign soft loans, only 1,832.2 million dollars can be procured
from the above-mentioned various fund sources, that is, 342.3 million dollars becomes the
shortfall (15.7% of the necessary cost). It is recommended to make up for this shortfall by the
following measures;
1) The introduction of a capital gains tax should be examined in the CBD and the Metro
extension area,
2) Cheaper construction methods should be applied through reviewing the construction cost,
methods, design, etc.,
3) The introduction of a special tax like the public transport tax in France should be
examined,
14-10
4) The Municipality should request the contribution from the central government and the
Ministry of Transport,
5) RATB and METROREX should make efforts to raise their income by deducing the free-
riders, rationalizing operation and maintenance, etc.
2) Estimation Formula
First of all, the total amount of emissions, in the Do Nothing case and Master Plan case, of
each substances are estimated by total vehicle kilometers, which is divided into three modes,
and speed related emission factors. Then, the balance is considered between the Do Nothing
case and the Master Plan case. If the balance is negative, it means that the Master Plan case
has a lesser amount of emissions than that Do Nothing case; hence, Master Plan has
improvement benefits. The estimation formula is shown as follows:
(Vdo x Efa) – (Emp x Efb) = Emb
Emb x Cu = Ev
Where,
Vkdo : Vehicle kilometers per day of Do Nothing case
VKmp : Vehicle kilometers per day of Master Plan case
Efa : Speed related emission factor of subject substance
Emb : Balance of total emission amount per day
Cu : Currency unit
Ev : Environmental external cost ( Benefit)
14-11
3) Speed Related Emission Factors for Different Type of Engines
Emission factors differ for different engine types and vehicle speeds as shown in Figure
14.3.1. EC carried out a study of the speed related emission factors, for a catalyst car, non-
catalyst car and deisel engine for three years from 1989-1992 in Germany , France and UK.
The detaild a reserch conditions such as engine type and engine capacity are shown in Table
14.3.1.
The nature of the emission factors is that vehicles produce higher amounts of substances at
lower speed-less than 20 km/h for both CO2 and NOx. In comparison between non-catalyst
and catalyst, non-catalyst produces higher amounts of emission particularly at less than 35
km/h.
However, CO2, catalyst car produces higher amont of emission, 31% higher at 35km/h, than
non-catalyst car, while catalyst car reduces 85% of NOx at 35km/h compared to no catalyst
car.
In addition diesel engine car emits similar amount of CO2 as non-catalyst car and higher
amount of NOx than non-catalyst car. (see table 17.3.2)
14-12
CO2 Emission by Speed (EC)
NOx Emission by Speed (EC)
700
7
600
6
200 2
100 1
0 0
5
15
25
35
45
55
65
75
85
95
105
115
125
15
25
35
45
55
65
75
85
95
5
105
115
125
T ravel Speed (km/h) Travel Speed (km/h)
M P.OP1-CO2
M P.OP1-NOx 3,500,000
41,994 Public
35,000
3,000,000 Private
166 Public
30,000 Freight
Private
2,500,000 20,096
122 Freight
25,000
CO2 (kg/day)
2,000,000
NOx (kg/day)
2,572,350
20,000
29,402 1,500,000 1,855,119
15,000
23,483
1,000,000
10,000
500,000
5,000
614,800 496,100
2,432 2,022
0 0
Do Nothing MP.OP.1 Do Nothing MP.OP.1
14-13
MP OP-2 - CO2
MP.OP2 - NOx 3,500,000
35,000 41,994 Public
166.2 3,000,000 Private
30,000 Public
Freight
Private 2,500,000 20,096
25,000 Freight
CO2 g/km
2,000,000
NOx (g/day)
20,000 2,572,350
29,401.8 2,026,298
1,500,000
15,000
10,000 1,000,000
121.7
5,000 6,104.9 500,000
614,800 496,100
2,432.0 2,021.7
0 0
Do Nothing MP.OP.2 Do Nothing MP.OP.2
Figure 14.3.3 Emission Amount of Master Plan Option-2
As the results of estimation, the Master Plan Option 1 Case reduces 27% for CO2 and 20% for NOx,
and the Master Plan Option 2 Case reduces 21% for CO2 and 74% for NOx respectively. One of the
reasons is less total vehicle kilometers and increased travel speed. In addition, Option 2 reduces the
total NOx emission in private mode much more due to higher ratio of catalyst engine.
Consequently, the Master Plan, which is only a planning scenario, contributes to reducing the total
amount of environmentally concerned substances and the Master Plan is recommended from the
viewpoint of environmental sustainability in the city.
14-14
(2) Environmental Benefits Estimation
The environmental benefit in currency value is useful in order to evaluate the benefit in the
economic sense. This estimation intends to show how much the environmental benefit in
currency unit would be if the EU’s standards are applied. The benefit was estimated based on
the estimated amount of emission in each case and the currency units are applied to each
substance.
This figure shows that both Option 1 and 2 are positive external costs of environment, which
mean that both optional cases are beneficial especially being contributed by private transport
mode. In addition, in the case of Option 1, even for the same condition of catalyst share,
benefit is created, hence, public transport oriented planning scenario contributes to increasing
environmental benefits.
14-15
To evaluate the impacts that are necessary to examine in more detail whether or not.
Mitigation measures should be formulated
To examine detail survey items that is for further environmental surveys such as EIA
(3) Screening
The screening is a tool of rational impact prediction using existing data and information
in each environmental factor in consideration of project phases based on the impact
identification flow shown in
Figure 14.3.4. As a result, resettlement, cultural property, waste, landscape, air pollution and
noise and vibration are identified as environmental impacts. In addition, economic activity,
traffic and public facilities, water rights and rights of common, ground water and water
pollution were identified as unknown shown in Table 14.3.8. So that the EIA shall be carried
out when the Plan will be implemented.
14-16
Pre-construction Stage
Public Perception
Public Restlessness
Construction
Stage
Economic
Activity
Operation Stage
Operation of Maintenance of
Transport Transport
Environmentally
Land use Change Comfortable
14-17
Table 14.3.8 Screening of Master Plan
No. Environmental items Description Evaluation Remarks (reason)
Social environment
1. Resettlement Resettlement by occupancy of proposed land Yes high-rise housing area in
proposed project sites
2. Economic activities Loss of productive opportunity such as land Unknown Various economic activities
exist
3. Traffic and public Influence of existing traffic such as Unknown Public facilities exist in the
facilities congestion project sites
4. Split of communities Split of communities by obstruction of Unknown Some access controlled roads
traffic may create split
5. Cultural property Loss of cultural property and falling of Yes Cultural heritage buildings exit
values in central part of the city
6. Water rights and rights Obstruction of fishing rights, water rights, Unknown land ownership exists and not
of common and common rights of forest yet clarified some ares
7. Public health condition Deterioration of a hygienic environment by No Large refuse amount will not be
production of refuse and noxiousness produced
8. Waste Occurrence of waste dumps and solid waste Yes Some construction waste of
dumps will be produced
9. Hazards (Risk) Increase of possibility of danger of landslide No Low possibility
and accident
Natural environment
10. Topography and geology Change of valuable topography and geology No No large scale structure or earth
by excavation or filling works work
11. Soil erosion Surface soil erosion by rainwater after land No Subject areas are urbanized
development (vegetation removal) already
12. Ground water Change of distribution of ground water by Unknown earth work might cause changes
large scale excavation of ground water level
13. Hydrological situation Change of river discharge and riverbed No No structure will be built on the
condition due to landfill and drainage rivers
14. Coastal zone Coastal erosion and sedimentation due to No Project area is on land
landfill or change in marine condition
15. Flora and fauna Obstruction of breeding and extinction of No Project sites are urbanized and
spices due to change of habitat condition developed area
16. Meteorology Change of temperature, precipitation, No no large scale development
wind ,etc., due to large-scale devmt. affecting meteorology
17. Landscape Change of topography and vegetation by Yes Existing urban landscape will
land development and harmonious be affected by projects
obstruction by structural objects
Pollution
18. Air pollution Pollution caused by exhaust gas or toxic gas Yes Impact by exhaust gas from
from vehicles and factories increasing traffic
19. Water pollution Pollution by inflow of silt, and effluent into Unknown Discharge residual water form
rivers and ground water transport facilities
20. Soil contamination Contamination of soil by dust and chemicals No No chemical activities for soil
and fuel will be unleaded
21. Noise and vibration Noise and vibration generated by vehicles Yes During construction and
operation
22. Land subsidence Deformation of land and land subsidence No Sensitive lands do not exist in
due to the lowering of ground water the subject area
23. Offensive odor Generation of exhaust gas and offensive No No factor
odor by facilities and operation
Overall evaluation Environmental impact assessment (EIA) is From the results of the evaluation, EIA is
required or not required.
14-18
(4) Scoping
Based on the result of screening examination, scoping was carried out in order to identify
items that should be examined in more detail in the coming stage of further environmental
impact analysis shown in Table 14.3.9. As a result, Resettlement, Cultural Property and
Landscape are the most important items to be examined. The other important items are
Economic Activities, Rights of Common, Waste, Air Pollution, and Noise and Vibration.
14-19
In detail, land procurement of new roads or widening of roads before the projects will cause
Resettlement. Cultural Property, in other words, cultural heritage, such as historical buildings
especially in the central part of the City will be affected by the project implementation, for
reclamation and spatial occupancy before the projects and operation stage. The other
significant impact predicted is Landscape especially urban landscape in relation to historical
buildings, which affects scenery in the center, and Bucharest’s spatial characteristics
especially green areas and residential zones shown in Table 14.3.10.
Moreover, minor items for further study were also proposed such as Economic Activities,
Traffic and Public Facilities, Waste, Ground Water, Air Pollution, Water Quality, and Noise
and Vibration. Among those items, air pollution is the key to mitigate pollution from road
transport.
14-20
Table 14.3.11 Summary of Scoping for Proposed Projects
Urban roads and Public transport Transport facility Transport system and
No. Environmental items intersections (tram, trolley, metro) (signal , terminal) institutional
improvement improvement improvement development
Social environment
1. Resettlement A A C D
2. Economic activities B B C D
3. Traffic and public facilities B B C D
4. Split of communities D D D D
5. Cultural property A A C D
6. Water rights and rights of B C C D
common
7. Public health condition D D D D
8. Wastes B B B D
9. Hazards (Risk) D D D D
Natural environment
10. Topography and geology D D D D
11. Soil erosion D D D D
12. Ground water D D D D
13. Hydrological situation D D D D
14. Coastal zone D D D D
15. Flora and fauna D D D D
16. Meteorology D D D D
17. Landscape A A A D
Pollution
18. Air pollution B C D D
19. Water pollution C C D D
20. Soil contamination D D D D
21. Noise and vibration B B D D
22. Land subsidence D D D D
23. Offensiveodor D D D D
Note 1: Evaluation categories
A: Serious impact is predicted
B: Some Impact is predicted
C: Extent of impact is unknown (Examination is needed. Impact may become clear as study progresses)
D: No impact is predicted. EIA is not necessary
Note 2: The evaluation should be made with reference to the Explanation of Item.
As a result, Master Plan, which is public transport oriented scenario, brought 4,396 Euro/day
in CO2 and 29,797 Euro/day in CO2 in the Option 1 case and 3,519 Euro/day in CO2 and
111,039 Euro/day in NOx in the Option 2 case respectively. Followings are remarkable
matters on this estimation.
14-21
research works in Romania. The majority of passenger cars in Romania, Dachia were not
considered in the emission factor. It is recommended that Romanian emission factors
including Romanian made vehicles be established for more accurate analysis. Indeed, fuel
consumption will be appropriate level if the speed rises more compared to current level.
2) Urban Landscape
There exist place of historical value in the central part of the City and green areas scattered
throughout the City. These factors of urban landscape should be conserved in order to avoid
degradation of the urban value of Bucharest that affects economic activities indirectly such as
tourism. In this regard, the projects shall be harmonized improve existing urban value.
3) Air Pollution
Currently, air pollution is the most important aspect in urban environmental improvement due
to the majority of non-catalyst vehicles, which consume leaded fuels. Introducing catalyst
vehicles and applying EURO2 standard will improve air pollution in Bucharest gradually, so
that concentration of harmful substances from motor vehicles will be reduced.
14-22
city center in accordance with historical heritage will be likely to increase urban value and
attract citizens and visitors.
14-23
15. Action Plan
15. Action Plan
Investment schedule of the Master Plan projects is examined and five priority projects are
selected in this Chapter. Then, in order to realize the Master Plan, financial resource plan,
operation and management plan and institutional reform plan are established.
15.1 Investment Schedule
Investment schedule of the master plan was established based on the general flow shown in
Figure 15.1.1.
In order to formulate the investment schedule of the projects proposed by the transport master
plan, the following items were considered.
- Projects which solve present problems efficiently without requiring large amount of
investments should have priority.
- Projects which do not have constraints such as land acquisition problems should have
priority.
- Economic and financial return should be considered.
- Projects which have a close relationship to each other should have related
construction timing.
- Financial resources capability should be considered.
- Investment amount in each year should be equalized if possible.
Based on the above items and their qualitative evaluation listed in Table 15.1.1, the
implementation schedule was determined as shown in Figure 15.1.2. As a result, the 673.7
million dollars was allocated in the short term, 608.8 million dollars in the medium term and
892.0 million dollars in the long term. Since the necessity for the improvement of the public
transport system is desired in an early stage, the allocation of the investment amount becomes
a little higher in the short term period than in the medium term period.
15-1
Table 15.1.1 Evaluation for Priority Project
Criteria (*=middle, **=large)
Cost Strategic
No. Project Feasibility Possibility
effectiveness importance
Roads 1. Inner Ring Road (Basarab West section) ** ** ** **
7. Other Roads - - - -
2. Environmental Protection ** ** ** *
15-2
No. Project Short Medium Long Cos t(Mil.us $)
Roads 1. Inner Ring Road (Basarab & West section) 63.1
2. Inner Ring Road (South Section) 16
3. Central Circulation Roads 49.6
4. Connection Roads bw. IRR & Circulation Rds. 143.6
5. Middle Ring Road 104.3
6. Outer Ring Road 16.5
7. Street Improvement 54.8
Intersections Improvement of intersections 89.8
Traffic 1. Development of Parking Facilities 76.9
Management 2. Development of Signals & Traffic Management 31.5
Metro 1. Construction of M4 line (1 May - Laromet) 77
2. Construction of M5 line (Drumul Taberei - Universitate) 257.5
3. Construction of MR4 line (N. Grigorescu – L. de Centura) 88
4. Modernization of rolling stocks 19.8
5. Purchasing of new rolling stocks (1) for M2 127.6
6. Purchasing of new rolling stocks (2) 48.4
Tram 1. Construction of Cross-center Linkages 28.6
2. Construction of Tram Route along Middle Ring Road 47.3
3. Construction of Tram Route along Inner Ring Road 15.4
4. Construction of North-South Tram Route 31.9
5. Introduction of New Tram system 319
6. Rehabilitation of Tram Infrastructure in southwest 121
7. Rehabilitation of Tram Infrastructure in other area 132
8. Purchasing of Rolling Stocks 88
Trolley Trolley route construction 0.8
Piata 1. Improvement of Gara de Nord 24.2
2. Improvement of Pta. Obor 28.5
3. Improvement of Pta. Sudului 3.1
4. Improvement of Pta. Unirii 13.2
5. Improvement of Pta. Universitatii 5.5
6. Improvement of Passenger Facilities 1.1
Renovation of 1. New Ticketing Device system 19.6
O/M system 2. Other Renovations for Operation/Management 0
Others 1. Construction of Freight Terminals 8.5
2. Street Environment 22.4
Total 673.7 608.8 892 2,174.5
- Does the project match the city structure in the intensive multi-center development
pattern from the perspective of strategy?
- Does the project concern the completion of a ring road?
- Does the project match the public transport improvement in the multi-modal
transport axis pattern?
15-3
- Does the project contribute to the improvement of the central area?
- Can the project use the existing facilities?
- Does the project have a high efficiency?
- Do the fund procurement, land acquisition, and environmental effects have any
problems?
- Is a new Study necessary?
Based on the evaluation listed in Table 15.2.1, eight projects were selected (marked “***” in
the third column from the last column of this Table), however, excluding projects already
finished the Study, the following five projects were determined to be the priority projects
necessary for the further study.
The relationship between basic strategies and projects to be further studied is shown in Figure
15.2.1. Other criteria such as efficiency, implementation possibility and environmental effect
are strongly satisfied for five selected projects.
Figure 15.2.1 Relation between Basic Strategies and Selected Projects to be Further
Studied.
15-4
Table 15.2.1 Evaluation of the Projects for the Further Study
15-5
15.3 Financial Resource Plan
15.3.1 Background of Fund Procurement
In Romania, the financial position in the public sector has been deteriorated, mainly due to the
absence of significant progress in implementing structural reforms and pressures to support
ailing sectors and enterprises. In order to overcome such financial hardships, the government
continues to make efforts for proceeding a privatization program, attracting foreign
investment, accelerating structural reforms, and making a priority and efficient use of
revenues.
As for public investment in the Study Area, the infrastructures continue to suffer from a
chronic lack of investment and maintenance, which hampers the citizens’ smooth traffic
movement. The authorities are expected to modernize them by reviewing present public
expenditure, raising new fund resources, and introducing foreign investment.
(2) Bonds
The project implementing entities and/or related public authorities are possible to issue bonds
to finance their investment fund. However, bonds issue is effective for cases which can obtain
the operating income or increment of property value, including air rights over surface land.
Generally the bond issue for improving the infrastructure is not easy in developing countries
because of fund shortage.
