Professional Documents
Culture Documents
June 4 ESC Certification Summer Walk Through For School Administrators
June 4 ESC Certification Summer Walk Through For School Administrators
June 4 ESC Certification Summer Walk Through For School Administrators
raise the quality of educational institutions in both the public and the
private sector. With the recent passage of RA 10533 otherwise known
as the Enhanced Basic Education Act of 2013, new reforms involving
the addition of two years of high school were implemented for the
overall goal of producing graduates who are globally competitive and
equipped with 21st century skills.
❖The Department of Education (DepEd) which focuses on the
management and supervision of Basic Education has established
quality assurance mechanisms to ensure the attainment of the goals
of the K12 curriculum program. Efforts to enhance these mechanisms
in line with K12 requirements and standards need to continue and
become part of the Certification program of participating private high
schools in the Education Service Contracting (ESC) Program.
❖The ESC Certification program aimed at assessing and evaluating the
extent of compliance to minimum standards of quality of ESC
participating institutions. Such certification process has proved to be an
effective tool of encouraging quality improvement efforts among ESC
participating private schools. Such scheme has assured the communities
served that the ESC schools are not only meeting minimum DepEd
standards but are manifesting commitment to raising their standards
above the minimum requirement in delivering quality educational
programs and services.
❖The main purpose of certification is to determine whether ESC
participating private high schools comply with DepEd minimum
standards and with the criteria established in the RA 8545 or the
“Expanded Government Assistance to Students and Teachers in Private
Education” or GASTPE Law.
Among the CAI Areas, school performance is highest in Area F (Physical Plant and
Instructional Support Facilities) and lowest is in Area C (Instructional Leadership) and I
(Institutional Planning and Development).
2. School performance among the sample schools vary, to wit :
2.1. Lowest for Area F (Physical Plant and Instructional Support Services)
indicating that it is in this Area that the schools vary least in their
compliance level.
2.2. Highest for Area I (Institutional Planning and Development) indicating
that it is in this Area that the schools vary greatly in their compliance
level.
2.3. There is a very high variance (CV=60.22) in the schools’ overall
certification rating.
3. Regional location of the schools has no significant effect on its overall certification
rating.
4. School size is associated with the overall certification rating.
5. There exists a strong relationship between the schools’ ratings in all Core Areas and
their overall certification rating.
6. Support Areas E, H and I also have a strong relationship with overall certification rating.
However, it should be noted that some of the values of r for these Support Areas are
lower than the values for the Core Areas.
7. There exists a moderate to strong relationship between and among the CAI Areas but
does not imply causal relationship and cannot be used for prediction.
The following may then be concluded from the above findings:
1. School size plays a role in the performance of the school undergoing certification. As
indicated by the data, large schools with higher enrollments may have greater resources
which enable them to perform better.
2. Since the findings show that schools vary greatly in their overall school performance or
certification rating and a high percentage are only at the Partial Compliance level, a
system of continuous follow-up, assistance and support to schools may be explored to
raise their performance level to full compliance. Areas needing attention are
Instructional Leadership and Institutional Planning and Development
3. Moreover, since there is a strong and tighter relationship among all
Core Areas and these areas influence on the overall certification
rating when compared with the Support Areas, schools’
performance in Core Areas may serve as the basis for PEAC’s policy
discussions. That is, schools’ performance in Core Areas merit more
consideration and priority in PEAC’s determination and
differentiation of the schools’ extent of participation in the ESC
program.
With regards to the first objective of this report, this study has initially
established trends in the data on schools’ performance during the
certification visits scheduled during school year 2018-19. The general
trend is one of high variance with the level of Partial Evidence of
compliance with standards dominating the results. The findings also
confirm the instrument’s use of a decision rule that puts greater value
on Core Areas compared to Support Areas. In particular, the area of
Instructional Leadership rates the highest influence in the Core Areas.
In response to the second objective, the certification results confirm the
distinction between Core and Support Areas when evaluating schools’
compliance with the standards. Key findings on the school’s performance in
these different areas need to be incorporated in policy decisions affecting the
schools’ extent of participation in the ESC program. The findings also need to
be reflected in the design of forthcoming professional development programs
offered to administrators as part of their in-service training.
