PROJECT INFORMATION
Project Name : PROPOSED GROUND + 6 PODIUM + 7TH HEALTH CLUB + 17 TYP
Location : AL NAHDA
Plot No. : 2310103
Client : ABDULLA RASHID MOHD. ALI BAKHIT AL FALASI
Consultant : ADNAN SAFFRINI
Main Contractor : BUSET CONTRACTING AND GENERAL TRANSPORT CO. LLC
MEP Contractor : EMCC
MEP Engineer : ENG. AHMED
S/N Level Inspected
NOTES:
THIS SITE SURVEY REPORT IS BASED ON SITE CONDITIONS DURING THE DATE
OF INSPECTION.
Sheet 1 of 12
PROJECT : PROPOSED GROUND + 6 PODIUM + 7TH HEALTH CLUB + 17 TYP
MEP CONTRACTOR : EMCC
INSPECTION COMMENTS
FIRE PUMP & WATER TANK:
BASEMENT 02 FLOOR:
Site condition:
Sheet 2 of 12
SPRINKLER SYSTEMS:
Site condition:
Quotation required:
NOTE: MEP Services will appear ducts, cable trays, etc. Extra 79 degree upright & pendant
sprinklers with heat shield plates to be quoted.
PODIUM 02 & 03 FLOOR:
Site condition:
Quotation required:
NOTE: MEP Services will appear ducts, cable trays, etc. Extra 79 degree upright & pendant
sprinklers with heat shield plates to be quoted.
PODIUM 01 & 04 FLOOR:
Site condition:
Quotation required:
NOTE: MEP Services will appear ducts, cable trays, etc. Extra 79 degree upright & pendant
sprinklers with heat shield plates to be quoted.
BASEMENT 02 & LEVEL 18 FLOOR:
Site condition:
Quotation required:
ALL FLOORS
Site conditions:
Sheet 10 of 12
FIREFIGHTING SYSTEMS:
Site Condition:
Breaching inlet & cabinets with accessories installation not yet started.
Level 18 to roof - Fire hose cabinets with accessories & piping installation not yet
started.
Fire hydrants not started.
All gate valves.
Breaching inlet & cabinets with accessories. Type and quantity depends on project
specifications and site requirements.
Level 18 to roof - Fire hose cabinets with accessories & piping.
VERTICAL RISER PIPES:
Site condition:
Site condition:
Sheet 11 of 12
SPRINKLER DRAIN RISER:
Site condition:
Site condition:
ALL RISERS
Site condition:
Roof - Installation of air release valve, pressure gauges and globe valves pending .
Roof - Installation of air release valve, pressure gauges and globe valves.
SPECIAL SYSTEMS:
Site condition:
Special systems (Foam, Pre-action, FM 200 & Medium velocity water spray systems) to
be quoted .
OMAR ANSAR