Rencanakan tebal pondasi bawah (D3),jika D1 min dan D2 : jalan arteri 6 jalur 2 arah, UR = 20 tahun
CBR tanah dasar
4x 4 3.5 5 4.5 4 4y 3.5
4.2 4 3.5 5 4.5 4 4.1 3.5

Curah hujan rata-rata 750 mm/thn,kelandaiaan rata - rata 6% angka selama pelaksanaan = 6%
jalan di buka 2019, survey LHR 2017
KR 2 ton 1210 = 1XY0
KB 8 t0n 420 = 4X0
KT 2 as 13 ton 91 = 9Y
KT 3 as 20 ton 42 = 4X
1763

1) CBR rerata = 4.2 + 4 + 3.5 + 5 + 4.5 + 4 + 4.1 + 3.5


8

= 4.10

2) CBR segmen = CBR rerata - CBR Maks - CBR min Ct


R R = Lihat di tabel

= 4.10 - 5 - 3.5
2.9

= 4.10 - 0.52

= 3.58 % Memenuhi syarat untuk perkerasan jalan


3) LHR awal = LHR Survey X 1 + i ²

KR 2 ton = 1210 X 1 + 0.06 ²

= 1210 X 1.06 ²

= 1210 X 1.12 = 1359.56

KB 8 ton = 420 X 1 + 0.06 ²

= 420 X 1.06 ²

= 420 X 1.12 = 471.91

KT 2 as 13 ton = 91 X 1 + 0.06 ²

= 91 X 1.06 ²

= 91 X 1.12 = 102.25

KT 3 as 20 ton = 42 X 1 + 0.06 ²

= 42 X 1.06 ²

= 42 X 1.12 = 47.19

4) LHR akhir = LHR awal 1+ i ²⁰

KR 2 ton = 1359.56 X 1+ 0.075 ²⁰


= 1359.56 X 1.075 ²⁰

= 1359.56 X 4.25 = 5775.19

KB 8 ton = 471.91 X 1+ 0.075 ²⁰

= 471.91 X 1.075 ²⁰

= 471.91 X 4.25 = 2004.61

KT 2 as 13 ton = 102.25 X 1+ 0.075 ²⁰

= 102.25 X 1.075 ²⁰

= 102.25 X 4.25 = 434.33

KT 3 as 20 ton = 47.19 X 1+ 0.075 ²⁰

= 47.19 X 1.075 ²⁰

= 47.19 X 4.25 = 200.46

5) Mencari angka ekivalen ( E ) ↔ Sama dg Buku

Kend.Ringan 2 ton = 0.0002 + 0.0002 = 0.0004


Bus 8 ton = 0.0183 + 0.141 = 0.1593
Truk 2 as 13 ton = 0.141 + 0.9238 = 1.0648
Truk 3 as 20 ton = 0.2923 + 0.7452 = 1.0375

6) Mencari LEP C X CBR Awal X E


Kend.Ringan 2 ton = 0.2 X 1359.56 X 0.0004 = 0.11
Bus 8 ton = 0.4 X 471.91 X 0.1593 = 30.07
Truk 2 as 13 ton = 0.4 X 102.25 X 1.0648 = 43.55
Truk 3 as 20 ton = 0.4 X 47.19 X 1.0375 = 19.58
LEP = 93.31

7) Mencari LEA C X CBR Akhir X E

Kend.Ringan 2 ton = 0.2 X 5775.19 X 0.0004 = 0.46


Bus 8 ton = 0.4 X 2004.61 X 0.1593 = 127.73
Truk 2 as 13 ton = 0.4 X 434.33 X 1.0648 = 184.99
Truk 3 as 20 ton = 0.4 X 200.46 X 1.0375 = 83.19
LEP = 396.38

8) LET = 0.5 LEP + LEA

= 0.5 X 93.31 + 396.38

= 0.5 X 489.69 = 244.85

9) LER = LET X UR
10

= 244.85 X 20
10

= 244.85 X 2= 489.69

10) Mencari ITP


DDT = 4.3 X log CBR + 1.7

= 4.3 X log 3,59 + 1.7

= 4.3 X 0.56 + 1.7

= 2.41 + 1.7 = 4.11

11) IP = Jln. Arteri LER = IP = 2

FR (Hal 14) = Kelandaian 6 % II Iklim 1 < 900 mm/thn

% Kendaraan berat = Bus + Truk X 100%


1763

= 420 + 91 + 42 X 100%
1763

= 553 X 100%
1763

= 0.31 = 31%

IPO (Halaman 16) Laston roughnes 2000 IP0 = 3,9 - 3,5

Berdasarkan nilai IP = 2 dan IP0 = 3,9 - 3,5

ITP = a1 X D1 + a2 X D2 + a3 X D3
a1 = Laston ms 744 = 0.40
a2 = Batu Pecah Kls A = 0.14 (Halaman 17 -18)
a3 = Sirtu Kelas B = 0.12

D1 Min = 10
D2 min = 20 Halaman 18 -19
D3 min = ?

ITP = 0.40 X 10 + 0.14 X 20 + 0.12 X D3

11.2 = 4+ 2.8 + 0,12 D3

0,12 D3 = 11.2 - 6.8

D3 = 4.40 36.7 Cm
0.12