(3) Loans
Loans from private banks, domestic government, and international funding organizations or
foreign governments are available. However, in Romania, borrowing loans from private banks
is very difficult for the improvement of infrastructure since inflation rate and interest rate are
very high. Both private banks and the government can not foresee for long-term projects. If
there is no special long-term / low-rate loans offered from the government and private banks,
loans from foreign governments and international lending agencies are useful sources for
initial investment.
(4) Subsidies
The central and local government subsidies are often an important financial resource for
capital investment. As shown in the Table 15.3.2, subsidies cover the major portion of cost to
construct transport infrastructures. In the case of England, approximately 80% of subway
construction costs in 1995/96 were financed by central government’s subsidy. The ratio was
almost same in the case of metro construction in Ile de France region. In Germany, 40% of
15-6
urban railway construction costs have been financed by central government’s subsidy.
However, considering the gloomy Romanian economy, the government or Municipality would
be difficult to give relatively large amount of subsidy to the public transport operating entities.
(2) Subsidy
Romanian Law No.189/1998 named ‘Law of local public finances’ became effective from
January 1999. It has established the rules of own financial base of local authorities, including
the Municipality of Bucharest. As for the implementation of the projects in the Master Plan,
however, the financial support of the central government is also important because the
financial base of the Municipality is not sufficient, considering the scale of those projects.
15-7
(3) Earmarked Tax
In the development of urban public transport projects, the beneficiaries should bear the project
costs according to the amount of direct / indirect benefits generated from the construction of
facilities, based on the principle that beneficiaries should pay for their benefits
(beneficiary-pay principle). This contributes to the realization of sustainable project
implementation. Though it is disputable to establish earmarked tax system related to vehicle
and real estate in order to capture the direct and indirect benefits generated from urban public
transport development (for instance, financial rigidity should be avoided), it is considered to
be necessary for project implementation as far as the rate is not so high. At present it is very
difficult to establish new taxation in Romania. Consequently a little surcharge on the existing
fuel tax rate and property tax rate is recommended for the time being as an earmarked tax.
Note: The solid arrow sign shows the period when loans of international funding organizations are
appropriated for project implementation.
15-8
Table 15.3.2 Financial Resources for Urban Mass Transit Railway
Measures to Secure Financial Resources England France Germany U.S.A.
Fare Revenue (accumulated funds, Covers only part of operation cost, not for Covers only part of operation cost, not for Covers only part of operation cost, not for Covers only part of operation cost, not for
internal reserves) repayment of initial construction cost repayment of initial construction cost repayment of initial construction cost repayment of initial construction cost
Subsidy from Governmental General London Regional Transport receives Subsidies from general account of central, A part of construction cost is covered by Both construction and operation are
Account (general tax revenue) subsidy from national general fund.. regional, and local government for both general accounts of central and local covered by general accounts of federal,
Subsidy from national government covers construction and operation. governments. state, and local governments.
majority of capital investment.
Subsidy from Governmental Special No earmarking revenue exists. Fare discounts are compensated by Oil tax (national tax) is earmarked by Rule of diversion of gas tax (road
Account (earmarked tax revenue, i.e. oil A residential tax increase was proposed to payroll charges from private companies in Local Transport Subsidy Act. construction fund) to railway based on
tax, car registration tax, consumption tax, reduce public transport fares in London Paris and local cities. Oil tax is appropriated as subsidy for ISTEA, 1991.
property tax, area licensing tax, other (1981), but rejected as illegal. Local additional taxes are temporarily operation costs by Local Decentralization Los Angels City raised fund from special
various surcharges) collected for improvement and Act. benefit tax with SAD.
construction of station in Paris and local Increased revenue of oil tax has been Los Angels County raised fund from
cities. allocated to repayment of railway debt increased revenue of sales tax by local
since 1994. referendum.
Collection of Indirect Development None None None Los Angels City collected tax from
Benefit business alongside railway as a special
(i.e. development charge, connecting benefit tax (tax from special assessment
passage construction charge, special district, SAD).
assessment district (SAD), tax increment
financing (TIF), internalization of
development profit by real estate
development, etc.)
Fund Raising (governmental soft loan, None Regional government supplies None Various kinds of bonds were issued in
bond issue, overseas aid organization loan, low-interest loan to operators. New York (revenue bind, collateral bond
special business revenues) for railway facilities).
State railway bonds were issued in Los
Angels by local referendum.
Introduction of Private Funds (private Private finance is promoted by Private None None Federal Transit Administration promotes
railway project, turnkey (design & build), Finance Initiative (PFI) in forms of BOT, turnkey style (design & build) projects
full-turnkey (BOT, BOO, etc.)) BOO. financed by private companies.
Source: Research Institute of Development Assistance, the Overseas Economic Cooperation Fund, “Urban Railway Projects in Bangkok: Measures for Securing Financial Resources” August 1998
Note: Special Assessment District (SAD) in the U.S. is the district approved by the state law, where indirect development benefits are levied based on the assessment of the local public transport development
15-9
15.3.6 Empirical Examination of Financial Revenue
In the above, several financial resources are examined, together with the examples in western
European countries and U.S.A. However, considering the present economic and political
situation in Romania, most of the investment fund would be obliged to depend on the foreign
loans from the bi-lateral countries and/or international lending agencies. As for the own
sources, it looks like very difficult to levy the new tax to the citizens from both economic and
legal aspects and to increase the public transport fare level. Therefore, by adding a small tax
surcharge both on the fuel and the property, the earmarked taxes that consist of fuel tax
(applied mainly for road improvement) and property tax (redefined as city planning tax
applied mainly for urban living environment) are defined in Chapter 14.
In this Section, factors to raise income in public transport modes, as well as impact on income
increment by decreasing the fare evasion, and the effect of introduction of the private fund to
parking construction and operation are examined empirically.
In this Master Plan, some recommendation are given for the above problems, for example,
introduction of new cars for problem (f), introduction of traffic control system for problem (e),
introduction of new ticketing system for problem (a), improvement of changing facility for
problem (c). As for problem (d), it looks like very difficult to increase the existing fare level,
judging from the questionnaire survey for users of public transport modes. Answers from
these users are summarized:
On the other hand, problem (a) is also difficult to be solved, For example, picking up the
maintenance problem. At present the only one factory provides parts to RATB, however, the
quality is said to be low, therefore, RATB has a lot of inactive fleet of vehicles (about 23.2%
of the total number of fleet), irrespective of hardship maintenance work, of which solution is
given in Section 15.4.
15-10
In order to examine to improve the profitability of the public transport operation entities, the
above revenue-cost indicator was dissolved into the following five factors;
The value of each factor is shown in Table 15.3.3. From this Table, the following points are
considered:
a) Revenue against cost is very low for every public transport mode.
b) Revenue per passenger-km of Metro is almost double as that of RATB, which seems to
come from the difference from the fare evasion rate (Metro is 6% and RATB is 25%).
c) From the passenger collection performance, Bus and Trolley collect short trip passengers,
Metro collects long trip passengers and Tram is in the middle point.
d) Tram shows high potential passengers collection, which comes from the service provision
mainly within the high population density area, compared with other public transport
modes. However, this indicator suggests the importance of excavation of the potential
demand.
e) Operating productivity and labor productivity depend on the average operating speeds. The
improvement of operating speed leads to the profitability.
15-11
Table 15.3.3 Factor Value by Public Transport Mode
Item Metro Tram Trolley Bus
Revenue (Mil. lei per day) 295 244 79 248
Passenger km (Mil. Person-km per day) 1.7 2.6 0.8 2.6
Potential Demand (Mil. Persons) 0.128 0.372 0.307 0.892
Vehicle km (Mil. Vehicle-km per day) 0.035 0.089 0.035 0.187
Operating Hours of Drivers (Mil. Drivers-Hours) 0.001 0.006 0.003 0.011
Cost (Mil lei-per day) 773 774 325 941
Indicator
Revenue/Passenger km 177.7 93.8 93.4 95.3
Passenger km/Potential Demand 13.0 7.0 2.8 2.9
Potential Demand/Vehicle km 3.7 4.2 8.8 4.8
Vehicle km/Operating Hours of Drivers 42.1 14.3 13.0 16.7
Operating Hours of Drivers/(Cost per 10,000) 0.011 0.080 0.083 0.119
Revenue/(Cost per 10,000) 3816.3 3152.5 2430.8 2635.5
Revenue/Passenger-km 177.7 93.8 93.4 95.3
Cost/Passenger-km 465.7 297.6 384.2 361.8
For improving the financial position, the following case study was tried:
The results of these three cases are shown in Table 15.3.4 Among three cases the potential
demand increase case (Case 2) give the most largest improvement effect for the cost coverage
to “Metro”, however, for the other three modes both case 1 and Case 2 are important to the
increment of the cost recover. In addition, the increase of the labor productivity through the
operating speed also contributes to the improvement of the cost recover for “Tram” (through
the improvement of the tram truck and introduce of the new type tram), however, for “Trolley
bus” and “Bus”, the external factors such as the alleviating the traffic congestion becomes a
key factor.
15-12
(2) Decrease of Fare Evasion
In the Master Plan about 1,497.6 million dollars are to be invested for the public transport
projects, especially, metro and tram improvement projects. Owing to this huge amount of
investment, the number of paid passengers using public transport modes will increase 2,214
thousand persons in 1998 (Annual Report from METROREX and RATB) to 3,182 thousand
persons in 2015 (Study Team forecast). In 1998 the revenue from tickets reaches 146,225
million lei for METROREX and 1,144,045 million lei for RATB by assuming the average
ticket price is 1,222 lei (in 1998 the ticket price was changed six times, therefore, this ticket
price was estimated by the weighted average). If this ticket price is fixed until 2015, the
revenue in 2015 increases to 230,608 million lei for METROREX and 421,112 million lei for
RATB under the current fare evasion rate). In this case METROREX can improve its financial
position, however, the financial position of RATB remains almost same level (See Working
Ratio in Table 15.3.5). If the fare evasion rate can be decreased to the reasonable rate of 5%,
RATB’ financial position can drastically be improved. To be concluded, RATB should make
every effort hereafter.
15-13
Table 15.3.6 Capacity and Construction Cost of Parking Facilities
Capacity Construction cost
Location Parking type
(Vehicles) (1,000 US$)
1) Academiei/Doamnei 220 4,697 Building
2) Nicolae Balcescu 265 4,820 Underground
3) Pta. Decebal 510 10,510 Building/Surface
4) Pta. Salii Palatului 600 10,710 Underground
5) Pta. Revolutiei 780 13,923 Underground
6) Pta. Galati (Bdul Dacia) 502 1,068 Building
7) Armand Calinescu 302 536 Underground
8) Regina Elisabeta 1,000 17,850 Underground
9) Bdul Unirii/Libertatii 600 10,710 Underground
10) Natiunilor Unite 200 490 Surface
11) Bdul Libertatii 340 833 Surface
12) Pta. Concordiei 40 98 Surface
13) Panait Cerna 30 588 Underground
14) Str. Ion Nou 20 49 Surface
Total 4,685 76,882
In order to examine the profitability of the above parking facilities, the financial internal rate
of return (FIRR) was calculated in the various conditions such as parking fee level,
Investment amount of private companies, and the size of contribution from the Municipality.
Under these conditions the following points were confirmed:
a) Under the present parking fee level, it is very difficult to construct and operate the parking
facilities except surface parking facilities,
b) Surface parking facilities can be constructed and operated by private sector under the
sufficient profit,
c) Underground and building parking facilities are indispensable for the contribution from the
Municipality,
d) In case that the parking facilities are constructed and operated by the private sector, about
two third of the contribution from the Municipality are necessary.
e) If the private sector provides one third of the construction cost, it is desired to construct and
operate parking facilities by the municipality and the private sector jointly (Third Sector
Method).
The results of the financial analysis are shown in Table 15.3.7. This financial analysis was
performed under the following premises after the trial-error examination:
a) One-third of construction cost was provided by the private sector and two-third was
contributed by the Municipality,
b) Parking fee is assumed to be reviewed every five years and increased by 20%,
c) Maintenance cost was determined by referring to the existing Obor underground parking.
In Table 15.3.7, “ FIRR (financial internal rate of return) on Investment” shows the possibility
of the recovery of the project cost and “FIRR on Equity” shows the possibility of recovery of
the invested capital. The former value shows the difficulty of recovery of the project cost
because of its low values of FIRR on Investment (except surface parking surface), however,
FIRR on Equity shows the financial viability for the private companies participated in these
parking projects under the premise of two-third contribution of project cost from the
Municipality. In addition, if these fourteen parking facilities can be constructed and operated
by on entity, FIRR on Investment also becomes financially feasible because of its 7% of FIRR
one Investment. Since the current inflation rate is almost 50% and the interest of domestic
bank ranges from 55% to 65%, 7% of FIRR on Investment can be judged not so bad, if
15-14
cheaper loan could be borrowed. Therefore, it is recommended that the private sector and the
Municipality constitute the third sector and proceed the improvement of parking facilities.
Competent Authorities
Background
Organization that Transport network
coordinates transport does not work
Competent authorities are services does not effectively
different according to function
transportation mode
Operating Companies
The levels of labor productivity of both companies shown in the Tables 6.11.4, 6.11.9, 6.11.10,
and 6.11.11 are very low both in demand side (passenger/km/staff) and supply side (vehicle/
15-15
km/staff), comparing with the international standards. Even if the comparison does not stand
on the same basis, the performance of RATB and METROREX is apparently behind other
European transport operating companies. On the other hand, cost recovery ratios of each
transport mode are indicated in the Table 15.4.1, compared with that of other European
transport operating companies three years before. Fares still fail to cover direct operating
costs in spite of the fact that they have been increased many times in recent years.
However, several fundamental reasons can be pointed out to explain why the levels of labor
productivity and cost recover ratio are very low. These weaknesses are mainly derived from
the fact that both institutions have never been exposed to competition. Their mission under
planned economy had been the provision of quantity of services, not quality of service. The
bulk of their revenue has been coming from subsidies, not from fare revenue. As a result, their
operational and management practice does not work efficiently in the present transitional
economy. Figure 15.4.2 shows the relationship among the factors that lead to the poor
performance of management indicators.
(Trolley)
City Bucharest Belgrade Geneva Milan Riga
Service provider RATB GSP TPG Azienda Riga
Transporti Tram-Trolley
Bus
Organization type City owned City owned Private City owned
Cost recovery ratio (%) (excl. dep.) 11.8 45.1 97.1 25.8 82.1
Fare revenue/Operating cost (%) (excl. dep.) 11.0 38.8 56.4 23.7 77.8
(Bus)
City Bucharest Belgrade Helsinki Milan Oslo
Service provider RATB GSP Helsinki City Azienda AS Oslo
Transport Transporti Sporveier
Organization type City owned City owned City owned City owned
Cost recovery ratio (%) (excl. dep.) 50.4 58.8 97.1 32.1 55.6
Fare revenue/Operating cost (%) (excl. dep.) 46.9 50.6 38.6 29.5 46.9
(Metro)
City Bucharest Helsinki Milan Oslo Vienna
Service provider METROREX Helsinki City Azienda AS Oslo Wiener Linien
Transport Transporti Sporveier
Organization type City owned City owned City owned
Cost recovery ratio (%) (excl. dep.) 40.0 193.4 66.0 69.3 169.3
Fare revenue/Operating cost (%) (excl. dep.) 37.9 77.0 60.7 58.5 108.0
Source: RATB Annual Report 1998
Data from METROREX
1997 edition of the UITP Book of Urban Transport Statistics
15-16
Note: 1) The data of Bucharest is as of 1998, while the data of other cities are as of 1995.
2) The revenue of operating companies is divided proportionally into each mode according to the number of
passenger trips/km/year of each mode. In the case of RATB, the result of JICA person trip survey is applied.
3) The cost of operating companies is divided proportionally into each mode according to the number of employees
working for each mode. The number of administrative staff is divided into each mode based on the ratio of drivers.
4) There is a large difference between the cost recovery ratio and the fare revenue/operating cost ratio in Helsinki and
Vienna, because the operating companies in those cities receive consignment fee from other operators.
Competent authorities are Organization that coordinates Transport network does not
different according to transport services does not exist work effectively
transportation mode
Operating Companies
Passenger fare tends to be
controlled from political
consideration Cost recovery
Ticket system for surface
transport does not work ratio is extremely
effectively low compared
with other
European cities
Administrative section
Public transport service is not tends to be overstaffed
practically exposed to
competition with private sector
Operation and
management are not fully Labor
market-oriented productivity is
extremely low
compared with
other European
Subsidy is granted as a lump sum Incentive for cities
productivity
development is
weak
Renewal of rolling
Investment is difficult for lack of stock and
financial resources equipment is not
sufficient
Figure 15.4.2 Key Issues Regarding Productivity and Cost Recovery Ratio
15-17
productivity development. The empirical evidence from around the world suggests that costs
of some activities, such as cleaning and maintenance of infrastructure and rolling stock, can
generally be reduced, while workmanship standards are being raised, by moving from
in-house to contractual arrangements. Activities within institutions that are capable of
attracting external customers can be corporatized and divested from the main body to reduce
investment as well as the number of staff. Second, it is necessary to introduce incentives so as
to direct operation and management to more commercial orientation. Internal activities, such
as improvement of employee training curriculum, should be brought in to further
market-oriented operation.
(1) Restructuring
Services that are expected to support operations and maintenance could be entrusted to the
private sector. A key issue to make the best use of outsourcing is to enhance labor productivity,
rather than to reduce operating cost. RATB and METROREX can concentrate their
investments on core activities as well as enjoying the service of private contractors, who can
provide much more effective operation than their own staff by outsourcing. RATB has already
concluded management contracts with private service providers in the fields of station and
vehicle cleaning, rolling stock repairing, etc. METROREX is also planning to transfer its
personnel who specialize in cleaning and maintenance to a private service provider, and then
to make a management contract with it. This outsourcing method, which is called business
transfer and is prevailing among European countries, will help METROREX to reduce its
number of employees, while the private provider can improve the quality of its service with
the help of those skilled staff.