In the Certification process, the Applicant School proceeds from Steps 1
to 10 when it gets certified. If the school’s application requirements and
the Self-Study Report are found to have deficiencies (Steps 1-3a), the
school repeats the process from Step 1. If the application requirements
and Self-Study Report are deemed complete and adequate, the school
proceeds to Steps 4b-5. If after the visit, PEAC-NS through PEAC-CU
informs the school that it is Certified, the school proceeds from 7b-10. If
on the other hand, the school is informed that it has not complied with
the certification standards, the school repeats the process.
For Recertification, PEAC-CU schedules the visit and informs the school
through the PEAC website (Steps 1-3). With the revisit schedule, the
ESC Participating school proceeds from Steps 4-6. If after the visit,
PEAC-NS through PEAC-CU informs the school that it is Recertified, the
school takes on Steps 8a-9. If on the other hand, the school is informed
that it has not complied with the recertification standards, the school
proceeds from 8b-9b.
A school wishing to participate in the ESC
program submits the following:
PART I.
Letter of Intent
DepEd Recognition
Latest AFS
Latest SEC
Latest GIS
A school wishing to participate in the ESC
program submits the following:
PART II.
Accomplished Revised CAI
School Profile
Faculty Profile for current SY
Class Schedule for current SY
It is imperative for private schools participating in the ESC programs to
maintain adequacy of their resources and capabilities in effectively
providing quality education. These institutions have the responsibility
to periodically carry out a self-evaluation process designed to clarify its
mission and goals, to realistically assess its success in attaining them,
and to develop means of increasing its educational effectiveness.
To achieve the greatest benefit, the self-study should be inclusive and
must encourage wide participation from all sectors of the school
community. An institution that carries out its self-study with care and
diligence in an open and honest manner, will find that it has
established the foundation for school improvement and organized the
system to plan for the future of the school.
❖The Pre-Certification Visit involves:
• To generate collective and unified action in the conduct of the school self-study, an
orientation on the overview, purpose and significance of the certification process must be
undertaken by the school. A multi-level approach whereby a series of orientation sessions
for the administrators, teachers and staff, students, parents and other stakeholders would
lead to the understanding of the certification process
2. Organization of the School Self-Study Team
• The self-study is properly implemented by a well-organized school community. Towards this end, the school
community members are organized into Self-Study working committees corresponding to the areas for
evaluation of the Certification instrument.
• The School Self-Study Team. Ideally, the entire community is engaged in the certification process. To meet the
needs of the certification preparations and the roll-out of the school self-study, the school community is
organized into working committees for each evaluation area. The working committees shall have a Chairperson
and three (3) to five (5) members, depending on the size of the school, representing the different school
sectors. They are tasked with the factual review and assessment of the school’s compliance with the minimum
DepEd standards and traits of excellence as prescribed in the Certification Assessment Instrument, preparation
of the area report, and collection and organization of the evidences of compliance for presentation during the
certification visit.
• To coordinate the school-based certification related
activities, the school should designate a liaison officer to
work with the PEAC-CU Such officer, who has been named
by the school administrator, can provide an effective means
of communication between the school and the Committee
and of more direct participation in the certification process.
3. Review and Assessment using the CAI
• As tasked, the Self-Study Working Committees review the areas of school operations and assess
objectively the school’s compliance of the DepEd minimum requirements and prescribed Kto12
standards. The process of self-assessment involves six steps which must be thoughtfully and
diligently followed.
In St Padre Pio High School, a medical mission from the New York Holy Angels Community
Hospital has updated the school clinic and left provisions for emergency care of the school
community. The school Doctor comes once a month to conduct the on-going medical check-ups.
Dental check-ups are done in June by a volunteer parent-dentist. Otherwise, the clinic stays
closed to keep the clinic secure because there is no one else to take on the job.
In this case, the Certifier rated this standard 2 because the provisions are adequate but
emergency care is not available.
