M A C O N N ER

Construction And Trading Incorporated


Email address:maconner.const@gmail.com/Office Address:Blk C1 Lot 6 Villa Caceres Subdivison,Brgy.Balibago Sta. Rosa Laguna/049 539 4072;09175450166
ITEM DESCRIPTION BRAND/COLOR QUANTITY UNIT COST UNIT COST TERMS OF PAYMENT AVAILABILITY OF STOCK WARRANTY EXCLUSION/INCLUSION REMARKS

Supply and Installation of 4mm thick 50% downpayment


ACP including fixing accessories: Alumaster 25% upon ex-stock,otherwise 4 to 8
10 years on Exterior Structural mainframe is
Panel Thickness: 4mm/0.3mm Color:Alumaster 562,817.50 delivery/mobilization weeks excluding approval
Application excluded
Panel Size: 1220mm x 2440mm Standards Colors 25% by way of of colors
Finish Coating:Polyester(PE) progress billing

1.) Supply and Installation of ACP


Roofing Fascia 223.50 sq.m 2,450.00 547,575.00
2.) Mobilization 1.00 lot 45,000.00 45,000.00
3.) Scaffolding 1.00 lot 25,000.00 25,000.00
4.) Discount-10% 0.10 54,757.50

Supply and installation of 4mm thick


ACP including fixing accessories:
Panel Thickness: 0.3mm Panel Size:
1220mm x 2440mm Finish 50% Downpayment; Indent/Importation Lead 1 year after final
Structural Steel Framing is
Coating:surface-Polyvinylfluoride 518,124.00 balance by way of Time for ACP not available: acceptance of ACP
excluded
(PVDF) back-aluminum coated with Progress Billing 45 to 60 days installation Work
Polyester (PE) service coat for rigid
bonding;center core material is
made of non-toxic polyethylene.

1.) Supply and Installation of ACP


Roofing Fascia 232.44 sq.m 2,100.00 488,124.00
2.) Mobilization 1.00 lot 30,000.00 30,000.00
3.) Scaffolding NOT INCLUDED
4.) Discount-10% NO DISCOUNT

50%Downpayment;
Supply and Installation of 4mm thick
45% Progress 1 year for
ACP including fixing accessories: Frames and Sub-frames
612,992.80 Billing;5% Full Payment workmanship;15
Finish Coating: Polyvinylfluoride included
7 days after issuance of years discoloration
(PVDF)
certificate of
completion.
1.)Supply and installation of
ACP(Frames and Sub-frames) 229.68 sq.m 1,300.00 298,587.00
Aluminum Tubular1x1x1mm
Aluminum < bar 3/4 x 3/4 x 1.8mm
Aluminum < bar 1.5 x 1.5 x 2mm
PU Sealant
Hardware Accessories-Black Screw
1";Wafer Teckscrew 10 x 22mm;5/16
Ø;Dynabolt 1" Ø;Blind Rivets 5/32 &
3/4;Backer Rod 12mm
Hardware Accessories-Black Screw
1";Wafer Teckscrew 10 x 22mm;5/16
Ø;Dynabolt 1" Ø;Blind Rivets 5/32 &
3/4;Backer Rod 12mm
2.) Mobilization/Demobilization 1.00 lot 25,000.00 25,000.00
3.)Scaffolding assembly and 1.00 lot 8,000.00 8,000.00
4.)Fabrication;Labor;Installation; Tools
and Equipment 1.00 lot 147,600.00 147,600.00
5.) Safety,Contingencies,duties and
delivery 1.00 lot 68,128.00 68,128.00
6.)VAT 0.12 65,677.80

Supply and installation of ACP No attached Proposal: Cost is from PR 490,000.00

Supply and installation of ACP No attached Proposal: Cost is from PR 458,590.50 Scaffolding is excluded

Prepared by: Checked by:

Venus Y. Banatao Eldenizer Ruben Vasquez Jr


President