In conclusion, activities which no longer form any part of the core business and are capable of
attracting external customers should be corporatized in their own rights and divested from the
main bodies as soon as they become practicable. In RATB, Construction Site (“Santierul de
constructii Montaj”), which consists of 235 personnel, is the candidate for this corporatization
procedure.
Training courses performed in RATB and METROREX these days seem to meet their
expectation, since they have covered the necessary fields to enhance employees’ technical
level. To improve the efficiency of operation, however, it is recommended to include
additional subjects that ensure passenger service/security and, at the same time, training
courses for middle-management staff members should be prepared. For example, Teito Rapid
Transit Authority (metro) in Tokyo offers various kinds of training courses that are intended
not only for the staff who need technical training, but also for the ones who are expected to
show their ability in managing their units. The subjects (contents) taught in Teito Rapid
Transit Authority are: management development planning, incentive implementation, basic
cost analysis, etc. The subjects that cannot be taught by staff in the organizations should be
handled by professionals outside.
15-18
(3) Measures for Demand Increase
As one of measures for increasing revenue, the common ticketing system is recommended.
Common ticketing system is designed in order that public transport passengers may utilize the
several public transport modes by only one common ticket after the integration of fare and
ticketing system of each public transport mode within a city or metropolitan area. Such a
system is commonly observed in European large cities.
The common ticketing system has following merits:
Ù Increase in the number of public transport passengers and more efficient use of public
transport facilities through the improvement of convenience
Ù Reduction of the operating cost by simplification of ticket checking system
Ù Introduction of precise data collection regarding public transport passengers’ movement
Therefore, it is necessary to establish the management system for introducing the common
ticketing system.
15-19
taxation, therefore, the necessary legal support should be arranged.
For the effective implementation of integrated urban transport strategy, an executive body that
consists of full-time members should be created and placed at the highest level within the
executive functions of Bucharest. It would cooperate with the similar bodies within the
Municipality responsible for the strategic planning of land use and public services in order to
produce the General Urban Plan. It would also provide the policy direction to the bodies
charged with the development of the Transportation Master Plan. Integrated transport
planning would be made by a professional team under the control of this body. Thus
integrated planning of public transport would be actualized.
The concept of private sector participation, known broadly as Private Finance Initiative (PFI)
including Build-Operate-Transfer (BOT), can be defined as a business for which private
organizations (concessionaires) undertake to build and operate a project that would normally
be undertaken by the government. Concessionaires return the ownership to the government
after a fixed concession period (typically more than 20 years). Though taking no financial
burden, the government can undertake the project with efficient operation offered by the
private sector. On the other hand, the concessionaires can recover the project cost during the
concession period. Project lenders (financial institutions) look to the revenues generated
during the concession period as the main source of security for repaying debts.
In the case of urban railway and metro, it is widely said that BOT scheme is difficult to apply
15-20
because of huge initial investment. For example, an urban elevated railway project in
Bangkok, Thailand had to be cancelled in 1998, in the middle of construction that had started
in 1993. Main reasons for the failure can be summarized as follows: first, the change in
economic circumstances in Thailand after the conclusion of concession agreement brought
two important effects to the project; i) reduced project profitability due to lower real property
prices; ii) increased construction costs due to devaluated Thai currency. Second, the lack of
legal framework and Mater Plan in the period of conclusion of the agreement had brought
inconsistent government attitudes toward the project. Third, the concessionaire could not raise
enough funds to complete the project.
15-21
16. Inner Ring Completion with Basarab Overpass
16. Inner Ring Completion with Basarab Overpass
The route and design of Basarab overpass are determined after examining the four
Alternatives. The standard structure consists of a four-lane roadway and a two-lane tram
track. This project is highly feasible and has no environmental problems.
16-1
- Sos. Nicolae Titulescu has a wide median and a service road on one side, therefore, the
width is sufficiently wide for accommodating a grade-separated carriage way.
- The width of Sos. Orhideelor is 29 m, which is not enough width for the grade separate
carriage way.
2) Intersection
There are 3 intersections related to the project.
- The intersections of A, I. Cuza and Sos. N Titulescu, Sos. N Titulescu and Calea Grivitei
are of three-leg type.
- The intersection of Sos. Orhideelor and Calea Giulesti forms a rotary.
16-2
BD. DINICU GOLESCU
Sos. N Titulescu
b. Industrial Lines
There is a railway track at the northwest side of Sos Orhideelor. This railway has been used
for the manufacturing industries located at the surrounding area, but it is seldom to be used at
present because of the modal shift from rail to road traffic. The industrial railway track and
the surrounding land are belonging to the corresponding company’s properties.
16-3
2) Basarab Station
Railway Basarab (Gara Basarab) station is located at the crossing point between
Sos.Orhideelor and B-dul Dinicu Golescu, in the southwest side of the main railway lines.
Basarab station is used exclusively for the local trains, serving the area within 200km from
Bucharest. The station is a one-story building and planed to be relocated at the west side of
the existing location, when the Basarab area is redeveloped in the future.
3) Metro
The M3 Line, a ring type metro line, is passing through the Basarab area. The Basarab metro
station is located at just the northeast side of the main railways, more precisely, lying in
between the main railway lines and Calea Grivitei. The entrance of Basarab metro station is
located at the sidewalk of Calea Grivitei.
The M4 Line, extending from Gara de Nord toward the northwest along Calea Grivitei is now
under construction. At the Basarab station, the new line is constructed side by side the
existing line so as to be able to use the existing platform of the underground station.
4) Tram Lines
The tramlines near Basarab area are subdivided into two groups by the railway lines; one is
the tramline operated on the roads, Titulescu and Calea Grivitei, the other is those on Sos
Orhideelor. The former consists of the ones from Pta. Victoriei toward Gara de Nord and the
ones from Chitilei or Mihalache to Gara de Nord. The latter is those from Oltenitei, Razoare
area toward Gara de Nord.
The tram stations for each lines are located near the each intersection, Titulescu / Grivitei and
Orhideelor / Dinicu Golescu.
16-4
5) Underpass Crossing
In relation with the new metro line construction, a pedestrian underpass is to be built across
the railway, connecting Calea Grivitei with B-dul Dinicu Golescu. When it is completed, the
existing pedestrian bridge over the railway is to be removed. In addition, another pedestrian
underpass crossing Calea Grivitei from the metro exit to Titulescu is now constructed.
16-5
N.Titulescu
176
214 150
411 587
28
165
N.Titulescu
187
275 173
457 644
26
112
16-6
Total Number of Vehicles per hour
(8:00-9:00)
Cal
ea
1062 Total Number of Tram per hour
Giu
(8:00-9:00)
lest
i
220
153 79
8
12 365 8
544
90
21
51
603
424 108
417
r
eelo 181
.O rhid
Sos 1201 100
11
16
632
Ca
le
a
Pl
ev
ne
i
Total Number of Vehicles per hour
Cal
(16:00-17:00)
ea
961
Giu
(16:00-17:00)
i
325
143 123
9
10 478 12
340
158
17
386 44
510 93
274
elor
hide
. Or 94
Sos 754 149
13
18
752
Ca
le
a
Pl
ev
ne
i
7) Traffic Forecast
The traffic demand for the Basarab overpass is estimated by assigning the vehicle O-D
volume obtained from the Person Trip Survey to the road network including the Basarab
overpass.
As shown in Table 16.2.3, the total demand on the bridge section over the railway at present
is estimated to be about 39,000 vehicles per day. The demand will increase to 61,000 vehicles
per day in the year 2015.
16-7
Table 16.2.3 Traffic Demand on Basarab Overpass
(vehicles/day)
Road section Car Bus Truck Total
Titulescu section 20,750 500 1,640 22,880
Present
Rail Overpass Section 35,100 690 3,350 39,140
(1998)
Plevnei – Dambovita 21,950 560 2,390 24,900
Titulescu section 38,520 610 4,450 43,580
Future
Rail Overpass Section 55,140 760 5,230 61,130
(2015)
Plevnei – Dambovita 48,720 590 3,880 53,190
Note: The above demands indicate those on the new road sections, therefore, the demands for the existing roads,
Titulescu, Orhideelor are not included.
16-8
Table 16.2.4 Road Classification
Width of carriage way Design speed Traffic intensity
Category No. of lanes
(m) (km/hr) (pcu/day)
I: Arterial 6 21.0 60 More than 6,000
II: Semi-arterial 4 14.0 50 / 60 3,000 - 6,000
III: Collector 2 6.0 / 7.0 40 / 50 300 – 3,000
IV: Local service 1 3.0 / 3.5 25 Less than 3,000
Note: Design speeds are those for plan
Source: National standard STAS 10144/1-90
Sos. Nicolae Titulescu - Sos. Orhideelor (Inner Ring Road) is proposed as an arterial road, i.e.,
Category I, therefore, the design speed is assumed to be V=60 km/hr, based on the national
standard.
16-9
Figure 16.2.6 Typical Cross Section
2) Tram
a. Geometrical Elements
Geometrical elements for tramway are shown as follows.
16-10
Figure 16.2.7 Construction Gauge of Tram
3) Railway
The construction gauge is shown below. The height is 7.8 m from rail.
16-11
16.2.3 Alternative Plans
(1) General
1) Plan
The Basarab overpass is to be constructed crossing over the railway, to connect Nicolae
Titulescu with Sos. Orhideelor. The required cross section is 2 lanes for vehicle traffic in each
direction and 1 tramway for public transport. The sidewalk is not necessary for the overpass,
since a pedestrian underpass is to be built under the railway by the Metrorex in the year 2000.
Above the bridge over the railway yard, a tram station will be constructed. For the passengers
from / to the tram station, pedestrian stairs, elevators or escalators will be also installed.
2) Alternatives
The following two routes can be envisaged as an alternative route based on the basic plan by
CPU.
I - The route along the existing roads, Titulescu and Orhideelor
II - The route along the existing road, Titulescu at the north side of the railways, and the route
runs along the idle industrial railway lines at the south side of the railway.
In addition, the following two cases are considered by the above two routes.
a) The plan to construct a continuous viaduct from Titulescu to Dambovita crossing railway
lines and Plevnei (based on the plan by CPU).
b) The plan to construct a short viaduct over the railway from Titulescu and connect to the
intersection with Plevnei.
As a result, the four alternative plans, I-a), I -b), II -a), II -b), are proposed to be studied.
The plan to construct an underpass crossing the railway was excluded, since it requires much
longer structure than overpass, and more land acquisition, henceforth, much higher
construction cost, due to the metro line from Gara de Nord lying under Calea Grivitei .
The alternative plans are summarized in Table 16.2.7.
2 1 Shortest Overpass - The overpass will be constructed along Titulescu and Orhideelor.
connecting to the - Orhideelor will be widened.
intersection with Calea Plevnei - Level crossing with Calea Plevnei
(with tram)
3 2 Continuous Overpass - The overpass will be constructed along Titulescu and idle railway
Connecting to Dambovita lines
(with tram) - Tram stations can be constructed at the bridge over the railway and
over the intersection with Calea Plevnei.
- No access for vehicle traffic to the intersection with Calea Plevnei
- If the connection ramps are added, additional widening will be
required.
4 2 Shortest Overpass - The overpass will be constructed along Titulescu and idle railway
connecting to the lines
intersection with Calea Plevnei - Level crossing with Calea Plevnei
(with tram) - Tram stations can be constructed at the bridge over the railway
16-12
Figure 16.2.9 Alternative Routes
(2) Preliminary Design
The preliminary design of the objective road was carried out based on maps at a scale of 1 to
500.
In the course of the design work, all data obtained from site reconnaissance, the boring survey
are referred to and utilized.
1) Alignment
The alignment is designed so as not to affect the roadside properties as much as possible.
2) Profile
- Taking into account the design standard for tramway, the maximum gradient is assumed
to be 5%.
- Minimum radius for the vertical concave connections is proposed to be 1,000m for
securing sufficiently distance from the intersection to the nose of the overpass. This is
general value of Japanese highway standard.
3) Design of Structure
- A standard bridge type is adopted, taking the span length into account.
- For the bridge across the railway, continuous steel box girder bridge with RC plate floor is
proposed, for minimizing the height of girder, because the railway is close to the
intersection
- The ratio of main span and side span is 1:1.2 - 1:1.5 in case of the continuous steel bridge.
16-13
Table 16.2.8 Main Span Length and Bridge Type
Railway crossing Giulesti crossing Another
Alternatives Main Main Main
Type of bridge Type of bridge Type of bridge
span span span
Continuous steel box
PC box girder bridge PC T girder bridge
1,2 55m girder bridge with RC 45m 30m
(post-tension) (post-tension)
plate floor
Continuous steel box
PC T girder bridge PC T girder bridge
3,4 97m girder bridge with RC 30m 30m
(post-tension) (post-tension)
plate floor
- As for the foundation, casts in place piles of more than 22 m are assumed, considering the
results of the boring survey.
As a result, the distance from the overpass nose to the intersection become as follows. At the
A I. Cuza intersection, the distance is very short, therefore, a weaving problem may occur in
the case of Alternative 1 and 2. As for the other intersection, the distance is sufficiently long
for all the alternative cases.
4) Design Drawing
The preliminary designs for the alternatives are shown in Figure 16.2.10 – Figure 16.2.20.
16-14
Table 16.2.10 Improvement Cost for Basarab Overpass
Unit: US$
Alternative 5
Alternative 1 Alternative 2 Alternative 3 Alternative 4
(Additional Underpass)
TOTAL 23,416,525 11,576,961 26,600,706 16,216,596 7,781,167
June. 16.1999
1) Land Acquisition
There is a law for the compulsory land purchase in Romania, however, it has never applied
since the revolution in 1989. This is deeply related with the situation that most part of land
have been or are in the process to be returned back to the former land owner from the
Government based on the statements from the individual owner, therefore it is time
consuming to purchase the land if the ownership is crossing over in a complicated manner.
Accordingly whether the land acquisition of private property is required or not becomes an
important factor for selecting the best alternative plan.
4) Landscape
Historically, landscape has been an important factor in Romania, particularly for planning
large permanent structures, since it is influential to even the overall image of the city.
5) Construction Cost
Since the costs for land acquisition and compensation is taken into account in the 1st factor,
the cost only for the construction is compared.
16-20
6) Difficulties During Construction
As for the difficulties during the construction, the following two aspects are envisaged; one is
the engineering difficulties regarding the construction such as problems related to hydrology,
geology etc. or application of an inexperienced construction method and so on, the other is the
disturbances to the traffic due to the construction work.
7) Environmental Impacts
Among the various impacts to the environmental factors, the most crucial ones may be the
public nuisance such as noise, vibration, air pollution etc. because the project area is an urban
area.
1) Land Acquisition
In case of Alternative 2, both sides of Orhideelor have to be widened as much as 7 meters
each to accommodate the 4-lane carriage way with tramway, thus the acquisition of residents’
private properties along the road is required.
16-21
6) Construction Cost
The construction cost is relatively lower in the case of Alternative 2 or 4 compared to the
other cases.
7) Environmental Impacts
In cases of Alternative 1 and 2, the overpass is located on the existing road, relatively higher
impacts are anticipated in terms of noise, vibration and sunshine etc..
As a consequence, it is found that the Alternatives 3 or 4 are more desirable than Alternatives
1 or 2. Hence, Alternatives 3 and 4 will be further studied from the aspect of cost-benefit
analysis.
16-22
Figure 16.2.20 Traffic Volume Capacity Analysis at Basarab Overpass / Plevnei
&$6(!
/2&$7,21 %DVDUDE2YHUSDVV3OHYQHL (;,67,1*75$)),&92/80($73($.+285
3($.5$7(
75$)),& 3HDN+U7UDIILF 6285&(5(68/762)75$)),&$66,*10(17
&<&/(7,0(2)75$)),&6,*1$/$VVXPHGWREHVHF
75$)),&92/80 ($1'75$)),&/$1(6
L +HDY\9HK
9HK
7UDP
1HZ5RDG
+HDY\9HK
7UDP 9HK
*LXOHVWL
LL
9HK 7UDP
LY
&DOHD3OHYQHL
+HDY\9HK
/DQH:LGWKP
)HHW
1HZ5RDG
7UDP +HDY\9HK
9HK
LLL
75$)),&&21',7,216
3DUNLQJ/DQH 3('(675,$16 %XWWRQIRU3HGHVWULDQV
$SSURDFK *UDGLHQW +9 %861% 3+) )ORZ7\SH
<1 1P 3HUVRQV+U <1 0 LQ*UHHQ7LPH
L 1 1
LL 1 1
LLL 1 1
LY 1 1
*UDGLHQW83'2:1 1%1RRI%XVSHU+U 0 LQ7LPH0 LQLPXP&URVVLQJ7LPHIRU3HGHVWULDQV
+99HKLFOHVZLWKZKHHOVRUPRUH 3+)3HDN7LPH&RHIILFLHQW
1P1RVRI3HUNLQJ7LPHSHUKU )ORZ7\SH7\SH
6,*1$/3+$6(
3$77(51
* * * * * * *
3+$6(
<5 <5 <5 <5 <5 <5 <5
)L[HGRU
)L[HG )L[HG
$FWXDWHG
$552:9HKLFOH0 RYHPHQW 'RWWHG/LQH3HGHVWULDQV
&\FOH/HQJWK 6HFRQGV
16-24
Table 16.2.12 Traffic Volume Capacity Analysis at Basarab Overpass / Plevnei
/DQH*URXSHV
6DWXUDWLRQ &DSDFLW\
5DWHRI *UHHQ &ULWLFDO 5HTXLUH
)ORZ5DWH )ORZ5DWLR RI/DQH YF5DWLR &RQJHVWL &DSDFLW 4XHXH 5HTXLUH
/DQH )ORZY 5DWLR /DQH ,QIORZ G
$SSURDFK VYHK YV *URXS ; RQ \ /HQJWK G1RRI
*URXS YHKKU *& *URXS &\FOH 'XUDW
Q
*UK YHKKU 'HJUHH &\FOH YHK &\FOHV
PLQ
[ EHORZ EHORZ
/RVV7LPHSHU&\FOH/ VHFRQGV
6XPRI)ORZ5DWLR
RQWKH&ULWLFDO/DQH*URXS
&ULWLFDOYF5DWLR;F
16-25
16.3 Preliminary Cost Estimation
Based on the comparison, detailed cost estimation was made for promising Alternative 3 and
4.