STANDARDS OF
FOCUS QUESTIONS LOOK – FORS ECE’s
COMPLIANCE
- Learning plans in each - Is there PVMGO-CV - Inclusion of PVMGO-CV - Subject Learning Plans
subject area that show integration in the LP and integration in LP - System of Learning Plan
incorporation of the learning encounters? - Inclusion in LP of activities Preparation
PVMGO, teaching of 21st - Are there 21st century skills related to development of - Instructional Supervisory
century skills, use of real- development activities in the 21st century skills in LP Reports
world situations, inter- LP and learning encounters? - Provision of opportunities in - Minutes of meetings of
subject integration and use - Are there real-world/ LP for subject integration Department Subject
of technology* authentic transfer tasks in - Provision in LP for regarding classroom strategies
the LP and in the learning discussion of or encounters - Faculty Development
encounters? with real-world challenges Training Seminars and
- Are interdisciplinary or issues Workshops
discussions, projects and - Provision in LP for use of - Classroom Observation
tasks included in classroom technology in class activities Form
instruction? or assessment - Integrated Performance
- Is technology used to Tasks
support classroom - Community Awareness,
instruction? Exposure or Immersion
Activities related to Unit
Topic
- System of Technology
Integration
- Technology Platforms or
Learning Management
Systems
STANDARDS OF FOCUS
LOOK – FORS ECE’s
COMPLIANCE QUESTIONS
C.7. - Are instructional - Policies for teachers’ - System for Selection,
Provision for timely materials and access to and use of Procurement,
access to and optimum equipment available instructional materials, Development and
use of instructional and accessible for equipment and Utilization of
resources, facilities teachers’ use? resources Instructional
materials and equipment - Is the use of Resources/Materials
instructional materials - Library Policies for
and equipment borrowing and using
consistent? Optimized? print, audiovisual and
electronic resources
and materials
- Custodian reports on
utilization of print,
audiovisual and
electronic resources
and materials and
equipment
- Subject curriculum
maps
- Subject learning plans
STANDARDS OF
FOCUS QUESTIONS LOOK – FORS ECE’s
COMPLIANCE
D.4. - Is faculty performance - Regular faculty - Summary of Faculty
Regular conduct of appraisal conducted performance Performance
faculty performance regularly? appraisal Appraisal results
appraisal as basis for - Is faculty performance - Use of - Promotion Policies
promotion and utilized as basis for performance - Salary Scale
clinical supervision * promotion/recognition results in - Supervisory
Clinical supervision? promotion, salary Plan/Clinical
upgrading, Supervision Plan
recognition and
clinical
supervision
STANDARDS OF
FOCUS QUESTIONS LOOK – FORS ECE’s
COMPLIANCE
G.8. - Is the Principal - MA degree of the - 201 File of the
Qualified School qualified with a Masteral Principal Principal
Principal with MA degree in Education? - OTR of the Principal
Degree in Education* and
Notarized Contract
1. - * 3
-*
2
2. * 2
4 3 2 1 0 3. *
1
Power* 0 1 2 2 0
4. * 1
Support 0 0 0 1 0
Area
1 5. 1
Rating
The Self-Study findings pinpoint the standards complied by the school as well as
those which have not been complied or partially complied with. To assure school
quality, plans towards purposive compliance of these standards are plotted by the
Planning Committee composed of sectoral representatives of the school community
in a Standards-based School Improvement Plan with implementation details
spreading across three (3) years. A simple format defining the targeted standards,
objectives, desired outputs, implementation steps, specific time frame, monitoring
mechanisms, persons responsible budget and budget sources is suggested by PEAC.
SCHOOL: REGION:
AREA:
STANDARDS-BASED SCHOOL IMPROVEMENT PLAN
IMPROVEMENT SMART OUTPUT ACTION TIME MONITORING PERSON IN BUDGET
PLAN ITEM GOALS STEPS PERIOD SYSTEM CHARGE AND
BUDGET
SOURCE
• To review and revise instructional • The school conducted a • Curriculum Development Plan
materials curriculum development • Curriculum Development
workshop for summer 2018 and Workshop Calendar
summer 2019. As a result, • Attendance sheets
curriculum maps and learning • Minutes of the meetings
plans for each area were • Curriculum maps
designed • Learning plans
School's Actions Towards Compliance (of Related Standard).
This is a description or narrative of what the school did to implement
the pertinent recommendations.