SITE SURVEY REPORT Date: 11-07-2019

PROJECT INFORMATION
Project Name : PROPOSED GROUND + 6 PODIUM + 7TH HEALTH CLUB + 17 TYP
Location : AL NAHDA
Plot No. : 2310103
Client : ABDULLA RASHID MOHD. ALI BAKHIT AL FALASI
Consultant : ADNAN SAFFRINI
Main Contractor : BUSET CONTRACTING AND GENERAL TRANSPORT CO. LLC
MEP Contractor : EMCC
MEP Engineer : ENG. AHMED
S/N Level Inspected

1 GROUND TO ROOF FLOOR – FIRE PROTECTION SYSTEMS

NOTES:

 THIS SITE SURVEY REPORT IS BASED ON SITE CONDITIONS DURING THE DATE
OF INSPECTION.

 THE OBSERVATIONS DOCUMENTED WITHIN THIS REPORT DEPICTS THE SITE


INSTALLATION DONE TILL THE DATE OF SITE SURVEY.

 ALL AVAILABLE MATERIAL DETAILS SUCH AS CERTIFICATIONS (MATERIAL IS


LISTED/APPROVED), HANDLING & STORAGE CONDITIONS WILL BE THE
RESPONSIBILITY OF THE MEP CONTRACTOR

Reviewed by : NAFFCO NAFFCO Sales


NAFFCO Inspectors
Technical Manager Manager
OMAR ANSAR
MOHAN SHAN
ABED AL MAJEED

Sheet 1 of 12
PROJECT : PROPOSED GROUND + 6 PODIUM + 7TH HEALTH CLUB + 17 TYP
MEP CONTRACTOR : EMCC
INSPECTION COMMENTS
FIRE PUMP & WATER TANK:

BASEMENT 02 FLOOR:

Site condition:

 Suction and discharge sides completed. PRV station completed.

Quotation required for:

 All fire pump.

Sheet 2 of 12

SPRINKLER SYSTEMS:

BASEMENT 01 & 02 FLOOR:

Site condition:

 Sprinkler system –Cross main and branches in progress.

Quotation required:

 Piping & fittings for cross main, branches & droppers.


 Sprinkler heads – 68 degree/ 79 degree upright/pendant standard/quick response
depending on false ceiling and air-conditioning present.
 Zone control valve assemblies.
 Sidewall sprinklers to be quoted for lift pit sprinklers.
 Sidewall sprinklers to be quoted for ramp areas

NOTE: MEP Services will appear ducts, cable trays, etc. Extra 79 degree upright & pendant
sprinklers with heat shield plates to be quoted.
PODIUM 02 & 03 FLOOR:

Site condition:

 Sprinkler system –Not yet started.

Quotation required:

 Piping & fittings for cross main, branches & droppers.


 Sprinkler heads – 68 degree/ 79 degree upright/pendant standard/quick response
depending on false ceiling and air-conditioning present.
 Zone control valve assemblies.
 Sidewall sprinklers to be quoted for lift pit sprinklers.
 Sidewall sprinklers to be quoted for ramp areas

NOTE: MEP Services will appear ducts, cable trays, etc. Extra 79 degree upright & pendant
sprinklers with heat shield plates to be quoted.
PODIUM 01 & 04 FLOOR:

Site condition:

 Sprinkler system – Cross main and branches in progress.

Quotation required:

 Piping & fittings for cross main, branches & droppers.


 Sprinkler heads – 68 degree/ 79 degree upright/pendant standard/quick response
depending on false ceiling and air-conditioning present.
 Zone control valve assemblies.
 Sidewall sprinklers to be quoted for lift pit sprinklers.
 Sidewall sprinklers to be quoted for ramp areas

NOTE: MEP Services will appear ducts, cable trays, etc. Extra 79 degree upright & pendant
sprinklers with heat shield plates to be quoted.
BASEMENT 02 & LEVEL 18 FLOOR:

Site condition:

 ACV assemblies and gate valves installation pending.

Quotation required:

 Quote for alarm check valves and gate valves.


SPRINKLER SYSTEMS:

ALL FLOORS

Site conditions:

 Zone control valve assemblies completed.

Sheet 10 of 12

FIREFIGHTING SYSTEMS:

LEVELS GROUND TO ROOF:

Site Condition:

 Breaching inlet & cabinets with accessories installation not yet started.
 Level 18 to roof - Fire hose cabinets with accessories & piping installation not yet
started.
 Fire hydrants not started.
 All gate valves.

Quotation required for:

 Breaching inlet & cabinets with accessories. Type and quantity depends on project
specifications and site requirements.
 Level 18 to roof - Fire hose cabinets with accessories & piping.
VERTICAL RISER PIPES:

SPRINKLER RISER PIPES:

Site condition:

 Level 05 to Level 31 – Sprinkler riser piping completed.

Quotation required for:

 Sprinkler riser piping for rest of the floors.

WET RISER PIPES:

Site condition:

 Level 05 to Level 31 – One shaft 150 mm WRP completed

Quotation required for:

 150 mm piping for remaining Wet riser piping.

Sheet 11 of 12
SPRINKLER DRAIN RISER:

Site condition:

 Levels 05 to 27 - Installation completed.

Quotation required for:

 Rest of the floors – Quote for piping.

SPRINKLER RISER FOR GARBAGE CHUTE:

Site condition:

 Levels 05 to 27 - Installation completed.

Quotation required for:

 Levels 05 to 27 – 79 degree standard response pendant sprinklers.


 Rest of the floors – Quote for piping and 79 degree standard response pendant
sprinklers.

ALL RISERS
Site condition:

 Roof - Installation of air release valve, pressure gauges and globe valves pending .

Quotation required for:

 Roof - Installation of air release valve, pressure gauges and globe valves.

SPECIAL SYSTEMS:

GROUND FLOOR/TERRACE FLOOR:

Site condition:

 Special systems installation not yet started.

Quotation required for:

 Special systems (Foam, Pre-action, FM 200 & Medium velocity water spray systems) to
be quoted .

Reviewed by : NAFFCO Technical NAFFCO Inspectors


Manager
MOHAN SHAN

OMAR ANSAR

Sheet 12 of 12