16-26
Table 16.4.1 Implementation Schedule for Basarab Overpass
According to this analysis, both Alternatives showed significantly viable results of the
economic indicators, above all, Alternative 4 shows higher value of IRR (30.7.0%). As a
result, Alternative 4 was selected for the Basarab overpass from the viewpoint of the national
economy.
16-27
Table 16.5.2 shows the sensitivity analysis for the selected Alternative 4. All of the economic
indicators were robust against the change of the factors.
Table 16.5.4 Sensitivity Analysis for Inner Ring Road Completion Project
Change of
Indicators EIRR B/C NPV
Factors
-5% 0.240 1.668 575,456
Benefit Decrease -10% 0.225 1.581 499,859
-20% 0.194 1.405 348,666
+5% 0.240 1.673 608,009
Cost Increase +10% 0.227 1.597 564,965
+20% 0.205 1.464 478,877
-5% 0.245 1.704 605,695
Traffic Volume
-10% 0.234 1.633 545,217
Decrease
-20% 0.210 1.493 424,263
Foreign -5% 0.251 1.739 642,444
Exchange Rate -10% 0.249 1.722 633,835
Decrease -20% 0.243 1.689 616,617
16-28
16.5.2 Environmental Evaluatio
(1) Environmental Benefits
The environmental benefit defines as external cost of pollutants, which are Green House
Effects (CO2) and major source of air pollution (NOx) are estimated in accordance with
demand forecast results in year 2015. In comparison between Do Nothing and Do Nothing
Case with this priority project are examined.
DN-DNpj = Benefit
Where,
DN: Total emission of Do Nothing Case
DNpj: Total emission of Do Nothing Case with Priority Project
Basarab-NOx
Basarab-CO2 35,000
3,000,000
156
30,000 150 Public
39,600 Public
2,500,000 38,213 Private
Private
25,000 Freight
2,000,000 Freight
CO2 (kg/day)
CO2 (kg/day0
20,000
1,500,000 1,835,277 1,762,926 28,736
27,208
15,000
1,000,000
10,000
500,000 5,000
603,276 602,628
2,386 2,235
0 0
Do Nothing DN + Basarab Do Nothing DN + Basarab
Figure 16.5.1 Emission Amount Comparison (CO2 and NOx) –Basrab Overpass
16-29
2) Environmental Benefits
This is a trial estimation taken in account of currency unit value as discussed in evaluation of
master plan section. The cost of Green House Effects (CO2) and Air Pollutant (NOx) are
estimated based on the emission amount estimation and applying currency unit value. As
results of estimation, benefits of 424 Euro/day in CO2 and 15,170 Euro/day in NOx are
estimated respectively.
(DN – DNpj) x Cu = Ec
Where,
DN: Do Nothing Case
DNpj: Do Nothing case + Priority Project
Cu: Currency Unit
Ec: External Cost
Basarab proposed site is located in north side of Gara de Nord. The proposed site belongs to mainly
government and factories. However, there are some private lands along the Sos.Orchideelor. Beside
the project site, medium-rise apartments are located along with N.Titulescu, Calea Grivitei,
Environmental impacts such as resettlement, traffic flow, landscape, noise, which may have
significant impact by the project implementation on both before operation and operation
phases are identified shown in matrix table as follows:
16-30
Table 16.5.6 Matrix Table of Environmental Impacts by Project Stage-Basarab
Overpass
Major facilities, activities Facilities/ Construction
which may Before Operation Operation
cause impacts Overall Reclamation Operation of Accumulation
Evaluation and spatial construction Occupancy Operation of people and
Environmental Factors of land
occupancy equipment goods
1. Resettlement X X
2. Economic Activities
Social Environment
2) Environmental Considerations
Resettlement
Land acquisition of total surface, 28,500 square meters, which includes residential and
government lands along the alignment, especially Sos.Orhideelor side is required in order to
align the overpass and to widen the road both sides of 7 meters. Blvd.N.Titulescu side has no
land acquisition required due to enough space within in right of way.
To enhance the project implementation, the project proponent shall prepare proper
coordination with landowners in advance and provide appropriate compensation for
landowners.
16-31
b. Landscape
Structure of the overpass has a significant feature crossing over railway. Viewpoint from
urban landscape, overpass itself has much impact on visual sense. In order to mitigate visual
impact, design of overpass shall be sophisticated in order to harmonize with surrounding
environment.
c. Air Pollution
CO2 emission estimated by traffic volume forecasted has a little disadvantage that emission
amount CO2 increase 5% compared to Do Nothing case due to increasing of number of traffic.
However NOx emission decreased 84% compared to Do Nothing case.
d. Noise
Noise form tram and vehicle are predicted preliminary, so that noise alleviation shall be made
especially for tram. There are some experiences reducing noise from tram wheel in Europe.
To avoid noise refection from tram way paved by hard material, tram way shall be soft
substance, which could absorb the noise such as lawn. In addition, rolling stocks of tram shall
use higher value of elasticity wheel such as rubber-cushioned wheels which is less noise (3.5-
4.0 dB(A)) than rigid wheels.
In addition,
Regarding environmental external cost, the project yields 154,760 Euro/year in CO2 and
5,536,948 Euro/year in NOx respectively. Currency unit value applied to the trial estimations
are based on EU’s research works so that it is difficult to say that those benefits are for this
project directly. However there are environmental benefits on this project at least.
16-32
17. Bottleneck Piata Improvement
- Handrail: Provision of handrails to stairs and slopes
17-4
The number of railway passengers at Gara de Nord was forecast applying the increase rate of
trips in the Study area from 1998 to 2005 (Table 17.2.2).
The number of the transfer passengers in front of the Gara de Nord among metro, tram, trolley
bus and bus was estimated at 67,000 passengers per day by transit assignment using JICA
STRADA. However it should be noted that these numbers are sensitive and affected by the
future public transport network established.
17-5
2) Parking Demand
Parking survey was conducted in Gara de Nord area to estimate the parking demand. The
survey was made only to count the vehicles on road and off road excluding the vehicles
seemingly owned by inhabitants. The number of parked vehicles fluctuates in the range
between 300veh. and 550veh. (Table 17.2.3).
The parking space in this area is considered not only to apply to vehicles to this area but also
to vehicles of inhabitants in this area. Considering the above, parking space for 1,000veh.
was assumed.
Table 17.2.3 Number of Vehicles Parked in Gara de Nord Area
7:00 9:00 11:00 13:00 15:00 17:00 19:00
Total on street 183 221 217 254 194 184 148
Total arranged 53 62 69 69 69 56 42
Total unarranged 130 159 148 185 125 128 106
Total off street 217 249 255 271 243 176 170
Total no. of vehicles 400 470 472 525 437 360 318
Source: JICA Study Team
3) Others
International buses and long distance buses also start from Gara de Nord area.
The terminals for long distance buses other than RATB or autogaras are in direct liaison with
the Bucharest Municipality not with RATB. These buses are concentrated on Calea Grivitei
and are affecting road traffic. Countermeasures for these buses should be taken.
The long distance buses and international buses with terminus in Bucharest are summarized
below.
Table 17.2.4 Long Distance Buses
Company Location Destination
- Calea Grivitei all around the country
Touring, Double T Gara de Nord Germany
Viego, Double T Calea Victoriei – Piata Operetei - Giurgiu
Piata Eroii Revolutiei
- Oltenia
- Calea Dorobanti Germany
Toros Sos. Viilor-Antiaeriana Istanbul
Source: Bucharest Municipality
Considering the convenience of passenger transfer and efficiency of land use (open space
should not be left unused), the land in front of Hotel Nord is selected for the study of
improvement.
17-7
will not be affected. However the existing tramways to the east of the railway will be affected
and the tram network needs to be rearranged (Figure 17.2.7).
As the turn at Piata Victoriei is physically difficult for the existing tram routes to/from the
east due to the underground tracks, the route passing Str. Maltopol and Str. Sevastopol is
proposed. The tram route on Str. Sevastopol once existed (Figure 17.2.8).
a. Car
Str. Witting and Bd. G. Duca will be connected in front of the station to bear the main vehicle
traffic flow in the east-west direction.
The entrances and exits for cars will be located on the south side of the park to avoid the
congestion at into the station front.
b. Tram
Three groups of tram routes are considered. No significant route alteration will be made for
tram routes in the west of the railway. Bd. D. Golescu will be used for those routes.
The tram routes coming to/from the north will be separated. The tram routes from the north
will be located on Bd. G. Duca and Str. Witting. The tram routes from the south will be
located on Str. Witting and Calea Grivitei.
The tram routes to/from the east will be separated to reach Gara de Nord front.
c. Bus
Terminal Island will be constructed for buses.
d. Trolley Bus
Minor alteration will be made to trolley bus routes to form a loop pattern.
e. Taxi
Taxis are planned to flow from the east to the west. Taxi pool will be established.
f. Pedestrian
Pedestrians are expected to move in this area through two transfer platforms, one bus terminal
island, and pedestrian crossing (Figure 17.2.9).
5) Improvement Plan
Improvement plans are shown in Figures 17.2.10 through 17.2.13.
17-8
Table 17.2.5 Necessary Number of Berths - Obor
Year Increase Enroute Terminus Peak Number of arrival and Time for Capacity Necessary Remarks
departure boarding per berth number of
rate ratio and berths
Enroute Terminus Total alighting
2) Parking Demand
Parking survey was conducted in Obor area to estimate the parking demand. The survey was
made only to count the vehicles on road and off road excluding the vehicles seemingly owned
by inhabitants. The number of parked vehicles fluctuates in the range between 800veh. and
1,500veh. (Table 17.2.6).
The parking space in this area is considered to apply to the parking demand of vehicles to this
area.
Considering to above, parking space for 1,100veh. was assumed.
2) Bus
Possible areas for bus terminals is the space along Sos. Colentina, the space on the northwest
side of the park, and the space between park and market building. The space on the between
park and market building was chosen because of the efficient use of the space on the
northwest side of the park.
Buses are designed to approach the terminal through Str. Ziduri Mosi to avoid the traffic
confusion brought about by the establishment of the approach road near the intersection.
3) Maxi Taxi
Terminus of maxi taxi will be moved to the front space of Obor station to avoid the
occupancy of road space on Sos. Colentina near intersection.
The stops will be located along Sos. Colentina.
17-15
4) Taxi
The stops will be located along Sos. Colentina.
5) Car
Underground parking is proposed in the area which is now used for the market. The entrances
and exits are planned on Str. Ziduri Mosi and Sos. Mihai Bravu.
6) Truck
The entrance and exits of trucks to and from the market building will be separated from other
vehicles.
7) Pedestrian
Regarding the location of pedestrian crossings, two alternatives are considered. The
pedestrian crossings are proposed near the entrance of metro in alternative 1. In alternative 2,
pedestrian crossings are located near the intersection.
Alternative 1 has the advantage of shorter walking distance, however also has the
disadvantage of the construction of additional traffic lights. This disadvantage can be solved
by integrated systematic traffic
On the contrary alternative 2 has the advantage that no additional traffic lights are necessary,
however passengers are compelled to walk a longer distance. As the passengers are assumed
to have the habit of crossing the carriage way by the shortest route, countermeasures such as
construction of a fence along the carriage way should be taken (Figure 17.2.16).
17-16
17.2.4 Improvement of Piata Sudului
(1) Existing Condition
Existing condition of Piata Sudului area is summarized below.
- The entrances of metro are located only on Sos. Berceni and transfer to RATB is
inconvenient.
- The intersection is large and crossing it is not easy or safe.
- There is open space left unused.
- The frequencies of arrivals and departures on the route at peak period are 52 times/hour-
direction for tram, 91 times/hour-direction for trolley bus, and 88 times/hour-direction for
bus. The number of arrival and departure at peak period in case of terminus is 34
times/hour for bus. (Figures 17.2.20 and 17.2.21)
17-20
direction for bus. The frequency of arrival and departure at peak period in case of terminus in
2015 is also estimated 39 times/hour for bus.
However Sudului area is also planned to intensify its function as multi-modal transport
terminal, concentration of feeder public transport routes and trunk public transport routes in
future is expected.
In this Study the following frequencies as planning condition are assumed (Table 17.2.7).
The number of transfer passengers among metro, tram, trolley bus and bus at Piata Sudului
was estimated at around 65,000 passengers per day, by transit assignment using JICA
STRADA. However this number is sensitive and affected by the future public transport
network established.
2) Parking Demand
Parking survey was conducted in Sudului area to estimate the parking demand. The survey
was made only to count the vehicles on road and off road excluding the vehicles seemingly
owned by inhabitants. The number of parked vehicles fluctuates in the range between 100 veh.
and 200 veh.(Table 17.2.8)
The parking space in this area is considered to apply to the parking demand of vehicles to this
area.
Considering the above and difficulty in site acquisition, parking space for 100 veh. is assumed.
17-21
17.2.5 Sudului Intersection Improvement
(1) Background and Objectives
Pta.Sudului is located at the intersection of arterial roads, Vacaresti / Nitu Vasile and Sos.
Oltenitei. The road Vacaresti / Nitu Vasile is the major radial road to Berceni / Progresului
area, and the Sos. Oltenitei is the major radial road connecting with National Route 4. In
addition, Vacaresti and Sos.Oltenitei are used as a part of the Inner Ring Road.
There are many pedestrians related to the roadside commercial facilities and transferring
among the public transport. Together with the roadside parking, they are additional factors for
the traffic congestion at the intersection.
As Pta Sudului is defined as a development center in the future, the social/economic activities,
are expected to expand.
Accordingly the purposes of the project are to facilitate the passengers transferring among
public transport and alleviate the traffic congestion by improving the transport facilities and to
promote the development of new urban core.
17-25
Fig.17.2.24 Location of the Related Roads
SOS. BERCENI
17-26
2) Traffic Conditions
a. Traffic Survey Result
A traffic volume counting survey was conducted at the Sudului intersection in the middle of
September,1999. The survey was made for 6 hours including morning, noon and evening peak
hours. The resulting highest peak volumes in the morning and evening are shown in
Fig.17.2.27.
As for the north-south roads, Carea Vacaresti / Nitu Vasile, the predominant flow is from the
south to the north in the morning, while the opposite direction is predominant in the evening.
The total traffic inflow from Calea Vacaresti is extremely heavy, about 2300 vehicles per
hour during the evening peak. It is also noted that the left turn or right turn traffic volume
from Calea Vacaresti is considerably high during the both peak hours, while those from Nitu
Vasile is not so high.
For the east-west road, Sos.Oltenitei, the traffic volume at the east section is higher than the
west section. This is because the traffic from Sos.Berceni joins to the east section of
Sos.Oltenitei about 100 m before the Pta.Sudului.
It is remarked that the traffic from Oltenitei to Vacaresti is much higher than that to Nitu
Vasile.
The composition rate of heavy vehicles is comparatively low, ranging from 5 % to 10% of the
total traffic. Most vehicles are small size ordinary cars and vans. The traffic volume of
tramcar is ranging from 10 to 30 cars per direction during the peak hour.
The future traffic demand at Pta.Sudului will vary depending on the network condition, for
instance, there will be a large difference due to the progress in the development of the Inner
Ring Road.
In the above estimation, it is assumed that all the road development plans proposed in the
master plan are completed.
17-28
Calea Vacaresti
Total Number of Vehicles
So 2262 per hour
s.
Ol
ten
ite (16:00-17:00)
i
So
s. B
ile
Vas
erc
eni
Nitu
Calea Vacaresti
1196
ile
Vas
erc
eni
Nitu
17-29
Traffic demand in 1998 Traffic demand in 2015
b. Weaving Problem
The Sos.Berceni is crossing with Oltenitei near Pta.Sudului without traffic signal, then a
weaving problem can be often observed. Sos Berceni is a semi-arterial road connecting
between the IMGB area and Pta.Sudului, hence the traffic inflow is not low.
c. Pedestrian Crossing
There are many pedestrian crossings on the carriage way from metro and tram /bus stations to
the market and other service facilities. The disordered pedestrian movement including a
jaywalk is an additional factor for hindering the traffic from a smooth flow.
e. Roadside Parking
Many cars including taxis parked on street, particularly those at the corner of the intersection
are being obstacles for both the traffic of vehicles and pedestrians.
17-30
Accordingly the intersection improvement of Pta.Sudului should be made to create a
smoother vehicle traffic and more convenient public transport system at the same time,
taking into account the development potential of the surrounding area.
(2) Plan
In order to cope with the existing and foreseeable problems stated above, the following
improvement plan can be proposed.
The Pta. Sudului is to be improved firstly by widening the road width to ease the traffic
congestion during the peak hours, and further improved at the later stage, by undertaking a
grade separation of the intersection.
This is because the congestion is not so serious yet at present and can be solved by a minor
improvement such as the widening only for the time being. This is confirmed by the volume
capacity analysis, where the peak hour traffic obtained from the traffic counting survey is
used as shown in Table 17.2.11.
1) First Stage
As stated above, there is no alternatives for the first stage, where the traffic segregation by
providing pedestrian underpass, the widening of road width, the introduction of one way
system into Berceni are proposed to realize a smoother and safer traffic movements for both
vehicles and pedestrians.
First Stage
a) Traffic Segregation by constructing pedestrian underpass
network
b) Change of Sos.Berceni (short section only) into one way and
widening of small entry road to Oltenitei.
c) Widening of corners and road width for turning lanes
d) Restriction of parking at the intersection and provision of
parking facilities
2) Second Stage
Since the traffic demand along the road, Vacaresti / Nitu Vasile is higher than the crossing
road, either an overpass or underpass will be examined on this road. The tramway is not
running on the road Nitu Vasile, then only the vehicle carriage way is grade-separated.
For the grade separation at the second stage, therefore, there are two alternative plans as
follows.
Alternative 1: Construction of an overpass carriage way crossing over Sos Oltenitei
Alternative 2: Construction of an underpass carriage way crossing under Sos Oltenitei
Second Stage
- Grade separation of vehicle traffic
(Underpass or Overpass)
17-31
Table 17.2.10 (1) Traffic Volume Capacity Analysis at Pta.Sudului
<CASE>
LOCAT ION : Pta. Sudului EXISTING TRAFFIC VOLUM E AT EVENING PEAKÔ16:00-17:00Õ
SOURCE: TRAFFIC COUNTING DATA)
CYCLE TIME AND PHASING OF TRAFFIC SIGNAL: ACTUAL
T RAFFIC : 16:00 - 17:00è EVE.PEAKé
(SOURCE: STREET ADMINISTRATION)
i Heavy Veh
Veh 665 932 665 213 7%
T ram 4 24
VACAREST I
Heavy Veh
68 7%
13 461
8 491 ii
111
Veh T ram
313 3
iv 357 5
Heavy Veh
20 9%
Lane Width:3.5m
12 Feet
VASILE NIT U
T ram Heavy Veh
Veh 107 566 141 132 10%
iii
SIGNAL PHASE
PATTERN
G + Y= 32 G + Y 47 G + Y = 67 G + Y= 67 G + Y= G + Y= G + Y=
PHASE
R= 84 R= 69 R = 49 R= 49 R= R= R=
Fixed or
Fixed Fixed Fixed Fixed
Actuated
ARROW: Vehicle M ovements Dotted Line:Pedestrians
Cycle Length: 116 Seconds
17-32
Table 17.2.10 (2) Traffic Volume Capacity Analysis at Pta.Sudului
Lane Groupes 3 4 5 6 7 8 9 10 11 12 13 14 15
1 2 *8 * * * * *
Require
Rate of Saturation Flow Green Capacity of Critical Require
v/c Ratio Conges- Capa- Queue d
Lane Flow Flow Rate Ratio Ratio Lane Group Lane Inflow / d No
Approach X tion city / Length( Duratio
Group (veh/hr.) (veh/ Gr.1h) v/s G/C (veh/hr.) Group Cycle of
Degree Cycle Veh) n
Cycles
(Min.)
3/4 4x6 3/7 3/7 below below 11-12 13/12
17-33
(3) Improvement Plans
1) Design Condition
a. Design Speed
Design speed is assumed to be 60km/hr based on the National Standard in Romania, since
both the roads, Vacaresti / Nitu Vasile and Sos.Oltenitei are defined as arterial roads.
c. Construction Gauge
The construction gauge is assumed as follows;
4.5m for the vehicle traffic height, and 5.5m in case of trolley and tram height.
d. Land Acquisition
- As a school is located at the southwestern side of the intersection, the widening should be
made so as not to affect the school land.
- There is a graveyard at the roadside of Str. Nitu Vasile, which should not be affected,
therefore, it is important to minimize the length of structure for the grade separation.
2) Preliminary Design
a. First Stage
In the first stage, the corners of the intersection are widened to provide a lane and a curb for
the right turn. At the Nitu Vasile side, two lanes are prepared for the right turn, taking into
account the bus stops. In relation to this improvement, the tramway is slightly shifted from the
existing location. The design is illustrated in Fig.17.2.29.
b. Second Stage
The grade separation work is planed for the north- south direction, i.e., the road Vacaresti /
Nitu Vasile. This is because the traffic demand on this road is higher than the crossing road.
The underpass or overpass is designed as a 4 lane separated carriageway flanking the tramway
from the both sides on the road Vacaresti. Hence, the tramways cross each other at the center
of the intersection at the ground surface level.
17-34
Alternative 2 (Overpass Case)
An overpass of 4-lane carriage way is designed so as to minimize the overpass section.
The bridge is assumed to be a PC box girder type with the center span of 45 m. The height of
the box girder is also assumed as 3m. As a result, the total overpass section length will be
570m, of which 320 m will be the bridge section. The structure length in Alternative 2 is
longer than the Alternative 1, since the existing road, Vacaresti has a descending slope of
about 2 % toward the south direction. The preliminary designs of the plan and the cross
section are shown in Fig.17.2.32 and Fig.17.2.33.
17-35
17.2.7 Comparative Analysis
(1) Consideration Viewpoint
For the alternative plans identified in the previous section, the best solution should be selected.
The consideration viewpoints for the comparative analysis are almost same as those identified
in the previous chapter except some modification.
1) Viewpoints Added
The following viewpoints are added for the comparative analysis, taking into account the
characteristics of Pta.Sudului.
a. Influence on trolley bus lines
b. Pedestrian Crossing
c. Influence on Open-air market
2) Viewpoints Excluded
The following viewpoints are excluded because it is obvious that either there would be no
significant impacts for both the alternatives or no significant difference between the
alternatives.
a. Influence on Tram Lines
b. Difficulties during the construction
1) Land Acquisition
In both the alternative cases, some part of roadside green spaces on Calea Vacaresti and some
part of open air market space along Nitu Vasile will be required for the widening. In case of
Alternative 2, the length of structure section is longer than the another case. This is because
Vacaresti has a descending slope to the southward. Hence, Alternative 2 requires more land
acquisition than Alternative 1.
17-39
is not desirable compared to Alternative 1.
6) Pedestrian Crossing
There is no difference for zebra crossing in both cases. For the pedestrian underpass, the
location of the passage should be slightly shifted to the southward because of the vehicle
carriage way underpass in case of Alternative 1
7) Construction Cost
The construction cost is relatively lower in the case of Alternative 2 compared to Alternative 1.
8) Environmental Impacts
In cases of Alternative 1 the overpass is located on the existing road, then relatively higher
impacts are anticipated in terms of noise, vibration sunshine etc..
17-40
Table17.2.11 Comparative Analysis for Sudului Intersection
Alternative 1 Alternative 2
Factors Underpass construction Overpass construction
Under the Sos.Oltenitei Over the Sos.Oltenitei
1.Land Acquisition
- Some part of roadside green space on Calea
Vacaresti will be required for widening.
- Some part of open-air market will be required for
- Because the length of structure section is longer
widening.
than the Alternative 1, more land will be
- The length of structure section is shorter than
required.
Alternative 2, less land will be required.
2. Influence on - Same condition as Alternative 1
vehicle traffic - Side lanes will be provided, therefore, all the
vehicle movements will be secured.
3.Influence on
trolley bus lines - Trolley bus U-turn route will be changed to use - Trolley bus U-turn route will be changed to use
the space over the underpass in the intersection. the space under the overpass in the intersection.
4.Influence on
Open air market - Some of the shops will be relocated. - Some of the shops will be relocated.
5.Influence on the - No adverse impacts -Overpass may have an adverse
landscape impacts
6. Pedestrian
Crossings (1) Zebra crossing can be (1) Zebra crossing can be
(1) Zebra crossing provided without problem. provided without problem.
(2) Underpass (2) Pedestrian passage under Nitu (2) Pedestrian passage under Nitu
Vasile will be shifted to Vasile can be made without
southward. Problem
7.Construction Cost
- Relatively high - Relatively low
8. Environmental - Relatively low
Impacts - Relatively high (noise, sunshine etc.)
9. Overall
- Although the construction cost is higher, the - Although the construction cost is lower, the
adverse impacts on environment or landscape adverse impacts on environment and
can be minimized. ( recommended) landscape are anticipated.
17-41
17.3 Project Cost Estimation
Project costs of Piata improvement were estimated below.
The costs for the intersection improvement are estimated by using unit cost by work item
obtained from the past construction work. The total for the first stage is estimated to be about
US$ 1 million. As for the second stage, the cost of the alternative 1 and 2 will be US$ 7.7
millions US$ 6.5 millions respectively.
17-42
Table 17.3.2 Intersection Improvement Cost
Unit: USD
widening Alternative.1 Alternative.2
RC PT bridge - - 3,920,000
price per m2($) - - 700
total surface (m2) - - 5,600
Retaining wall - - 514,380
price per m2($) - - 120
surface (m2) - - 4,287
Tunnel - 4,005,200 -
price per m2($) - 1,700 -
total surface (m2) - 2,356 -
Tunnel access - 1,672,088 -
price per m3($) - 75 -
total volume (m3) - 20,408 -
pavement price per m2($) - 25 -
pavement surface (m2) - 5,661 -
Tramway 340,000 804,100 804,100
price per m($) 1,700 1,700 1,700
total length (m) 200 473 473
Streets improvement 426,000 461,250 549,375
price per m2($) 15 15 15
total surface (m2) 28,400 30,750 36,625
Land acquisition 191,700 75,050 106,450
price per m2($) 50 50 50
total surface (m2) 3,834 1,501 2,129
Miscellaneous contingencies 95,770 701,769 589,431
TOTAL 1,053,470 7,719,456 6,483,736
As of June.16.1999
17-43
For the pedestrian underpass, for instance, b) and c) are considered. As for the one way
system and road widening, a) and b) are reflected.
In the case of grade separation, it is scheduled for the traffic demand expected to exceed the
capacity of the intersection by the year to be opened to traffic.
Underground passages and bus terminals can be independently constructed. Parking
restriction at intersection and parking facilities shall be implemented at the same time. Also
alteration and relocation of tram routes shall be simultaneously implemented so that the
influence on public transport will be minimized.
Function for transferring among public transport modes should be intensified by
rearrangement of public transport routes when bus terminal is constructed.
Gara de Nord
Piata Obor
Piata Sudului
17-44
17.5 Project Evaluation
17.5.1 Economic and Financial Evaluation
(1) Economic Analysis
As mentioned on the above section, various improvement measures were recommended for
Gara de Nord, Obor and Sudului as the Piata improvement project. Especially,
a. Reforming the intersection configuration
b. Improving transferring facilities for public transport modes
c. Constructing parking facility
give a lot of benefit to pedestrians or passengers who change public transport modes around
these Piatas and in addition vehicles passing through these Piatas can also shorten the time to
cross the Piata or to park their cars. Therefore, under the following premises, the traffic
assignment was made for the purpose of estimating the time saving benefit and VOC saving
benefit.
Premise 1 Increase of the capacity of the road section (links in the network) near the
intersection by reforming its configuration and/or adding a left turn lane or right
turn lane ( 2,000 PCU per day )
Premise 2 Increase of the capacity of the road section (links in the network) by excluding
roadside parking cars through the implementation of strict car parking regulation
and construction of parking facilities ( 4,000 PCU per day )
Premise 3 Increase of velocity on the road section by excluding roadside parking cars ( 5km
per hour )
Premise 4 Reduction of transfer time between public transport modes by improving
transferring facilities (1 minute per one transfer)
The economic evaluation for Piata improvement facilities was made for these three Piatas
under the premises. Table 17.5.1 shows the results of the economic analysis. According to the
results of the economic evaluation, Piata improvement projects at these three Piatas were
judged to be viable from their high values of EIRR. Table 17.5.2 shows the sensitivity
analysis, which indicates all cases are feasible under the change of 20% of each factor .
17-45
Table 17.5.2 Sensitivity Analysis for Piata Improvement Project
Change of factors Indicators Gara de Nord Obor Sudului
-5 % 0.250 0.236 0.222
Benefit decrease -10 % 0.238 0.224 0.213
-20 % 0.213 0.200 0.195
+5 % 0.250 0.237 0.223
Cost increase +10 % 0.240 0.227 0.215
+20 % 0.221 0.209 0.201
-5 % 0.254 0.241 0.226
Traffic volume
-10 % 0.245 0.231 0.219
decrease
-20 % 0.225 0.213 0.204
-5 % 0.259 0.245 0.229
Foreignexchange rate
-10 % 0.221 0.209 0.227
decrease*
-20 % 0.205 0.193 0.224
Note: The foreign portion is assumed to be 20 % of the project cost.
The results of the financial analysis are shown in Table 17.5.4. According to this Table, the
private sector would be reluctant to participate in this business, since the value of FIRR on
investment is very low. However, judging from the value of FIRR on equity, the financial
feasibility of the capital becomes very high under the assumption of the contribution of two
third of the project cost from the Municipality (two thirds of the project cost) for Gara de
Nord and Obor. For Sudului no contribution from the Municipality is necessary for its parking
facilities because of its good business performance without contribution from the
Municipality. Therefore, it is recommended to run the parking business jointly by the
Municipality and private enterprises, since the Municipality could reduce its investment
burden, on the other hand, the participatory enterprises could obtain some benefit through the
management of parking. In addition, the management can be done by the private enterprises,
which is considered to be much more efficient than that by the Municipality itself.
Consequently, the construction and operation of these three parking facilities should be
entrusted to a joint entity of the Municipality and private enterprises, that is, the third sector
method.
Table 17.5.4 Result of Parking Development Project at Three Piatas
Location FIRR on equity FIRR on investment
1) Gara de Nord 11.9 1.7
2) Obor 15.0 3.6
3) Sudului 73.0* 73.0*
Total 14.3 3.3
Note : * The same value comes from the assumption of no contribution from the Municipality.
17-46
17.5.2 Environmental Evaluations
(1) Environmental Benefit
1) Estimation of Key Emissions
Amount of key emission is estimated based of following method.
(MPav x F) – (MPbv x F) = Em
Where,
F Emission Factor
MPav Total vehicle km. of Master Plan case including whole MP projects
MPbv Total vehicle km. of of MPa case except subject priority project
Em effects in emission amount
a. Gara de Nord
Amount of total emission from vehicle is estimated in order to evaluate an external cost of
environment with the currency unit prepared by ECMT. In comparison between Mater Plan
Case and Master Plan Case exncludes Gara de Noed case, total CO2 emission of Basarab case
decreases 0.07% and total emission amount in NOx reduces 0.51% according to following
evaluation method.
2,000,000
Private 4,035 Freight
NOx (kg/day)
4,032
4,000
2,211,493 2,213,126 Freight
1,500,000
3,000
1,000,000
2,000
2,114
500,000 1,000 2,149
546,139 546,460
0 0
M P case M P except Gara de Nord M P case M P except Gara de Nord
Figure 17.5.1 Comparison of Emission Amount (CO2 and NOx)- Gara de Nord
b. Piata Obor
Amount of total emission from vehicle is estimated in order to evaluate an external cost of
environment. In comparison between Master Plan Case and Master Plan excludes Piata Obor,
total CO2 emission of Obor case decreases 0.57% and total emission amount in NOx reduces
5.34%.
17-47
Piata Obor-CO2 Piata Obor -NOx
7,000
3,000,000 16,942
16,942 69
6,000 69
2,500,000 Public
Public 5,000 Private
2,000,000
NOx (kg/day)
CO2 (kg/day)
Private 4,032 Freight
4,000 3,687
2,211,493 2,224,770 Freight
1,500,000
3,000
1,000,000
2,000
Figure 17.5.2 Comparison of Emission Amount (CO2 and NOx)- Piata Obor
c. Sudului
Amount of total emission from vehicle is estimated in order to evaluate an external cost of
environment. In comparison between Master Plan Case and Master Plan that excludes Sudului,
total CO2 emission of Sudlui case decreases 0.02% and total emission amount in NOx reduces
0.01%.
Sudului-NOx
Sudlui-NOx
7,000
Sudlui-CO2
Sudului-CO2
3,000,000 69 69
6,000 Public
16,942 16,942
Private
2,500,000
5,000 Freight
Public
NOx (kg/day)
Private
2,211,493 2,212,456
Freight
1,500,000 3,000
1,000,000 2,000
Figure 17.5.3 Comparison of Emission Amount (CO2 and NOx)- Piata Sudlui
17-48
a. Gara de Nord
External costs of Green House Effects (CO2) and Air Pollutant (NOx) are estimated based on
the emission estimation. As a result, 11 Euro/day in CO2 and 3,747 Euro/day in NOx are
estimated.
b. Piata Obor
External costs of Green House Effects (CO2) and Air Pollutant (NOx) are estimated based on
the emission estimation. As a result, 91 Euro/day in CO2 and 1,026 Euro/day in NOx are
estimated.
c. Piata Sudului
External costs of Green House Effects (CO2) and Air Pollutant (NOx) are estimated based on
the emission estimation. As a result, 2 Euro/day in CO2 and 4,029 Euro/day in NOx are
estimated.
17-49
(2) Environmental Impact by the Project
1) Environmental Impacts
The projects comply of three Piata improvements, Gara de Nord, Obor and Sudlui, including
transfer station, channelization of Piata, underground parking, pedestrian crossing and
pedestrian improvement. A few impacts are identified on this project due to improvement
transfer terminals. Resettlement, Traffic flow, economic activities of small shops, which may
have significant impact depending on the project scale or site condition.
a. Gara de Nord
Component of the project is transfer terminal improvement and underground parking facility.
This project is proposed in existing transfer terminal of Gara de Nord, which is major transfer
station in the city, so that land acquisition is not occurred. However, impacts on existing
traffic flow, which is mainly public transport such as bus, trolley bus, taxi, maxi-taxi during
construction. In addition, construction waste on construction of underground parking was
identified as environmental item that may have significant impacts depending of the project
scale and site condition. The identification matrix is shown as follows:
Table 17.5.8 Matrix Table of Environmental Impacts by Project Phase -Gara de Nord
Major facilities, activities Facilities/ Construction
which may Before Operation After Operation
cause impacts Overall Reclamation Operation of Accumulation
Evaluation and spatial construction Occupancy Operation of people and
Environmental Factors of land
occupancy equipment goods
1. Resettlement
2. Economic Activities
Social Environment
17-50
b. Obor
One of major transfer and commercial station called Obor located in north-east part of
Bucharest where is cross road of middle ring road and Colentina road is proposed to improve
existing transport functions including Metro, Tram, Trolley Bus, bus, long-distance bus
terminals and parking facilities. Large market is also located in proposed project site.
No major impact is identified in the course of evaluation, however some minor impact such as
land acquisition for long distance bus terminal in pre-construction phase and traffic flow in
construction phase are identified. In addition, during the construction phase, minor impact on
economic activities for market is identified.
c. Sudului
This is also major transfer station located in south part of Bucharest and major commercial
point. The plan proposes an improvement of the terminal including Metro, Tram, Trolley, Bus,
and parking facility. Existing condition of this intersection is rather complicated that the
intersection has five legs and four mode of transportation on surface.
17-51
Vacaresti and Nitu Vasile. in pre-construction phase, traffic flow especially on alternative
route traffic flow in construction stage.
2) Environmental Considerations
a. Gara de Nord
a) Traffic Flow
Subject site is located in Gara de Nord which is one of busiest transport node and the Gara is
gateway of international surface transport. Alternative transport flow during construction shall
be provided in order to avoid inconvenient for the people.
b) Construction Waste
The plan proposes an under grand parking facilities which could park 2000 vehicles under the
park located in front of Gara de Nord. Large amount of excavation is occurred in construction
phase so that construction waste shall be managed. More over, transferring construction waste
shall be transfer safely to the site.
17-52
b. Obor
a) Land Acquisition
Total land of 10,700 m2 for proposed bus terminal is required to acquire lands. However,
there is no resident there so that it may not have impact.
b) Economic Activities
Wholesale market and other commercial facilities exist in subject area. Especially during the
construction, traffic flow and alternative routes shall be formulated in order to mitigate impact
on their economic activities.
c) Traffic Flow
Project area is one of major transferring terminal with commercial facilities. Proper
alternative route and stops shall be made for the people in sense of convenience especially
during constriction phase.
c. Sudului
a) Land Aquisition
Land acquisition of total area, 3,934 m2, where some part of roadside along with Calea
Vacaresti and Nitu Vasile for channelization improvement is required. However, it is green
space there, so that resettlement does not occur.
b) Economic Activities
There are small-scale open-air commercial facilities there. According to the proposed plan,
along with Nitu Vasile, some parts of commercial facilities are required to relocate.
Appropriate coordination with them shall be made before the construction.
c) Traffic Flow
This area is one of major transport terminal and most of transport mode passing through this
Piata. In addition, Trolley bus U-turn loop shall be relocated in accordance with proposed
plan. Proper traffic flow management during construction shall be made strongly.
(3)Overall Evaluation
Those three projects have a little amount of environmental benefits. This aspect implies that
those three Piata improvements are reasonable at least view points from environment.
Three Piata improvements are located in existing transfer terminals. Some space requires to
acquiring lands, however no residential area is targeted. In addition, some small economic
activities, which are acting on roads, are relocated. Moreover, existing traffic flow will have
some impact during construction. However those identified impacts are not significant
impacts.
17-53
18. Parking System Development in the Central Area
18. Parking System Development in the Central Area
Parking system development is studied in order to restrict the vehicle use in the central
area. The parking facilities will be provided and public transport will be the principle
transport mode in the central area.
As shown in Table 18.2.1, there are approximately 22,000 vehicles parked in the central area
of Bucharest. Of this amount, nearly 4,000 (18%) are located in off-street parking facilities,
and the remaining 18,000 (82%) occupy on-street parking spaces. Of these 18,000, however,
about half is in arranged parking spaces; the remaining 50% (about 9,100 vehicles) are parked
in undesignated areas, including illegal parking on sidewalks. Clearly, parking is a critical
issue that requires immediate attention.
With regard to the future parking demand, it can be estimated from the growth of the future
vehicle trips. As elaborated in Chapter 11, the future traffic demand in the optimal alternative
case increases by as much as 20% of the existing demand. However, owing to the
multi-centered development plan, the trip attraction to the central area will grow to as much as
3.4% of the existing trip attraction. Hence, the future parking demand in 2015 is estimated to
be 67,900 vehicles in terms of cumulative total. Consequently, the incremental future parking
demand in the central area is calculated as 22,000 vehicles.
18-1
18.2.2 Development Concept
As explained in the Masterplan, the parking on-street is proposed to be restricted to the area
enclosed by the central circulation road. For this purpose, it is indispensable to improve the
public transport system on the one hand and develop the parking facilities on the other hand.
The parking system development in this study is not necessarily aiming to meet all the
expanding parking demand, but rather aiming to reduce the on street parking. Since the on
street parking has not been illegal in Bucharest except for some specific zones such as the
streets in front of hospitals, important buildings etc. a sudden introduction of parking
restriction without providing a substitute facility may result in traffic disorder because an
alternative transport mode is not attractive yet and usually requires many years to be
developed. Accordingly the following parking development policy is proposed in order to
carry out the parking restriction without causing a chaotic condition.
1) The parked cars at off-street parking will not be taken into account for preparing the
parking facility development plan, since it aims to reduce the on-street parking.
2) The restriction is not applied to parking at road side spaces already arranged for parking
use, since they are normally designated not to affect vehicular as well as pedestrian traffic.
3) Among the parked vehicles on-street, those at unarranged spaces are classified into vehicles to be
removed and accommodated in the off-street spaces and ones to remain at the on-street spaces.
4) For the above purpose, all the roads in the central area are to be classified in terms of the manner of
road use. Some roads should be used exclusively for vehicular traffic to secure smooth traffic flow,
while others may be used as an additionally arranged parking space. The latter may be better used
as a pedestrian mall. Accordingly, at first it is indispensable to identify what purpose a street should
be used for.
5) Off-street parking facilities should not be excessively supplied in the central area and
should be developed to accommodate only the existing demand barred from parking in the
restricted area.
As mentioned above, parking demand in the central area will increase in accordance with the
traffic growth in future, however, further development of parking facilities should not be
made for the purposes (a) to encourage people converting to public transport use from
private vehicles, (b) to promote the “park and ride” policy.
6) Outside the central area, parking facilities should be developed with sufficient capacity,
particularly at the suburban metro terminal areas and the fringe areas, for pursuing the
above policy.
The above policy provides that all the parking demand in the restricted area is guaranteed to
be accommodated in the legal spaces for the time being, however, this restricted demand will
gradually become larger year by year in accordance with the traffic growth.
Accordingly it will be important to decide what type of parking should be prioritized and
what type should be discouraged.
Parking for professional business, goods delivery, service vehicles must be accommodated.
Although the number of residents in the city center has been decreasing, the density is still
quite high, about 150 to 190 persons per ha. Most of the residents do not have garages.
Therefore the parking demand for residence is also to be given higher priority.
Consequently the parking for other purposes such as shopping and private purposes, should be
reduced, -particularly commuting trips should be restricted because their average parking
duration is much longer than others.
As experienced in some European cities, the volume and the structure of parking can be
controlled by means of parking fees. For instance, if the parking for commuters is discouraged,
a progressive fee system is applied, that is the hourly fee increases with parking duration.
18-3
18.2.3 Road Classification in Terms of Road Use
In order to identify whether the road side spaces can be used as a parking area or used for
other purposes, all the roads in the central area are classified into the following 4 categories.
Category A: Roads exclusively used for vehicular traffic including public transport
- The roads are mainly composed of arterial and semi-arterial roads.
- On street parking is generally prohibited.
- The existing roadside parking spaces are exceptional, but additional parking lot will not be
provided.
Category B: Roads used for vehicular traffic including public transport, but also used for
parking only if it does not affect traffic.
- The roads are mainly regarded as collector roads, and are supposed to function to substitute
or supplement the Category A roads. Consequently Category B roads, together with Category
A, make up the total network for vehicular traffic including public transport.
- On-street parking is allowed only at arranged spaces
- On-street parking is not allowed if it affects the traffic condition that two vehicles can pass
by each other.
- If parking does not affect the traffic condition, space will be additionally arranged for
parking use.
In applying the above categories to the actual road network in the central area, the following
factors are taken into account.
As a result, the roads in the central area can be classified as shown in Figure 18.2.2.
18-4
18.2.4 Parking Facility Development Plan
(1) Overall Development Plan
A parking facility development plan is prepared for both the off-street and on-street facilities.
Parking should be located in the same zone as the parking demand or a nearby zone.
b. Development Plan
Taking into account the land availability for developing parking facilities, the site location, the
parking facility development plan is formulated as shown in Table 18.2.3 and Figure 18.2.3.
18-6
2) On-street Facilities
Based on the development concept, parking facilities on-street should be additionally
arranged for the roads, Category B and Category C.
a. For Category B, the remaining half of the parked vehicles at the unarranged spaces at
roadside are to be covered by additionally arranged spaces at roadside.
b. Similarly, in case of Category C, all the vehicles parked on streets are regarded to be
accommodated within the road space, therefore, unarranged spaces will be changed to
arranged.
As a result, the following spaces are to be additionally arranged as parking lots on-street.
Table 18.2.4 Parking Spaces to be Arranged On-Street
Zone Parking Spaces Zone Parking Spaces
1 154 11 173
2 0 12 570
3 538 13 7
4 129 14 19
5 341 15 412
6 119 16 583
7 53 17 395
8 906 18 1
9 68 19 11
10 0 20 10
Total 2,308 Total 2,171
Grand Total 4,479
18-8
Figure 18.2.5 Layout Plan of Piata Decebal Parking
18-9
Figure 18.2.6 Layout Plan of Parking Balcescu
18-10
18.2.5 Parking Information System
When parking restrictions are introduced in the central area, they may have a negative side
effect.
Because of the limited number of parking spaces, there will be a fairly high proportion of cars
driving around in search of vacant parking spaces. This may cause additional traffic
congestion on the access roads to main parking facilities.
In order to reduce the number of such cars searching for parking space on the roads, and raise
the efficiency of parking facilities, the introduction of a parking information system is
proposed.
The parking information system is to inform the vacancy of parking spaces to the drivers
through radio or a message sign board installed at the roadside. The information on the
vacancy of parking spaces is usually collected from the automatic parking charge calculator
installed at the entrance of parking facilities. This system is applicable to roadside parking
spaces as well by installing parking meters.
P Vacant P Full
P P
P
P
P P
Message Board
18-11
Table 18.3.1 Construction Cost
Surface/Building Unit cost Const.cost
Location
Underground (US$/) (1000 US$)
1) Academiei/Doamnei Building 610 4,697
2) Nicolae Balcescu Underground 510 4,820
3) Pta.Decebal Building / Surface 610 10,510
4) Pta.Salii Palatului Underground 510 10,710
5) Pta.Revolutiei Underground 510 13,923
6) Pta.Galati(Bdul Dacia) Building 610 1,068
7) Armand Calinescu Underground 510 536
8) Regina Elisabeta Underground 510 17,850
9) Bdul Unirii/Libertatii Underground 510 10,710
10) Natiunilor Unite Surface 70 490
11) Bdul Libertatii Surface 70 833
12) Pta.Concordiei Surface 70 98
13) Panait Cerna Underground / Building 560 588
14) Str.Ion Nou Surface 70 49
Total 76,882
Note: the area required for a parking lot is assumed to be 35m2
18-12
18.4.2 Implementation Concept
The parking restriction policy cannot be successfully carried out if the parking regulation is
not strictly enforced and well published to drivers.
If the drivers have learned that they have little chance not to pay, or face much higher fines for
attempting to avoid paying fees, the illegally parked vehicles will decrease and the legal
parking facilities will be effectively utilized, even if a higher parking fee system is
strategically adopted. As observed in many European cities, the parking restriction should be
accompanied by “pull” strategies that emphasize attractive and alternative modes for car users
in the long term. These include:
a) An attractive and modern public transport system, which is more economically efficient
than car use
b) More favorable and pleasant conditions for pedestrians and bicycle users
As stated above, the parking restriction requires the development of parking facilities as well.
For the implementation and operation of the parking facility, the following three alternatives
can be identified;
a) Municipality or related agency
b) Private Sector
c) Third Sector (Joint venture by Municipality and Private sector)
Since the government budget is limited, it may be advisable to attract private sector’s finance
as much as possible. Since the facilities to be developed are located in the central area, it may
not be so difficult to realize the investment from private sector if the related conditions are
found to favorable for the investors. In the case of involving the private sector, there are
several forms of project implementation and operation. A typical method is the BOT (Build,
Operate, Transfer) scheme.
In this context, the land property generally belongs to the government, the private sector will
finance the construction of the parking facility and operate it for a certain period and finally
return it back to the government. The initial investment and operating cost are recovered by
income from the parking charges. The operation period for the concession is usually
determined by contract.
In order to reduce the vehicle inflow into the central area, and promote the use of public
transport, the parking charge in the central area should be sufficiently high. If it is operated by
a private company, however, the parking charge will be determined by the company without
any attention to the public transport oriented policy.
Because of its characteristics as social infrastructure for public use, the Municipality in
general has the right to oversee the due performance of the implementation / operation body
irrespective of whether it is a private or other form of entity.
The time saving benefits and VOC saving benefits were estimated and the economic analysis
18-14
was performed under the following premises;
Premise 1 Increase of the capacity for the road section by eliminating roadside parking cars
through the implementation of strict car parking regulations and construction of
parking facilities (4,000 PCU per day)
Premise 2 Increase of velocity on the road by eliminating roadside parking cars (5km per
hour)
As shown in Table 18.5.1, this parking system development project was judged to be viable
because of its high IRR value of 13.7%.
Table 18.5.2 shows the sensitivity analysis of this project. Except the decrease of the foreign
exchange rate, the three economic indicators could be sensitive against the factor changes.
Other than the above quantitative economic benefits, the parking system development in the
central area has other uncountable important benefits. The shortage of parking space in the
central area is considered to occur the following problems;
a) The attractiveness of the central area as a commercial area may be gotten lost,
b) Business activities may become slumped,
c) Many customers may prefer the shops located outside of the central area.
Therefore, the development of the parking system is indispensable for enhancing the
attractiveness as a commercial and business center, together with the improvement of the
public transport system.
18-15
(2) Financial Evaluation
Among fourteen parking facilities, three parking facilities, that is, Academiei/Doamnei,
Nicolae Balcescu and Pta. Decebal, were recommended to be implemented at the first stage.
The revenue and expenditure of these parking facilities were analyzed, based on the project
viability from the financial viewpoint, which summarized below;
a) These three parking facilities are not viable financially under the current parking fee level
alone.
b) Any private company cannot invest without a contribution from the public sector.
c) Under a 20% parking fee increase every five years and a contribution of two thirds of the
construction cost from the public sect, construction and operation of the parking facilities
becomes financially viable.
d) The construction and operation is performed by the third sector as mentioned in Chapter
15.2.3 from the viewpoint of the improvement of the parking facilities in the central area of
the Bucharest metropolitan area.
e) The public sector is requested to provide two thirds of the construction cost.
As shown in Table 18.5.3, these three parking facilities are not feasible from FIRR on
Investment, however, feasible from FIRR on Equity. As mentioned in 14.2.3, fourteen parking
facilities development until 2015 in the central area would be feasible for both FIRR on
Investment and FIRR on Equity. Therefore, even though these three parking facilities are not
viable from FIRR on Investment, these three parking development project should be
implemented, together with other parking development projects.
18-16
Parkings- NOx
7,000.0
Parkings-CO2
3,000,000 69 69
16,941.7 17,842.8 Public
Public 6,000.0
Private
2,500,000 Private
5,000.0 Freight
Freight
2,000,000
NOx (kg/day)
4,032 4,037
CO2 (kg/day)
4,000.0
2,211,493 2,214,251
1,500,000
3,000.0
1,000,000
2,000.0
500,000
1,000.0 2,149 2,149
546,139 546,135
0
0.0
M P case M P except Parkings
M P case M P except Parkings
18-17
Table 18.5.5 Matrix Table of Environmental Impacts by Project Phase- Parking System
Major facilities, activities Facilities/ Construction
which may Before Operation After Operation
cause impacts Overall Reclamation Operation of Accumulation
Evaluation and spatial construction Occupancy Operation of people and
Environmental Factors of land
occupancy equipment goods
1. Resettlement
2. Economic Activities
Social Environment
1) Cultural Property
Special attentions to historical and cultural assets in historical zone should be made especially
during contradiction. Some of proposed toll parking are underground structure, so that
excavation shall carefully proceed for preventing vibration to surrounding buildings.
2) Waste
The plan proposes underground parking structure. Large amount of construction waste will
occurred by excavation. Both transferring and depositing construction wastes shall be
managed properly.
3) Landscape
Structural design of parking both underground and surface including building type parking
shall pay attention to surrounding atmospheres and shall harmonize with them.
4) Vibration
Historical buildings located in proposed sites are weak to vibration. Construction method
especially construction machines and its operation, which occur vibration, shall be considered
low vibration method.
18-18
19. New Public Transit Corridor Development
19. New Public Transit Corridor Development
The route between Alexandria and Colentina is selected to form the main public transport
corridor. The plan contains construction of segregated tracks, introduction of
environmentally sound high speed trams, construction of automatic switcher,
establishment of public transport priority signaling system, and is designed to make step
by step improvement from the existing tram operation.
19.1.2 Outline
For the improvement of capacity, operation speed and comfort, following measures will be
performed.
- Modernized rolling stock is to be mobilized.
- Public transport priority signals and automatic point switch movements are to be introduced.
- Segregated track is to be introduced where possible.
(1) Key Issues to be Solved
- Deteriorated running conditions
- Confusing use of road space with general traffic
(2) Planning Condition
- Staged construction from existing tram
- Jointed use of track with existing tram
19-1
Table 19.2.2 Assumed Specification of New Type Tram
items Specification
New type tram Proposed by HTA
- vehicle length 37m
- vehicle width 2.65m
- maximum height 3.55m
- maximum speed 70 km/h
- maximum speed 80 km/h
- average speed minimal 25 km/h
- horizontal curves
- the normal minimum horizontal radius Rh=100m
- absolutely minimum 50m
- on depots and in other sections 25m
- The upgrade cab exceed to a maximum of 4.5%
- convex-position Rv=1500m
- concave-position Rv=2000m
Platform for stops - height of the floor 0.60m(0.55m)
- the length of the new type tram-car 37.5m
- minimum length of platform 75m
19-3
1) Selection of Route Alternatives in the Central Area
a. Piata Unirii Area
The selection of the route at Piata Unirii is currently missing and cross-center linkage shall be
newly delineated.
Following two alternatives are considered in Piata Unirii area. The route passing north part of
Piata Unirii was proposed after the comparison of the alternatives (Table 19.2.4 and Figure
19.2.3).
Regarding the route comparison Alternative 1 is preferred at this moment. However planning
condition is not concrete because the cathedral construction proposal at Piata Unirii recently
arose. Route delineation at Piata Unirii still needs to be further discussed hereafter.
At Piata Unirii the track location inside was adopted for the new tram route on Calea Victoriei
because of the less influence on the general traffic (Figure 19.2.4).
19-5
- No sharp curves are existing.
- Influence of duplicated operation of tram routes on the same track is small.
(Duplicated operation of routes on the same track is likely to reduce the performance
of New Type Tram.)
Concerning this route (relocation of tram route), extension of tram routes between northern
Bucharest and Sf. Gheorghe is preferable for rectification of existing tram routes. Also
alteration of tram routes on Calea Calarasi will be necessary to avoid the duplicated use of the
same track by tram routes.
Rearrangement of tram routes affected by the new type tram introduction will be necessary on
the principles of the public transport network formation.
19-9
Table 19.2.8 Route Data Relevant to the New Type Tram Route
route no. route length round vehicle-km vehicle-km pax./day Ave. trip Ave. number of pax
trips/day (1,000 pax./day) Length (km) (pax./veh.)
1 25.6 34 869.3 2135.3 9 4.6 47.6
2 25.4 76 1931.0 781.5 25 5.7 73.8
5 32.1 118.5 3809.1 1975.9 163 5 214.0
8 28.6 129 3683.1 3037.3 59 4.6 73.7
14 16.1 124.5 2008.2 735.6 41 4.6 93.9
15 30.5 129 3935.5 1574.6 47 4.8 57.3
16 30.3 183 5541.9 2226.3 121 3.6 78.6
18 17.4 73 1273.5 1549.1 38 3.7 110.4
21 15.0 260 3910.2 1230.8 127 3.2 103.9
23 27.6 47 1298.9 2077.8 16 4.2 51.7
30 21.5 98 2104.2 2268.3 25 3.8 45.1
32 10.5 314 3284.8 252.3 65 2.1 41.6
37 22.2 49 1085.6 2134.8 14 5.2 67.1
52 15.8 50.5 798.4 625.6 16 3.2 64.1
Source: RATB and JICA Study Team
As an elementary central control system ATS (automatic transport assistance system) has
been partly introduced by RATB since 1984 for some bus and trolley routes. This system is
composed of radio transmitter, receiver and computers. The location of bus or trolley bus is
detected by receiver and displayed on the screen of the computer at control center. And the
command on the bus operation for adjustment is transmitted to the bus by radio to avoid the
chained operation of vehicles. However this system only displays the information on the
number of buses or trolley buses in the section and no precise location data of each bus or
trolley bus is informed. Therefore it is difficult to control traffic light and switcher based on
this system. For the realization of appropriate traffic control and switcher control, more
advanced system which enables to detect the location of vehicle and send command for
control is necessary (Figure 19.2.9 and Tables 19.2.9 and 19.2.10).
19-13
Table 19.2.10 Types of Public Transport Control System
Contents
Local ex. track The receivers along the route detect the access of the tram.
control installed type This system tram can operate priority traffic light. Advanced system is necessary to
system I identify the direction of the tram at intersection.
Local ex. cable Contacters are set on the cable, and when the tram contact the device signal is remitted to
control mounted type relay device.
system II The switcher is automatically operated responding to the time difference between contacts.
Central ex. vehicle Radio transmitter is mounted on the car. The signal from the transmitter is to be detected at
control mounted type central control center.
system This system tram will operate priority traffic light system and automatic track switcher
automatically by computer.
Source: JICA Study Team
Electricity power is supplied to the tram through catenary with a DC voltage of approximately
750V. The rail track is used for the return current from tram to the substation. RATB has its
own improvement plan of power supply system. The brief check of the required charge level
necessary for the new type tram operation was made based on the following assumption:
It was proposed to improve the power supply system as an essential condition for new type
tram introduction (Table 19.2.12 and Figure 19.2.12).
This system shall be designed to respond to the arrival of tram for the safety of passengers to
cross the carriage way when boarding and alighting.
19-15
2) Necessary Number of Tram Trains
In case of 2-minute headway at peak period, necessary number of tram trains are estimated
below.
- route length 13.2 km
- commercial speed 22.5 km/h
- necessary number of tram trains
(13.2 km x 2)/(22.5 km/h) x (2 min./60 min.) =about 35 (tram trains)
Other than above 10% of necessary number of tram trains are considered as spare trains
totaling 39 tram trains.
Category
(5) Facilities
1) Easy Boarding and Alighting, Safety
The level difference between platform and floor of tram shall be reduced. Introduction of low
floor vehicles is desirable (Figure 19.2.11 and 19.2.12).
The horizontal gap between platform and doors of vehicles shall be also reduced.
The platform shall be relocated after crossing the intersection (Figure 19.2.13).
19-17
19.4 Implementation Plan
(1) Implementation Schedule
Implementation schedule is assumed below.
Fund procurement is a dominating factor for the implementation of the project. Large
investment cost is required not only for the improvement and construction of track but also
for the improvement of power supply system and installation of controlling system. It is
difficult for RATB to procure all investment funds and redeem by itself. Utilization of foreign
soft loan from international organization or bi-lateral organization is desirable. In order to
examine technical, economic and financial feasibility of the project, a further study should be
conducted urgently. Utilization of foreign soft loan from international organization or bi-
lateral organization is desirable.
Direction total time (ave.) ave. time (stops and intersections) ave. speed
Tram Route 21 (7.5 km)
Sf. Gheorghe - Colentina 1951 sec. 818 sec. 15.1 km/h
Colentina - Sf. Gheorghe 1871 sec. 817 sec. 15.4 km/h
Tram Route 32 (5.2 km)
Piata Unirii - Dep. Alexandria 1056 sec. 311 sec. 17.7 km/h
Dep. Alexandria - Piata Unirii 1388 sec. 535 sec. 13.5 km/h
19-20
a) the waiting time at intersection is 0 sec. owing to the tram priority traffic light, automatic
switcher, and exclusive tram track,
b) running speed is 25 km/h,
c) stopping time at stop is 16 sec.
The expected commercial speeds were estimated at 20.7 km/h for tram route 21 and 20.6
km/h for tram route 32. If the running speed is 30 km/h, the expected commercial speeds were
estimated at 23.1 km/h for tram route 21 and 23.9 km/h for tram route 32.
As a result, 22.5 km/h is considered to be suite likely to be obtained by the new type tram.
The effect on time reduction was estimated based on this figure.
As for the economic analysis for the new public transit corridor development (introduction of
the new type tram), EIRR of this route shows 17.6% for the Colentina – Unirii – Alexandrai
route (Route TR32) as shown in Table 19.5.1, which can be considered feasible. Comparing
EIRRs of the section Unirii – Alexandra with the section of Colentina – Unirii route, the
former section shows the higher value of EIRR. As a result, the Unirii – Alexandria section
was selected the priority section for the new public transit corridor development. Table 19.5.2
shows the sensitivity analysis for Colentina-Alexandra new tram route project, which
suggested that there was no sensitivity problems for this project.
19-21
cost including construction cost. However, it is much higher than 0.323 of the usual type tram.
Therefore, it could be concluded that the new type tram can manage to operate in the black if
the construction cost is contributed. If not, some subsidy will be necessary for the new tram,
however, the amount of subsidy can be reduced compared with the usual tram operation.
NOx (kg/day)
4,169
2,000,000 Freight 4,000 4,032 Public
2,211,493 2,286,751 Private
1,500,000 3,000
Freight
1,000,000 2,000
2,149 2,330
500,000 1,000
546,139 592,012
0 0
MP case MP except New Tram MP case MP except New Tram
Figure 19.5.1 Estimation of Emission Amount (CO2 and NOx) – New Tram
19-22
2) Environmental External Cost
External costs of Green House Effects (CO2) and Air Pollutant (NOx) are estimated based on
the emission estimation. As a result, 706 Euro/day in CO2 and 6,994 Euro/day in NOx are
estimated.
Table 19.5.4 Environmental External Costs –New Tram
Balance ( MPa-MPb)
MP case MP except new tram
in euro
CO2 NOx CO2 NOx CO2 NOx
Public 97 621 113 725 -16 -103
Private 12,606 32,252 13,034 37,519 -429 -5,266
Freight 3,113 19,341 3,374 20,966 -261 -1,625
Daily total 15,815 52,215 16,522 59,209 -706 -6,994
Yearly total 5,772,499 19,058,487 6,030,368 21,611,334 -257,869 -2,552,848
Table 19.5.5 Matrix Table of Environmental Impacts by Project Phase- New Tram
Major facilities, activities Facilities/ Construction
which may Before Operation After Operation
cause impacts Overall Reclamation Operation of Accumulation
evaluation Occupancy
and spatial construction Operation of people and
Environmental Factors of land
occupancy equipment goods
1. Resettlement
2. Economic activities
Social Environment
19-23
1) Traffic Flow
During construction of new rail infrastructure, some impacts on traffic flow will be occurred
especially central part of the city, which aligns on narrow streets.
2) Noise
As same as traffic flow, noise impacts were identified during construction and operation
stages.
Regarding external cost, both Green House Effects (CO2) and Air Pollutant (NOx) were
estimated as positive results. CO2 and NOx were estimated 257,869 Euro/year and 2,552,848
respectively.
19-24
20. Fare System Improvement
20. Fare System Improvement
Integration of the fare system, ticketing system and supporting devices and introduction of
common ticketing system among different public transport administration bodies as a
participants is proposed to improve the convenience of transferring and rationalization of
the public transport management bodies.
20.1.2 Outline
Integration of fare system, ticketing system and supporting devices will be promoted and
common ticketing system will be introduced among different public transport administration
bodies as a participant.
Revenues are pooled and then distributed to each participating public transport body
according to certain rules agreed upon.
1) formation of rapid and convenient public transport system will be established by area
servicing public transport and trunk public transport with high speed and large transport
capacity
2) minimization of transferring time and number of transferring times through a unification of
operation system
3) simplification of the fare system so as to achieve convenient transferring to enable
passengers to travel any destination with only one ticket
4) formation of the network in accord with the activities of the passengers
"Unification" of public transport is the key word to improve the convenience of transferring in
public transport system. Unification of public transport implies the following;
1) unification of operation
2) unification of ticketing system
20-1
3) unification of tariff
4) unification of public transport network
5) unification of public transport policy
Convenience of transferring will be much improved by the public route setting, diagram
setting, improvement of facilities, provision of convenient fare and ticketing system with the
background of supportive public transport policies assuming transferring system.
In Western Europe the unification of fare system and common ticketing system are adopted in
many cities. Verkehrsverbund in Germany is one of the representative examples of such
system.
* Verkehrsverbund in Germany
EC regulation 119/ 69 stipulates that cost for transport service should be recovered by
the revenue from the sales of the ticket and so on and otherwise if impossible,
transport service should be entrusted to the transport company by means of bidding
based on the judgement of the authority involved.
Although the frame for the consensus to fare system based on the law on passenger
transport is retained, the standard to meet the transport policy for consensus on the
fare system was abolished on this occasion.
- In Germany urban public transport has a multi-layered structure comprising public
transport service by federal government and public transport services (metro and
tram) by local companies.
- "Verkehrsverbund" in Germany is the structural measure to unify the fare system
and to promote the coordination and restructuring of transport service in such
circumstances.
- Verkehrsverbund is usually established as a company cooperatively invested in by
the transport companies located in the peculiar local area to coordinate transport
services including the diagram and fare system provided by the participating
companies.
- In such a case, a common fare system is to be applied to all transport services
provided by the participating companies in the area considered.
- Usually revenues from the sales of the tickets are pooled once within the
Verkehrsverbund and then distributed to each company based on rules agreed
beforehand.
20-2
Common ticketing system enables passengers to use different public transport
modes provided by administrative entity or administrative entities with a common
ticket.
Common ticketing system seems relatively easy to be introduced and actually is
often introduced as the set with a transfer discount fare system.
* Transfer discount fare system
Transfer discount alleviates the burden of the fixed transport fare accruing
to the transferring between different public transport modes by
administrative entity or administrative entities
b. Demerits
- Some possibility emerges to hinder the self-effort to improve managerial
efficiency.
- The cost increases because of the liquidation of the revenues for each public
transport entity.
It can be said that the needs of users and necessity of managerial restructuring existed on the
background and conditions for the consensus for a unified fare system had matured.
In the situation surrounding the public transport in Bucharest Metropolitan area from this
point of view, the same conditions can be found concerning the needs of public transport
passengers and administration entities.
They are the following;
- Competitive routes by different transport modes are observed and profitability of
these routes are depressed.
- The public transport network is not easily understandable for the users due to the
lack of a unified public transport operation plan.
- The fixed cost accruing to the transferring lowers the convenience of public
transport and becomes a factor to hinder the use of public transport.
- The cost for infrastructure, facilities, and personnel due to the difficulty in
establishing streamlined and efficient public transport network.
Considering the above, the necessity of the unified fare system for the urban public transport
in Bucharest Metropolitan area is evident.
20-3
Confirmation of the details of unification of fare system and formation of consensus is
required in Bucharest Metropolitan area.
20.2.2 Basic Plan
(1) Type of Unified Fare System
1) Types of Fare System
Types of fare system are the following:
20-4
Actually the combination of above fare collection and ticket checking and canceling system is
adopted according to the fare system.
3) Combination Types of Fare Collection and Ticket Checking and Canceling
Combination types of fare collection and ticket checking and canceling are summarized below
(Table 20.2.2 and Figure 20.2.1).
20-5
(2) Supportive Facilities, Devices and Personnel
The supportive facilities and devices differ according to the type of ticket such as magnetic
ticket, non-magnetic ticket and contact-less ticket. Also the number of personnel and
distribution of personnel are affected.
The representative ticket types are following:
a. METROREX
Flat fare system is adopted. Main ticket types are the following.
- normal ticket valid for 2 trips
- one day trip ticket (valid for two trip)
- communication ticket (10 trips)
- season ticket (one month)
Magnetic tickets are adopted.
b. RATB
Flat fare system is adopted. Different flat fare system is adopted for express buses and
regional buses (beyond 30 km).
Main ticket types are following. Non-magnetic tickets are used, however as for the surface
public transport it is only used for express buses.
- one way ticket valid for one route
- one day ticket (valid for all routes in urban area)
- season tickets (one week, half month and one month are adopted as duration of
validity. various ticket types are available depending on number of routes
available and area.)
RATB has a plan now to adopt magnetic ticketing system or contact-less ticketing system.
20-6
Table 20.2.4 Representative Liquidation Method and Cost Sharing Method
d Commonly observed method; Other method
Ticket
Liquidation method Cost sharing method for ticketing
issuing
Season Issuing same d proportional distribution to d independent sharing by company without mutual
ticket ticket vehicle-km adjustment
d proportional distribution to the
number of operation d entrusting ticket seller at the cost of sales commission (ex.
d proportional distribution to place- some 5% of total amount of ticket sales) for ticket production
km and sales
d proportional distribution to d entrusting ticket seller at the cost of sales commission and
passenger-km sharing the cost for ticket production by the operation
n combination of fixed ratio and companies in proportion to the number of operation, etc.
proportional distribution to the n equal sharing (in case of equal distribution)
vehicle-km
n equal distribution (In case no
discerning difference in transport
capacity by company is recognized)
Coupon Issuing own d proportional distribution to tickets d independent sharing by company without mutual
ticket, company at destination adjustment
ordinary ticket d proportional distribution to place- n entrusting ticket seller at the cost of sales commission for
ticket km only sales
d proportional distribution to
passenger-km
Coupon issuing same d proportional distribution to tickets d entrusting ticket seller at the cost of sales commission for
ticket, ticket at destination only sales
ordinary d proportional distribution to place- d entrusting ticket seller at the cost of sales commission and
ticket km sharing the cost for ticket production by the operation
d proportional distribution to companies in proportion to the number of tickets or amount
passenger-km of tickets at destination, etc.
n proportional distribution to n independent sharing by company without mutual
number of operation adjustment
n proportional distribution to sales n sharing the costs for ticket production, ticket selling,
amount accounting work for tickets at destination
n equal distribution n equal sharing
1) Cost for Inspector Increase and Benefit from Fare Evader Decrease
Since magnetic cards are used at Metrorex, the number of inspectors for ticket checking is
low. On the contrary the number of inspectors in RATB is large because self-service checking
system on board with non-magnetic card is adopted.
The number of inspectors in RATB was almost doubled from 1992 to 1999 and also numbers
of disclosed fare evaders increased corresponding to the increase of number of inspectors.
Though the increase of inspectors was supposed to have an effect on the decrease of fare
evaders, no apparent evidence to exist that effort.
Presently the rate of fare evaders are estimated some 25% for surface transport and 6% for
Metro according to the survey result in "Pre-investment Study for Bucharest Urban Transport,
1998, EU PHARE".
20-8
Table 20.2.5 Comparison of Fare and Ticketing System
Fare system Ticket type Ticket Checking Problems Countermeasures Cost Benefit
1. Existing - flat fare - non-magnetic - ticket office - nothing relevant to public - increase of inspectors - inspector cost - decrease of fare evasion
system
improvement (Long distance (RATB) - self-servcie on board (RATB) Transport passenger increase - imposition of heavy penalty - passenger survey
route is exclusive.) - magnetic - automatic checking - large possibility of fare on fare evaders cost
- no transfer discount (Metrorex) outside of car at boarding Evasion - enforcement of passenger
- no time limitation (Metrorex) - insufficient statistical data transport survey
for validity on transport demand
2. RATB - flat fare - magnetic (RATB, - ticket office - nothing relevant to public - increase of inspectors - inspector cost - decrease of fare evasion
proposal 1 Metrorex)
(Long distance - self-service on board Transport passenger increase - imposition of heavy penalty - checking device
route is exclusive.) (RATB) - large possibility of fare on fare evaders - vending machine
- no transfer discount - automatic checking Evasion - statistical center
- time limitation for validity outside of car at boarding
(Metrorex)
3. RATB - flat fare - magnetic (RATB, - ticket office - nothing relevant to public - checking device - decrease of fare evasion
proposal 2 Metrorex)
(Long distance - self-service checking Transport passenger increase - vending machine - decrease of the number of
route is exclusive.) inside of car at boarding - possibility of the boarding - statistical center inspectors
- no transfer discount - automatic checking and alighting time increasing
- time limitation for validity outside of car at boarding Because of the separation of
(Metrorex) entrance and exit
4. Common - flat fare - magnetic (RATB, - ticket office - nothing relevant to public - checking device - decrease of fare evasion
ticket 1 Metrorex)
(Long distance - self-service checking transport passenger increase - vending machine
route is exclusive.) inside of car at boarding - possibility of the boarding - statistical center
- free transfer within - automatic checking and alighting time increasing
each organization outside of car at boarding because of the separation of
(RATB, Metrorex) (Metrorex) Entrance
- time limitation for validity
5. Common - flat fare - magnetic (RATB, - ticket office - possibility of the boarding - checking device - increase of public transport
fare 1 Metrorex)
(Long distance - self-service checking and alighting time increasing - vending machine passengers
route is exclusive.) inside of car at boarding because of the separation of - statistical center - decrease of fare evasion
- free transfer among - automatic checking Entrance - liquidation cost - decrease of the number of
participating organizations outside of car at boarding - rise of ticket fare inspectors
- time limitation for validity (Metrorex) - revenue distribution
20-9
6. Common - flat fare - non-magnetic - ticket office - large possibility of fare - increase of inspectors - inspector cost - increase of public transport
fare 2
(Long distance (RATB) - self-servcie on board (RATB) Evasion - imposition of heavy penalty - passenger survey passengers
route is exclusive.) - magnetic - automatic checking - insufficient statistical data on fare evaders cost - decrease of fare evasion
- free transfer among (Metrorex) outside of car at boarding on transport demand - enforcement of passenger - liquidation cost
participating organizations (Metrorex) - difficulty in inspection transport survey
- time limitation for validity at peak period
- rise of ticket fare
- revenue distribution
7. Common - flat fare - magnetic (RATB, - ticket office - large possibility of fare - increase of inspectors - inspector cost - increase of public transport
fare 3 Metrorex)
(Long distance - self-servcie on board (RATB) Evasion - imposition of heavy penalty - checking device passengers
route is exclusive.) - automatic checking - rise of ticket fare on fare evaders - vending machine - decrease of fa re evasion
- free transfer among outside of car at boarding - revenue distribution - statistical center
participating organizations (Metrorex) - liquidation cost
- time limitation for validity
8. Common - flat fare - magnetic (RATB, - ticket office - possibility of the boarding - issuing short time/distance - checking device - increase of public transport
fare 4 Metrorex)
(Long distance - self-service checking and alighting time increasing ticket - vending machine passengers
route is exclusive.) inside of car at boarding because of the separation of - statistical center - decrease of fare evasion
- free transfer among - automatic checking Entrance - liquidation cost
participating organizations outside of car at boarding - rise of ticket fare
- no time limitation (Metrorex) - revenue distribution
for validity
9. Common - flat fare - non-magnetic - ticket office - large possibility of fare - increase of inspectors - inspector cost - increase of public transport
fare 5
(Long distance (RATB) - self-service on board (RATB) Evasion - imposition of heavy penalty - passenger survey passengers
route is exclusive.) - magnetic - automatic checking - insufficient statistical data on fare evaders cost - decrease of fare evasion
- free transfer among (Metrorex) outside of car at boarding on transport demand - enforcement of passenger - liquidation cost
participating organizations (Metrorex) - difficulty in inspection transport survey
- no time limitation at peak period - issuing short time/distance
for validity - rise of ticket fare ticket
- revenue distribution
10. Common - flat fare - magnetic (RATB, - ticket office - large possibility of fare - issuing short time/distance - inspector cost - increase of public transport
fare 6 Metrorex)
(Long distance - self-service on board (RATB) Evasion ticket - checking device passengers
route is exclusive.) - automatic checking - rise of ticket fare - vending machine - decrease of fare evasion
- free transfer among outside of car at boarding - revenue distribution - statistical center
participating organizations (Metrorex) - liquidation cost
- no time limitation
for validity
20-10
In this study, the based on the following assumptions, the necessary number of inspectors to
lower the rate of fare evaders was roughly estimated as 334 inspectors for a one percent rate.
Table 20.2.6 Cost for the Increase of Inspectors and Decrease of Revenue Loss
Table 22.3.1 Benefit of the inspector increase
Rate of No. of Unit cost Total No. of fare Estimated loss
fare evadors inspectors evadors
(%) (pers.) (USD/year) (mil.USD/year) (mil.pax./year) (mil.USD/year)
Existing condition 25 530 2,000 1.06 252.7 25.27
Case 1 20 2,200 2,000 4.40 202.1 20.21
Case 2 15 3,870 2,000 7.74 151.6 15.16
Table 22.3.2 Benefit of the inspector Decrease and Decrease of Revenue Loss
Rate of No. of Unit cost Total No. of fare Estimated loss
fare evadors inspectors evadors
(%) (pers.) (USD/year) (mil.USD/year) (mil.pax./year) (mil.USD/year)
Existing condition 25 530 2,000 1.06 252.7 25.27
20-11
Table 20.2.8 Costs for Statistical Processing
RATB Metrorex Total
Common Ticket within RATB and Metrorex > Common Fare System -0.146 80,964 1.022
Existing fare system > Common fare system -0.180 198,537 1.055
Source: JICA Study Team
Note:1.52 was applied as multiplier of fare alteration in common fare system.
1.62 and 1.10 were applied to the fares of RATb and Metrorex respectively in common ticket system
within RATB and Metrorex.
In the case the improvement of transfer convenience is reflected by the time required for
transferring without raise of fair level, the expected passenger increase estimated in a same
way is shown in the table below (Table 20.2.10).
20-12
Table 20.2.10 Estimated Public Transport Passenger Increase
by Improvement of Transfer
Based on these forecasts the benefits from the passenger increase were estimated (Table
20.2.11 and 20.2.12).
In the comparison of the fare and ticketing system half cost was estimated for the non-
magnetic card system.
It was clarified that the minus cost by reducing the number of fare evaders is a decisive factor
for the project feasibility.
In case of the introduction of magnetic card system, checking of ticket shall be strictly carried
out, otherwise the advantage of the system is rather decreased compared with the non-
magnetic card system (Table 20.2.13).
20-13
Table 20.2.13 Comparison of Fare and Ticketing System
20-14
Following process is considered to be realistic for the realization of new fare and ticketing
system.
(1) Realization of common flat fare system for the public transport modes by same public
transport service supplier
(2) Realization of common flat fare system for the public transport modes regardless of the
public transport service supplier
The introduction of this ticketing system increases the number of passengers due to:
1) Passengers are not required to pay extra money to transfer public transport modes,
2) Passengers can save time at transferring points even if they do not have another mode’s
tickets.
Therefore, passengers save money and time to transfer, which increases the number of
passengers by public transport modes through decreasing the general cost (“fare” + “time cost
converted into money”) from origin to destination to move by public transport modes.
Since there are two entities to operate the public transport modes, one is RATB, the other is
METROREX, the following two economic evaluations were performed;
Case 1 : Introduction of common ticketing system for all public transport modes,
irrespective of RATB and METROREX
Case 2 :Introduction of common ticketing system among only RATB.
By using the common ticket, the following two points are assumed to try the economic
evaluation.
1) The passengers can save 5 minutes of time for transferring public transport modes.
2) The fare system is changed so that the short distance trip fare becomes a little higher than
the present fare.
20-15
From the above assumption, the general cost matrix was made using fare and time between
Origin and Destination. Using this matrix, the economic analysis was made as mentioned in
section 20.4. The results are shown in Table 20.5.1. Both case 1 and case 2 are viable,
however, Case 1 is recommended because of higher value of EIRR. Table 20.5.2 shows the
sensitivity analysis for introducing the common ticketing system, which indicates a little
sensitive values of the economic indicators, especially the change of 20%.
Table 20.5.2 Sensitivity Analysis for Introducing the Common Ticketing System
Change of Factors Indicators EIRR B/C NPV
-5% 0.130 1.067 10,474
Benefit Decrease -10% 0.122 1.011 1,714
-20% 0.104 0.899 -15,807
+5% 0.131 1.070 11,436
Cost Increase +10% 0.123 1.021 3,637
+20% 0.110 0.936 -11,960
-5% 0.134 1.090 13,978
Traffic Volume Decrease -10% 0.127 1.045 6,970
-20% 0.113 0.955 -7,046
-5% 0.134 1.096 15,335
Foreign Exchange Rate
-10% 0.131 1.070 11,436
Decrease
-20% 0.123 1.021 3,637
20-16
(233,061 million lei – 230,608 million lei) and RATB by 421,189 million lei (842,301 million
lei – 421,112 million lei), respectively. From the introduction of this system, RATB can
obtain almost two times the revenue, compared with the existing revenue. Looking at the
working ratio (revenue/cost), the financial position is expected to improve after introducing
this system.
This is the fact that according to a result of transit assignment, average transferring time is
1.23. In addition, opinion survey on willingness to pay carried out by JICA Study team shows
more than 76% of passenger changes 1 time transport shown in following tables.
Consequently, common ticketing system is acceptable for public transport user, although
appropriate public information including trial period shall be made.
20-17
Table 20.5.5 Transferring Transport Number from Opinion Poll Survey
Transferring Number Ratio
0 times 9 18%
1 times 38 76%
2 times 3 6%
50 100%
Source: JICA Study Team
This is the fact that according to a result of transit assignment, average transferring time is
1.23. In addition, opinion survey on willingness to pay carried out by JICA Study team shows
more than 76% of passenger changes 1 time transport shown in following tables.
Those aspects support to introduce common ticketing system, which is acceptable for public
transport user, although appropriate public information including trial period shall be made.
20-18
SUMMARY OF THE STUDY
1. Country Republic of Romania
2. Name of Study The Comprehensive Urban Transport Study of Bucharest City and Its
Metropolitan Area
3. Counterpart Agency The Municipality of Bucharest
4. Objective of Study Formulation of the Comprehensive Urban Transport Master Plan up to the
year 2015
i
Summary
1. Background
After the democratic revolution of the year 1989, the Romanian economy has been shifting from
a planned economy to a market economy. In the course of the transition, the purchase of
vehicles became deregulated and the number of vehicle owners is sharply increasing. The
average annual increase of vehicles registered for the past four years reached 4.7%. As it is
expected that the present increase of vehicles will continue in future, the study area will become
more congested and air pollution in the central area will be more serious. Thus, Bucharest may
make the same mistakes that the cities of Western Europe and the United States have made.
Bucharest stands at a turning point of going to which way and should establish a basic policy of
public transport for the future.
2. Objectives
The objectives of the Study are as follows:
1) To formulate a Comprehensive Urban Transport Master Plan of the Bucharest City and its
Metropolitan Area for the period up to the year 2015;
2) To conduct a further study on priority projects and programs which should be
implemented within 2 or 3 years after the completion of the Study; and
3) To carry out a technology transfer through the implementation of the Study.
3. Study Area
The Study Area (61,681 ha) is the “Bucharest Metropolitan Area” including the city of
Bucharest and its environ areas.
4. Traffic Survey
In order to grasp the trip behaviors of inhabitants of the Study Area, the person trip survey,
screen line survey, cordon line survey, travel speed survey, traffic volume counting survey,
freight movement survey, public transport passenger survey, parking survey, and passenger
opinion survey were conducted.
ii
n40% of trips by persons belonging to the car-owned household used their cars.
nLarge trip generation excluding “go-home” trips appears in traffic zones along the Inner
Ring Road and the Middle Ring Road where the population distributes. On the other hand,
the large trip concentration appears on central city zones and their surrounding zones
agglomerating commercial and business activities.
nTrips by mode heading for the center were depending on its modal development
condition.
iii
the basic network pattern and Multi-Modal Axis Pattern as the public transport network pattern
was selected as appropriate. By adding the following concrete points from the viewpoint of the
realisation of the projects, the Master Plan was finalised.
1) To reinforce the transport skeleton for the formation of the future urban structure
- The ring roads such as Central Circulation Road, Inner Ring Road, Middle Ring Road,
and Outer Ring Road will be completed.
- Metro line M4, a part of line M5 and line MR4 will be constructed as the radial axes of
the public transport.
- A new type of Tram will be introduced into the radial and ring axis routes of the public
transport system.
2) To support urban development cores
- The nodal points of passenger transfer between different transport modes such as Gara
de Nord, Obor and Sudului are also to be developed as commercial sub-centers.
- At these nodal points, the facilities for transferring between public transport modes are
to be improved.
- The intersections are to be improved to ensure smooth traffic flow.
- Parking facilities are to be provided to contribute to the fostering of future development
cores.
3) To improve the urban environment of the central area
- The concentration of road traffic will increase if the present tendency of car use
continues. Traffic demand management in the central area should be introduced.
- Parking areas are to be provided properly and the parking systems such as illegal
parking regulations are to be introduced.
- The public transport systems are improved.
- The cultural and historical blocks in the central area should be improved by providing
pedestrian malls, sidewalk and green space for citizens and tourists.
iv
Road Related Projects
Project Cost
Project Remarks
Contents (Million US$)
Inner Ring Road 9.61km 128.7 No.1 – 4
Central Circulation Roads 7.03km 31.9 No.5 – 9
Road Middle Ring Roads 15.84km 104.3 No13 –15
Development Connection roads between Inner Ring and
7.90km 22.9 No.10- 12
Central Circulation Roads
Outer Ring Road 75.00km 16.5 No.18
Connection roads to Autostrada 14.62km 143.6 No16, 17
Intersection improvement 8 intersections 89.8
4,700 vehicle
Parking system development 76.9
Traffic spaces
management Synchronization
Traffic signal & ITS 31.5
etc.
Street environment improvement Pedestrian way etc. 22.4
Others
Freight terminal development 2 terminals 8.5
Total 676.9
8. Implementation Schedule
In order to formulate the investment schedule of the projects proposed by the Master Plan, the
following items were considered.
- Projects which can solve the present problems efficiently without requiring a large amount
of investment should have priority.
v
- Projects that may be involved in any problems such as land acquisition should be
implemented considering the period for solving the problems.
- Projects with economic and financial returns should have higher priority.
- Projects that have a close relationship to each other should have related construction
timing.
- Financial resources capability should be considered.
- Investment amount in each year should be equalized if possible.
9. Priority Projects
Priority projects to be studied were selected from the projects that it is desirable to implement
within 2 or 3 years after the completion of the Study, according to the following criteria:
- Whether the project matches the urban structure in the intensive multi-center development
vi
pattern from the perspective of strategy;
- Whether the project concerns the completion of the Ring Road;
- Whether the project matches the public transport improvement in the Multi-Modal
Transport Axis Pattern;
- Whether the project contributes to the improvement of the central area;
- Whether the project can use the existing facilities;
- Whether the project have a high efficiency;
- Whether the fund procurement, land acquisition, and environmental effects have any
problems; and
- Whether a new Study is required.
vii
building construction plan that has recently arisen.
The major contents of the projects are as follows:
- Construction of segregated tracks in principle
- Introduction of environmentally sound high speed trams
- Construction of automatic point-switches
- Establishment of public transport priority signaling system (PTPS)
- Improvement of depots (Colentina, Alexandira)
- Improvement of power supply system (4 new sites)
9. Recommendations
(1) To realize the Master Plan, especially, priority projects
(2) To conduct the feasibility studies and/or basic designs necessary for preparing the fund
procurement and implementing the projects
(3) To proceed the legal and institutional reform necessary for the implementation of the
Master Plan
(4) To update and expand the data base according to the change of socioeconomic situation
viii